4. Introduction
Offline examiner is a real time project. The project will be implemented
using VB. The aim of the project is to allow teachers to conduct
examinations to the students. There are many unique features in the
project. The students are not allowed to go back to the previous question
once they click the next question.
This option is up to the teachers to decide the teachers can either enable
such an option or disable the option. The teachers are also given option to
set the time limit of the exam.
Various types of reports can be generated both for the teachers as well as
the Administrators.
The software will be used by three different types of users namely:-
Students
Staffs
Administrators
5. Nature and Scope of “On-Line Examination”:
Teachers can add new questions to the exam paper
Teachers can set the duration of the exam
Students attend the exam
Administrators can generate various types of reports
Administrators can enable security settings
Print out of the grade sheet is issued when the student
completes the exam, or when the duration is finished
Students can view their past exam history.
6. Existing System:-
Lack of security of data.
More man power.
Time consuming.
Consumes large volume of pare work.
Needs manual calculations.
PROPOSED SYSTEM:-
Security of data.
Proper control of the higher officials.
Minimize manual data entry.
Greater efficiency.
Better service.
Minimum time required.
Need of System:-
7. HARDWARE REQUIREMENTS
Processor : X86 Compatible processor
with 1.7 GHz Clock speed
RAM : 512 MB or more
Hard disk : 20 GB or more
Monitor : VGA/SVGA
Keyboard : 104 Keys
Mouse : 2 buttons/ 3 buttons
System Requirement
9. Testing PlanningTesting Planning
Project Organization:-The s/w testing consists of levels of testing:
1)Unit testing
2)Integration testing
3)System testing
1)UNIT TESTING:
This testing forces verification efforts on the smallest of the s/w.
While doing this, each module was tested to see that information properly
flows into and out of the program under consideration.
2)INTEGRATION TESTING:
Once all modules have been tested individually, then system is tested
by integrating modules.
3)SYSTEM TESTING:
Last of all the whole system is tested to find weather the system and its
original objectives tally.
10. Technical OverviewTechnical Overview
Language Used:-Language used
Visual Basic:-
Visual basic 6.0 for windows requires at least windows-95 and minimum
of 16MB of RAM.
A complete installation of visual basic 6.0 requires more than 250MB of
hard disk space.
DATABASE:
ORACLE
To store the records of the students or database we require oracle as a
backend. In addition to this it also act as a front-end. Using oracle forms
can be created that act as a interface between user and the tables.
12. 1)Exam can be conducted easily.
2)Exam time management i.e., Exam starts and end at the right time.
3)Valuation is easy and result can be published with in time.
4)Only manual work needed is entering questions and corresponding right
answer key.
5)No mishap is possible because the system is password protected.
Advantages
15. ReferencesReferences
BOOKS:-
A Complete Guide to Programming in Visual Basic .Net
Advanced Programming Using Visual Basic: Version 6.0
Advanced MS Visual Basic
Site Address:-
www.associatedcontent.com
www.members.tripod.com
www.vbcodesource.com