County of Los Angeles - Department of
                       Public Works
                                        Construction Division
 ';     COR~I~~           l''~,~,        FQ~~            ~           ~.                       C             ,~~~~,
                                                                                                      f                  ~~
       +~GN   I                                      Y           Y
                                                                                                  r         `   t-



                                                     b           T        L ~,     ~.' ~    4 ~    ~h'~ .   ~ ~'     ~    ,hail':+
`~'~     "~       .:~ ~    ~~

  RDC0015463              Buelah Circle Drainage Improvements         02(21112   03120112



  TSM0010049              San Gabriel Boulevard - Sierra Madre        02121/12   03120112
                          Boulevard TSSP



  FCC0001209              Alamitos Bay & Claretta Drain Pump          03/06/12   04110112
                          Station Upgrades includes:

                  1) Alamitos Bay Pump Station


                  2) Claretta Drain Pump Station


  SMDAC00132              Calabasas Sewer Upgrade                     03106/12   04103/12   AAA


  RDC0015526              Holliston Avenue, et al.                    03106112   04103112



  RDC0015500              Mulholland HighwaylNewton Canyon            03/06112   04103112
                          Road, et al. includes:


  (RDC0014070) 1. Mulholland Highway at C.M. 15.47,
               et al.


  (RDC0014798) 2. Newton Canyon Road, et al.



   SLT0000004             Workman Mill Road Between Valley            03106112   04103112
                          Blvd          &San Jose Creek


   RDC0015137             Admiralty Way at Palawan Way, et al.         3113/12   04110/12    Pending MDR Ph - II
                                                                                             Waterline Schedule


   FCC0001198             Alamitos Barrier Project New                03120112   04117112
                          Observation Wells

   RDC0014151             Slauson Avenue - Compton                    03120/12   04117112   Start construction after
                          AvenuelAlameda Street                                             completion of Randolph St.
                                                                                            (RDC0014410)
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
                                                  CAPITAL PROJECTS



                                                                                                           ESTIMATED       ADVERTISING
             PROJECT                              DESCRIPTION                              LOCATION
                                                                                                             COST             DATE


 Fire Station 69 Septic Tank    The proposed new septic system will replace the Topanga, CA                    $360,000       Jan-12
 Replacement                    existing failing system which will cAnsist of a 1,500-
                                gallon main processing tank, filter pods, a
                                distribution box, and three seepage pits.

 Manhattan Beach Library        The project consists of demolition of a 12,118 Manhattan Beach               $14,500,000      Jan-12
                                square-feet existing library and the construction of a CA
                                21,500 square-feet library facility on the same site.
                                The project will be designed and built to LEED Gold
                                Certification level.

 OVMC Can Sterilizer Bldg       The building is a single story concrete masonry Sylmar, CA                     $187,500       Jan-12
 Replacement                    block, 800 square feet in area, with steel sash
                                windows, steel door frames and composition
                                shingled roof.

 Bald Mountain New              The project will consist of aself-supporting steel     Gorman, CA              $682,000       Feb-12
 CommunicationTower             lattice communications antenna tower that will be
                                150 feet in height and will be equipped with all the
                                necessary mounts and accessories.

 Barton Fuel System             The scope of work is to remove and replace six Pacoima, CA                    $1,988,800      Feb-12
 Refurbishment                  fueling locations and all piping from existing
                                underground tank, add a seventh fueling location,
                                add a 10,000 gallon above ground fuel tank, add two
                                canopies and new fuel pumps, and remove and
                                replace two existing 500 gallon waste oil tanks.
                                Upgrade all electrical components and add a new
                                electrical service.

 Hauser Peak New Tower          The project will consist of aself-supporting steel Palmdale, CA                $682,000       Feb-12
                                lattice communications antenna tower that will be
                                150 feet in height and will be equipped with all the
                                necessary mounts and accessories.

 KH Eastern Ridgeline Project   LANDSCAPE: The project is located within the           Baldwin Hills, CA      $1,460,000      Feb-12
                                Kenneth Hahn State Recreational Area. The project
                                proposes to construct four fitness areas along a
                                proposed and approximate 1l2 mile nature walking
                                trail.

 Puente Hls New Communication The project will consist of one communications Rowland Heights,                 $1,656,000      Feb-12
 Tower                        building (approximately 422 square feet), one CA
                              equipment building (approximately 999 square feet),
                              and aself-supporting steel lattice communications
                              antenna tower that will be 150 feet in height and will
                              be equipped with all the necessary mounts and
                              accessories.

 Rio Hondo New Communication The project will consist of a communications building     Whittier, CA           $1,483,500      Feb-12
 Tower                       (approximately 999 square feet) and a self-
                             supporting steel lattice communications antenna
                             tower that will be 150 feet in height and will be
                             equipped with all the necessary mounts and
                             accessories.

 Santa Monica Canyon Rubber     The Santa Monica Canyon Channel Rubber Dam Santa Monica                       $1,007,500      Feb-12
 Dam                            Project will use an inflatable rubber dam installed in Canyon Channel
                                the Santa Monica Channel to divert winter low water
                                flows to the City of L. A.'s water treatment plant.




01/12/2012                                                                                                                        Page 1 of 3
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
                                                     CAPITAL PROJECTS



                                                                                                                  ESTIMATED       ADVERTISING
             PROJECT                                   DESCRIPTION                               LQCATION
                                                                                                                    COST             DATE.


  Lennox Library and Community     The project will renovate the 3,000-square-foot Inglewood, CA                     $4,410,000      Mar-12
  Center                           existing library, construct a new 5,400-square-foot
                                   addition to the library, and renovate the remaining
                                   11,000 square feet for a community center.

  OVMC Child Care                  The project scope involves the design and re- Sylmar, CA                          $2,909,500      Apr-12
                                   construction of approximately 5,200 sf. Day Care
                                   Facility within the Olive View Medical Center
                                   Campus.

 Eastern Ave Hill and Blanchard    This project consists of addressing the slope erosion     Los Angeles, CA        $14,066,000     May-12
 Slope                             and storm water drainage issues on the Eastern
                                   Avenue Hill including the temporary repairs to be
                                   implemented at the Blanchard East Slope erosion.

  Los Angeles River Headwaters     The proposed project consists of design and Canoga Park, CA                       $6,700,000      Jun-12
                                   construction of a trail path along both side of the Los
                                   Angeles River from the confluence of Bell Creek and
                                   Calabasas Creek to the confluence of Los Angeles
                                   River and Browns Creek. The project includes
                                   landscaping, interpretive signage, decorative
                                   fencing, and a pedestrian bridge across Browns
                                   Creek.

 Los Angeles River-North           The proposed project consists of construction of a Studio City/Sherman            $1,824,100      Jun-12
 Valleyheart                       pedestrian trail along north sides of the Los Angeles Oaks, CA
                                   River adjacent to Valleyheart Drive between Fulton
                                   and Coldwater Canyon Avenues.

  Will Rogers Coastline Pkg        Proposed improvements consist of reconstruction Malibu, CA                        $6,700,000      Jun-12
  LoWiew                           and reinforcement of the existing eroding asphalt
                                   concrete parking lot adjacent to the beach bluff with
                                   a new 15ft high and approx. 600 LF Seawall to
                                   stabilize the slope. Also to be constructed will be a
                                   new concrete view deck on a pile foundation system
                                   with an accessible pedestrian walkway to the beach,
                                   landscaping and irrigation improvements.

  Camp Glenn Rockey - Modular      Procure and install one (1) new modular living San Dimas, CA                       $629,000       Aug-12
  Unit                             quarter (3,600 sq. ft.). Develop site (i.e., ADA
                                   compliant path of travel, utilities POC, etc.) as
                                   required for the use of new modular living quarter.

  Oxford Retention Basin Project   This project is to improve the capacity and water         Marina Del Rey, CA      $8,800,000      Aug-12
                                   quality in the O~ord Retention Basin by dredging
                                   the basin and adding a berm in the basin to
                                   recirculate water.

  County Data Center               The project consists of constructing a new data           Downey, CA            $110,000,000      Sep-12
                                   center for the County of Los Angeles. The facility
                                   will include approximately 30,000 square feet of
                                   raised floor data center. Atwo-story, 27,000 square
                                   foot annex building with two floors of underground
                                   parking will also be constructed.

                                   The facility is an essential facility, and as such, all
                                   main and support services must be designed and
                                   constructed to provide continuous service.




01/12/2012                                                                                                                              Page 2 of 3
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
                                                   CAPITAL PROJECTS



                                                                                                         ESTIMATED       ADVERTISING'
             PROJECT                                 DESCRIPTION                              LQCATION
                                                                                                           COST             DATE


 RLANRC North Campus             The North Campus Consolidation project includes          Downey, CA       $30,590,000      Sep-12
 Consolidation                   renovation of the inpatient acute care rehabilitation
                                 services JPI building, construction of a new inpatient
                                 acute care rehabilitation services addition to the
                                 north of the JPI building, demolition of some existing
                                 buildings, and relocation of the outpatient services
                                 and construction of new outpatient facilities.

 Castaic Animal Shltr SN Clinc   The Project will consist of construction of a new Castaic, CA               $800,000       Oct-12
 and HQ                          approximately 1,600-square-foot spay/neuter clinic
                                 with proper evaluation, presurgery, and post-surgery
                                 rooms, and a customer service area. In addition, the
                                 Project will include installation of a new 1,440-
                                 square-foot modular administration building.

 Dan Blocker Beach               General improvements includes a parking lot, picnic      Malibu, CA        $1,276,000      Oct-12
                                 area with protective railing, restroom facilities,
                                 planting erosion control landscape for the beach.



                                                TOTAL                                                    $27 2,711,900




01/12/2012                                                                                                                     Page 3 of 3

Más contenido relacionado

Destacado

Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2AGC of California
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1AGC of California
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceAGC of California
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsAGC of California
 

Destacado (7)

Crisis Management
Crisis ManagementCrisis Management
Crisis Management
 
Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2Massood Eftekhari Outlook 2012 1 of 2
Massood Eftekhari Outlook 2012 1 of 2
 
Market Outlook
Market Outlook Market Outlook
Market Outlook
 
Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1Analysis of Renting Equipment vs Purchasing 1
Analysis of Renting Equipment vs Purchasing 1
 
General Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC ConferenceGeneral Session =- John McArthur - AGCC Conference
General Session =- John McArthur - AGCC Conference
 
Safety Forum
Safety ForumSafety Forum
Safety Forum
 
Managing Cash Flows On Construction Projects
Managing Cash Flows On Construction ProjectsManaging Cash Flows On Construction Projects
Managing Cash Flows On Construction Projects
 

Similar a Massood Eftekhari Outlook 2012 2 of 2

Project List
Project ListProject List
Project ListJim Ryan
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b ProjectsAnandhan Annasamy
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2Ismael Vazquez, LSIT
 
Enwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastEnwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastToronto 2030 District
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Fairfax County
 
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...TWCA
 
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Michael Hewitt, GISP
 
Capital Investment Plan - Tobin Tellers
Capital Investment Plan - Tobin TellersCapital Investment Plan - Tobin Tellers
Capital Investment Plan - Tobin TellersAGC of California
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Stephen Bolduc
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementFairfax County
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxgilpinleeanna
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgiaVladimir Popovic
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectVladimir Popovic
 

Similar a Massood Eftekhari Outlook 2012 2 of 2 (20)

Project List
Project ListProject List
Project List
 
Short summary of PH4b Projects
Short summary of PH4b ProjectsShort summary of PH4b Projects
Short summary of PH4b Projects
 
ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15 ASCE San Ramon Canyon Storm Drain 6 4-15
ASCE San Ramon Canyon Storm Drain 6 4-15
 
Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report Highbank Resources 43-101 Technical Report
Highbank Resources 43-101 Technical Report
 
2016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev22016-08-18-DCCR Presentation for DOT rev2
2016-08-18-DCCR Presentation for DOT rev2
 
Enwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC BreakfastEnwave Deep Lake Cooling - SBC Breakfast
Enwave Deep Lake Cooling - SBC Breakfast
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016Potomac Meadow Water Quality Improvement July 2016
Potomac Meadow Water Quality Improvement July 2016
 
SFPUC-#377404v1.PDF
SFPUC-#377404v1.PDFSFPUC-#377404v1.PDF
SFPUC-#377404v1.PDF
 
Ellis Sess14 102009
Ellis Sess14 102009Ellis Sess14 102009
Ellis Sess14 102009
 
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
Luce Bayou Interbasin Project: Updates on a Key Regional Water Supply Project...
 
Jack Oler 1
Jack Oler 1Jack Oler 1
Jack Oler 1
 
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
Brad Shultz, Skelly and Loy, "Broad Top Township Six Mile Run AMD Treatment a...
 
Capital Investment Plan - Tobin Tellers
Capital Investment Plan - Tobin TellersCapital Investment Plan - Tobin Tellers
Capital Investment Plan - Tobin Tellers
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
PPPL FINAL POSTER
PPPL FINAL POSTERPPPL FINAL POSTER
PPPL FINAL POSTER
 
Brown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall ImprovementBrown's Chapel Property Pond and Outfall Improvement
Brown's Chapel Property Pond and Outfall Improvement
 
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docxMTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
MTH 251 Lab 7 FALL 2016NAME 1. Inverse trigonometric .docx
 
Ws project ozurgeti, georgia
Ws project ozurgeti, georgiaWs project ozurgeti, georgia
Ws project ozurgeti, georgia
 
Ozurgeti City / Water Supply Project
Ozurgeti City / Water Supply ProjectOzurgeti City / Water Supply Project
Ozurgeti City / Water Supply Project
 

Más de AGC of California

Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2AGC of California
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessAGC of California
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsAGC of California
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.AGC of California
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestAGC of California
 
Transportation Projects Outlook 2012 - Mark Leja, Caltrans
Transportation Projects Outlook 2012  - Mark Leja, CaltransTransportation Projects Outlook 2012  - Mark Leja, Caltrans
Transportation Projects Outlook 2012 - Mark Leja, CaltransAGC of California
 
California Legislative Update - Dave Ackerman
California Legislative Update - Dave AckermanCalifornia Legislative Update - Dave Ackerman
California Legislative Update - Dave AckermanAGC of California
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed PuchiAGC of California
 
Environmental Compliance - Brenda Davis
Environmental Compliance - Brenda DavisEnvironmental Compliance - Brenda Davis
Environmental Compliance - Brenda DavisAGC of California
 
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGS
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGSDVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGS
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGSAGC of California
 
Californias Infrastructure Crisis - Bert Sandman
Californias Infrastructure Crisis - Bert SandmanCalifornias Infrastructure Crisis - Bert Sandman
Californias Infrastructure Crisis - Bert SandmanAGC of California
 
Transportation California: Rebuilding California (Bert Sandman)
Transportation California: Rebuilding California (Bert Sandman)Transportation California: Rebuilding California (Bert Sandman)
Transportation California: Rebuilding California (Bert Sandman)AGC of California
 

Más de AGC of California (20)

Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2Analysis of Renting Equipment vs Purchasing 2
Analysis of Renting Equipment vs Purchasing 2
 
Crisis Management Checklist
Crisis Management ChecklistCrisis Management Checklist
Crisis Management Checklist
 
The Cal/OSHA Appeals Process
The Cal/OSHA Appeals ProcessThe Cal/OSHA Appeals Process
The Cal/OSHA Appeals Process
 
Workers Compensation 101
Workers Compensation 101Workers Compensation 101
Workers Compensation 101
 
The Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident InvestigationsThe Do's and Don'ts of Workplace Accident Investigations
The Do's and Don'ts of Workplace Accident Investigations
 
Skin Cancer Prevention
Skin Cancer PreventionSkin Cancer Prevention
Skin Cancer Prevention
 
Joplin Blitz Build 2012
Joplin Blitz Build 2012Joplin Blitz Build 2012
Joplin Blitz Build 2012
 
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
Working at the Speed of Night - Vicky Hoyt, Flatiron West, Inc.
 
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil WestSafety Leadership - Clark Peterson, SKANSKA USA Civil West
Safety Leadership - Clark Peterson, SKANSKA USA Civil West
 
Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012Cliff Brewis Outlook 2012
Cliff Brewis Outlook 2012
 
Barry Correa Outlook 2012
Barry Correa Outlook 2012Barry Correa Outlook 2012
Barry Correa Outlook 2012
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 
Roy Fisher Outlook 2012
Roy Fisher Outlook 2012Roy Fisher Outlook 2012
Roy Fisher Outlook 2012
 
Transportation Projects Outlook 2012 - Mark Leja, Caltrans
Transportation Projects Outlook 2012  - Mark Leja, CaltransTransportation Projects Outlook 2012  - Mark Leja, Caltrans
Transportation Projects Outlook 2012 - Mark Leja, Caltrans
 
California Legislative Update - Dave Ackerman
California Legislative Update - Dave AckermanCalifornia Legislative Update - Dave Ackerman
California Legislative Update - Dave Ackerman
 
General Water Permit - Ed Puchi
General Water Permit - Ed PuchiGeneral Water Permit - Ed Puchi
General Water Permit - Ed Puchi
 
Environmental Compliance - Brenda Davis
Environmental Compliance - Brenda DavisEnvironmental Compliance - Brenda Davis
Environmental Compliance - Brenda Davis
 
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGS
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGSDVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGS
DVBE Commercially Useful Function (CUF) Worksheet - Eric Mandel, DGS
 
Californias Infrastructure Crisis - Bert Sandman
Californias Infrastructure Crisis - Bert SandmanCalifornias Infrastructure Crisis - Bert Sandman
Californias Infrastructure Crisis - Bert Sandman
 
Transportation California: Rebuilding California (Bert Sandman)
Transportation California: Rebuilding California (Bert Sandman)Transportation California: Rebuilding California (Bert Sandman)
Transportation California: Rebuilding California (Bert Sandman)
 

Último

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 

Último (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

Massood Eftekhari Outlook 2012 2 of 2

  • 1. County of Los Angeles - Department of Public Works Construction Division '; COR~I~~ l''~,~, FQ~~ ~ ~. C ,~~~~, f ~~ +~GN I Y Y r ` t- b T L ~, ~.' ~ 4 ~ ~h'~ . ~ ~' ~ ,hail':+ `~'~ "~ .:~ ~ ~~ RDC0015463 Buelah Circle Drainage Improvements 02(21112 03120112 TSM0010049 San Gabriel Boulevard - Sierra Madre 02121/12 03120112 Boulevard TSSP FCC0001209 Alamitos Bay & Claretta Drain Pump 03/06/12 04110112 Station Upgrades includes: 1) Alamitos Bay Pump Station 2) Claretta Drain Pump Station SMDAC00132 Calabasas Sewer Upgrade 03106/12 04103/12 AAA RDC0015526 Holliston Avenue, et al. 03106112 04103112 RDC0015500 Mulholland HighwaylNewton Canyon 03/06112 04103112 Road, et al. includes: (RDC0014070) 1. Mulholland Highway at C.M. 15.47, et al. (RDC0014798) 2. Newton Canyon Road, et al. SLT0000004 Workman Mill Road Between Valley 03106112 04103112 Blvd &San Jose Creek RDC0015137 Admiralty Way at Palawan Way, et al. 3113/12 04110/12 Pending MDR Ph - II Waterline Schedule FCC0001198 Alamitos Barrier Project New 03120112 04117112 Observation Wells RDC0014151 Slauson Avenue - Compton 03120/12 04117112 Start construction after AvenuelAlameda Street completion of Randolph St. (RDC0014410)
  • 2. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING PROJECT DESCRIPTION LOCATION COST DATE Fire Station 69 Septic Tank The proposed new septic system will replace the Topanga, CA $360,000 Jan-12 Replacement existing failing system which will cAnsist of a 1,500- gallon main processing tank, filter pods, a distribution box, and three seepage pits. Manhattan Beach Library The project consists of demolition of a 12,118 Manhattan Beach $14,500,000 Jan-12 square-feet existing library and the construction of a CA 21,500 square-feet library facility on the same site. The project will be designed and built to LEED Gold Certification level. OVMC Can Sterilizer Bldg The building is a single story concrete masonry Sylmar, CA $187,500 Jan-12 Replacement block, 800 square feet in area, with steel sash windows, steel door frames and composition shingled roof. Bald Mountain New The project will consist of aself-supporting steel Gorman, CA $682,000 Feb-12 CommunicationTower lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Barton Fuel System The scope of work is to remove and replace six Pacoima, CA $1,988,800 Feb-12 Refurbishment fueling locations and all piping from existing underground tank, add a seventh fueling location, add a 10,000 gallon above ground fuel tank, add two canopies and new fuel pumps, and remove and replace two existing 500 gallon waste oil tanks. Upgrade all electrical components and add a new electrical service. Hauser Peak New Tower The project will consist of aself-supporting steel Palmdale, CA $682,000 Feb-12 lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. KH Eastern Ridgeline Project LANDSCAPE: The project is located within the Baldwin Hills, CA $1,460,000 Feb-12 Kenneth Hahn State Recreational Area. The project proposes to construct four fitness areas along a proposed and approximate 1l2 mile nature walking trail. Puente Hls New Communication The project will consist of one communications Rowland Heights, $1,656,000 Feb-12 Tower building (approximately 422 square feet), one CA equipment building (approximately 999 square feet), and aself-supporting steel lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Rio Hondo New Communication The project will consist of a communications building Whittier, CA $1,483,500 Feb-12 Tower (approximately 999 square feet) and a self- supporting steel lattice communications antenna tower that will be 150 feet in height and will be equipped with all the necessary mounts and accessories. Santa Monica Canyon Rubber The Santa Monica Canyon Channel Rubber Dam Santa Monica $1,007,500 Feb-12 Dam Project will use an inflatable rubber dam installed in Canyon Channel the Santa Monica Channel to divert winter low water flows to the City of L. A.'s water treatment plant. 01/12/2012 Page 1 of 3
  • 3. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING PROJECT DESCRIPTION LQCATION COST DATE. Lennox Library and Community The project will renovate the 3,000-square-foot Inglewood, CA $4,410,000 Mar-12 Center existing library, construct a new 5,400-square-foot addition to the library, and renovate the remaining 11,000 square feet for a community center. OVMC Child Care The project scope involves the design and re- Sylmar, CA $2,909,500 Apr-12 construction of approximately 5,200 sf. Day Care Facility within the Olive View Medical Center Campus. Eastern Ave Hill and Blanchard This project consists of addressing the slope erosion Los Angeles, CA $14,066,000 May-12 Slope and storm water drainage issues on the Eastern Avenue Hill including the temporary repairs to be implemented at the Blanchard East Slope erosion. Los Angeles River Headwaters The proposed project consists of design and Canoga Park, CA $6,700,000 Jun-12 construction of a trail path along both side of the Los Angeles River from the confluence of Bell Creek and Calabasas Creek to the confluence of Los Angeles River and Browns Creek. The project includes landscaping, interpretive signage, decorative fencing, and a pedestrian bridge across Browns Creek. Los Angeles River-North The proposed project consists of construction of a Studio City/Sherman $1,824,100 Jun-12 Valleyheart pedestrian trail along north sides of the Los Angeles Oaks, CA River adjacent to Valleyheart Drive between Fulton and Coldwater Canyon Avenues. Will Rogers Coastline Pkg Proposed improvements consist of reconstruction Malibu, CA $6,700,000 Jun-12 LoWiew and reinforcement of the existing eroding asphalt concrete parking lot adjacent to the beach bluff with a new 15ft high and approx. 600 LF Seawall to stabilize the slope. Also to be constructed will be a new concrete view deck on a pile foundation system with an accessible pedestrian walkway to the beach, landscaping and irrigation improvements. Camp Glenn Rockey - Modular Procure and install one (1) new modular living San Dimas, CA $629,000 Aug-12 Unit quarter (3,600 sq. ft.). Develop site (i.e., ADA compliant path of travel, utilities POC, etc.) as required for the use of new modular living quarter. Oxford Retention Basin Project This project is to improve the capacity and water Marina Del Rey, CA $8,800,000 Aug-12 quality in the O~ord Retention Basin by dredging the basin and adding a berm in the basin to recirculate water. County Data Center The project consists of constructing a new data Downey, CA $110,000,000 Sep-12 center for the County of Los Angeles. The facility will include approximately 30,000 square feet of raised floor data center. Atwo-story, 27,000 square foot annex building with two floors of underground parking will also be constructed. The facility is an essential facility, and as such, all main and support services must be designed and constructed to provide continuous service. 01/12/2012 Page 2 of 3
  • 4. LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS CAPITAL PROJECTS ESTIMATED ADVERTISING' PROJECT DESCRIPTION LQCATION COST DATE RLANRC North Campus The North Campus Consolidation project includes Downey, CA $30,590,000 Sep-12 Consolidation renovation of the inpatient acute care rehabilitation services JPI building, construction of a new inpatient acute care rehabilitation services addition to the north of the JPI building, demolition of some existing buildings, and relocation of the outpatient services and construction of new outpatient facilities. Castaic Animal Shltr SN Clinc The Project will consist of construction of a new Castaic, CA $800,000 Oct-12 and HQ approximately 1,600-square-foot spay/neuter clinic with proper evaluation, presurgery, and post-surgery rooms, and a customer service area. In addition, the Project will include installation of a new 1,440- square-foot modular administration building. Dan Blocker Beach General improvements includes a parking lot, picnic Malibu, CA $1,276,000 Oct-12 area with protective railing, restroom facilities, planting erosion control landscape for the beach. TOTAL $27 2,711,900 01/12/2012 Page 3 of 3