Abbas Saeidi, P.Eng.
Senior Process Engineer
(Phone-H): 403-460-8677
(Cell): 587-703-2503
Email:sabba.saeidi@gmail.com
Professional summary
Abbas has many years of progressive experience in power, process and utility provision projects. He
has completed various projects in “oil and gas”, “power generation”, “chemical manufacturing” and
“food products manufacturing” industries.
He has fulfilled various roles as “project manager”, “engineering manager”, construction site
engineer, “operation manager”, “technical services engineer and troubleshooting specialist”
and “plant engineer”.
He has performed various duties in client, EPC and consulting companies.
Employment history
AMEC Americas, Senior Utilities Process Engineer, 2008 – Present
Wings Hing Lung (WHL) Ltd., Plant Engineer/Process Engineer, 2000 – 2007
Acres International Ltd., Process Engineer, 1999 – 2000
Monenco Iran Consulting Engineers, Lead Process Engineer, 1997 – 1999
MAPNA, Co (EP&CM), Lead Process Engineer 1994 – 1999
G N Consulting Engineers, Construction Site Resident Process Engineer, Lead Process engineer and
construction site manager 1983 – 1994
Oil Service Company of Iran (OSCO), Assistant Technical Services Engineer-Operation Engineer,
1976-1982
Achievements
1. At AMEC:
a. Supervised and controlled a multi-disciplinary team to conduct FEED and
Detailed design for a multi-billion dollars oil sands project. Provided technical
support to construction site for installation, commissioning, trouble shooting and
startup of the facilities. This achievement included meeting all project
requirements, milestones, cost restrictions and time schedule.
2. At W.H.L Ltd:
a. Supervised a $2,500,000.00 food plant expansion project from start to finish on
time and with no cost over-runs
1. Overseas Projects:
a. Performed a feasibility study to evaluate addition of a steam power plant with
capacity of 1300 MW adjacent to a Petrochemical & Refinery complex. The
work was approved and included Fuel Gas & Oil provision from refinery to the
power plant. The environmental protection issues were of concerns and the
impact were reduced via
i. -proper stack design
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 1 of 6
Abbas Saeidi
ii. -use of dry cooling towers to minimize water consumption and waste
water production
b. Design, construction supervision, commissioning and startup of a combined
cycle power plant and several other conventional steam power plants.
Professional qualifications/registration(s)
Member, Association of Professional Engineers and Geoscientists of Alberta (APEGA)
Member, Professional Engineers Ontario (PEO), Voluntary member of ERC committee of PEO for 8
years
Education
B.A.Sc. Degree in Chemical Engineering, AMIR KABIR University of Technology, Tehran, Iran
Projects Details
AMEC Americas, (EP&CM), Canada, 2008 – Present
Projects include:
Shell Albian oil Sands Debottlenecking, 2014 – Present: Senior Utilities Process Engineer. This is
a project to upgrade oil production from Shell Albian Oil Sands. Preliminary reviews were conducted.
PFD’s were prepared and updated. Utilities system capacity evaluated and heat and mass balances
completed. Project is now on hold for client review due to lower oil prices.
Kearl TSRU Solvent Pumps Upgrading To Debottleneck the TSRU Plant, 2014: Lead Process
Engineer. This was a fast track project, to do the upgrading without plant shut down
Reviewed site report on bottlenecks and come up with debottlenecking of solvent pumps, control
valves, flow meters, strainers, minimum flow lines and flow limiting restriction orifices and hydraulic
calculations for piping.
Reviewed upstream condensate drum PSVs and instrumentation and control process data sheets.
Updated PFDs and P&IDs for HAZOP and SIL review
Performed HAZOP closed out activities and issued PFDs-IFD and P&IDs-IFC
Prepared System description and Process control narratives including alarm and trip settings.
Provided construction site support to operation for commissioning and start-up of first train
Kearl Cogeneration Project, 85 MW, 2011 – 2014: Lead Process Engineer
Prepared detail design scope of work and estimated engineering man hours (MHs) required to
complete design of the Cogeneration.
Supervised development of PFDs, P&IDS, heat and mass balance
Presented process design in HAZOP review and 3-D model review meetings
Supervised “PSVs, Control valves, steam desuperheaters and silencers” sizing calculations, and
prepared/updated technical specifications and data sheets for Glycol cooling system, control valves,
steam traps, condensate receiving drums .
Attended bids technical evaluation (BTE) and clarifications for Steam turbine generator, control
valves, desuperheaters, etc.
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 2 of 6
Abbas Saeidi
Reviewed transient study and dynamic simulation of the Cogeneration plant to fit to Kearl Phase
project considering different operating scenarios in order to provide uninterrupted steam supply and
power generation, while continue production with minimum side effects.
Performed Process detail design with 6 full time process engineers, in a multi-discipline environment.
Vendor’s documents were reviewed and approved in time.
Prepared/reviewed procedures of chemical cleaning and steam blowing for Kearl expansion and Kearl
Cogen projects. Performed hydraulic calculation to make sure that steam blowing satisfies the
cleaning criterion
Carried out power point presentations to plant operating and maintenance personnel for standard
Operating procedures (SOPs).
Recognized and awarded by client for excellence in training and knowledge transfer to operating and
maintenance personnel.
Recognized and awarded for best performance, on quality, time and budget
Kearl Initial development oil sand project, 2008 – 2011: Senior Process Engineer, utilities- FEED
and detail design
Prepared and elaborated utilities PFDs and P&IDs
Prepared/supervised sizing calculations of piping, PSVs, control valves and various vessels, pumps,
steam traps, Deaerator, steam and condensate hydraulic calculations and compiled calculation
reports.
Reviewed plant utilities including fuel gas design and supply system for steam generators. Steam
generators provide 1040 ton/hr high pressure steam for process heating and cogeneration
requirements. Reviewed chemical injection and sampling of steam and condensate system.
Designed steam conditioning system to let down high pressure steam to medium and low pressure
steam including desuperheaters for various applications throughout the plant.
Presented process design to FEED HAZOP and 3D model review meetings and prepared HAZOP
action plans and close outs.
Participated in bids technical evaluation process (BTE) for steam generators, boiler feed water pumps,
steam turbine drives and other equipment’s and report.
Elaborated plant utilities detailed design and presented steam and condensate process design for the
final HAZOP and 3-D model review.
Performed vendor design review
Prepared/ lead preparation of P&IDs, LDTs for construction and shut down Hierarchy for plant safety
and protection.
Performed/lead case study of black out and black starts of the plant concluding changing the some
motor drives of the Boiler Feed Water pumps and steam generators Forced Draft FANS to steam
turbine drives to diverse power sources and comply with code.
Participated in plant alarm rationalization review (ARE) meeting
Prepared system description and updated process control study report
Rendered construction support, commissioning and start up engineering services and close
out/completion for Kearl Initial development project.
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 3 of 6
Abbas Saeidi
Wings Hing Lung Ltd, Food Products plant, Toronto, ON. Plant Engineer /Process Engineer-
2000 – 2007
Prepared preliminary design and layout of plant expansion including specifications of new process
packaging equipment and machineries with total cost of $2,500,000. The scope of work included
Project contract management on a non-turnkey basis for purchase of additional steam generator,
pumps, air compressors heat exchangers, tanks, processing kettles, homogenizers, mixers, piping,
insulation, I&C, power supply MCCs , cabling and installation & commissioning
Prepared and followed up preventive maintenance program for plant utilities, processing equipment
and machineries and managed maintenance crew of mechanical, electrical and I&C technicians
Managed plant utilities operations including steam generation and distribution systems, condensate
recovery, water treatment, compressed air supply. Carried out water utilization study to optimize
consumption in the plant.
Converted the ketchup batch systems to semi-batch increasing the production and reducing the down
time periods
Monenco Iran Consulting Engineers, Engineering manager /Lead Process Engineer- Iran, 1997
– 1999
(Partnership between Agra Monenco Canada and MAPNA), responsible for Design and Engineering
of Combined Cycle power plants
Lead updating & project planning, for conversion of six operating gas turbine power plants total of 28
X 110 MW gas turbines to combined cycle power plants (14x330 MW), finalizing layout of main and
auxiliaries, establishing project control system to assure implementation within time and budget in a
matrix organization with about 100 multi-discipline engineers and design drafters, using concept of
D1BM
Participated Bids technical evaluation (BTE) review and bid clarification meetings with vendors
Lead design review and approval of vendors P&IDs, sizing calculations of main and auxiliary systems
including water treatment plant and polishing plant considering technical specifications/design criteria,
standards as client representative.
Rendered engineering support for construction site and start up and commissioning of first block of
one combined Cycle plant.
MAPNA, Iran Power Plant Projects Management CO (EP&CM), Engineering manager and Lead
Process Engineer-Iran, 1994 – 1999
Arak Steam Power Plant (4 X 325 MW)
Lead preliminary design for Arak Steam Power Plant (4x325 MW); completed technical specifications
and tender documents for international tendering for main steam generators, turbines, control
packages and main cooling systems
Participated bids technical evaluation of the bid packages and bid clarification meetings with vendors
Organized and lead design review groups, coordinating suppliers and sub-engineering firms
Lead process design of the balance of plant systems including fuel oil supply and storage, fuel gas
supply and reducing station, auxiliary steam generation and distribution, water supply and treatment,
polishing plant, wastewater gathering and treatment, sewage system, main and auxiliary cooling
system, compressed air system
Rendered technical support to construction site and field engineering
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 4 of 6
Abbas Saeidi
GN Consulting Engineers, (Former branch of Montreal Engineering- Canada) Iran, 1983 – 1994
Projects included:
Bandar-Abbas Steam Power Plant 4 X 320 MW-Turn Key project- Construction site resident Process
engineer (Field Engineer) as client representative.
1982 – 1988 Construction site Process engineer/Site manager
Supervised equipment storage, preservation and installation, especially desalination plant, water
demineralization plant and polishing plant, hydrogen production and chlorination plant . Supervised
installation and commissioning of units 2, 3 and 4 of the plant in different stages of construction,
commissioning and start up
Reviewed and approved the comprehensive commissioning and start up procedures of the plant main
and auxiliaries including procedures of chemical cleaning and steam blowing. Supervised the
commissioning, start up and performance test and hand over activity of units 2, 3, 4 to plant operating
personnel.
Supervised preparation and approval of plant as built drawings and documents.
Ramin –Ahwaz Steam Power Plant 6 X 315 MW, 1990-1993
Project Engineering Manager
Following were accomplished during this assignment:
Assessment of war damaged units #1 , 2, 3 and 4 and rehabilitation/reconstruction, start up and
commissioning of units 2 and 3
Oil Service Company of Iran (OSCO), Ahwaz, Assistant Technical Services Engineer-Operation
Engineer
Rendered technical services to operating gas and gas liquid treatment plants (NGL plants), rich and
lean gas pipeline, with capacities of 100 to 600 MMSCFD, including case studies, troubleshooting and
de-bottlenecking as detailed hereunder:
Performed case studies including plant performances with different feed gas input, analyzing
shortcomings and bottlenecks of different equipment to be considered for upgrading and de-
bottlenecking and supervised upgrading and de-bottlenecking activities at site
Supervised plant annual overhaul, engineering inspection specially on locations susceptible to
corrosion and erosion using Ultra Sonic method for metal thickness survey
Supervised commissioning and operating performance test, comparing plant efficiencies before and
after overhaul and upgrading to access the effectiveness of changes recommended
Attended construction supervision, commissioning and start-up of 2x1500 MMSCFD gas and gas
liquid treatment plants (NGL plans)
Training courses and Recognitions
Power plant project management course by Siemens, Germany
Advanced training course in engineering management, FIDIC
Sanitary design and engineering in food industry training, Canada
Effective Energy Management for compressed air systems training, Canada
Basic Workplace Health and Safety training level 1 & 2, Canada
President recognition/appreciation of eight years voluntary member of ERC in PEO Ontario
Recognition/award for completion of Kearl Cogen project within time, engineering budget and Quality
Recognition by client on Kearl Cogen Knowledge transfer to plant operating and maintenance people
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 5 of 6
Abbas Saeidi
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 6 of 6
Abbas Saeidi
Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 6 of 6

Más contenido relacionado

La actualidad más candente

Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedDennis Talley
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz HabidFeroz Habid
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONElliott Molnar
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan IIjohn chan
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashid Faruqi
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resumeArun Goyle
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16Edward Ruebling
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray ResumeRon Bray
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam Das
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil
 

La actualidad más candente (19)

Resume talley 1.5.2016.formatted
Resume talley 1.5.2016.formattedResume talley 1.5.2016.formatted
Resume talley 1.5.2016.formatted
 
Ankur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gasAnkur Singh 7 years exp. oil & gas
Ankur Singh 7 years exp. oil & gas
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
Anil Pachpande-CV2016
Anil Pachpande-CV2016Anil Pachpande-CV2016
Anil Pachpande-CV2016
 
Resume Feroz Habid
Resume Feroz HabidResume Feroz Habid
Resume Feroz Habid
 
MY C.V
MY C.VMY C.V
MY C.V
 
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATIONNRG INTERN POWER DOWN END OF SUMMER PRESENTATION
NRG INTERN POWER DOWN END OF SUMMER PRESENTATION
 
John P Chan II
John P Chan IIJohn P Chan II
John P Chan II
 
Nazmy Markos
Nazmy MarkosNazmy Markos
Nazmy Markos
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
CV Jalaj Verma
CV Jalaj VermaCV Jalaj Verma
CV Jalaj Verma
 
khalid mowafy CV
khalid mowafy CVkhalid mowafy CV
khalid mowafy CV
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
Anupam CV - Process & system engineer power plants (Renewable and non-renewable)
 
Resume - Anirvan
Resume - AnirvanResume - Anirvan
Resume - Anirvan
 
Ahmed Khalil CV & Resume
Ahmed Khalil CV & ResumeAhmed Khalil CV & Resume
Ahmed Khalil CV & Resume
 

Destacado

Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews
 
Anant Wright Resume HVAC
Anant Wright Resume HVACAnant Wright Resume HVAC
Anant Wright Resume HVACAnant Wright
 
Top 8 engineering manager resume samples
Top 8 engineering manager resume samplesTop 8 engineering manager resume samples
Top 8 engineering manager resume samplesAndyCole345
 
Karthikeyan_DB2_Resume
Karthikeyan_DB2_ResumeKarthikeyan_DB2_Resume
Karthikeyan_DB2_ResumeKarthi Keyan
 
Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingQuentin McColgin
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15Joe Fain
 
Top 8 agency director resume samples
Top 8 agency director resume samplesTop 8 agency director resume samples
Top 8 agency director resume samplestonychoper2005
 
Top 8 call center manager resume samples
Top 8 call center manager resume samplesTop 8 call center manager resume samples
Top 8 call center manager resume samplesLatinGrammy999
 
Top 8 tumor registrar resume samples
Top 8 tumor registrar resume samplesTop 8 tumor registrar resume samples
Top 8 tumor registrar resume samplesshahakahn
 
Paul_Kirk Resume 2015
Paul_Kirk Resume 2015Paul_Kirk Resume 2015
Paul_Kirk Resume 2015Paul Kirk
 
Abraham Yang Resume 2015
Abraham Yang Resume 2015Abraham Yang Resume 2015
Abraham Yang Resume 2015Abraham Yang
 
SFournia_resume_11-20-2016
SFournia_resume_11-20-2016SFournia_resume_11-20-2016
SFournia_resume_11-20-2016Sean Teamwork
 
Top 8 grant coordinator resume samples
Top 8 grant coordinator resume samplesTop 8 grant coordinator resume samples
Top 8 grant coordinator resume sampleslallesamantha
 
Top 8 qa engineer resume samples
Top 8 qa engineer resume samplesTop 8 qa engineer resume samples
Top 8 qa engineer resume samplesRoyKeane789
 
Top 8 market coordinator resume samples
Top 8 market coordinator resume samplesTop 8 market coordinator resume samples
Top 8 market coordinator resume samplestonychoper5205
 

Destacado (20)

Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015Scotty Matthews Resume Feb 2015
Scotty Matthews Resume Feb 2015
 
Will's Resume[1]
Will's Resume[1]Will's Resume[1]
Will's Resume[1]
 
Anant Wright Resume HVAC
Anant Wright Resume HVACAnant Wright Resume HVAC
Anant Wright Resume HVAC
 
Top 8 engineering manager resume samples
Top 8 engineering manager resume samplesTop 8 engineering manager resume samples
Top 8 engineering manager resume samples
 
Karthikeyan_DB2_Resume
Karthikeyan_DB2_ResumeKarthikeyan_DB2_Resume
Karthikeyan_DB2_Resume
 
My Resume
My ResumeMy Resume
My Resume
 
Resume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_SchedulingResume_McColgin_Quentin_Master_Scheduling
Resume_McColgin_Quentin_Master_Scheduling
 
JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15JOE FAIN RESUME 8-8-15
JOE FAIN RESUME 8-8-15
 
Resume
ResumeResume
Resume
 
Top 8 agency director resume samples
Top 8 agency director resume samplesTop 8 agency director resume samples
Top 8 agency director resume samples
 
Top 8 call center manager resume samples
Top 8 call center manager resume samplesTop 8 call center manager resume samples
Top 8 call center manager resume samples
 
Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015Michael Grumbach PM Resume 2015
Michael Grumbach PM Resume 2015
 
Top 8 tumor registrar resume samples
Top 8 tumor registrar resume samplesTop 8 tumor registrar resume samples
Top 8 tumor registrar resume samples
 
Paul_Kirk Resume 2015
Paul_Kirk Resume 2015Paul_Kirk Resume 2015
Paul_Kirk Resume 2015
 
Abraham Yang Resume 2015
Abraham Yang Resume 2015Abraham Yang Resume 2015
Abraham Yang Resume 2015
 
Kartheek Resume
Kartheek ResumeKartheek Resume
Kartheek Resume
 
SFournia_resume_11-20-2016
SFournia_resume_11-20-2016SFournia_resume_11-20-2016
SFournia_resume_11-20-2016
 
Top 8 grant coordinator resume samples
Top 8 grant coordinator resume samplesTop 8 grant coordinator resume samples
Top 8 grant coordinator resume samples
 
Top 8 qa engineer resume samples
Top 8 qa engineer resume samplesTop 8 qa engineer resume samples
Top 8 qa engineer resume samples
 
Top 8 market coordinator resume samples
Top 8 market coordinator resume samplesTop 8 market coordinator resume samples
Top 8 market coordinator resume samples
 

Similar a Saeidi-Abbas-Resume April 2015-updated

Similar a Saeidi-Abbas-Resume April 2015-updated (20)

JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
My Updated CV
My  Updated CVMy  Updated CV
My Updated CV
 
CV-ZTUFAIL2016
CV-ZTUFAIL2016CV-ZTUFAIL2016
CV-ZTUFAIL2016
 
Hossein emadi CV
Hossein emadi CVHossein emadi CV
Hossein emadi CV
 
SHREYAS__SABNIS CV
SHREYAS__SABNIS CVSHREYAS__SABNIS CV
SHREYAS__SABNIS CV
 
Curriculum vitae Bhupat Kanani
Curriculum vitae Bhupat KananiCurriculum vitae Bhupat Kanani
Curriculum vitae Bhupat Kanani
 
Curriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat KananiCurriculum vitae_Bhupat Kanani
Curriculum vitae_Bhupat Kanani
 
CV-cassidy
CV-cassidyCV-cassidy
CV-cassidy
 
Leon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016RLeon Chacon Resume_Sept2016R
Leon Chacon Resume_Sept2016R
 
Kanika Chadha
Kanika ChadhaKanika Chadha
Kanika Chadha
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.Walaa Ahmed-CV3)-production eng. 14 year exp.
Walaa Ahmed-CV3)-production eng. 14 year exp.
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
Oam mechanical eng
Oam mechanical engOam mechanical eng
Oam mechanical eng
 
Process Engineer
Process EngineerProcess Engineer
Process Engineer
 
CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
MPK - Resume
MPK - ResumeMPK - Resume
MPK - Resume
 
cv
cvcv
cv
 
RESUME - Abhay Paranjape
RESUME - Abhay ParanjapeRESUME - Abhay Paranjape
RESUME - Abhay Paranjape
 
Ukeje cv updated
Ukeje cv updatedUkeje cv updated
Ukeje cv updated
 

Saeidi-Abbas-Resume April 2015-updated

  • 1. Abbas Saeidi, P.Eng. Senior Process Engineer (Phone-H): 403-460-8677 (Cell): 587-703-2503 Email:sabba.saeidi@gmail.com Professional summary Abbas has many years of progressive experience in power, process and utility provision projects. He has completed various projects in “oil and gas”, “power generation”, “chemical manufacturing” and “food products manufacturing” industries. He has fulfilled various roles as “project manager”, “engineering manager”, construction site engineer, “operation manager”, “technical services engineer and troubleshooting specialist” and “plant engineer”. He has performed various duties in client, EPC and consulting companies. Employment history AMEC Americas, Senior Utilities Process Engineer, 2008 – Present Wings Hing Lung (WHL) Ltd., Plant Engineer/Process Engineer, 2000 – 2007 Acres International Ltd., Process Engineer, 1999 – 2000 Monenco Iran Consulting Engineers, Lead Process Engineer, 1997 – 1999 MAPNA, Co (EP&CM), Lead Process Engineer 1994 – 1999 G N Consulting Engineers, Construction Site Resident Process Engineer, Lead Process engineer and construction site manager 1983 – 1994 Oil Service Company of Iran (OSCO), Assistant Technical Services Engineer-Operation Engineer, 1976-1982 Achievements 1. At AMEC: a. Supervised and controlled a multi-disciplinary team to conduct FEED and Detailed design for a multi-billion dollars oil sands project. Provided technical support to construction site for installation, commissioning, trouble shooting and startup of the facilities. This achievement included meeting all project requirements, milestones, cost restrictions and time schedule. 2. At W.H.L Ltd: a. Supervised a $2,500,000.00 food plant expansion project from start to finish on time and with no cost over-runs 1. Overseas Projects: a. Performed a feasibility study to evaluate addition of a steam power plant with capacity of 1300 MW adjacent to a Petrochemical & Refinery complex. The work was approved and included Fuel Gas & Oil provision from refinery to the power plant. The environmental protection issues were of concerns and the impact were reduced via i. -proper stack design Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 1 of 6
  • 2. Abbas Saeidi ii. -use of dry cooling towers to minimize water consumption and waste water production b. Design, construction supervision, commissioning and startup of a combined cycle power plant and several other conventional steam power plants. Professional qualifications/registration(s) Member, Association of Professional Engineers and Geoscientists of Alberta (APEGA) Member, Professional Engineers Ontario (PEO), Voluntary member of ERC committee of PEO for 8 years Education B.A.Sc. Degree in Chemical Engineering, AMIR KABIR University of Technology, Tehran, Iran Projects Details AMEC Americas, (EP&CM), Canada, 2008 – Present Projects include: Shell Albian oil Sands Debottlenecking, 2014 – Present: Senior Utilities Process Engineer. This is a project to upgrade oil production from Shell Albian Oil Sands. Preliminary reviews were conducted. PFD’s were prepared and updated. Utilities system capacity evaluated and heat and mass balances completed. Project is now on hold for client review due to lower oil prices. Kearl TSRU Solvent Pumps Upgrading To Debottleneck the TSRU Plant, 2014: Lead Process Engineer. This was a fast track project, to do the upgrading without plant shut down Reviewed site report on bottlenecks and come up with debottlenecking of solvent pumps, control valves, flow meters, strainers, minimum flow lines and flow limiting restriction orifices and hydraulic calculations for piping. Reviewed upstream condensate drum PSVs and instrumentation and control process data sheets. Updated PFDs and P&IDs for HAZOP and SIL review Performed HAZOP closed out activities and issued PFDs-IFD and P&IDs-IFC Prepared System description and Process control narratives including alarm and trip settings. Provided construction site support to operation for commissioning and start-up of first train Kearl Cogeneration Project, 85 MW, 2011 – 2014: Lead Process Engineer Prepared detail design scope of work and estimated engineering man hours (MHs) required to complete design of the Cogeneration. Supervised development of PFDs, P&IDS, heat and mass balance Presented process design in HAZOP review and 3-D model review meetings Supervised “PSVs, Control valves, steam desuperheaters and silencers” sizing calculations, and prepared/updated technical specifications and data sheets for Glycol cooling system, control valves, steam traps, condensate receiving drums . Attended bids technical evaluation (BTE) and clarifications for Steam turbine generator, control valves, desuperheaters, etc. Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 2 of 6
  • 3. Abbas Saeidi Reviewed transient study and dynamic simulation of the Cogeneration plant to fit to Kearl Phase project considering different operating scenarios in order to provide uninterrupted steam supply and power generation, while continue production with minimum side effects. Performed Process detail design with 6 full time process engineers, in a multi-discipline environment. Vendor’s documents were reviewed and approved in time. Prepared/reviewed procedures of chemical cleaning and steam blowing for Kearl expansion and Kearl Cogen projects. Performed hydraulic calculation to make sure that steam blowing satisfies the cleaning criterion Carried out power point presentations to plant operating and maintenance personnel for standard Operating procedures (SOPs). Recognized and awarded by client for excellence in training and knowledge transfer to operating and maintenance personnel. Recognized and awarded for best performance, on quality, time and budget Kearl Initial development oil sand project, 2008 – 2011: Senior Process Engineer, utilities- FEED and detail design Prepared and elaborated utilities PFDs and P&IDs Prepared/supervised sizing calculations of piping, PSVs, control valves and various vessels, pumps, steam traps, Deaerator, steam and condensate hydraulic calculations and compiled calculation reports. Reviewed plant utilities including fuel gas design and supply system for steam generators. Steam generators provide 1040 ton/hr high pressure steam for process heating and cogeneration requirements. Reviewed chemical injection and sampling of steam and condensate system. Designed steam conditioning system to let down high pressure steam to medium and low pressure steam including desuperheaters for various applications throughout the plant. Presented process design to FEED HAZOP and 3D model review meetings and prepared HAZOP action plans and close outs. Participated in bids technical evaluation process (BTE) for steam generators, boiler feed water pumps, steam turbine drives and other equipment’s and report. Elaborated plant utilities detailed design and presented steam and condensate process design for the final HAZOP and 3-D model review. Performed vendor design review Prepared/ lead preparation of P&IDs, LDTs for construction and shut down Hierarchy for plant safety and protection. Performed/lead case study of black out and black starts of the plant concluding changing the some motor drives of the Boiler Feed Water pumps and steam generators Forced Draft FANS to steam turbine drives to diverse power sources and comply with code. Participated in plant alarm rationalization review (ARE) meeting Prepared system description and updated process control study report Rendered construction support, commissioning and start up engineering services and close out/completion for Kearl Initial development project. Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 3 of 6
  • 4. Abbas Saeidi Wings Hing Lung Ltd, Food Products plant, Toronto, ON. Plant Engineer /Process Engineer- 2000 – 2007 Prepared preliminary design and layout of plant expansion including specifications of new process packaging equipment and machineries with total cost of $2,500,000. The scope of work included Project contract management on a non-turnkey basis for purchase of additional steam generator, pumps, air compressors heat exchangers, tanks, processing kettles, homogenizers, mixers, piping, insulation, I&C, power supply MCCs , cabling and installation & commissioning Prepared and followed up preventive maintenance program for plant utilities, processing equipment and machineries and managed maintenance crew of mechanical, electrical and I&C technicians Managed plant utilities operations including steam generation and distribution systems, condensate recovery, water treatment, compressed air supply. Carried out water utilization study to optimize consumption in the plant. Converted the ketchup batch systems to semi-batch increasing the production and reducing the down time periods Monenco Iran Consulting Engineers, Engineering manager /Lead Process Engineer- Iran, 1997 – 1999 (Partnership between Agra Monenco Canada and MAPNA), responsible for Design and Engineering of Combined Cycle power plants Lead updating & project planning, for conversion of six operating gas turbine power plants total of 28 X 110 MW gas turbines to combined cycle power plants (14x330 MW), finalizing layout of main and auxiliaries, establishing project control system to assure implementation within time and budget in a matrix organization with about 100 multi-discipline engineers and design drafters, using concept of D1BM Participated Bids technical evaluation (BTE) review and bid clarification meetings with vendors Lead design review and approval of vendors P&IDs, sizing calculations of main and auxiliary systems including water treatment plant and polishing plant considering technical specifications/design criteria, standards as client representative. Rendered engineering support for construction site and start up and commissioning of first block of one combined Cycle plant. MAPNA, Iran Power Plant Projects Management CO (EP&CM), Engineering manager and Lead Process Engineer-Iran, 1994 – 1999 Arak Steam Power Plant (4 X 325 MW) Lead preliminary design for Arak Steam Power Plant (4x325 MW); completed technical specifications and tender documents for international tendering for main steam generators, turbines, control packages and main cooling systems Participated bids technical evaluation of the bid packages and bid clarification meetings with vendors Organized and lead design review groups, coordinating suppliers and sub-engineering firms Lead process design of the balance of plant systems including fuel oil supply and storage, fuel gas supply and reducing station, auxiliary steam generation and distribution, water supply and treatment, polishing plant, wastewater gathering and treatment, sewage system, main and auxiliary cooling system, compressed air system Rendered technical support to construction site and field engineering Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 4 of 6
  • 5. Abbas Saeidi GN Consulting Engineers, (Former branch of Montreal Engineering- Canada) Iran, 1983 – 1994 Projects included: Bandar-Abbas Steam Power Plant 4 X 320 MW-Turn Key project- Construction site resident Process engineer (Field Engineer) as client representative. 1982 – 1988 Construction site Process engineer/Site manager Supervised equipment storage, preservation and installation, especially desalination plant, water demineralization plant and polishing plant, hydrogen production and chlorination plant . Supervised installation and commissioning of units 2, 3 and 4 of the plant in different stages of construction, commissioning and start up Reviewed and approved the comprehensive commissioning and start up procedures of the plant main and auxiliaries including procedures of chemical cleaning and steam blowing. Supervised the commissioning, start up and performance test and hand over activity of units 2, 3, 4 to plant operating personnel. Supervised preparation and approval of plant as built drawings and documents. Ramin –Ahwaz Steam Power Plant 6 X 315 MW, 1990-1993 Project Engineering Manager Following were accomplished during this assignment: Assessment of war damaged units #1 , 2, 3 and 4 and rehabilitation/reconstruction, start up and commissioning of units 2 and 3 Oil Service Company of Iran (OSCO), Ahwaz, Assistant Technical Services Engineer-Operation Engineer Rendered technical services to operating gas and gas liquid treatment plants (NGL plants), rich and lean gas pipeline, with capacities of 100 to 600 MMSCFD, including case studies, troubleshooting and de-bottlenecking as detailed hereunder: Performed case studies including plant performances with different feed gas input, analyzing shortcomings and bottlenecks of different equipment to be considered for upgrading and de- bottlenecking and supervised upgrading and de-bottlenecking activities at site Supervised plant annual overhaul, engineering inspection specially on locations susceptible to corrosion and erosion using Ultra Sonic method for metal thickness survey Supervised commissioning and operating performance test, comparing plant efficiencies before and after overhaul and upgrading to access the effectiveness of changes recommended Attended construction supervision, commissioning and start-up of 2x1500 MMSCFD gas and gas liquid treatment plants (NGL plans) Training courses and Recognitions Power plant project management course by Siemens, Germany Advanced training course in engineering management, FIDIC Sanitary design and engineering in food industry training, Canada Effective Energy Management for compressed air systems training, Canada Basic Workplace Health and Safety training level 1 & 2, Canada President recognition/appreciation of eight years voluntary member of ERC in PEO Ontario Recognition/award for completion of Kearl Cogen project within time, engineering budget and Quality Recognition by client on Kearl Cogen Knowledge transfer to plant operating and maintenance people Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 5 of 6
  • 6. Abbas Saeidi Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 6 of 6
  • 7. Abbas Saeidi Oil & Gas Canada: 18 Feb 2015 amecfw.com Page 6 of 6