1. Summative Assessment: Wetlands Project
PPT Evaluation: “California Wetlands Creature”
Name: ________________________________________
Title of PPT: __________________________________
CATEGORY 4 3 2 1
Organization Content relates Content is at least Content is at least Content is less
directly to the 85% accurate and 70% accurate but than 70% accurate
wetlands creature information is lacks clear and there was no
chosen and is organized with structure so that clear or logical
100% accurate. some flaws in comprehension is organization, just
Content is well grouping. compromised. lots of random
organized and facts.
easy to follow.
Mechanics There are no There are 3-4 There are 5-6 There are more
more than 2 misspellings and misspellings and than 6
misspellings or grammatical grammatical misspellings and
grammatical errors but they do errors and they errors, making it
errors. not interfere with affect the content difficult to
the flow of the and flow of the understand what
project. project. the content of the
project is.
Requirements Student more Student meets Student meets 3 to Student meets less
Name (common than meets all six five of the six 4 of the fact than three of the
& scientific), fact requirements fact requirements requirements for requirements for
Diet, Habits, for their creature. for their creature. their creature. their creature.
Appearance,
Enemies, & Life
Cycle – Babies.
Oral Presentation Student does oral Student reads Student has Student has great
presentation in a some directly difficulty reading difficulty reading
clear & engaging from the PPT aloud and makes aloud which
manner. Uses presentation with little eye contact significantly
gestures and sporadic eye impairs clarity,
good eye contact. contact. and has no eye
contact.
Slide Show Student includes Student includes Student includes 1 Student includes 1
more than 1 1 relevant picture relevant picture relevant picture
relevant picture per slide. Has 6 on a majority of on less than half
per slide. Has slides. the slides. Project of the slides.
more than 6 has only 4-5 Project has less