1. ADEPP a tool for HSE Management System Configuration Management
2. Layers of Management System Implementation From: http://www.aiha.org/aihce07/handouts/po116palassis.pdf Requirement Engineering Requirement Management
3. How it can go Wrong? Each level consists of many sub-levels . People, methods, equipment, materials, environment and management are involved in each level and sub-level. Failure of any of these elements will cause partial or total failure of sub-levels, levels and system.
4. Life Cycle Concept Sub-levels can be related not only through a hierarchy but also through evolution with time. Project Management Engineering Procurement Manufacturing Construction Commissioning Plant Management Operation Maintenance
9. Requirement Engineering Client needs and regulations are the most critical source of requirements. Project solutions in form of philosophies are established based on these critical requirements as well as company, contractors and subcontractors working practices, code & standards, guidelines and project specific studies. Sources of requirements and Solutions are presented in the Bulk documents. Update and audit of these bulk documents are time and effort consuming.
10.
11.
12.
13. Work Breakdown Structure Unit (e.g. Norsok P-100) Module System (e.g. Norsok S-001) Sub-System Component Plant Element
16. ADEPP Monitor & Requirement Engineering ADEPP Monitor experts provide the “Referential” requirements based on contract, applicable regulations, codes & standards, project specific studies. This is an intellectual work which depends on the quality and competency of requirement engineer(s). For more complex and/or critical cases the engineered requirements shall be verified by further brainstorming sessions. These “Referential” requirements can be easily Copied and Tagged for a given equipment, device or working practice. If there is any deviation from the “Referential” requirements users can add , delete or modify the requirement. User shall also report why this deviation is justified and what will be the impact of requirement modification on project. 1- COPY Requirement 2- Customise for given case
20. When “Referential” requirements are customised for a given subject we are ready to define and plan the activities and assign the tasks . Using an intranet based system ADEPP monitor offers a dedicated web page to each user on which they are informed about their tasks without being flooded with unnecessary information. The required activities and tasks of each user is centralised and planned. All relevant activities and tasks are also centralised on the Project and/or discipline managers web page to follow up and track the progress and actions. ADEPP Monitor & Requirement Engineering 1- Define the required Activities 2- Assign Tasks
21. Each user have a dedicated activity and task web page and will not be “flooded” by unnecessary information. ADEPP Monitor & Requirement Engineering
22.
23.
24. ADEPP Monitor is easy to be customised, used and modified for any application because like “Lego” it consists of the ready made blocks rather than a rigid and centralised database like an “Intelligence Cube”. ADEPP HSE Toolkit risk models and ADEPP monitor open source databases are easily linked to the 2D process and/or 3D plant models by the URLs. ADEPP & Object Oriented Approach
26. ADEPP Selects and Federates the required software to model project, its associated risks and safety measures. The know how and know why are applied as Performance standards and verification schemes to the project and its associated risk models in a traceable, auditable, life cycle, online and open source manner by ADEPP Academy experts. ADEPP does NOT impose the choice of simulation tools. It starts by Client tools and develops the required interfaces to create the consistent life cycle Bow-Tie oriented models and method for project. When required ADEPP suggests the new useful tools. ADEPP Academy is NOT a generic software development and/or vendor company. It provides the tailor made and customised tool for standardised and/or specific projects. ADEPP Business Model ADEPP HSE Toolkit ADEPP Monitor