SlideShare una empresa de Scribd logo
1 de 16
Project on
“Offline -
examiner”PRESENTED BY
 Mr.Shelar Sagar Sunil
 Mr.Nimbalkar Amar Pradiprao
Under the Guidance of “Chatse sir”
Introduction
Offline examiner is a real time project. The project will be implemented
using VB. The aim of the project is to allow teachers to conduct
examinations to the students. There are many unique features in the
project. The students are not allowed to go back to the previous question
once they click the next question.
This option is up to the teachers to decide the teachers can either enable
such an option or disable the option. The teachers are also given option to
set the time limit of the exam.
Various types of reports can be generated both for the teachers as well as
the Administrators.
The software will be used by three different types of users namely:-
Students
Staffs
Administrators
 Nature and Scope of “On-Line Examination”:
Teachers can add new questions to the exam paper
Teachers can set the duration of the exam
Students attend the exam
Administrators can generate various types of reports
Administrators can enable security settings
Print out of the grade sheet is issued when the student
completes the exam, or when the duration is finished
Students can view their past exam history.
Existing System:-
Lack of security of data.
More man power.
Time consuming.
Consumes large volume of pare work.
Needs manual calculations.
PROPOSED SYSTEM:-
Security of data.
Proper control of the higher officials.
Minimize manual data entry.
Greater efficiency.
Better service.
Minimum time required.
Need of System:-
HARDWARE REQUIREMENTS
Processor : X86 Compatible processor
with 1.7 GHz Clock speed
RAM : 512 MB or more
Hard disk : 20 GB or more
Monitor : VGA/SVGA
Keyboard : 104 Keys
Mouse : 2 buttons/ 3 buttons
System Requirement
Software Requirement:-
Operating System : Windows 2000/XP
Front end : Visual Basic 6.0
Back end : oracle 10g
Testing PlanningTesting Planning
Project Organization:-The s/w testing consists of levels of testing:
1)Unit testing
2)Integration testing
3)System testing
1)UNIT TESTING:
This testing forces verification efforts on the smallest of the s/w.
While doing this, each module was tested to see that information properly
flows into and out of the program under consideration.
2)INTEGRATION TESTING:
Once all modules have been tested individually, then system is tested
by integrating modules.
3)SYSTEM TESTING:
Last of all the whole system is tested to find weather the system and its
original objectives tally.
Technical OverviewTechnical Overview
Language Used:-Language used
 
Visual Basic:-
 Visual basic 6.0 for windows requires at least windows-95 and minimum
of 16MB of RAM.
A complete installation of visual basic 6.0 requires more than 250MB of
hard disk space.
DATABASE:
 
ORACLE
To store the records of the students or database we require oracle as a
backend. In addition to this it also act as a front-end. Using oracle forms
can be created that act as a interface between user and the tables.
Administrator Offline
Examiner
Teachers
Students
Admin details
Teacher details
Student details
Data Flow Diagram
LEVEL 0
1)Exam can be conducted easily.
2)Exam time management i.e., Exam starts and end at the right time.
3)Valuation is easy and result can be published with in time.
4)Only manual work needed is entering questions and corresponding right
answer key.
5)No mishap is possible because the system is password protected.
Advantages
Disadvantages
1.Exam won’t be conducted if there is power
failure.
2.Exam can’t be conducted without Hub.
ApplicationsApplications
• College Examination.
• For the Aptitude tests in interviews.
• Quiz competition.
ReferencesReferences
BOOKS:-
A Complete Guide to Programming in Visual Basic .Net
Advanced Programming Using Visual Basic: Version 6.0
Advanced MS Visual Basic
Site Address:-
www.associatedcontent.com
www.members.tripod.com
www.vbcodesource.com
offline eximiner vb project

Más contenido relacionado

Destacado

Inplant training report doordarshan
Inplant training report doordarshanInplant training report doordarshan
Inplant training report doordarshan
Abhishek Prasad
 
54039271 atm-project-report
54039271 atm-project-report54039271 atm-project-report
54039271 atm-project-report
Kalpana Reddy
 
Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platform
jeevansaral
 

Destacado (16)

Quiz tool proj
Quiz tool projQuiz tool proj
Quiz tool proj
 
Create project vb
Create project vbCreate project vb
Create project vb
 
Final project(vb)
Final project(vb)Final project(vb)
Final project(vb)
 
Exam system
Exam systemExam system
Exam system
 
ice cream management
ice cream managementice cream management
ice cream management
 
Online exam system
Online exam systemOnline exam system
Online exam system
 
Inplant training report doordarshan
Inplant training report doordarshanInplant training report doordarshan
Inplant training report doordarshan
 
Pixeom
PixeomPixeom
Pixeom
 
Tele immersion
Tele immersionTele immersion
Tele immersion
 
QTP VB Script Trainings
QTP VB Script TrainingsQTP VB Script Trainings
QTP VB Script Trainings
 
Examination Hall Allocation
Examination Hall Allocation Examination Hall Allocation
Examination Hall Allocation
 
Case study on village devp.
Case study on village devp.Case study on village devp.
Case study on village devp.
 
Basic vbscript for qtp
Basic vbscript for qtpBasic vbscript for qtp
Basic vbscript for qtp
 
54039271 atm-project-report
54039271 atm-project-report54039271 atm-project-report
54039271 atm-project-report
 
Implementation of automatic railway platform
Implementation of automatic railway platformImplementation of automatic railway platform
Implementation of automatic railway platform
 
Creating a quiz using visual basic 6
Creating a quiz using visual basic 6Creating a quiz using visual basic 6
Creating a quiz using visual basic 6
 

Último

Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 

Último (20)

Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024Manulife - Insurer Innovation Award 2024
Manulife - Insurer Innovation Award 2024
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 

offline eximiner vb project

  • 1.
  • 3. “Offline - examiner”PRESENTED BY  Mr.Shelar Sagar Sunil  Mr.Nimbalkar Amar Pradiprao Under the Guidance of “Chatse sir”
  • 4. Introduction Offline examiner is a real time project. The project will be implemented using VB. The aim of the project is to allow teachers to conduct examinations to the students. There are many unique features in the project. The students are not allowed to go back to the previous question once they click the next question. This option is up to the teachers to decide the teachers can either enable such an option or disable the option. The teachers are also given option to set the time limit of the exam. Various types of reports can be generated both for the teachers as well as the Administrators. The software will be used by three different types of users namely:- Students Staffs Administrators
  • 5.  Nature and Scope of “On-Line Examination”: Teachers can add new questions to the exam paper Teachers can set the duration of the exam Students attend the exam Administrators can generate various types of reports Administrators can enable security settings Print out of the grade sheet is issued when the student completes the exam, or when the duration is finished Students can view their past exam history.
  • 6. Existing System:- Lack of security of data. More man power. Time consuming. Consumes large volume of pare work. Needs manual calculations. PROPOSED SYSTEM:- Security of data. Proper control of the higher officials. Minimize manual data entry. Greater efficiency. Better service. Minimum time required. Need of System:-
  • 7. HARDWARE REQUIREMENTS Processor : X86 Compatible processor with 1.7 GHz Clock speed RAM : 512 MB or more Hard disk : 20 GB or more Monitor : VGA/SVGA Keyboard : 104 Keys Mouse : 2 buttons/ 3 buttons System Requirement
  • 8. Software Requirement:- Operating System : Windows 2000/XP Front end : Visual Basic 6.0 Back end : oracle 10g
  • 9. Testing PlanningTesting Planning Project Organization:-The s/w testing consists of levels of testing: 1)Unit testing 2)Integration testing 3)System testing 1)UNIT TESTING: This testing forces verification efforts on the smallest of the s/w. While doing this, each module was tested to see that information properly flows into and out of the program under consideration. 2)INTEGRATION TESTING: Once all modules have been tested individually, then system is tested by integrating modules. 3)SYSTEM TESTING: Last of all the whole system is tested to find weather the system and its original objectives tally.
  • 10. Technical OverviewTechnical Overview Language Used:-Language used   Visual Basic:-  Visual basic 6.0 for windows requires at least windows-95 and minimum of 16MB of RAM. A complete installation of visual basic 6.0 requires more than 250MB of hard disk space. DATABASE:   ORACLE To store the records of the students or database we require oracle as a backend. In addition to this it also act as a front-end. Using oracle forms can be created that act as a interface between user and the tables.
  • 11. Administrator Offline Examiner Teachers Students Admin details Teacher details Student details Data Flow Diagram LEVEL 0
  • 12. 1)Exam can be conducted easily. 2)Exam time management i.e., Exam starts and end at the right time. 3)Valuation is easy and result can be published with in time. 4)Only manual work needed is entering questions and corresponding right answer key. 5)No mishap is possible because the system is password protected. Advantages
  • 13. Disadvantages 1.Exam won’t be conducted if there is power failure. 2.Exam can’t be conducted without Hub.
  • 14. ApplicationsApplications • College Examination. • For the Aptitude tests in interviews. • Quiz competition.
  • 15. ReferencesReferences BOOKS:- A Complete Guide to Programming in Visual Basic .Net Advanced Programming Using Visual Basic: Version 6.0 Advanced MS Visual Basic Site Address:- www.associatedcontent.com www.members.tripod.com www.vbcodesource.com