                     VISAKHAPATNAM STEEL              Section No:1
                              PLANT
                    (RASHTRIYA ISPAT NIGAM            Issue/Rev. No :
                    LIMITED),VISAKHAPATNAM            01/00




 VISAKHAPATNAM STEEL PLANT (VSP)
 (RASHTRIYA ISPAT NIGAM LIMITED)




                    QUALITY MANUAL

                                          Submitted by
                          Sunny Gupta (QR1101)
                          Madhur Rawat (QR1105)
                     Indian Statistical Institute, Kolkata




  Approved by                Issued by:
                      Manager Quality Assurance
Managing Director     Management Representative
Page 2 of 23
                        VISAKHAPATNAM STEEL                    Section No:1
                                 PLANT
                       (RASHTRIYA ISPAT NIGAM                  Issue/Rev. No :
                       LIMITED),VISAKHAPATNAM                  01/00



                                      1. GENERAL

The basic objective of this documentation is to provide a brief information regarding
company commitments towards its quality management system specifying requirements
as per international standards.
To achieve this, our company--

a) demonstrates its abilities to consistently provide products that meet customer and
   application statutory and regulatory requirements ,and

b) is committed to enhance customer satisfaction through the effective application of the
   system, including processes for continual improvement of the system and the assurance
   of conformity to customer and applicable statutory and regulatory requirements.




   Approved by                   Issued by:
                          Manager Quality Assurance
Managing Director         Management Representative
Page 3 of 23
                     VISAKHAPATNAM STEEL           Section No:1
                              PLANT
                    (RASHTRIYA ISPAT NIGAM         Issue/Rev. No :
                    LIMITED),VISAKHAPATNAM         01/00


1.1)
                          COMPANY”S NAME

            VISAKHAPATNAM STEEL PLANT
   (RASHTRIYA ISPAT NIGAM LIMITED),VISAKHAPATNAM



                                 ADDRESS
                    VISAKHAPATNAM STEEL PLANT (VSP)
                             Dr. V. Phaneendrudu
                             Dy. General Manager
                        Email : drphani@vizagsteel.com
                        Website: www.vizagsteel.com
                        Tel: +91 - 891 - 2515854 (Off)
                             +91 - 891 - 2518017 (Fax)




  Approved by                Issued by:
                      Manager Quality Assurance
Managing Director     Management Representative
Page 4 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00


1.2) INTRODUCTION
With a view to give impetus to the industrial growth and to meet the inspiration of the people
from the south India, government of India decided to establish a integrated steel plant in public
sector at Visakhapatnam (Andhra Pradesh).
Seeds were thus sown for the construction of the modern sophisticated steel plant having annual
capacity of 3.4 million tonnes of hot metal. In February 1981 the contract was signed with
USSR(now Russia) for preparation of working drawings for Coke Ovens, Blast Furnace and
Sinter Plant. The blast furnace foundation was laid with first mass concreting in the project in
January 1982. The construction of township also started. It has the deepest port and is one of the
principal outlets for country's exporting Iron ore.
Vizag Steel Plant is the only Indian shore-based steel plant, and it has massive land, up to 19,000
acres (7,700 ha), and is poised to become up to 20 MT in a single campus.
Since VSP is accredited with ISO 9001:2000 Quality Management System Standard, all saleable
products of Visakhapatnam Steel Plant come under the ISO umbrella.

At VSP IS0:14001 has been awarded for Environment Management System in the Plant. It is the
only integrated steel plant in the country to be certified for ISO 9001:2000, ISO 14001:2004 and
OSHAS 18001:1999

Location: The plant is located in Visakhapatnam City, which is on the coast of Bay of Bengal.
Visakhapatnam city is an important commercial center of Andhra Pradesh.

PRODUCTS:

1) Wire rods (TMT, Plain & Ribbed)

2) Merchant Products
(Angles, Channels, Round & TMT bars)

3) Beam, Billets, Bloooms

4) Reinforce bars

5) Plates (up to 3600 mm wide)


   Approved by                     Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 5 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00


Turnover: The total turn over of this company is reported at last fiscal year (2010-11)
around Rs 11,500 Crores .

Manpower:
The total manpower of VSP is about 17000 strong trained personnel.


Future Plan:
VSP is committed to harness its growth potential at its best and sustain profitable growth and to
deliver high quality and cost competitive products and be the first choice of customers. To create
an inspiring work environment to unleash the creative energy of people and to achieve
excellence in enterprise management. To be respected corporate citizen, ensure clean and green
environment and develop vibrant communities around us. In line with the vision in National
Steel Policy envisaging 124 MT steel by 2019-20, Vizag Steel is also planning to expand it’s
capacity from 3.6 MT to 6.3 MT. After considering the buoyancy in domestic steel market for
long products, which is the product mix of VSP and the high acceptance of VSP’s brand image
in the market, an expansion plan has been proposed.




   Approved by                     Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 6 of 23
                     VISAKHAPATNAM STEEL          Section No:1
                              PLANT
                    (RASHTRIYA ISPAT NIGAM        Issue/Rev. No :
                    LIMITED),VISAKHAPATNAM        01/00


1.3)                      TABLE OF CONTENTS




   Approved by               Issued by:
                      Manager Quality Assurance
Managing Director     Management Representative
Page 7 of 23
                         VISAKHAPATNAM STEEL                           Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                         Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                         01/00

1.4)
 Section No.                                 Description                          ISO 9001 Clause
   1           GENERAL                                                                ---
   1.1         Company’s Name and Address                                             ---
   1.2         Introduction                                                           ---
   1.3         Table of Contents                                                      ---
   1.4         Manual Distribution                                                    4.2.3
   1.5         Definitions and Abbreviation                                           2, 3
   2           SCOPE & EXCLUSIONS                                                     1.2
   3           PROCESS MANAGEMENT APPROACH                                            4.1
   4           QUALITY MANAGEMENT SYSTEM                                              4
   4.1         Documentation Structure                                                4.2.1, 4.2.2
   4.2         Control of Documents                                                   4.2.3
   4.3         Control of Records                                                     4.2.4
   5           MANAGEMENT RESPONSIBILITY                                              5
   5.2         Quality Policy                                                         5.3
   5.3         Quality Planning                                                       5.4
   5.4         Responsibility and Authority                                           5.5.1
   5.5         Management Representative                                              5.5.2
   5.6         Internal Communication                                                 5.5.3
   5.7         Management Review                                                      5.6
   6           RESOURCE MANAGEMENT                                                    6
   6.1         Competence, Awareness and Training                                     6.2
   6.2         Infrastructure and Work Environment                                    6.3, 6.4
   7           PRODUCT/SERVICE REALISATION                                            7
   7.1         Planning of Service Realization                                        7.1
   7.2         Determination and Review of Requirements Related to Service            7.2.1, 7.2.2
   7.3         Shareholder/ Investor Feedback and Complaints                          7.2.3
   7.4         Design and Development                                                 7.3
   7.5         Purchasing                                                             7.4
   7.6         Control of Production and Service Provision                            7.5.1
   7.7         Validation of Production/Service Process                               7.5.2
   7.8         Identification and Traceability                                        7.5.3
   7.9         Preservation of Product                                                7.5.5
   7.10        Control of Monitoring and Measuring Devices                            7.6
   8           MEASUREMENT, ANALYSIS AND IMPROVEMENT                                  8
   8.1         Customer satisfaction                                                  8.2.1
   8.2         Internal Quality Audit                                                 8.2.2
   8.3         Monitoring and Measuring of Processes and Product.                     8.2.3, 8.2.4
   8.4         Control of Nonconforming Product/Service                               8.3
   8.5         Analysis of Data                                                       8.4
   8.6         Continual Improvement                                                  8.5.1
   8.7         Corrective Action                                                      8.5.2
   8.8         Preventive Action                                                      8.5.3
 Annexure-1    PDF AND Process Map                                                    ---

   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 8 of 23
                        VISAKHAPATNAM STEEL                      Section No:1
                                 PLANT
                       (RASHTRIYA ISPAT NIGAM                    Issue/Rev. No :
                       LIMITED),VISAKHAPATNAM                    01/00
                            MANUAL DISTRUBUTION


Soft copy through Local area network shall be provided to following personnel:
Sl.
No.    Copy                                             Copy Holder

1.     Hard copy                              Chairman cum Managing Director

2.     Hard copy                                           Auditor

3.     Master copy                            Management Representative (MR)
4.    Departmental copy                    HOD of individual departments
Finance Director, Head - Human Resources, Sales Manager, Production Manager, Marketing
Manager, Purchase Manager

NOTE: Furthermore, the Management Representative (MR) may issue uncontrolled copies to
any other person after obtaining prior permission of the Managing Director.

The master copy (Hard Copy) shall be held by the MR and shall not have any copy number. This
copy shall bear original signatures, and shall be printed on sheets bearing the company logo.




1.5)                               DEFINITION


     Approved by                  Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 9 of 23
                       VISAKHAPATNAM STEEL                      Section No:1
                               PLANT
                     (RASHTRIYA ISPAT NIGAM               Issue/Rev. No :
                     LIMITED),VISAKHAPATNAM               01/00
Controller of Document         :     Management Representative, who will be
                                     responsible for controlling and issuing a particular
                                     document.

Customer                            :      Who take a service or use the product produce
                                           from company.

Customer Process                    :       A process that receives inputs in the form
                                           of materials or information from another process is
                                           called the customer of the supplying process.


Direct Process for Service          :      A process which is directly involved in the
Realization                                delivery of specific service to Customers is
                                           called a direct process.

Document                            :      A document is an entity within the Quality
                                           Management System that needs to be
                                           maintained at a known revision status.

Internal Quality Auditor            :      Person within the company, who is having the
                                           Competence to conduct internal quality audit of the
                                           developed QMS.

Internal Customers                  :      An internal department, which receives
                                           materials/Services from another department
                                           is called internal Customer of the supplying

                                           department.

Process                             :      A process consists of an activity or a set of
                                           interrelated activities, intended to transform
                                           one or more inputs at least one of which
                                           represent customer requirements into one or




   Approved by                      Issued by:
                             Manager Quality Assurance
Managing Director            Management Representative
Page 10 of 23
                          VISAKHAPATNAM STEEL                        Section No:1
                                   PLANT
                         (RASHTRIYA ISPAT NIGAM                Issue/Rev. No :
                         LIMITED),VISAKHAPATNAM                01/00
                                         more outputs that represents solutions from
                                         internal or external customer’s point of view.

Supplier Process                      :        A process that supplies inputs to another
                                               process in the form of materials or information
                                               is called the supplier of the receiving process.

For all other quality related terms, definitions listed in ISO 9000: 2005 are applicable.

                                          Abbreviation

SL                                                              Explanation
No.
1.         QMS
                                      Quality Manual system
2.         QP
                                      Quality Process
3.         PO
                                      Process Map
4.         MR
                                      Management Representative
5.         ISO
                                      International organization of standard
6.         VSP
                                      Visakhapatnam Steel Plant
7.         OC
                                      Organization Chart
8.         CRM
                                      Customer Relationship Management
9.         R&D
                                      Research and Development
10.
           TS                         Technical specification

11.        PFD                        Process flow diagram




      Approved by                  Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 11 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00


                                       2. SCOPE
Apart from steel production,VSP is also engaged in production of other byproducts such as Tar,
Pitch, Chemicals like Benzoyl (and its product), Ammonium Sulphate, Methanol, Ethanol etc.
The scope of this quality management system restricted to production and distribution
of desired specific quality steel products.


                                      EXCLUSIONS
The Research & Development of organization is based on only verification and validation of
products produced at different stages of different process to get the specific required properties
rather than design
Hence, the requirements of design and development planning (clauses 7.3.1 of ISO 9001: 2008)
is, consequently, not applicable and have been excluded from the scope of the Quality
Management System.



                    3. PROCESS MANAGEMENT APPROACH
1. The scope of this quality system includes:

   •   Systematic approach for providing service to the Shareholders/Investors at the same time
       ensuring compliance with the regulatory requirements framed under different statutes
       from time to time.
   •   Systematic approach for collection and compilation of data obtained through various
       routes like internal quality audit process and process measurement system; Shareholder
       satisfaction measures and Shareholder/Investor complaints and consequent planning for
       improvements. The process of measuring shareholder satisfaction includes obtaining
       feedback from the Shareholders/Investors.
   •   To identify and provision of resources in terms of adequately skilled manpower,
       infrastructure and work environment.
   •   To manage activities including designing the organisational structure; defining the
       responsibilities and authorities; communicating the goals and procedures to concerned
       functions and defining as well as reviewing quality policy and objectives.
   •   Supporting activities like control of documents and control of records.
   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 12 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00

The major processes required for effective implementation of this quality management system
have been identified. These processes have been divided into four major categories, viz.

   •   Direct processes for Product Realisation,
   •   Support processes for identification and provision of resources,
   •   Measurement processes and
   •   Management processes.

       These four categories have been identified keeping in view the four major categories
       identified by ISO 9001: 2008, namely, management activities, provision of resources,
       product realisation/service provision and measurement.

   The major processes in VSP are:

Purchase
Storage
Production
Inspection
Maintenance
Marketing
Sales
Training and Awareness

Major Process Associated with the Production of final Steel /Stainless Steel Products are-

Metallurgical Coke Making
Sintering
Iron Making
Steel Making
Continuous Casting
Rolling




   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 13 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00

Direct Process: Iron Making, BOF, Argon Rinsing, AOD/VOD, Degassing
Indirect Process: Making Metallurgical coke, Procurement, Mineral dressing, Maintenance of
Machines.
Management Process: Training & Recruitment, Marketing & Sales, Internal Audit, Finance

The process maps of the above processes are available in Annexure-1.

                        4. QUALITY MANAGEMENT SYSTEM

4.1) DOCUMENTATION STRUCTURE

This manual contains documented statements of our quality policy and quality objectives and
references documented procedures required by ISO 9001:2008 and other documents needed to
ensure effective planning, operation and control of our key QMS processes.
The level and type of QMS documentation established for our business is continually reviewed
to ensure it remains appropriate for the complexity and interaction of our processes and the
competence of our employees. QMS documents and data may be in hard copy or electronic
media. QMS documentation includes this quality manual, process maps and other internal and
external documents and data needed to manage, perform or verify work affecting product
quality.
We also issue and control work instructions, job descriptions, and other internal and external
documents and data as appropriate and needed to effectively manage our QMS.
The quality manual is that part of our QMS that defines the scope of our QMS and
documents the policy, procedures and processes needed to implement our quality policy and
achieve our quality objectives. This manual also documents justifications for exclusions
from ISO 9001:2008 requirements and defines the overall sequence of and interaction
between our key QMS processes.

Revision / Issue Numbering
To start with every document shall have issue number one and revision number zero.
Whenever the contents of a page are modified, the revision number shall be incremented by
one. When several documents (or sections) of same category have different revision
numbers, issue number of all these documents shall be incremented by one and the revision
number of all the entire set shall be set to zero. The MR shall have the authority to decide
about bringing out a new issue.

   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 14 of 23
                        VISAKHAPATNAM STEEL                     Section No:1
                                 PLANT
                       (RASHTRIYA ISPAT NIGAM                   Issue/Rev. No :
                       LIMITED),VISAKHAPATNAM                   01/00

Format of Document

All pages of the internal document shall bear the issue number and revision number, signatures
of the controlling as well as approving authority and a “CONTROLLED COPY” stamp. The
pages shall be numbered as page x of n where n is the total number of pages in the relevant
section and x is the page serial number.

4.2) CONTROL OF DOCUMENTS
This procedure aims at ensuring that all documents and data, including the ones of external
origin are identified and controlled. Control shall include

•   Ensuring that all documents and data are reviewed and approved properly, and pertinent
    copies of appropriate documents should be made available at all points of usage.
•   The formulation of a system for withdrawal or identification of obsolete documents to
    prevent unintentional usages.

Identification of all Documents

The Master list of all documents should be maintained by MR. The master list should indicate
the name of the document, controller, approving authority and revision status.

Master Copy of Documents

A master copy has to be maintained for every internal document. The master copy should bear
original signatures of the controller and approving authority of the document. The
previous/obsolete master copies should be destroyed or can be stamped “OBSOLETE”. For each
external document the copy maintained by the respective controller shall be treated as master
copy.

Review and Approval of Documents

The Quality Manual should be reviewed and approved before being issued. Unless specified
otherwise, reviewer and approving authority of a document should be the same. The part




    Approved by                  Issued by:
                          Manager Quality Assurance
Managing Director         Management Representative
Page 15 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00

specified as "Approved By" in the documents identifies the approving authority.Whatever be the
change in the document should be incorporated on the master copy and the old copy (or
appropriate pages of
the old copy) should be stamped “OBSOLETE” or should be destroyed. The modified
documents shall also be reviewed and approved before issue.

For the external documents the copy received shall be treated as approved copy.

Identification of Revision / Status of Amendment

An amendment sheet must be maintained with every internal document, including the master
copy. Whenever a change is made, the reason and nature of change must be recorded in the
amendment sheet. At the time of issue, the controller should include updated amendment sheet in
every copy circulated ensuring maintenance of the revision history.
The date of receipt shall be maintained for external documents to indicate the latest revision
status.

4.3) CONTROL OF RECORDS

Master List
A master list of all records has to be be prepared and maintained by the Management
Representative. This list should identify each record, revision status of record format, the
originating document, the form of maintenance and the retention period. The form of
maintenance shall specify whether the record will be maintained as loose sheets filed, bound
registers or as computer files.
All records must be maintained for the retention period specified and may be dispositional upon
the end of this period at the discretion of the MR. The retention period should take care of legal
requirements, if legal process demands.




   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 16 of 23
                         VISAKHAPATNAM STEEL                       Section No:1
                                  PLANT
                        (RASHTRIYA ISPAT NIGAM                     Issue/Rev. No :
                        LIMITED),VISAKHAPATNAM                     01/00

Filing, Storage and Maintenance
Whatever records which are maintained as loose sheets filed, the file should clearly be marked
indicating the records stored in the file. In case of register,the name and content of the register
should be clearly stated. Some records has to be managed as soft copy.
Whenever a file which contains more than one type of record, it should be indexed to allow easy
retrievability.And further, the name of each record must be prominently marked on the top of the
record to facilitate identification and retrievability.
Control and Updating of Records
The blank formats of quality records (wherever the records are filled in a predestined format)
shall be maintained by the Management Representative as an Exhibit File.
Accessibility
The Quality records should be accessible internally to the internal quality auditors of ISC.
Accessibility should be provided for the purpose of reference purpose only. However, this rule
must not be
applicable for all records. Some records (e.g., service records of different personnel maintained
as part of training records) would have limited accessibility only and should be decided by the
Management Representative as to whom it would be accessible by.

Retention and Disposition of Records
Every record has to be maintained as per the retention period mentioned in the Master List of
Records. Once in a year all the records maintained would be checked and identified old records
would be disposed off, if required. The disposition of records has to be done by means of
shredding, pulping or by such other suitable means. The job of disposition rests with the
personnel responsible for management of the records.



                    5. MANAGEMENT RESPONSIBILITY
5.1) MANAGEMENT COMMITMENT AND CUSTOMER FOCUS

Management commitment
The VSP’s top management has nourished a quality policy, quality objectives and a quality
management system by which our company performs its operations to make sure the customer

   Approved by                     Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 17 of 23
                           VISAKHAPATNAM STEEL                      Section No:1
                                    PLANT
                          (RASHTRIYA ISPAT NIGAM                    Issue/Rev. No :
                          LIMITED),VISAKHAPATNAM                    01/00

satisfaction. The quality policy and efficiency of the quality management system is evaluated at
least annually during Management Review Meetings, where quality measurements are analyzed
against their established objectives and suggestions for improvement of the system are
considered. Quality planning is also conducted during Management Review Meetings to ensure
the continuous availability of the resources necessary to meet the expectations of our customers.

Customer focus
The company’s training focuses on the fact that each employee understands the necessity of
fulfilling requirements of both internal and external customers. The needs and expectations
of customers are processed in such a manner to satisfy customer requirements, in an effort to
gain and retain their confidence. To that end, customer requirements are identified,
reviewed, and translated into work orders under controlled conditions to make it sure that the
necessities are fully understood and met.


5.2) QUALITY POLICY

The quality policies of VSP are:

   •     VSP is committed to be amongst the most admired & trusted Steel Producing Companies
         in India.
   •     VSP shall deliver reliable and quality products and services to all customers at
         competitive costs, with international standards of customer care – thereby creating
         superior value for all stakeholders.
   •     VSP is committed to comply with requirements and continually improve the
         effectiveness of the Quality Management System as per ISO 9001:2008.

The quality policies of VSP are:

.VSP is committed to be amongst the most admired & trusted Steel Producing Company in
India.

   •     VSP shall deliver reliable and quality products and services to all customers at
         competitive costs, with international standards of customer care – thereby creating
         superior value for all stakeholders.

   Approved by                      Issued by:
                             Manager Quality Assurance
Managing Director            Management Representative
Page 18 of 23
                                 VISAKHAPATNAM STEEL                      Section No:1
                                          PLANT
                                (RASHTRIYA ISPAT NIGAM                    Issue/Rev. No :
                                LIMITED),VISAKHAPATNAM                    01/00

        •      VSP is committed to comply with requirements and continually improve the
               effectiveness of the Quality Management System as per ISO 9001:2008.

                                                        Qualit
                                                         y at
                                                         core




                                                                                                 √
 Customer               Continuous                                                           Freedom from
                                          Reliability            Safety       Performance/
satisfaction           improvement                                                               defect
                                                                               Suitability




  5.3) QUALITY PLANNING

  Quality objectives

  The management of VSP establishes annual key initiatives, which include quality objectives.
  which are derived from the Quality Policy. Quality objectives have been established to
  continually improve the quality management system as a whole as well as each management
  process, extending to processes involved with meeting product requirements. Quality objectives
  are measurable, so that they can be analyzed during Management Review to determine the
  degree to which they are met.

  Quality management system planning

  As a routine maintenance of our quality system, several proposed modifications to processes and
  procedures are reviewed during Management Review Meetings to make it sure that the
  requirements of the quality system have been addressed prior to the implementation of any
  modifications. This review ensures that no new process is implemented without first considering
  the actions that must be taken to ensure that the company remains in compliance with the system


       Approved by                          Issued by:
                                     Manager Quality Assurance
  Managing Director                  Management Representative
Page 19 of 23
                            VISAKHAPATNAM STEEL                                          Section No:1
                                     PLANT
                           (RASHTRIYA ISPAT NIGAM                                        Issue/Rev. No :
                           LIMITED),VISAKHAPATNAM                                        01/00

as it is documented. Items evaluated and planned actions are documented in the Management
Review Meetings.



                                      Organization structure (VSP)



                                                          Chairman cum
                                                         Managing Director




                                          Executive Director




                     Human Resource            Sales Manager
  Finance Director                                                  Production Manager      Purchase Manager      Marketing Manager
                         Head




                                                                       Maintenance                    Storage
                                      Inspection Unit Head
                                                                        Supervisor                   Supervisor




5.4) RESPONSIBILITY AND AUTHORITY

The responsibilities and authorities of the key personnels of the Quality System are described
below:

Authorities:

1. All staff are having authority to perform their allocated responsibilities. The following
provides a summary of the principal responsibilities of each job role, and these are clarified in
greater detail within the Operating Procedures.

2. All staff shares the authority and responsibility of identifying non-compliances or possible
improvements, and recording these instances such that corrective action can be taken, both to
rectify the immediate situation and to prevent recurrence.

   Approved by                        Issued by:
                               Manager Quality Assurance
Managing Director              Management Representative
Page 20 of 23
                         VISAKHAPATNAM STEEL                    Section No:1
                                     PLANT
                        (RASHTRIYA ISPAT NIGAM                      Issue/Rev. No :
                       LIMITED),VISAKHAPATNAM                       01/00
3. The Managing Director continually reviews the company's resources to ensure that adequate
staff, equipment and materials are available to satisfy customer requirements.

Responsibilities:

1. Chairman cum Managing Director

   •   Approval of the Quality Management System
   •   Management Review
   •   Supplier & Customer dealing
   •   Contract Management & Control
   •   Training

2. Executive Director

   •   Approval of various processes.
   •   Management & Co-ordination of different departments.
   •   Project Management
   •   Issuing Quality Management System
   •   Planning & organization
   •   Management Representative

3. Purchase Manager

   •   Maintaining the master-list of suppliers
   •   Supplier Selection
   •   Order placing
   •   Purchasing

4. Sales Manager

   •   Contract Review
   •   Quotations
   •   Sales Order Processing
   •   Estimating
   •   Control of Contract Documentation
   Approved by                    Issued by:
                           Manager Quality Assurance
Managing Director          Management Representative
Page 21 of 23
                           VISAKHAPATNAM STEEL                  Section No:1
                                    PLANT
                          (RASHTRIYA ISPAT NIGAM                Issue/Rev. No :
                          LIMITED),VISAKHAPATNAM                01/00


5. Human Resource Head

   •   Resource Management
   •   Competence, Training and Awareness
   •   Talent Acquisition
   •   Recruitment
   •   Retention
   •   Retirement

6. Production Manager

   •   Definition of Installation, Inspection, Test & Maintenance Requirements

   •   Planning & Performance of Installation, Technical Assistance
   •   Repairs, Testing and Maintenance Activities
   •   Control of Equipment and Materials Allocated

7. Finance Director

   •   Control of Finance, Accounts and Warehouse Operations
   •   Training
   •   Approving Sales and Purchasing

8. Marketing Manager

   •   Creating, maintaining and satisfying the customers
   •   Increasing the profit
   •   Analysis of customer demand
   •   Analysis of product features
   •   Advertising the product and company

9. Storage Supervisor

   •   Control of Stock

   Approved by                     Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 22 of 23
                          VISAKHAPATNAM STEEL                     Section No:1
                                   PLANT
                         (RASHTRIYA ISPAT NIGAM                   Issue/Rev. No :
                         LIMITED),VISAKHAPATNAM                   01/00
     •   Replenishment Recommendation




     •   Protection and Preservation of Stock
     •   Packaging and Dispatch

10. Inspection Unit Head

     •   Control of measuring equipments
     •   Control of conformed and non-conformed products
     •   Communicate with Sales and Manufacturing Departments

11. Maintenance Supervisor
     •   Control of maintenance materials.
     •   Communicate with Production and Inspection unit
     •   Control of machines

5.5) MANAGEMENT REPRESENTATIVE

The Managing Director has been appointed Management Representative. His responsibilities as
Management Representative include:

1.   To recognize the processes required for the efficient implementation of a QMS in line with
     ISO 9001: 2008.

2.   To ensure that these processes are established, implemented and maintained in a manner such
     that a QMS in line with ISO 9001: 2008 is effectively operative and the laid down policies
     and objectives of the organisation are met.

3.   Convening the Management Review Meetings.

4.   To encourage the importance of customer requirements throughout the organisation.




     Approved by                   Issued by:
                            Manager Quality Assurance
Managing Director           Management Representative
Page 23 of 23
                        VISAKHAPATNAM STEEL                         Section No:1
                                   PLANT
                       (RASHTRIYA ISPAT NIGAM                    Issue/Rev. No :
                       LIMITED),VISAKHAPATNAM                    01/00
5. To plan and conduct internal quality audits to verify the adequacy of and compliance to the
   system and interacting with the individuals, on NCRs found during audits, for review and
   system improvement.

6.   To ensure clarification of all issues related to the adopted quality management system.

7.   Liaising with audit and other external agencies on matters related to quality management
     system.

The Management Representative is responsible for the identification and recording of problems
related to the quality system, initiating actions to prevent occurrence of such non-conformance
and providing solutions for corrections of the existing ones. The management review system has
been designed to support the MR for carrying out the aforementioned activities effectively.

5.6) INTERNAL COMMUNICATION

VSP ensures smooth flow communication between its various levels and functions regarding the
processes of the quality engineering & management system through:
a. Top Management Meeting
b. Zonal Level Meeting
c. Circle Level Meeting
d. Internal notes/circulars.
e. Telephonic communication.
f. Fax and Carrier messages.
g. Personal communication.
h.Internet communication

5.7) MANAGEMENT REVIEW

The objective of this procedure is to introduce a structured method of reviewing the quality
system so as to ensure that
•    The system has been implemented and is effective in satisfying the stated quality policy and
     objectives.
•    The system continues to be suitable towards meeting the requirements of ISO 9001: 2008.
•    Corrective and preventive actions are being taken for continual improvement of the system.

     Approved by                    Issued by:
                             Manager Quality Assurance
Managing Director            Management Representative
Page 24 of 23
                      VISAKHAPATNAM STEEL                 Section No:1
                               PLANT
                     (RASHTRIYA ISPAT NIGAM               Issue/Rev. No :
                     LIMITED),VISAKHAPATNAM               01/00




Management Review Committee-
A committee called the Management Review Committee (MRC) has been formed. The members
of MRC are as follows:

             •   Managing Director
             •   Finance Director
             •   Head - Human Resources
             •   Sales Director
             •   Production Manager
             •   Marketing Manager




  Approved by                  Issued by:
                        Manager Quality Assurance
Managing Director       Management Representative

Más contenido relacionado

Más de Ankit Katiyar

Scatter diagrams and correlation and simple linear regresssion
Scatter diagrams and correlation and simple linear regresssionScatter diagrams and correlation and simple linear regresssion
Scatter diagrams and correlation and simple linear regresssionAnkit Katiyar
 
Probability mass functions and probability density functions
Probability mass functions and probability density functionsProbability mass functions and probability density functions
Probability mass functions and probability density functionsAnkit Katiyar
 
Introduction to basic statistics
Introduction to basic statisticsIntroduction to basic statistics
Introduction to basic statisticsAnkit Katiyar
 
Conceptual foundations statistics and probability
Conceptual foundations   statistics and probabilityConceptual foundations   statistics and probability
Conceptual foundations statistics and probabilityAnkit Katiyar
 
Applied statistics and probability for engineers solution montgomery && runger
Applied statistics and probability for engineers solution   montgomery && rungerApplied statistics and probability for engineers solution   montgomery && runger
Applied statistics and probability for engineers solution montgomery && rungerAnkit Katiyar
 
A hand kano-model-boston_upa_may-12-2004
A hand kano-model-boston_upa_may-12-2004A hand kano-model-boston_upa_may-12-2004
A hand kano-model-boston_upa_may-12-2004Ankit Katiyar
 
08.slauson.dissertation
08.slauson.dissertation08.slauson.dissertation
08.slauson.dissertationAnkit Katiyar
 
Understanding drawing histograms
Understanding drawing histogramsUnderstanding drawing histograms
Understanding drawing histogramsAnkit Katiyar
 

Más de Ankit Katiyar (20)

Scatter diagrams and correlation and simple linear regresssion
Scatter diagrams and correlation and simple linear regresssionScatter diagrams and correlation and simple linear regresssion
Scatter diagrams and correlation and simple linear regresssion
 
Queueing 3
Queueing 3Queueing 3
Queueing 3
 
Queueing 2
Queueing 2Queueing 2
Queueing 2
 
Queueing
QueueingQueueing
Queueing
 
Probability mass functions and probability density functions
Probability mass functions and probability density functionsProbability mass functions and probability density functions
Probability mass functions and probability density functions
 
Lesson2
Lesson2Lesson2
Lesson2
 
Lecture18
Lecture18Lecture18
Lecture18
 
Lect17
Lect17Lect17
Lect17
 
Lect 02
Lect 02Lect 02
Lect 02
 
Kano
KanoKano
Kano
 
Introduction to basic statistics
Introduction to basic statisticsIntroduction to basic statistics
Introduction to basic statistics
 
Conceptual foundations statistics and probability
Conceptual foundations   statistics and probabilityConceptual foundations   statistics and probability
Conceptual foundations statistics and probability
 
B.lect1
B.lect1B.lect1
B.lect1
 
Axioms
AxiomsAxioms
Axioms
 
Applied statistics and probability for engineers solution montgomery && runger
Applied statistics and probability for engineers solution   montgomery && rungerApplied statistics and probability for engineers solution   montgomery && runger
Applied statistics and probability for engineers solution montgomery && runger
 
A hand kano-model-boston_upa_may-12-2004
A hand kano-model-boston_upa_may-12-2004A hand kano-model-boston_upa_may-12-2004
A hand kano-model-boston_upa_may-12-2004
 
08.slauson.dissertation
08.slauson.dissertation08.slauson.dissertation
08.slauson.dissertation
 
Kano
KanoKano
Kano
 
Understanding drawing histograms
Understanding drawing histogramsUnderstanding drawing histograms
Understanding drawing histograms
 
Ronny steel plant
Ronny steel plantRonny steel plant
Ronny steel plant
 

Quality manual of vsp madhur & sunny

  • 1. Page 1 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 VISAKHAPATNAM STEEL PLANT (VSP) (RASHTRIYA ISPAT NIGAM LIMITED) QUALITY MANUAL Submitted by Sunny Gupta (QR1101) Madhur Rawat (QR1105) Indian Statistical Institute, Kolkata Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 2. Page 2 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 1. GENERAL The basic objective of this documentation is to provide a brief information regarding company commitments towards its quality management system specifying requirements as per international standards. To achieve this, our company-- a) demonstrates its abilities to consistently provide products that meet customer and application statutory and regulatory requirements ,and b) is committed to enhance customer satisfaction through the effective application of the system, including processes for continual improvement of the system and the assurance of conformity to customer and applicable statutory and regulatory requirements. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 3. Page 3 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 1.1) COMPANY”S NAME VISAKHAPATNAM STEEL PLANT (RASHTRIYA ISPAT NIGAM LIMITED),VISAKHAPATNAM ADDRESS VISAKHAPATNAM STEEL PLANT (VSP) Dr. V. Phaneendrudu Dy. General Manager Email : drphani@vizagsteel.com Website: www.vizagsteel.com Tel: +91 - 891 - 2515854 (Off) +91 - 891 - 2518017 (Fax) Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 4. Page 4 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 1.2) INTRODUCTION With a view to give impetus to the industrial growth and to meet the inspiration of the people from the south India, government of India decided to establish a integrated steel plant in public sector at Visakhapatnam (Andhra Pradesh). Seeds were thus sown for the construction of the modern sophisticated steel plant having annual capacity of 3.4 million tonnes of hot metal. In February 1981 the contract was signed with USSR(now Russia) for preparation of working drawings for Coke Ovens, Blast Furnace and Sinter Plant. The blast furnace foundation was laid with first mass concreting in the project in January 1982. The construction of township also started. It has the deepest port and is one of the principal outlets for country's exporting Iron ore. Vizag Steel Plant is the only Indian shore-based steel plant, and it has massive land, up to 19,000 acres (7,700 ha), and is poised to become up to 20 MT in a single campus. Since VSP is accredited with ISO 9001:2000 Quality Management System Standard, all saleable products of Visakhapatnam Steel Plant come under the ISO umbrella. At VSP IS0:14001 has been awarded for Environment Management System in the Plant. It is the only integrated steel plant in the country to be certified for ISO 9001:2000, ISO 14001:2004 and OSHAS 18001:1999 Location: The plant is located in Visakhapatnam City, which is on the coast of Bay of Bengal. Visakhapatnam city is an important commercial center of Andhra Pradesh. PRODUCTS: 1) Wire rods (TMT, Plain & Ribbed) 2) Merchant Products (Angles, Channels, Round & TMT bars) 3) Beam, Billets, Bloooms 4) Reinforce bars 5) Plates (up to 3600 mm wide) Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 5. Page 5 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Turnover: The total turn over of this company is reported at last fiscal year (2010-11) around Rs 11,500 Crores . Manpower: The total manpower of VSP is about 17000 strong trained personnel. Future Plan: VSP is committed to harness its growth potential at its best and sustain profitable growth and to deliver high quality and cost competitive products and be the first choice of customers. To create an inspiring work environment to unleash the creative energy of people and to achieve excellence in enterprise management. To be respected corporate citizen, ensure clean and green environment and develop vibrant communities around us. In line with the vision in National Steel Policy envisaging 124 MT steel by 2019-20, Vizag Steel is also planning to expand it’s capacity from 3.6 MT to 6.3 MT. After considering the buoyancy in domestic steel market for long products, which is the product mix of VSP and the high acceptance of VSP’s brand image in the market, an expansion plan has been proposed. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 6. Page 6 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 1.3) TABLE OF CONTENTS Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 7. Page 7 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 1.4) Section No. Description ISO 9001 Clause 1 GENERAL --- 1.1 Company’s Name and Address --- 1.2 Introduction --- 1.3 Table of Contents --- 1.4 Manual Distribution 4.2.3 1.5 Definitions and Abbreviation 2, 3 2 SCOPE & EXCLUSIONS 1.2 3 PROCESS MANAGEMENT APPROACH 4.1 4 QUALITY MANAGEMENT SYSTEM 4 4.1 Documentation Structure 4.2.1, 4.2.2 4.2 Control of Documents 4.2.3 4.3 Control of Records 4.2.4 5 MANAGEMENT RESPONSIBILITY 5 5.2 Quality Policy 5.3 5.3 Quality Planning 5.4 5.4 Responsibility and Authority 5.5.1 5.5 Management Representative 5.5.2 5.6 Internal Communication 5.5.3 5.7 Management Review 5.6 6 RESOURCE MANAGEMENT 6 6.1 Competence, Awareness and Training 6.2 6.2 Infrastructure and Work Environment 6.3, 6.4 7 PRODUCT/SERVICE REALISATION 7 7.1 Planning of Service Realization 7.1 7.2 Determination and Review of Requirements Related to Service 7.2.1, 7.2.2 7.3 Shareholder/ Investor Feedback and Complaints 7.2.3 7.4 Design and Development 7.3 7.5 Purchasing 7.4 7.6 Control of Production and Service Provision 7.5.1 7.7 Validation of Production/Service Process 7.5.2 7.8 Identification and Traceability 7.5.3 7.9 Preservation of Product 7.5.5 7.10 Control of Monitoring and Measuring Devices 7.6 8 MEASUREMENT, ANALYSIS AND IMPROVEMENT 8 8.1 Customer satisfaction 8.2.1 8.2 Internal Quality Audit 8.2.2 8.3 Monitoring and Measuring of Processes and Product. 8.2.3, 8.2.4 8.4 Control of Nonconforming Product/Service 8.3 8.5 Analysis of Data 8.4 8.6 Continual Improvement 8.5.1 8.7 Corrective Action 8.5.2 8.8 Preventive Action 8.5.3 Annexure-1 PDF AND Process Map --- Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 8. Page 8 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 MANUAL DISTRUBUTION Soft copy through Local area network shall be provided to following personnel: Sl. No. Copy Copy Holder 1. Hard copy Chairman cum Managing Director 2. Hard copy Auditor 3. Master copy Management Representative (MR) 4. Departmental copy HOD of individual departments Finance Director, Head - Human Resources, Sales Manager, Production Manager, Marketing Manager, Purchase Manager NOTE: Furthermore, the Management Representative (MR) may issue uncontrolled copies to any other person after obtaining prior permission of the Managing Director. The master copy (Hard Copy) shall be held by the MR and shall not have any copy number. This copy shall bear original signatures, and shall be printed on sheets bearing the company logo. 1.5) DEFINITION Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 9. Page 9 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Controller of Document : Management Representative, who will be responsible for controlling and issuing a particular document. Customer : Who take a service or use the product produce from company. Customer Process : A process that receives inputs in the form of materials or information from another process is called the customer of the supplying process. Direct Process for Service : A process which is directly involved in the Realization delivery of specific service to Customers is called a direct process. Document : A document is an entity within the Quality Management System that needs to be maintained at a known revision status. Internal Quality Auditor : Person within the company, who is having the Competence to conduct internal quality audit of the developed QMS. Internal Customers : An internal department, which receives materials/Services from another department is called internal Customer of the supplying department. Process : A process consists of an activity or a set of interrelated activities, intended to transform one or more inputs at least one of which represent customer requirements into one or Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 10. Page 10 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 more outputs that represents solutions from internal or external customer’s point of view. Supplier Process : A process that supplies inputs to another process in the form of materials or information is called the supplier of the receiving process. For all other quality related terms, definitions listed in ISO 9000: 2005 are applicable. Abbreviation SL Explanation No. 1. QMS Quality Manual system 2. QP Quality Process 3. PO Process Map 4. MR Management Representative 5. ISO International organization of standard 6. VSP Visakhapatnam Steel Plant 7. OC Organization Chart 8. CRM Customer Relationship Management 9. R&D Research and Development 10. TS Technical specification 11. PFD Process flow diagram Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 11. Page 11 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 2. SCOPE Apart from steel production,VSP is also engaged in production of other byproducts such as Tar, Pitch, Chemicals like Benzoyl (and its product), Ammonium Sulphate, Methanol, Ethanol etc. The scope of this quality management system restricted to production and distribution of desired specific quality steel products. EXCLUSIONS The Research & Development of organization is based on only verification and validation of products produced at different stages of different process to get the specific required properties rather than design Hence, the requirements of design and development planning (clauses 7.3.1 of ISO 9001: 2008) is, consequently, not applicable and have been excluded from the scope of the Quality Management System. 3. PROCESS MANAGEMENT APPROACH 1. The scope of this quality system includes: • Systematic approach for providing service to the Shareholders/Investors at the same time ensuring compliance with the regulatory requirements framed under different statutes from time to time. • Systematic approach for collection and compilation of data obtained through various routes like internal quality audit process and process measurement system; Shareholder satisfaction measures and Shareholder/Investor complaints and consequent planning for improvements. The process of measuring shareholder satisfaction includes obtaining feedback from the Shareholders/Investors. • To identify and provision of resources in terms of adequately skilled manpower, infrastructure and work environment. • To manage activities including designing the organisational structure; defining the responsibilities and authorities; communicating the goals and procedures to concerned functions and defining as well as reviewing quality policy and objectives. • Supporting activities like control of documents and control of records. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 12. Page 12 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 The major processes required for effective implementation of this quality management system have been identified. These processes have been divided into four major categories, viz. • Direct processes for Product Realisation, • Support processes for identification and provision of resources, • Measurement processes and • Management processes. These four categories have been identified keeping in view the four major categories identified by ISO 9001: 2008, namely, management activities, provision of resources, product realisation/service provision and measurement. The major processes in VSP are: Purchase Storage Production Inspection Maintenance Marketing Sales Training and Awareness Major Process Associated with the Production of final Steel /Stainless Steel Products are- Metallurgical Coke Making Sintering Iron Making Steel Making Continuous Casting Rolling Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 13. Page 13 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Direct Process: Iron Making, BOF, Argon Rinsing, AOD/VOD, Degassing Indirect Process: Making Metallurgical coke, Procurement, Mineral dressing, Maintenance of Machines. Management Process: Training & Recruitment, Marketing & Sales, Internal Audit, Finance The process maps of the above processes are available in Annexure-1. 4. QUALITY MANAGEMENT SYSTEM 4.1) DOCUMENTATION STRUCTURE This manual contains documented statements of our quality policy and quality objectives and references documented procedures required by ISO 9001:2008 and other documents needed to ensure effective planning, operation and control of our key QMS processes. The level and type of QMS documentation established for our business is continually reviewed to ensure it remains appropriate for the complexity and interaction of our processes and the competence of our employees. QMS documents and data may be in hard copy or electronic media. QMS documentation includes this quality manual, process maps and other internal and external documents and data needed to manage, perform or verify work affecting product quality. We also issue and control work instructions, job descriptions, and other internal and external documents and data as appropriate and needed to effectively manage our QMS. The quality manual is that part of our QMS that defines the scope of our QMS and documents the policy, procedures and processes needed to implement our quality policy and achieve our quality objectives. This manual also documents justifications for exclusions from ISO 9001:2008 requirements and defines the overall sequence of and interaction between our key QMS processes. Revision / Issue Numbering To start with every document shall have issue number one and revision number zero. Whenever the contents of a page are modified, the revision number shall be incremented by one. When several documents (or sections) of same category have different revision numbers, issue number of all these documents shall be incremented by one and the revision number of all the entire set shall be set to zero. The MR shall have the authority to decide about bringing out a new issue. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 14. Page 14 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Format of Document All pages of the internal document shall bear the issue number and revision number, signatures of the controlling as well as approving authority and a “CONTROLLED COPY” stamp. The pages shall be numbered as page x of n where n is the total number of pages in the relevant section and x is the page serial number. 4.2) CONTROL OF DOCUMENTS This procedure aims at ensuring that all documents and data, including the ones of external origin are identified and controlled. Control shall include • Ensuring that all documents and data are reviewed and approved properly, and pertinent copies of appropriate documents should be made available at all points of usage. • The formulation of a system for withdrawal or identification of obsolete documents to prevent unintentional usages. Identification of all Documents The Master list of all documents should be maintained by MR. The master list should indicate the name of the document, controller, approving authority and revision status. Master Copy of Documents A master copy has to be maintained for every internal document. The master copy should bear original signatures of the controller and approving authority of the document. The previous/obsolete master copies should be destroyed or can be stamped “OBSOLETE”. For each external document the copy maintained by the respective controller shall be treated as master copy. Review and Approval of Documents The Quality Manual should be reviewed and approved before being issued. Unless specified otherwise, reviewer and approving authority of a document should be the same. The part Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 15. Page 15 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 specified as "Approved By" in the documents identifies the approving authority.Whatever be the change in the document should be incorporated on the master copy and the old copy (or appropriate pages of the old copy) should be stamped “OBSOLETE” or should be destroyed. The modified documents shall also be reviewed and approved before issue. For the external documents the copy received shall be treated as approved copy. Identification of Revision / Status of Amendment An amendment sheet must be maintained with every internal document, including the master copy. Whenever a change is made, the reason and nature of change must be recorded in the amendment sheet. At the time of issue, the controller should include updated amendment sheet in every copy circulated ensuring maintenance of the revision history. The date of receipt shall be maintained for external documents to indicate the latest revision status. 4.3) CONTROL OF RECORDS Master List A master list of all records has to be be prepared and maintained by the Management Representative. This list should identify each record, revision status of record format, the originating document, the form of maintenance and the retention period. The form of maintenance shall specify whether the record will be maintained as loose sheets filed, bound registers or as computer files. All records must be maintained for the retention period specified and may be dispositional upon the end of this period at the discretion of the MR. The retention period should take care of legal requirements, if legal process demands. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 16. Page 16 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Filing, Storage and Maintenance Whatever records which are maintained as loose sheets filed, the file should clearly be marked indicating the records stored in the file. In case of register,the name and content of the register should be clearly stated. Some records has to be managed as soft copy. Whenever a file which contains more than one type of record, it should be indexed to allow easy retrievability.And further, the name of each record must be prominently marked on the top of the record to facilitate identification and retrievability. Control and Updating of Records The blank formats of quality records (wherever the records are filled in a predestined format) shall be maintained by the Management Representative as an Exhibit File. Accessibility The Quality records should be accessible internally to the internal quality auditors of ISC. Accessibility should be provided for the purpose of reference purpose only. However, this rule must not be applicable for all records. Some records (e.g., service records of different personnel maintained as part of training records) would have limited accessibility only and should be decided by the Management Representative as to whom it would be accessible by. Retention and Disposition of Records Every record has to be maintained as per the retention period mentioned in the Master List of Records. Once in a year all the records maintained would be checked and identified old records would be disposed off, if required. The disposition of records has to be done by means of shredding, pulping or by such other suitable means. The job of disposition rests with the personnel responsible for management of the records. 5. MANAGEMENT RESPONSIBILITY 5.1) MANAGEMENT COMMITMENT AND CUSTOMER FOCUS Management commitment The VSP’s top management has nourished a quality policy, quality objectives and a quality management system by which our company performs its operations to make sure the customer Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 17. Page 17 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 satisfaction. The quality policy and efficiency of the quality management system is evaluated at least annually during Management Review Meetings, where quality measurements are analyzed against their established objectives and suggestions for improvement of the system are considered. Quality planning is also conducted during Management Review Meetings to ensure the continuous availability of the resources necessary to meet the expectations of our customers. Customer focus The company’s training focuses on the fact that each employee understands the necessity of fulfilling requirements of both internal and external customers. The needs and expectations of customers are processed in such a manner to satisfy customer requirements, in an effort to gain and retain their confidence. To that end, customer requirements are identified, reviewed, and translated into work orders under controlled conditions to make it sure that the necessities are fully understood and met. 5.2) QUALITY POLICY The quality policies of VSP are: • VSP is committed to be amongst the most admired & trusted Steel Producing Companies in India. • VSP shall deliver reliable and quality products and services to all customers at competitive costs, with international standards of customer care – thereby creating superior value for all stakeholders. • VSP is committed to comply with requirements and continually improve the effectiveness of the Quality Management System as per ISO 9001:2008. The quality policies of VSP are: .VSP is committed to be amongst the most admired & trusted Steel Producing Company in India. • VSP shall deliver reliable and quality products and services to all customers at competitive costs, with international standards of customer care – thereby creating superior value for all stakeholders. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 18. Page 18 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 • VSP is committed to comply with requirements and continually improve the effectiveness of the Quality Management System as per ISO 9001:2008. Qualit y at core √ Customer Continuous Freedom from Reliability Safety Performance/ satisfaction improvement defect Suitability 5.3) QUALITY PLANNING Quality objectives The management of VSP establishes annual key initiatives, which include quality objectives. which are derived from the Quality Policy. Quality objectives have been established to continually improve the quality management system as a whole as well as each management process, extending to processes involved with meeting product requirements. Quality objectives are measurable, so that they can be analyzed during Management Review to determine the degree to which they are met. Quality management system planning As a routine maintenance of our quality system, several proposed modifications to processes and procedures are reviewed during Management Review Meetings to make it sure that the requirements of the quality system have been addressed prior to the implementation of any modifications. This review ensures that no new process is implemented without first considering the actions that must be taken to ensure that the company remains in compliance with the system Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 19. Page 19 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 as it is documented. Items evaluated and planned actions are documented in the Management Review Meetings. Organization structure (VSP) Chairman cum Managing Director Executive Director Human Resource Sales Manager Finance Director Production Manager Purchase Manager Marketing Manager Head Maintenance Storage Inspection Unit Head Supervisor Supervisor 5.4) RESPONSIBILITY AND AUTHORITY The responsibilities and authorities of the key personnels of the Quality System are described below: Authorities: 1. All staff are having authority to perform their allocated responsibilities. The following provides a summary of the principal responsibilities of each job role, and these are clarified in greater detail within the Operating Procedures. 2. All staff shares the authority and responsibility of identifying non-compliances or possible improvements, and recording these instances such that corrective action can be taken, both to rectify the immediate situation and to prevent recurrence. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 20. Page 20 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 3. The Managing Director continually reviews the company's resources to ensure that adequate staff, equipment and materials are available to satisfy customer requirements. Responsibilities: 1. Chairman cum Managing Director • Approval of the Quality Management System • Management Review • Supplier & Customer dealing • Contract Management & Control • Training 2. Executive Director • Approval of various processes. • Management & Co-ordination of different departments. • Project Management • Issuing Quality Management System • Planning & organization • Management Representative 3. Purchase Manager • Maintaining the master-list of suppliers • Supplier Selection • Order placing • Purchasing 4. Sales Manager • Contract Review • Quotations • Sales Order Processing • Estimating • Control of Contract Documentation Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 21. Page 21 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 5. Human Resource Head • Resource Management • Competence, Training and Awareness • Talent Acquisition • Recruitment • Retention • Retirement 6. Production Manager • Definition of Installation, Inspection, Test & Maintenance Requirements • Planning & Performance of Installation, Technical Assistance • Repairs, Testing and Maintenance Activities • Control of Equipment and Materials Allocated 7. Finance Director • Control of Finance, Accounts and Warehouse Operations • Training • Approving Sales and Purchasing 8. Marketing Manager • Creating, maintaining and satisfying the customers • Increasing the profit • Analysis of customer demand • Analysis of product features • Advertising the product and company 9. Storage Supervisor • Control of Stock Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 22. Page 22 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 • Replenishment Recommendation • Protection and Preservation of Stock • Packaging and Dispatch 10. Inspection Unit Head • Control of measuring equipments • Control of conformed and non-conformed products • Communicate with Sales and Manufacturing Departments 11. Maintenance Supervisor • Control of maintenance materials. • Communicate with Production and Inspection unit • Control of machines 5.5) MANAGEMENT REPRESENTATIVE The Managing Director has been appointed Management Representative. His responsibilities as Management Representative include: 1. To recognize the processes required for the efficient implementation of a QMS in line with ISO 9001: 2008. 2. To ensure that these processes are established, implemented and maintained in a manner such that a QMS in line with ISO 9001: 2008 is effectively operative and the laid down policies and objectives of the organisation are met. 3. Convening the Management Review Meetings. 4. To encourage the importance of customer requirements throughout the organisation. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 23. Page 23 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 5. To plan and conduct internal quality audits to verify the adequacy of and compliance to the system and interacting with the individuals, on NCRs found during audits, for review and system improvement. 6. To ensure clarification of all issues related to the adopted quality management system. 7. Liaising with audit and other external agencies on matters related to quality management system. The Management Representative is responsible for the identification and recording of problems related to the quality system, initiating actions to prevent occurrence of such non-conformance and providing solutions for corrections of the existing ones. The management review system has been designed to support the MR for carrying out the aforementioned activities effectively. 5.6) INTERNAL COMMUNICATION VSP ensures smooth flow communication between its various levels and functions regarding the processes of the quality engineering & management system through: a. Top Management Meeting b. Zonal Level Meeting c. Circle Level Meeting d. Internal notes/circulars. e. Telephonic communication. f. Fax and Carrier messages. g. Personal communication. h.Internet communication 5.7) MANAGEMENT REVIEW The objective of this procedure is to introduce a structured method of reviewing the quality system so as to ensure that • The system has been implemented and is effective in satisfying the stated quality policy and objectives. • The system continues to be suitable towards meeting the requirements of ISO 9001: 2008. • Corrective and preventive actions are being taken for continual improvement of the system. Approved by Issued by: Manager Quality Assurance Managing Director Management Representative
  • 24. Page 24 of 23 VISAKHAPATNAM STEEL Section No:1 PLANT (RASHTRIYA ISPAT NIGAM Issue/Rev. No : LIMITED),VISAKHAPATNAM 01/00 Management Review Committee- A committee called the Management Review Committee (MRC) has been formed. The members of MRC are as follows: • Managing Director • Finance Director • Head - Human Resources • Sales Director • Production Manager • Marketing Manager Approved by Issued by: Manager Quality Assurance Managing Director Management Representative