ADEPP a tool for HSE Management System Configuration Management
Layers of Management System Implementation From: http://www.aiha.org/aihce07/handouts/po116palassis.pdf Requirement  Engineering Requirement  Management
How it can go Wrong?  Each level consists of many  sub-levels . People, methods, equipment, materials, environment and management are involved in each level and sub-level.  Failure  of any   of these elements will cause partial or total failure of sub-levels, levels and system.
Life Cycle Concept Sub-levels can be related not only through a  hierarchy  but also through  evolution  with time.  Project Management Engineering Procurement Manufacturing Construction Commissioning Plant Management Operation Maintenance
Oil & Gas Projects
Process related deliverables ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Plant related deliverables
Requirement  Engineering
Requirement  Engineering Client needs  and  regulations  are the most critical source of requirements. Project solutions in form of  philosophies  are established based on these critical requirements as well as company, contractors and subcontractors working practices, code & standards, guidelines and project specific studies. Sources of requirements and Solutions are presented in the  Bulk documents.  Update and audit of these bulk documents are time and effort consuming.
Requirement Engineering ,[object Object],[object Object],[object Object],[object Object],Know How Know Why Bulk Documents Open Source  database
Requirement Engineering A Requirement is well engineered if: ,[object Object],[object Object],[object Object],A well engineered requirement is used as  “Referential”  for further similar works. For example PSV-001, PSV-002, PSV-nnn shall comply with the  “Referential”  requirements engineered based on API 521, API 581.
Performance Standards   Basis of Requirement Engineering Requirements from the different code and risk based bulk documents are broken to short, traceable and auditable  Performance Standards  to describe the following requirements during the life cycle of project/plant: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Work Breakdown Structure   Unit (e.g. Norsok P-100) Module System (e.g. Norsok S-001)  Sub-System Component  Plant Element
Performance Standard (Example)….
Performance Standard (Example)
ADEPP Monitor & Requirement Engineering ADEPP Monitor  experts provide the  “Referential”  requirements based on contract, applicable regulations, codes & standards, project specific studies. This is an intellectual work which depends on the quality and competency of requirement engineer(s). For more complex and/or critical cases the engineered requirements shall be verified by further brainstorming sessions. These  “Referential”  requirements can be easily  Copied  and  Tagged  for a given equipment, device or working practice. If there is any deviation from the  “Referential”  requirements users can  add ,  delete  or  modify  the requirement. User shall also report why this deviation is  justified  and what will be the impact of requirement modification on project. 1- COPY Requirement 2- Customise for given case
Requirement Management
Plan, Do, Check, Act
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Verification Scheme   Basis of Requirement Management
When  “Referential”  requirements are customised for a given subject we are ready to  define  and  plan  the  activities  and assign the  tasks . Using an intranet based system  ADEPP monitor  offers a dedicated web page to each user on which they are informed about their tasks without being  flooded  with unnecessary information. The required activities and tasks of each user is centralised and planned. All relevant activities and tasks are also centralised on the Project and/or discipline managers web page to  follow up  and track the progress and actions. ADEPP Monitor & Requirement Engineering 1- Define the required Activities 2- Assign Tasks
Each user have a dedicated activity and task web page and will not be   “flooded”  by unnecessary information.  ADEPP Monitor & Requirement Engineering
ADEPP & Object Oriented Approach ,[object Object],[object Object],[object Object],[object Object],Simulation Tools Life Cycle Requirement Engineering & Management Tool 3D and/or 2D Model
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],ADEPP & Object Oriented Approach ,[object Object],[object Object],[object Object]
ADEPP Monitor  is easy to be customised, used and modified for any application because like  “Lego”  it consists of the ready made blocks rather than a rigid and centralised database like an  “Intelligence Cube”. ADEPP HSE Toolkit  risk models and  ADEPP monitor  open source databases are easily  linked  to the 2D process and/or 3D plant models by the  URLs. ADEPP & Object Oriented Approach
ADEPP  and Software Partners
ADEPP  Selects  and  Federates  the required software to  model  project, its associated risks and safety measures. The  know how  and  know why  are applied as Performance standards and verification schemes to the project and its associated risk models in a traceable, auditable, life cycle, online and open source manner by ADEPP Academy experts. ADEPP does  NOT  impose the choice of simulation tools. It starts by Client tools and develops the required  interfaces  to create the consistent life cycle Bow-Tie oriented models and method for project.  When required ADEPP  suggests  the new useful tools. ADEPP Academy is  NOT  a generic software development and/or vendor company. It provides the tailor made and customised tool for  standardised  and/or specific projects. ADEPP Business Model   ADEPP HSE Toolkit ADEPP Monitor
ADEPP & Other Software EPCON HYSYS, PROII, ASPEN SimApp, OTS Matrikon, PAS HIMA, Exedia Flarenet, Flaresim PHAST, FLACS vsTasker Process BPCS Alarms,  Operators SIS Relief devices Physical Protection Emergency Response
[object Object],[object Object],ADEPP & Other Software ,[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],ADEPP & Other Software
[object Object],[object Object],[object Object],ADEPP & Other Software
ADEPP & Dassault Products   Dassault products  can bring a considerable added value to process industry including oil & gas, hydrocarbon processing, chemical and petrochemical, pharmaceutical and food industries by adding the following innovative aspects to 2D and 3D object oriented models of plant which are mainly developed on the  AVEVA  or  Intergraph  platforms: ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],ADEPP Academy   can customise the above applications in a consistent manner to enforce the  essential elements of HSEMS and TQM such as life cycle risk assessment, safety barrier management, competency management, verification schemes, Training and communication. ADEPP  applies the Bow-tie approach to identify the safety critical systems, activities and tasks and then centralise and engineer the requirements in  Performance standards  and their associated  verification schemes .
ADEPP & Dassault Products   In context of configuration Management  ENOVIA  can be used to create the life cycle performance standards and verification schemes. ,[object Object],[object Object],[object Object],[object Object]
ADEPP & Dassault Products   ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Thank You for  Your Kind Attention! ©2010, Copyright. No part of this demonstration may be copied or broadcast unless authorised. ADEPP is protected by APP (http://app.legalis.net). Copying is illegal and subject to prosecution.

More Related Content

What's hot

SIL | weyer special
SIL | weyer special SIL | weyer special
SIL | weyer special weyer gruppe
 
Managing your OnStream Inspection Program and External vs Internal inspections
Managing your OnStream Inspection Program and External vs Internal inspectionsManaging your OnStream Inspection Program and External vs Internal inspections
Managing your OnStream Inspection Program and External vs Internal inspectionsEdwin A Merrick
 
Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...Sterling Medical Devices
 
Risk Based Inspection-RBI
Risk Based Inspection-RBIRisk Based Inspection-RBI
Risk Based Inspection-RBIReza Shahrivar
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
 
Process Safety Life Cycle Management: Best Practices and Processes
Process Safety Life Cycle Management: Best Practices and ProcessesProcess Safety Life Cycle Management: Best Practices and Processes
Process Safety Life Cycle Management: Best Practices and ProcessesMd Rahaman
 
ESS and HASS: Concerns with the Practices and Standards
ESS and HASS:  Concerns with the Practices and StandardsESS and HASS:  Concerns with the Practices and Standards
ESS and HASS: Concerns with the Practices and StandardsHilaire (Ananda) Perera P.Eng.
 
Reliability Engineering 101 : Tonex Training
Reliability Engineering 101 : Tonex TrainingReliability Engineering 101 : Tonex Training
Reliability Engineering 101 : Tonex TrainingBryan Len
 
Best practice for risk based inspection
Best practice for risk based inspectionBest practice for risk based inspection
Best practice for risk based inspectionOsama Lari
 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsDigital-360
 
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALM
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALMApplying IEC 62304 Risk Management in Aligned Elements - the medical device ALM
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALMAligned AG
 
QAdvis - software risk management based on IEC/ISO 62304
QAdvis - software risk management based on IEC/ISO 62304QAdvis - software risk management based on IEC/ISO 62304
QAdvis - software risk management based on IEC/ISO 62304Robert Ginsberg
 
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Shay Ginsbourg
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationAndy_Watson_Sim
 

What's hot (20)

SIL | weyer special
SIL | weyer special SIL | weyer special
SIL | weyer special
 
Managing your OnStream Inspection Program and External vs Internal inspections
Managing your OnStream Inspection Program and External vs Internal inspectionsManaging your OnStream Inspection Program and External vs Internal inspections
Managing your OnStream Inspection Program and External vs Internal inspections
 
Rbi final report
Rbi final reportRbi final report
Rbi final report
 
Rbi
RbiRbi
Rbi
 
Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...Critical Steps in Software Development: Enhance Your Chances for a Successful...
Critical Steps in Software Development: Enhance Your Chances for a Successful...
 
Risk Based Inspection-RBI
Risk Based Inspection-RBIRisk Based Inspection-RBI
Risk Based Inspection-RBI
 
Understanding IEC 62304
Understanding IEC 62304Understanding IEC 62304
Understanding IEC 62304
 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
 
Process Safety Life Cycle Management: Best Practices and Processes
Process Safety Life Cycle Management: Best Practices and ProcessesProcess Safety Life Cycle Management: Best Practices and Processes
Process Safety Life Cycle Management: Best Practices and Processes
 
ESS and HASS: Concerns with the Practices and Standards
ESS and HASS:  Concerns with the Practices and StandardsESS and HASS:  Concerns with the Practices and Standards
ESS and HASS: Concerns with the Practices and Standards
 
Keeping Bowties Alive
Keeping Bowties AliveKeeping Bowties Alive
Keeping Bowties Alive
 
Reliability Engineering 101 : Tonex Training
Reliability Engineering 101 : Tonex TrainingReliability Engineering 101 : Tonex Training
Reliability Engineering 101 : Tonex Training
 
Best practice for risk based inspection
Best practice for risk based inspectionBest practice for risk based inspection
Best practice for risk based inspection
 
ISO 62304 & TIR 45
ISO 62304 & TIR 45ISO 62304 & TIR 45
ISO 62304 & TIR 45
 
Computerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence SolutionsComputerized System Validation Business Intelligence Solutions
Computerized System Validation Business Intelligence Solutions
 
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALM
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALMApplying IEC 62304 Risk Management in Aligned Elements - the medical device ALM
Applying IEC 62304 Risk Management in Aligned Elements - the medical device ALM
 
QAdvis - software risk management based on IEC/ISO 62304
QAdvis - software risk management based on IEC/ISO 62304QAdvis - software risk management based on IEC/ISO 62304
QAdvis - software risk management based on IEC/ISO 62304
 
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
Ginsbourg.com - Presentation of a Plan for Medical Device Software Validation...
 
Reliability Centred Maintenance Presentation
Reliability Centred Maintenance PresentationReliability Centred Maintenance Presentation
Reliability Centred Maintenance Presentation
 
Use of Failure Mechanisms enhance FMEA and FMECA
Use of Failure Mechanisms enhance FMEA and FMECAUse of Failure Mechanisms enhance FMEA and FMECA
Use of Failure Mechanisms enhance FMEA and FMECA
 

Viewers also liked

Shale eera fleury
Shale eera fleuryShale eera fleury
Shale eera fleuryPomcert
 
Baruwa Prezentacja Rzeszów
Baruwa Prezentacja RzeszówBaruwa Prezentacja Rzeszów
Baruwa Prezentacja RzeszówPomcert
 
Baruwa Prezentacja Wrocław
Baruwa Prezentacja WrocławBaruwa Prezentacja Wrocław
Baruwa Prezentacja WrocławPomcert
 
Innovative stimulation am ar_10.10
Innovative stimulation am ar_10.10Innovative stimulation am ar_10.10
Innovative stimulation am ar_10.10Pomcert
 
20141008 tno@eera unconventionals nl
20141008 tno@eera unconventionals nl20141008 tno@eera unconventionals nl
20141008 tno@eera unconventionals nlPomcert
 
Bonus miracle presentation (PL)
Bonus miracle presentation (PL)Bonus miracle presentation (PL)
Bonus miracle presentation (PL)Pomcert
 
Bonus miracle presentation
Bonus miracle presentationBonus miracle presentation
Bonus miracle presentationPomcert
 
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...Esther Petrilli-Massey
 
Hose_QMS_Presentation
Hose_QMS_PresentationHose_QMS_Presentation
Hose_QMS_Presentationuzoma nwogu
 
expro-welltest service partner
expro-welltest service partnerexpro-welltest service partner
expro-welltest service partneruzoma nwogu
 
choke mfd presentation
choke mfd presentationchoke mfd presentation
choke mfd presentationuzoma nwogu
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...James Robinson
 
P&ID presentation - Copy
P&ID presentation - CopyP&ID presentation - Copy
P&ID presentation - Copyuzoma nwogu
 
Produced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil RecoveryProduced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil Recoverygusgon
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم AFATous
 
Q931+rrl reference en le cs
Q931+rrl reference en le csQ931+rrl reference en le cs
Q931+rrl reference en le csAFATous
 
Q922+re2+l10 v1
Q922+re2+l10 v1Q922+re2+l10 v1
Q922+re2+l10 v1AFATous
 
جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم AFATous
 

Viewers also liked (20)

Shale eera fleury
Shale eera fleuryShale eera fleury
Shale eera fleury
 
Baruwa Prezentacja Rzeszów
Baruwa Prezentacja RzeszówBaruwa Prezentacja Rzeszów
Baruwa Prezentacja Rzeszów
 
Baruwa Prezentacja Wrocław
Baruwa Prezentacja WrocławBaruwa Prezentacja Wrocław
Baruwa Prezentacja Wrocław
 
Innovative stimulation am ar_10.10
Innovative stimulation am ar_10.10Innovative stimulation am ar_10.10
Innovative stimulation am ar_10.10
 
20141008 tno@eera unconventionals nl
20141008 tno@eera unconventionals nl20141008 tno@eera unconventionals nl
20141008 tno@eera unconventionals nl
 
Bonus miracle presentation (PL)
Bonus miracle presentation (PL)Bonus miracle presentation (PL)
Bonus miracle presentation (PL)
 
Bonus miracle presentation
Bonus miracle presentationBonus miracle presentation
Bonus miracle presentation
 
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...
Negotation of an Oil Exploration/Production Contract, Professeur Michel Vuill...
 
Hose_QMS_Presentation
Hose_QMS_PresentationHose_QMS_Presentation
Hose_QMS_Presentation
 
expro-welltest service partner
expro-welltest service partnerexpro-welltest service partner
expro-welltest service partner
 
choke mfd presentation
choke mfd presentationchoke mfd presentation
choke mfd presentation
 
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
Membrane Separation Technology for Water Treatment in Upstream Oil & Gas Oper...
 
P&ID presentation - Copy
P&ID presentation - CopyP&ID presentation - Copy
P&ID presentation - Copy
 
Produced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil RecoveryProduced Water Treatment to Enhance Oil Recovery
Produced Water Treatment to Enhance Oil Recovery
 
Introduction to oil & gas industry for economic student
Introduction to oil & gas industry for economic studentIntroduction to oil & gas industry for economic student
Introduction to oil & gas industry for economic student
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
 
Introduction to Gas Transportation
Introduction to Gas TransportationIntroduction to Gas Transportation
Introduction to Gas Transportation
 
Q931+rrl reference en le cs
Q931+rrl reference en le csQ931+rrl reference en le cs
Q931+rrl reference en le cs
 
Q922+re2+l10 v1
Q922+re2+l10 v1Q922+re2+l10 v1
Q922+re2+l10 v1
 
جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم
 

Similar to ADEPP & Other Software

Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Jauhari Ismail
 
Introduction,Software Process Models, Project Management
Introduction,Software Process Models, Project ManagementIntroduction,Software Process Models, Project Management
Introduction,Software Process Models, Project Managementswatisinghal
 
Software Development Life Cycle Model
Software Development Life Cycle ModelSoftware Development Life Cycle Model
Software Development Life Cycle ModelJ.T.A.JONES
 
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessAktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessInboundLabs (ex mon.ki inc)
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their ImplementationSonal Tiwari
 
[2015/2016] Software development process
[2015/2016] Software development process[2015/2016] Software development process
[2015/2016] Software development processIvano Malavolta
 
SDLC model Lecture 03.ppt
SDLC model Lecture 03.pptSDLC model Lecture 03.ppt
SDLC model Lecture 03.pptPriyanshTan
 
SDLC model Lecture 03.ppt
SDLC model Lecture 03.pptSDLC model Lecture 03.ppt
SDLC model Lecture 03.pptPriyanshTan
 
System Development
System  DevelopmentSystem  Development
System DevelopmentSharad Patel
 
Corporate profile steep graph aras innovator
Corporate profile steep graph aras innovatorCorporate profile steep graph aras innovator
Corporate profile steep graph aras innovatoranuragonline001
 
Software Devlopment Life Cycle
Software Devlopment Life CycleSoftware Devlopment Life Cycle
Software Devlopment Life CycleVivek Gupta
 

Similar to ADEPP & Other Software (20)

Incremental model
Incremental modelIncremental model
Incremental model
 
Workflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDMWorkflow Automation in SolidWorks Enterprise PDM
Workflow Automation in SolidWorks Enterprise PDM
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
Introduction,Software Process Models, Project Management
Introduction,Software Process Models, Project ManagementIntroduction,Software Process Models, Project Management
Introduction,Software Process Models, Project Management
 
Software Development Life Cycle Part II
Software Development Life Cycle Part IISoftware Development Life Cycle Part II
Software Development Life Cycle Part II
 
Software Development Life Cycle Model
Software Development Life Cycle ModelSoftware Development Life Cycle Model
Software Development Life Cycle Model
 
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocessAktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
Aktuelle BPM-Erfahrungen aus komplexen Branchen. Rainer Elvermann, cbprocess
 
software engineering
software engineering software engineering
software engineering
 
Sdlc
SdlcSdlc
Sdlc
 
Software models
Software modelsSoftware models
Software models
 
SDLC Models and Their Implementation
SDLC Models and Their ImplementationSDLC Models and Their Implementation
SDLC Models and Their Implementation
 
[2015/2016] Software development process
[2015/2016] Software development process[2015/2016] Software development process
[2015/2016] Software development process
 
SDLC model Lecture 03.ppt
SDLC model Lecture 03.pptSDLC model Lecture 03.ppt
SDLC model Lecture 03.ppt
 
SDLC model Lecture 03.ppt
SDLC model Lecture 03.pptSDLC model Lecture 03.ppt
SDLC model Lecture 03.ppt
 
System Development
System  DevelopmentSystem  Development
System Development
 
Corporate profile steep graph aras innovator
Corporate profile steep graph aras innovatorCorporate profile steep graph aras innovator
Corporate profile steep graph aras innovator
 
Sdlc
SdlcSdlc
Sdlc
 
Software Devlopment Life Cycle
Software Devlopment Life CycleSoftware Devlopment Life Cycle
Software Devlopment Life Cycle
 
CERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERTCERTIFIED DATA CENTRE EXPERT
CERTIFIED DATA CENTRE EXPERT
 

ADEPP & Other Software

  • 1. ADEPP a tool for HSE Management System Configuration Management
  • 2. Layers of Management System Implementation From: http://www.aiha.org/aihce07/handouts/po116palassis.pdf Requirement Engineering Requirement Management
  • 3. How it can go Wrong? Each level consists of many sub-levels . People, methods, equipment, materials, environment and management are involved in each level and sub-level. Failure of any of these elements will cause partial or total failure of sub-levels, levels and system.
  • 4. Life Cycle Concept Sub-levels can be related not only through a hierarchy but also through evolution with time. Project Management Engineering Procurement Manufacturing Construction Commissioning Plant Management Operation Maintenance
  • 5. Oil & Gas Projects
  • 6.
  • 7.
  • 9. Requirement Engineering Client needs and regulations are the most critical source of requirements. Project solutions in form of philosophies are established based on these critical requirements as well as company, contractors and subcontractors working practices, code & standards, guidelines and project specific studies. Sources of requirements and Solutions are presented in the Bulk documents. Update and audit of these bulk documents are time and effort consuming.
  • 10.
  • 11.
  • 12.
  • 13. Work Breakdown Structure Unit (e.g. Norsok P-100) Module System (e.g. Norsok S-001) Sub-System Component Plant Element
  • 16. ADEPP Monitor & Requirement Engineering ADEPP Monitor experts provide the “Referential” requirements based on contract, applicable regulations, codes & standards, project specific studies. This is an intellectual work which depends on the quality and competency of requirement engineer(s). For more complex and/or critical cases the engineered requirements shall be verified by further brainstorming sessions. These “Referential” requirements can be easily Copied and Tagged for a given equipment, device or working practice. If there is any deviation from the “Referential” requirements users can add , delete or modify the requirement. User shall also report why this deviation is justified and what will be the impact of requirement modification on project. 1- COPY Requirement 2- Customise for given case
  • 19.
  • 20. When “Referential” requirements are customised for a given subject we are ready to define and plan the activities and assign the tasks . Using an intranet based system ADEPP monitor offers a dedicated web page to each user on which they are informed about their tasks without being flooded with unnecessary information. The required activities and tasks of each user is centralised and planned. All relevant activities and tasks are also centralised on the Project and/or discipline managers web page to follow up and track the progress and actions. ADEPP Monitor & Requirement Engineering 1- Define the required Activities 2- Assign Tasks
  • 21. Each user have a dedicated activity and task web page and will not be “flooded” by unnecessary information. ADEPP Monitor & Requirement Engineering
  • 22.
  • 23.
  • 24. ADEPP Monitor is easy to be customised, used and modified for any application because like “Lego” it consists of the ready made blocks rather than a rigid and centralised database like an “Intelligence Cube”. ADEPP HSE Toolkit risk models and ADEPP monitor open source databases are easily linked to the 2D process and/or 3D plant models by the URLs. ADEPP & Object Oriented Approach
  • 25. ADEPP and Software Partners
  • 26. ADEPP Selects and Federates the required software to model project, its associated risks and safety measures. The know how and know why are applied as Performance standards and verification schemes to the project and its associated risk models in a traceable, auditable, life cycle, online and open source manner by ADEPP Academy experts. ADEPP does NOT impose the choice of simulation tools. It starts by Client tools and develops the required interfaces to create the consistent life cycle Bow-Tie oriented models and method for project. When required ADEPP suggests the new useful tools. ADEPP Academy is NOT a generic software development and/or vendor company. It provides the tailor made and customised tool for standardised and/or specific projects. ADEPP Business Model ADEPP HSE Toolkit ADEPP Monitor
  • 27. ADEPP & Other Software EPCON HYSYS, PROII, ASPEN SimApp, OTS Matrikon, PAS HIMA, Exedia Flarenet, Flaresim PHAST, FLACS vsTasker Process BPCS Alarms, Operators SIS Relief devices Physical Protection Emergency Response
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. Thank You for Your Kind Attention! ©2010, Copyright. No part of this demonstration may be copied or broadcast unless authorised. ADEPP is protected by APP (http://app.legalis.net). Copying is illegal and subject to prosecution.