Efficient Reliability Demonstration Tests
快速可靠性验证试验
Guangbin Yang (杨广斌), Ph.D.
Ford Motor Company, Dearborn, Michigan, U.S.A.
Email: gbyang@ieee.org
4
Overview
1. Introduction
2. Sample sizes for bogey tests (zero-failure tests)
3. Principles of test time reduction
4. Test cost modeling
5. Risk of early termination of the test
6. Optimal test plans
7. Procedures of test time reduction
8. Application example
9. Summary and conclusions
5
Bogey Testing (Zero-Failure Test)
 Bogey test is widely used in industry to
demonstrate, at a high confidence, that a product
achieves a specified reliability.
 This test method requires a sample of
predetermined size to be tested for a specified
length of time.
 The required reliability is demonstrated if no
failures occur in the testing.
 So a bogey test is sometimes called the zero-
failure test.
6
Motivation
 A bogey test requires a large sample size and
excessive test time.
 For example, to demonstrate that a product has
95% reliability at 1 million cycles with 95%
confidence, a bogey test requires 59 samples, each
tested for 1 million cycles.
 In the current competitive business environment,
the sample size and test time must be reduced.
7
Sample Size for Conventional Binomial
Bogey Testing
 In some applications, life distribution is unknown.
 To demonstrate at a 100(1–)% confidence that a
product achieves the reliability R0 at time t0, a
sample of size n1 is drawn from a population,
where
 Each of the n1 units is tested for t0. If zero failures
occur during testing, the reliability is demonstrated.
)ln(
)ln(
0
1
R
n


8
Sample Size for Conventional Lognormal
Bogey Testing
 In some situations, the life of products can be
reasonably modeled by lognormal distribution.
 The minimum sample size to demonstrate the
reliability requirement is
where  is called the bogey ratio, which is the ratio
of actual test time to t0.
 The equation indicates that the sample size can be
reduced by increasing the test time.
)]}1(/)ln([ln{
)ln(
0
12
R
n

 


9
Sample Sizes for Different Values of
Required Reliability and Bogey Ratio
0
10
20
30
40
50
60
70
80
90
0.8 0.85 0.9 0.95 1
bogey ratio=1.5
bogey ratio=2
bogey ratio=2.5
bogey ratio=3
Reliability
n2
10
Principles of Test Time Reduction
 For some products, a failure is said to have
occurred when a performance characteristic
exceeds its threshold.
 For these products, it is possible to measure the
performance characteristic during testing.
 The degradation measurements can be used to
reduce the test time.
11
Principles of Test Time Reduction (Conted)
y
G
t0tm t
12
Principles of Test Time Reduction (Conted)
y
G
ttm t0
13
Principles of Test Time Reduction (Conted)
y
G
t0tm t
14
Sample Size for Reduced Test Time
 When the test time is reduced, the type II error is
increased by c.
 The minimum sample size for the lognormal
distribution is
where  = c /.
)]}1(/)ln([ln{
)1ln()ln(
0
13
R
n


 


15
Test Cost Modeling
 The cost of a bogey test consists of
 the cost of conducting the test,
 the cost of samples, and
 the cost of measurements.
 Cost model
)(
)]}1(/)ln([ln{
)1ln()ln(
),( 32
0
101 mcc
R
tcTC 


 



16
Consumer’s Risk Due to Early Termination
 For a test unit that has y0<G, terminating test
earlier increases the consumer’s risk.
y
G
t0tm t
F(t0)
17
Producer’s Risk Due to Early Termination
 For a test unit that has y0>G, terminating test
earlier increases the producer’s risk.
y
G
ttm t0
F(t0)
18
Risk Formulation
 For a linear or transformed linear degradation
model, the risk can be formulated as
where T has the student-t distribution with m-2
degrees of freedom.





















)1(
)2(31
1ˆ
ˆ
Pr)(
22
2
0
0
mm
mm
m
yG
TtF



19
Optimal Test Plans
 The test plans are characterized by  and .
 The values of  and  are optimized by
minimizing the total cost TC(, ), while the
following constraints are satisfied:
(1) The risk associated with early termination of a test
must not exceed c/n3.
(2) The sample size must not be greater than the number
of available test units.
 The optimization model can be calculated using
Excel Solver.
20
Procedures of Test Time Reduction
 During testing, each unit is inspected periodically
to measure y. When there are three measurements,
a degradation model is fitted to the data, and the
estimates of the model parameters and the risk
F(t0) are calculated.
 Then we make one of the following decisions
based on the estimates.
21
Test Termination Rules
(1) If , then terminate the test of the unit.
This test unit passes the bogey test.
(2) If , where  is the specified type I error,
then terminate the test of the unit. This test unit fails
to pass the bogey test.
(3) If , continue the test until
decision rule (1) or (2) is met, or until t0 is reached,
whichever occurs sooner.
30 /)(ˆ ntF 
30 /1)(ˆ ntF 
303 /1)(ˆ/ ntFn  
22
Application Example
 Problem statement
A part is required to have a reliability of 95% at a
design life of 1.5105 cycles under the 95th
percentile of the customer usage profile. The part
fails due to its stiffness degradation; a failure is
said to have occurred when the stiffness degrades
to 20% of the initial value. We want to demonstrate
the reliability at a 95% confidence level.
23
Test Plans
 The calculation of optimization model for the test
plan gives  = 0.3147, and  = 0.631.
 Then the test plan is to test 39 samples and the
expected test time is 1.325105 cycles.
 In contrast, the conventional bogey test requires
testing 59 samples for each 1.5105 cycles, or 39
units each for 2.1105 cycles.
24
Decision Rules
 The decision rules for terminating the test of a
part are as follows.
(1) If , then terminate the test of the
unit. This test unit passes the bogey test.
(2) If , then terminate the test of the unit.
This test unit fails to pass the bogey test.
(3) If , continue the test of the
unit until decision rule (1) or (2) is met, or until
2.1105 cycles is reached, whichever occurs first.
3
0 10403.0)(ˆ 
tF
9987.0)(ˆ
0 tF
9987.0)(ˆ10403.0 0
3
 
tF
25
Summary and Conclusions
 The conventional binomial bogey test requires a
large sample size and excessive test time.
 If the life is known to be lognormal, the bogey
test sample size can be reduced by extending the
test time.
 For products subject to degradation failure, the
test time can be reduced substantially by using the
degradation measurements.
26
Additional Readings
 G. Yang, “Reliability Demonstration Through
Degradation Bogey Testing,” IEEE Transactions
on Reliability, vol. 58, no. 4, December 2009.
 G. Yang, “Optimum Degradation Tests for
Comparison of Products,” IEEE Transactions on
Reliability, vol. 61, no. 1, March 2012.
 G. Yang, Life Cycle Reliability Engineering,
Wiley, 2007. (Chapter 9)

Más contenido relacionado

La actualidad más candente

Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYSMaha Hassan
 
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...Karthikeyan Kannappan
 
Implimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDMImplimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDMkiranhg
 
Accelerated life testing
Accelerated life testingAccelerated life testing
Accelerated life testingSteven Li
 
DOE Full factorial
DOE Full factorialDOE Full factorial
DOE Full factorialMonty Webb
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari Studies
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari StudiesJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari Studies
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari StudiesJ. García - Verdugo
 
Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Sazedul Ekab
 
Leverage reinforced plastics durability prediction, from calibration to post-...
Leverage reinforced plastics durability prediction, from calibration to post-...Leverage reinforced plastics durability prediction, from calibration to post-...
Leverage reinforced plastics durability prediction, from calibration to post-...eXDigimat
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size J. García - Verdugo
 
Application of Taguchi Method to Reduce Rust
Application of Taguchi Method to Reduce RustApplication of Taguchi Method to Reduce Rust
Application of Taguchi Method to Reduce RustRiona Ihsan Media
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...J. García - Verdugo
 

La actualidad más candente (14)

Buckling Analysis in ANSYS
Buckling Analysis in ANSYSBuckling Analysis in ANSYS
Buckling Analysis in ANSYS
 
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...
Application of Design of Experiments (DOE) using Dr.Taguchi -Orthogonal Array...
 
Time Truncated Chain Sampling Plans for Inverse Rayleigh Distribution
Time Truncated Chain Sampling Plans for Inverse Rayleigh  Distribution Time Truncated Chain Sampling Plans for Inverse Rayleigh  Distribution
Time Truncated Chain Sampling Plans for Inverse Rayleigh Distribution
 
Implimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDMImplimentation of Taguchi method on CNC EDM and CNC WEDM
Implimentation of Taguchi method on CNC EDM and CNC WEDM
 
Accelerated life testing
Accelerated life testingAccelerated life testing
Accelerated life testing
 
DOE Full factorial
DOE Full factorialDOE Full factorial
DOE Full factorial
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari Studies
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari StudiesJavier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari Studies
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Multi - vari Studies
 
Dart reliability
Dart   reliabilityDart   reliability
Dart reliability
 
Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability Supplement to Chapter 04: Reliability
Supplement to Chapter 04: Reliability
 
Catapult DOE Case Study
Catapult DOE Case StudyCatapult DOE Case Study
Catapult DOE Case Study
 
Leverage reinforced plastics durability prediction, from calibration to post-...
Leverage reinforced plastics durability prediction, from calibration to post-...Leverage reinforced plastics durability prediction, from calibration to post-...
Leverage reinforced plastics durability prediction, from calibration to post-...
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W3 Sample Size
 
Application of Taguchi Method to Reduce Rust
Application of Taguchi Method to Reduce RustApplication of Taguchi Method to Reduce Rust
Application of Taguchi Method to Reduce Rust
 
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...
Javier Garcia - Verdugo Sanchez - Six Sigma Training - W2 Design Of Experimen...
 

Destacado

Sample size issues on reliability test design
Sample size issues on reliability test designSample size issues on reliability test design
Sample size issues on reliability test designASQ Reliability Division
 
A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFASQ Reliability Division
 
Top 10 reliability engineer interview questions and answers
Top 10 reliability engineer interview questions and answersTop 10 reliability engineer interview questions and answers
Top 10 reliability engineer interview questions and answersrivherjonh
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve ReliabilityRicky Smith CMRP, CMRT
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsRicky Smith CMRP, CMRT
 
Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategyCharlton Inao
 
Reliability - Availability
Reliability -  AvailabilityReliability -  Availability
Reliability - AvailabilityTom Jacyszyn
 
Software Availability by Resiliency
Software Availability by ResiliencySoftware Availability by Resiliency
Software Availability by ResiliencyReza Samei
 
Draft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesDraft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesAccendo Reliability
 
The Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityThe Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityRicky Smith CMRP, CMRT
 
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsTracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsArray Technologies, Inc.
 
Metastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureMetastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureprashant singh
 
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...CA Technologies
 
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesReliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesAccendo Reliability
 

Destacado (20)

Sample size issues on reliability test design
Sample size issues on reliability test designSample size issues on reliability test design
Sample size issues on reliability test design
 
A Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTFA Proposal for an Alternative to MTBF/MTTF
A Proposal for an Alternative to MTBF/MTTF
 
Top 10 reliability engineer interview questions and answers
Top 10 reliability engineer interview questions and answersTop 10 reliability engineer interview questions and answers
Top 10 reliability engineer interview questions and answers
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability
 
Asset Reliability Begins With Your Operators
Asset Reliability Begins With Your OperatorsAsset Reliability Begins With Your Operators
Asset Reliability Begins With Your Operators
 
How to measure reliability 2
How to measure reliability 2How to measure reliability 2
How to measure reliability 2
 
How to measure reliability
How to measure reliabilityHow to measure reliability
How to measure reliability
 
Unit 9 implementing the reliability strategy
Unit 9  implementing the reliability strategyUnit 9  implementing the reliability strategy
Unit 9 implementing the reliability strategy
 
Reliability - Availability
Reliability -  AvailabilityReliability -  Availability
Reliability - Availability
 
Software Availability by Resiliency
Software Availability by ResiliencySoftware Availability by Resiliency
Software Availability by Resiliency
 
Draft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologiesDraft comparison of electronic reliability prediction methodologies
Draft comparison of electronic reliability prediction methodologies
 
The Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset ReliabilityThe Seven Deadly Sins in Measuring Asset Reliability
The Seven Deadly Sins in Measuring Asset Reliability
 
Misuses of MTBF
Misuses of MTBFMisuses of MTBF
Misuses of MTBF
 
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other EventsTracker Lifetime Cost: MTBF, Lifetime and Other Events
Tracker Lifetime Cost: MTBF, Lifetime and Other Events
 
Metastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failureMetastability,MTBF,synchronizer & synchronizer failure
Metastability,MTBF,synchronizer & synchronizer failure
 
Overview and Basic Maintenance
Overview and Basic MaintenanceOverview and Basic Maintenance
Overview and Basic Maintenance
 
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
Technology Primer: Attain Faster MTTR through CA Application Performance Mana...
 
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability TechniquesReliability Maintenance Engineering 2 - 2 Reliability Techniques
Reliability Maintenance Engineering 2 - 2 Reliability Techniques
 
Pom
PomPom
Pom
 
MTTR
MTTRMTTR
MTTR
 

Similar a Efficient Reliability Demonstration Tests Webinar

Chap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc HkChap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc Hkajithsrc
 
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKARPPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKARKaustubh Babrekar
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01jasonhian
 
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docx
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docxCase Quality Management—ToyotaQuality Control Analytics at Toyo.docx
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docxcowinhelen
 
Acceptance sampling (SQC)
Acceptance sampling (SQC)Acceptance sampling (SQC)
Acceptance sampling (SQC)nilesh sadaphal
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Hariharan Ponnusamy
 
Parametric Tolerance Interval Testing
Parametric Tolerance Interval TestingParametric Tolerance Interval Testing
Parametric Tolerance Interval TestingSiva Chaitanya Addala
 
Using capability assessment during product design
Using capability assessment during product designUsing capability assessment during product design
Using capability assessment during product designMark Turner CRP
 
Enhanced technique for regression testing
Enhanced technique for regression testingEnhanced technique for regression testing
Enhanced technique for regression testingeSAT Journals
 
IRJET- Optimization of Plastic Injection Molding
IRJET- Optimization of Plastic Injection MoldingIRJET- Optimization of Plastic Injection Molding
IRJET- Optimization of Plastic Injection MoldingIRJET Journal
 
The Use Of Statistical Tolerance Limits For Process
The Use Of Statistical Tolerance Limits For ProcessThe Use Of Statistical Tolerance Limits For Process
The Use Of Statistical Tolerance Limits For ProcessDavid Goodrich
 
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...IRJET Journal
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control ChartAshish Gupta
 
680report final
680report final680report final
680report finalRajesh M
 

Similar a Efficient Reliability Demonstration Tests Webinar (20)

Chap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc HkChap 9 A Process Capability & Spc Hk
Chap 9 A Process Capability & Spc Hk
 
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKARPPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
 
Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01Quality andc apability hand out 091123200010 Phpapp01
Quality andc apability hand out 091123200010 Phpapp01
 
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docx
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docxCase Quality Management—ToyotaQuality Control Analytics at Toyo.docx
Case Quality Management—ToyotaQuality Control Analytics at Toyo.docx
 
Acceptance sampling (SQC)
Acceptance sampling (SQC)Acceptance sampling (SQC)
Acceptance sampling (SQC)
 
8745681.ppt
8745681.ppt8745681.ppt
8745681.ppt
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
 
Chapter9[1]
Chapter9[1]Chapter9[1]
Chapter9[1]
 
Parametric Tolerance Interval Testing
Parametric Tolerance Interval TestingParametric Tolerance Interval Testing
Parametric Tolerance Interval Testing
 
Using capability assessment during product design
Using capability assessment during product designUsing capability assessment during product design
Using capability assessment during product design
 
9. design of experiment
9. design of experiment9. design of experiment
9. design of experiment
 
Enhanced technique for regression testing
Enhanced technique for regression testingEnhanced technique for regression testing
Enhanced technique for regression testing
 
Facility Location
Facility Location Facility Location
Facility Location
 
Whitebox
WhiteboxWhitebox
Whitebox
 
IRJET- Optimization of Plastic Injection Molding
IRJET- Optimization of Plastic Injection MoldingIRJET- Optimization of Plastic Injection Molding
IRJET- Optimization of Plastic Injection Molding
 
The Use Of Statistical Tolerance Limits For Process
The Use Of Statistical Tolerance Limits For ProcessThe Use Of Statistical Tolerance Limits For Process
The Use Of Statistical Tolerance Limits For Process
 
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...
IRJET- Investigation of Mechanical Properties of Poly Lactic Acid Embedded Na...
 
Quality Control Chart
 Quality Control Chart Quality Control Chart
Quality Control Chart
 
680report final
680report final680report final
680report final
 
C39 x
C39 xC39 x
C39 x
 

Más de ASQ Reliability Division

Root Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartRoot Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartASQ Reliability Division
 
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...ASQ Reliability Division
 
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
Reliability Division Webinar Series -  Innovation: Quality for TomorrowReliability Division Webinar Series -  Innovation: Quality for Tomorrow
Reliability Division Webinar Series - Innovation: Quality for TomorrowASQ Reliability Division
 
Impact of censored data on reliability analysis
Impact of censored data on reliability analysisImpact of censored data on reliability analysis
Impact of censored data on reliability analysisASQ Reliability Division
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustnessASQ Reliability Division
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ Reliability Division
 
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementData Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementASQ Reliability Division
 
A Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringA Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringASQ Reliability Division
 
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...ASQ Reliability Division
 
Comparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsComparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsASQ Reliability Division
 
2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecastingASQ Reliability Division
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7ASQ Reliability Division
 
Introduction to Vibration Qualification Testing
Introduction to Vibration Qualification TestingIntroduction to Vibration Qualification Testing
Introduction to Vibration Qualification TestingASQ Reliability Division
 
Robust design and reliability engineering synergy webinar 2013 04 10
Robust design and reliability engineering synergy webinar   2013 04 10Robust design and reliability engineering synergy webinar   2013 04 10
Robust design and reliability engineering synergy webinar 2013 04 10ASQ Reliability Division
 

Más de ASQ Reliability Division (20)

On Duty Cycle Concept in Reliability
On Duty Cycle Concept in ReliabilityOn Duty Cycle Concept in Reliability
On Duty Cycle Concept in Reliability
 
Thermodynamic Reliability
Thermodynamic  ReliabilityThermodynamic  Reliability
Thermodynamic Reliability
 
Root Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin StewartRoot Cause Analysis: Think Again! - by Kevin Stewart
Root Cause Analysis: Think Again! - by Kevin Stewart
 
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
Dynamic vs. Traditional Probabilistic Risk Assessment Methodologies - by Huai...
 
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
Reliability Division Webinar Series -  Innovation: Quality for TomorrowReliability Division Webinar Series -  Innovation: Quality for Tomorrow
Reliability Division Webinar Series - Innovation: Quality for Tomorrow
 
Impact of censored data on reliability analysis
Impact of censored data on reliability analysisImpact of censored data on reliability analysis
Impact of censored data on reliability analysis
 
An introduction to weibull analysis
An introduction to weibull analysisAn introduction to weibull analysis
An introduction to weibull analysis
 
Reliably Solving Intractable Problems
Reliably Solving Intractable ProblemsReliably Solving Intractable Problems
Reliably Solving Intractable Problems
 
Reliably producing breakthroughs
Reliably producing breakthroughsReliably producing breakthroughs
Reliably producing breakthroughs
 
ASQ RD Webinar: Design for reliability a roadmap for design robustness
ASQ RD Webinar: Design for reliability   a roadmap for design robustnessASQ RD Webinar: Design for reliability   a roadmap for design robustness
ASQ RD Webinar: Design for reliability a roadmap for design robustness
 
ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process ASQ RD Webinar: Improved QFN Reliability Process
ASQ RD Webinar: Improved QFN Reliability Process
 
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability ImprovementData Acquisition: A Key Challenge for Quality and Reliability Improvement
Data Acquisition: A Key Challenge for Quality and Reliability Improvement
 
A Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software EngineeringA Novel View of Applying FMECA to Software Engineering
A Novel View of Applying FMECA to Software Engineering
 
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...Astr2013 tutorial by mike silverman of ops a la carte   40 years of halt, wha...
Astr2013 tutorial by mike silverman of ops a la carte 40 years of halt, wha...
 
Comparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging SystemsComparing Individual Reliability to Population Reliability for Aging Systems
Comparing Individual Reliability to Population Reliability for Aging Systems
 
2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting2013 asq field data analysis & statistical warranty forecasting
2013 asq field data analysis & statistical warranty forecasting
 
Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7Cost optimized reliability test planning rev 7
Cost optimized reliability test planning rev 7
 
Plan a more effective rdt
Plan a more effective rdtPlan a more effective rdt
Plan a more effective rdt
 
Introduction to Vibration Qualification Testing
Introduction to Vibration Qualification TestingIntroduction to Vibration Qualification Testing
Introduction to Vibration Qualification Testing
 
Robust design and reliability engineering synergy webinar 2013 04 10
Robust design and reliability engineering synergy webinar   2013 04 10Robust design and reliability engineering synergy webinar   2013 04 10
Robust design and reliability engineering synergy webinar 2013 04 10
 

Último

How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 

Último (20)

How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 

Efficient Reliability Demonstration Tests Webinar

  • 2. ASQ Reliability Division Chinese Webinar Series One of the monthly webinars on topics of interest to reliability engineers To view upcoming or recorded webinars visit us today at www.asqrd.org
  • 3. Efficient Reliability Demonstration Tests 快速可靠性验证试验 Guangbin Yang (杨广斌), Ph.D. Ford Motor Company, Dearborn, Michigan, U.S.A. Email: gbyang@ieee.org
  • 4. 4 Overview 1. Introduction 2. Sample sizes for bogey tests (zero-failure tests) 3. Principles of test time reduction 4. Test cost modeling 5. Risk of early termination of the test 6. Optimal test plans 7. Procedures of test time reduction 8. Application example 9. Summary and conclusions
  • 5. 5 Bogey Testing (Zero-Failure Test)  Bogey test is widely used in industry to demonstrate, at a high confidence, that a product achieves a specified reliability.  This test method requires a sample of predetermined size to be tested for a specified length of time.  The required reliability is demonstrated if no failures occur in the testing.  So a bogey test is sometimes called the zero- failure test.
  • 6. 6 Motivation  A bogey test requires a large sample size and excessive test time.  For example, to demonstrate that a product has 95% reliability at 1 million cycles with 95% confidence, a bogey test requires 59 samples, each tested for 1 million cycles.  In the current competitive business environment, the sample size and test time must be reduced.
  • 7. 7 Sample Size for Conventional Binomial Bogey Testing  In some applications, life distribution is unknown.  To demonstrate at a 100(1–)% confidence that a product achieves the reliability R0 at time t0, a sample of size n1 is drawn from a population, where  Each of the n1 units is tested for t0. If zero failures occur during testing, the reliability is demonstrated. )ln( )ln( 0 1 R n  
  • 8. 8 Sample Size for Conventional Lognormal Bogey Testing  In some situations, the life of products can be reasonably modeled by lognormal distribution.  The minimum sample size to demonstrate the reliability requirement is where  is called the bogey ratio, which is the ratio of actual test time to t0.  The equation indicates that the sample size can be reduced by increasing the test time. )]}1(/)ln([ln{ )ln( 0 12 R n     
  • 9. 9 Sample Sizes for Different Values of Required Reliability and Bogey Ratio 0 10 20 30 40 50 60 70 80 90 0.8 0.85 0.9 0.95 1 bogey ratio=1.5 bogey ratio=2 bogey ratio=2.5 bogey ratio=3 Reliability n2
  • 10. 10 Principles of Test Time Reduction  For some products, a failure is said to have occurred when a performance characteristic exceeds its threshold.  For these products, it is possible to measure the performance characteristic during testing.  The degradation measurements can be used to reduce the test time.
  • 11. 11 Principles of Test Time Reduction (Conted) y G t0tm t
  • 12. 12 Principles of Test Time Reduction (Conted) y G ttm t0
  • 13. 13 Principles of Test Time Reduction (Conted) y G t0tm t
  • 14. 14 Sample Size for Reduced Test Time  When the test time is reduced, the type II error is increased by c.  The minimum sample size for the lognormal distribution is where  = c /. )]}1(/)ln([ln{ )1ln()ln( 0 13 R n      
  • 15. 15 Test Cost Modeling  The cost of a bogey test consists of  the cost of conducting the test,  the cost of samples, and  the cost of measurements.  Cost model )( )]}1(/)ln([ln{ )1ln()ln( ),( 32 0 101 mcc R tcTC        
  • 16. 16 Consumer’s Risk Due to Early Termination  For a test unit that has y0<G, terminating test earlier increases the consumer’s risk. y G t0tm t F(t0)
  • 17. 17 Producer’s Risk Due to Early Termination  For a test unit that has y0>G, terminating test earlier increases the producer’s risk. y G ttm t0 F(t0)
  • 18. 18 Risk Formulation  For a linear or transformed linear degradation model, the risk can be formulated as where T has the student-t distribution with m-2 degrees of freedom.                      )1( )2(31 1ˆ ˆ Pr)( 22 2 0 0 mm mm m yG TtF   
  • 19. 19 Optimal Test Plans  The test plans are characterized by  and .  The values of  and  are optimized by minimizing the total cost TC(, ), while the following constraints are satisfied: (1) The risk associated with early termination of a test must not exceed c/n3. (2) The sample size must not be greater than the number of available test units.  The optimization model can be calculated using Excel Solver.
  • 20. 20 Procedures of Test Time Reduction  During testing, each unit is inspected periodically to measure y. When there are three measurements, a degradation model is fitted to the data, and the estimates of the model parameters and the risk F(t0) are calculated.  Then we make one of the following decisions based on the estimates.
  • 21. 21 Test Termination Rules (1) If , then terminate the test of the unit. This test unit passes the bogey test. (2) If , where  is the specified type I error, then terminate the test of the unit. This test unit fails to pass the bogey test. (3) If , continue the test until decision rule (1) or (2) is met, or until t0 is reached, whichever occurs sooner. 30 /)(ˆ ntF  30 /1)(ˆ ntF  303 /1)(ˆ/ ntFn  
  • 22. 22 Application Example  Problem statement A part is required to have a reliability of 95% at a design life of 1.5105 cycles under the 95th percentile of the customer usage profile. The part fails due to its stiffness degradation; a failure is said to have occurred when the stiffness degrades to 20% of the initial value. We want to demonstrate the reliability at a 95% confidence level.
  • 23. 23 Test Plans  The calculation of optimization model for the test plan gives  = 0.3147, and  = 0.631.  Then the test plan is to test 39 samples and the expected test time is 1.325105 cycles.  In contrast, the conventional bogey test requires testing 59 samples for each 1.5105 cycles, or 39 units each for 2.1105 cycles.
  • 24. 24 Decision Rules  The decision rules for terminating the test of a part are as follows. (1) If , then terminate the test of the unit. This test unit passes the bogey test. (2) If , then terminate the test of the unit. This test unit fails to pass the bogey test. (3) If , continue the test of the unit until decision rule (1) or (2) is met, or until 2.1105 cycles is reached, whichever occurs first. 3 0 10403.0)(ˆ  tF 9987.0)(ˆ 0 tF 9987.0)(ˆ10403.0 0 3   tF
  • 25. 25 Summary and Conclusions  The conventional binomial bogey test requires a large sample size and excessive test time.  If the life is known to be lognormal, the bogey test sample size can be reduced by extending the test time.  For products subject to degradation failure, the test time can be reduced substantially by using the degradation measurements.
  • 26. 26 Additional Readings  G. Yang, “Reliability Demonstration Through Degradation Bogey Testing,” IEEE Transactions on Reliability, vol. 58, no. 4, December 2009.  G. Yang, “Optimum Degradation Tests for Comparison of Products,” IEEE Transactions on Reliability, vol. 61, no. 1, March 2012.  G. Yang, Life Cycle Reliability Engineering, Wiley, 2007. (Chapter 9)