SUMMARY OF EXPERIENCE
I have over 23 years experienced in piping and mechanical discipline started as piping foreman to
Piping/mechanical Supervisor and also Piping/mechanical Superintendent both onshore and offshore
works in various company and various project such as; Geothermal power plant project, Pulp and
Paper Mill plant Project, Modification and Installation Platform project, Fertilizer plant project,
Chemical plant project, Diesel power plant project, Carbon Black plant project, Piping Fabrication
work and support, piping erection work and support, piping line checker works, punch list works,
testing works, reinstatement works, tie-in works, pre-commissioning and commissioning work,
flushing, blowing, air freeing, pigging works, well head piping works maintenance works, shutdown
works.
JOBS AND RESPONSIBILITY
1. Overall Supervision of Piping/Mechanical work including HSE, House Keeping, Piping
Prefabrication including Pipe Supports ,Piping Installation including Pipe Supports ,Spool Piece
Control ,Check and Monitor Tools, Equipment, and Welding Consumables, Check and Monitor
Preservation, Pipe Internal Cleaning .
2. Schedule Monitoring for Man-power Mobilization, Construction Equipment, welding diameter-
inch, No of Spools, and Pipe Supports
3. Pipe Internal Inspection Witness for Fabricated Piping Spool
4. Check if the latest Construction Drawings are Used
5. Consult Engineering problem with Engineers
6. Check and Consult Spool Delivery at Site
7. Check Work Front and Coordinate with Other Disciplines
8. Request Scaffolding Installation
9. Work Permit request.
10. Check Flange Alignment of Rotating Equipment
11. Follow Up of Punch Work
12. Prepare Daily and weekly Report
13. Perform Piping Line Check
14. Consult Punch work with Subcontractor
15. Perform Official Line Check
22
CURRICULUM VITAE
16. Perform Back Check of Punch Work
17. Check and Ensure Piping Test Preparation is properly Made
18. Check and Review of Test Packs prepared by Subcontractor
19. Coordinate and Consult with Subcontractors and Other Discipline concerning Testing
20. Witness of Piping Pressure Test
21. Check and Ensure Piping Flushing and Blowing Preparation is properly Made.
22. Coordinate and Consult with Subcontractors and Other Discipline concerning Piping Flushing
and Blowing
23. Perform Piping Reinstatement Check
24. Attend Daily and Regular Meeting.
25. Ensure Sub-contractor completes all piping activities safely and meets project schedules.
26. Ensure Sub-Contactor meets all project specifications and requirements
27. Member of the Project Management Team supervising the Sub-Contractor.
28. Monitored fabrication / erection of pipe work on remote Oil Gathering Stations.
29. Undertook quality control and safety auditing of all mechanical construction activities
WORKING EXPERIENCE
 March 4/2014 – May 31/2015
Company : PT.TRIPATRA ENGINEERING
Project : GG New field development Project
Location : Offshore West Java
Position : Sr Construction Engeneer
 Dec 1/2013 – February 28/2014
Company : PT.TRIPATRA ENGINEERING
Project : PRRP Project PHE ONWJ
Location : Offshore West Java
Position : Sr Construction Engeneer
 May 1/2013 – Nov 4/2013
Company : PT.TRIPATRA ENGINEERING
Project : UL PHE ONWJ
Location : Bakrie Construction, Sumuranja , Cilegon
Position : Sr Construction Engeneer
 July 22 / 2011 - July 31/2012
Company : PT.AUSENCO
Project : Martabe Gold Project
Location : South Tapanuli , North Sumatra
Position : Structure , Mechanical , Piping Supervisor
 May 02 / 2011 - July 20 / 2011
22
CURRICULUM VITAE
Company : PT.PETROSEA Tbk
Project : Newmont GDA Project
Location : Sumbawa (NNT)
Position : Mechanical Hull Supervisor (Night Shift)
 March 02 / 2009 - October 31 / 2009
Company : NorCE Offshore Pte Ltd
Project : Derrick Lay Barge project-22.000 DWT
Location : Bintan Kepulauan Riau
Position : Structural / Piping Hull Supervisor (Night Shift)
 June 10 / 2008 - December 26 / 2008
Company : PT. PETROSEA Tbk
Project : Bumbun Kalsel Project No : 32725C
Location : Bumbun Kalimantan Selatan
Position : Mechanical/piping Supervisor
 January 07/2008 – May 31/2008
Company : PT. JUMA KIRANA ABADI
Project : Cibaliung Sumber Daya No : 3841C
Location : Cibaliung ,Pandeglang,Banten ,West Java
Position : Mechanical /Piping Superintendent
 October 2/2006 – June 31/2007
Company : PT. ADHI KARYA (Persero)
Project : Pengembangan Bandar Udara
Location : Hasanudin Makasar , Sulsel
Position : Piping Superintendent
 May 2 / 2005 – August 5 / 2006
Company : PT PETROSEA
Project : APN 3553
Location : BP Mike offshore
Position : Piping Supervisor
 Nov 25 / 2004 – Feb 21 / 2005
Company : PT PETROSEA
Project : TLP Project
Location : Unocal off shore
Position : Piping Supervisor
 January 2 / 2004 – June 2 /2004
Company : PT PETROSEA Tbk
Project : Attaka project 3588
Location : Unocal Attaka Offshore
Position : Piping Supervisor
 May 16 / 2003 – Des 7 / 2003
22
CURRICULUM VITAE
Company : PT PETROSEA
Project : 3019 West Seno ( Precom )
Location : Unocal Tanjung Santan Kaltim
Position : Piping Supervisor
 February 26 / 2003 – May 5 / 2003
Company : PT PETROSEA Tbk
Project : Optimalisasi BP Project
Location : Pagerungan Bali South
Position : Piping Supervisor
 June 15 / 2002 – February 20 / 2003
Company : PT PETROSEA Tbk
Project : West Seno 3019
Location : Unocal Tanjung santan Kalimantan timur
Position : Piping Supervisor
 May 21 / 2002 – July 12 / 2002
Company : PT YASA INDUSTRI NUSANTARA
Project : Work shop PGN Project
Location : Bojonrgoro Cilegon
Position : Piping Supervisor
 Dec 11 / 2001 – May 30 / 2001
Company : PT YASA INDUSTRI NUSANTARA
Project : Work shop PIM Project
Location : Bojonegoro Cilegon
Position : Piping Supervisor
 Feb 01 / 2001 – March 31 / 2001
Company : PT YASA INDUSTRI NUSANTARA
Project : Pertamina Indramayu
Location : Balongan Indramayu
Position : Piping Supervisor
 April 04 / 1998 -- May 31 / 1999
Company : PT REKAYASA INDUSTRI
Project : Wayang Windu Geothermal
Location : Pengalengan West Java
Position : Piping Supervisor
 March 03 / 1997 – April 01 / 1998
Company : PT. REKAYASA INDUSTRI
Project : SBR Project
Location : Merak West Java
Position : Piping Supervisor
 July 10 / 1996 - October 20 / 1996
22
CURRICULUM VITAE
Company : PT GREEN HARVA INTERNUSA
Project : PLN – PLTD Air Raja Bintan project
Location : Kepulauan Riau Sumatra
Position : Piping Supervisor
 September 23 / 1995 – June 05 / 1995
Company : PT REKAYASA INDUSTRI
Project : Melamin Project
Location : Bontang Kaltim
Position : Piping Supervisor
 February 15 / 1995 - August 10 / 1995
Company : PT REKAYASA INDUSTRI
Project : Optimalisasi Kaltim 1
Location : Bontang Kalimantan timur
Position : Piping Supervisor
 October 05 / 1994 -- January 10 / 1995
Company : PT GREEN HARVA INTERNUSA
Project : Candra Asri CAPC Project
Location : Anyer West Java
Position : Piping Supervisor
 March 05 / 1994 – September 30 / 1994
Company : PT REKAYASA INDUSTRI
Project : Candra Asri CAPC Project
Location : Anyer West Java
Position : Piping Supervisor
 May 11 / 1993 – March 07 / 1994
Company : PT REKAYASA INDUSTRI
Project : Unocal Geotermal of Indonesia Project
Location : Gunung Salak Sukabumi West Java
Position : Piping Supervisor
 May 19 / 1992 -- April 30 / 1993
Company : PT REKAYASA INDUSTRI
Project : Pusri 1B REK 364
Location : Pusri Palembang Project
Position : Piping Supervisor
 October 09 / 1991 -- January 07 / 1992
Company : KOPERASI DARMA PROFESI
Project : Cabot Carbon Black Plant
Location : Anyer West Java
Position : Foreman Piping
 May 29 / 1991 -- August 24 / 1991
22
CURRICULUM VITAE
Company : PT TIMUR SENTOSA PURNAMA
Project : KODECO Project
Location : Tanjung Priok Jakarta Utara
Position : Foreman Piping
 August 18 / 1990 – December 26 / 1990
Company : PT TRUBA JURONG ENG
Project : PT Inco Project 105 Soroako
Location : Soroako South Sulawesi
Position : Piping Lead Hand
 March 03 / 1990 – June 26 / 1990
Company : PT NIPPON STEEL CONSTRUCTION
Project : Maxsus Pabelokan Project
Location : Pabelokan Kepulauan Seribu
Position : Pipe Fitter
 November 17 / 1987 – July 31 / 1989
Company : PT TRUBA JURONG ENG
Project : Kertas Kraff Aceh
Location : Jamuan Lhokseumawe
Position : Piping Foreman
 November 17 / 1987 – July 31 / 1989
Company : HITACHI ZOSEN
Project : Kertas Kraff Aceh
Location : Jamuan Lhokseumawe
Position : Piping Foreman
22
CURRICULUM VITAE
Company : PT TIMUR SENTOSA PURNAMA
Project : KODECO Project
Location : Tanjung Priok Jakarta Utara
Position : Foreman Piping
 August 18 / 1990 – December 26 / 1990
Company : PT TRUBA JURONG ENG
Project : PT Inco Project 105 Soroako
Location : Soroako South Sulawesi
Position : Piping Lead Hand
 March 03 / 1990 – June 26 / 1990
Company : PT NIPPON STEEL CONSTRUCTION
Project : Maxsus Pabelokan Project
Location : Pabelokan Kepulauan Seribu
Position : Pipe Fitter
 November 17 / 1987 – July 31 / 1989
Company : PT TRUBA JURONG ENG
Project : Kertas Kraff Aceh
Location : Jamuan Lhokseumawe
Position : Piping Foreman
 November 17 / 1987 – July 31 / 1989
Company : HITACHI ZOSEN
Project : Kertas Kraff Aceh
Location : Jamuan Lhokseumawe
Position : Piping Foreman

Más contenido relacionado

Similar a CV Achmad Zaelani

Similar a CV Achmad Zaelani (20)

Curicculum Vitae Mardianto
Curicculum Vitae MardiantoCuricculum Vitae Mardianto
Curicculum Vitae Mardianto
 
CV Kitjuk Harijanto
CV Kitjuk HarijantoCV Kitjuk Harijanto
CV Kitjuk Harijanto
 
CV Komar Eduar Irfanudin.pdf
CV Komar Eduar Irfanudin.pdfCV Komar Eduar Irfanudin.pdf
CV Komar Eduar Irfanudin.pdf
 
CV
CVCV
CV
 
CV_Arijanto EP_2016
CV_Arijanto EP_2016CV_Arijanto EP_2016
CV_Arijanto EP_2016
 
cv Syukur Anton Nugroho
cv  Syukur Anton Nugrohocv  Syukur Anton Nugroho
cv Syukur Anton Nugroho
 
CV
CVCV
CV
 
CV Hendra mai muklis
CV Hendra mai muklisCV Hendra mai muklis
CV Hendra mai muklis
 
01 CV Fajar (welder 5G,6G & Automatic)
01 CV Fajar (welder 5G,6G & Automatic)01 CV Fajar (welder 5G,6G & Automatic)
01 CV Fajar (welder 5G,6G & Automatic)
 
CV
CVCV
CV
 
CV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baruCV_SUPARMAN_TERUPDATE.pdf baru
CV_SUPARMAN_TERUPDATE.pdf baru
 
CURRICULUM VITAE complete
CURRICULUM VITAE completeCURRICULUM VITAE complete
CURRICULUM VITAE complete
 
CV. Muhammad Habibi
CV. Muhammad HabibiCV. Muhammad Habibi
CV. Muhammad Habibi
 
Company Profile PT WSA per Agustus 2016
Company Profile PT WSA per Agustus 2016Company Profile PT WSA per Agustus 2016
Company Profile PT WSA per Agustus 2016
 
CURRICULUM VITE
CURRICULUM VITECURRICULUM VITE
CURRICULUM VITE
 
Lee Choy Huat Resume - 2015
Lee Choy Huat Resume - 2015Lee Choy Huat Resume - 2015
Lee Choy Huat Resume - 2015
 
Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016Update CV-Junaidi_Juni 2016
Update CV-Junaidi_Juni 2016
 
Update CV Warsan 2
Update CV Warsan 2Update CV Warsan 2
Update CV Warsan 2
 
Oloantoni S - Welder CV
Oloantoni S - Welder CVOloantoni S - Welder CV
Oloantoni S - Welder CV
 
CV Wahyu Wahono
CV Wahyu WahonoCV Wahyu Wahono
CV Wahyu Wahono
 

CV Achmad Zaelani

  • 1. 22 CURRICULUM VITAE PERSONAL INFORMATION Name : ACHMAD ZAELANI Place and date of birth: Cilacap March 21 / 1961 Address : Jl Pete No : 6 Rt 01//07 Tritihwetan , Kec Jeruklegi , Kab Cilacap , jawa tengah Telephone No : 081315417882 Sex / Marital Status : Male / Married Religion : Moslem Health : Excellent Nationality : Indonesian Email : ach_zaelani@rocketmail.com SUMMARY OF EXPERIENCE I have over 23 years experienced in piping and mechanical discipline started as piping foreman to Piping/mechanical Supervisor and also Piping/mechanical Superintendent both onshore and offshore works in various company and various project such as; Geothermal power plant project, Pulp and Paper Mill plant Project, Modification and Installation Platform project, Fertilizer plant project, Chemical plant project, Diesel power plant project, Carbon Black plant project, Piping Fabrication work and support, piping erection work and support, piping line checker works, punch list works, testing works, reinstatement works, tie-in works, pre-commissioning and commissioning work, flushing, blowing, air freeing, pigging works, well head piping works maintenance works, shutdown works. JOBS AND RESPONSIBILITY 1. Overall Supervision of Piping/Mechanical work including HSE, House Keeping, Piping Prefabrication including Pipe Supports ,Piping Installation including Pipe Supports ,Spool Piece Control ,Check and Monitor Tools, Equipment, and Welding Consumables, Check and Monitor Preservation, Pipe Internal Cleaning . 2. Schedule Monitoring for Man-power Mobilization, Construction Equipment, welding diameter- inch, No of Spools, and Pipe Supports 3. Pipe Internal Inspection Witness for Fabricated Piping Spool 4. Check if the latest Construction Drawings are Used 5. Consult Engineering problem with Engineers 6. Check and Consult Spool Delivery at Site 7. Check Work Front and Coordinate with Other Disciplines 8. Request Scaffolding Installation 9. Work Permit request. 10. Check Flange Alignment of Rotating Equipment 11. Follow Up of Punch Work 12. Prepare Daily and weekly Report 13. Perform Piping Line Check 14. Consult Punch work with Subcontractor 15. Perform Official Line Check
  • 2. 22 CURRICULUM VITAE 16. Perform Back Check of Punch Work 17. Check and Ensure Piping Test Preparation is properly Made 18. Check and Review of Test Packs prepared by Subcontractor 19. Coordinate and Consult with Subcontractors and Other Discipline concerning Testing 20. Witness of Piping Pressure Test 21. Check and Ensure Piping Flushing and Blowing Preparation is properly Made. 22. Coordinate and Consult with Subcontractors and Other Discipline concerning Piping Flushing and Blowing 23. Perform Piping Reinstatement Check 24. Attend Daily and Regular Meeting. 25. Ensure Sub-contractor completes all piping activities safely and meets project schedules. 26. Ensure Sub-Contactor meets all project specifications and requirements 27. Member of the Project Management Team supervising the Sub-Contractor. 28. Monitored fabrication / erection of pipe work on remote Oil Gathering Stations. 29. Undertook quality control and safety auditing of all mechanical construction activities WORKING EXPERIENCE  March 4/2014 – May 31/2015 Company : PT.TRIPATRA ENGINEERING Project : GG New field development Project Location : Offshore West Java Position : Sr Construction Engeneer  Dec 1/2013 – February 28/2014 Company : PT.TRIPATRA ENGINEERING Project : PRRP Project PHE ONWJ Location : Offshore West Java Position : Sr Construction Engeneer  May 1/2013 – Nov 4/2013 Company : PT.TRIPATRA ENGINEERING Project : UL PHE ONWJ Location : Bakrie Construction, Sumuranja , Cilegon Position : Sr Construction Engeneer  July 22 / 2011 - July 31/2012 Company : PT.AUSENCO Project : Martabe Gold Project Location : South Tapanuli , North Sumatra Position : Structure , Mechanical , Piping Supervisor  May 02 / 2011 - July 20 / 2011
  • 3. 22 CURRICULUM VITAE Company : PT.PETROSEA Tbk Project : Newmont GDA Project Location : Sumbawa (NNT) Position : Mechanical Hull Supervisor (Night Shift)  March 02 / 2009 - October 31 / 2009 Company : NorCE Offshore Pte Ltd Project : Derrick Lay Barge project-22.000 DWT Location : Bintan Kepulauan Riau Position : Structural / Piping Hull Supervisor (Night Shift)  June 10 / 2008 - December 26 / 2008 Company : PT. PETROSEA Tbk Project : Bumbun Kalsel Project No : 32725C Location : Bumbun Kalimantan Selatan Position : Mechanical/piping Supervisor  January 07/2008 – May 31/2008 Company : PT. JUMA KIRANA ABADI Project : Cibaliung Sumber Daya No : 3841C Location : Cibaliung ,Pandeglang,Banten ,West Java Position : Mechanical /Piping Superintendent  October 2/2006 – June 31/2007 Company : PT. ADHI KARYA (Persero) Project : Pengembangan Bandar Udara Location : Hasanudin Makasar , Sulsel Position : Piping Superintendent  May 2 / 2005 – August 5 / 2006 Company : PT PETROSEA Project : APN 3553 Location : BP Mike offshore Position : Piping Supervisor  Nov 25 / 2004 – Feb 21 / 2005 Company : PT PETROSEA Project : TLP Project Location : Unocal off shore Position : Piping Supervisor  January 2 / 2004 – June 2 /2004 Company : PT PETROSEA Tbk Project : Attaka project 3588 Location : Unocal Attaka Offshore Position : Piping Supervisor  May 16 / 2003 – Des 7 / 2003
  • 4. 22 CURRICULUM VITAE Company : PT PETROSEA Project : 3019 West Seno ( Precom ) Location : Unocal Tanjung Santan Kaltim Position : Piping Supervisor  February 26 / 2003 – May 5 / 2003 Company : PT PETROSEA Tbk Project : Optimalisasi BP Project Location : Pagerungan Bali South Position : Piping Supervisor  June 15 / 2002 – February 20 / 2003 Company : PT PETROSEA Tbk Project : West Seno 3019 Location : Unocal Tanjung santan Kalimantan timur Position : Piping Supervisor  May 21 / 2002 – July 12 / 2002 Company : PT YASA INDUSTRI NUSANTARA Project : Work shop PGN Project Location : Bojonrgoro Cilegon Position : Piping Supervisor  Dec 11 / 2001 – May 30 / 2001 Company : PT YASA INDUSTRI NUSANTARA Project : Work shop PIM Project Location : Bojonegoro Cilegon Position : Piping Supervisor  Feb 01 / 2001 – March 31 / 2001 Company : PT YASA INDUSTRI NUSANTARA Project : Pertamina Indramayu Location : Balongan Indramayu Position : Piping Supervisor  April 04 / 1998 -- May 31 / 1999 Company : PT REKAYASA INDUSTRI Project : Wayang Windu Geothermal Location : Pengalengan West Java Position : Piping Supervisor  March 03 / 1997 – April 01 / 1998 Company : PT. REKAYASA INDUSTRI Project : SBR Project Location : Merak West Java Position : Piping Supervisor  July 10 / 1996 - October 20 / 1996
  • 5. 22 CURRICULUM VITAE Company : PT GREEN HARVA INTERNUSA Project : PLN – PLTD Air Raja Bintan project Location : Kepulauan Riau Sumatra Position : Piping Supervisor  September 23 / 1995 – June 05 / 1995 Company : PT REKAYASA INDUSTRI Project : Melamin Project Location : Bontang Kaltim Position : Piping Supervisor  February 15 / 1995 - August 10 / 1995 Company : PT REKAYASA INDUSTRI Project : Optimalisasi Kaltim 1 Location : Bontang Kalimantan timur Position : Piping Supervisor  October 05 / 1994 -- January 10 / 1995 Company : PT GREEN HARVA INTERNUSA Project : Candra Asri CAPC Project Location : Anyer West Java Position : Piping Supervisor  March 05 / 1994 – September 30 / 1994 Company : PT REKAYASA INDUSTRI Project : Candra Asri CAPC Project Location : Anyer West Java Position : Piping Supervisor  May 11 / 1993 – March 07 / 1994 Company : PT REKAYASA INDUSTRI Project : Unocal Geotermal of Indonesia Project Location : Gunung Salak Sukabumi West Java Position : Piping Supervisor  May 19 / 1992 -- April 30 / 1993 Company : PT REKAYASA INDUSTRI Project : Pusri 1B REK 364 Location : Pusri Palembang Project Position : Piping Supervisor  October 09 / 1991 -- January 07 / 1992 Company : KOPERASI DARMA PROFESI Project : Cabot Carbon Black Plant Location : Anyer West Java Position : Foreman Piping  May 29 / 1991 -- August 24 / 1991
  • 6. 22 CURRICULUM VITAE Company : PT TIMUR SENTOSA PURNAMA Project : KODECO Project Location : Tanjung Priok Jakarta Utara Position : Foreman Piping  August 18 / 1990 – December 26 / 1990 Company : PT TRUBA JURONG ENG Project : PT Inco Project 105 Soroako Location : Soroako South Sulawesi Position : Piping Lead Hand  March 03 / 1990 – June 26 / 1990 Company : PT NIPPON STEEL CONSTRUCTION Project : Maxsus Pabelokan Project Location : Pabelokan Kepulauan Seribu Position : Pipe Fitter  November 17 / 1987 – July 31 / 1989 Company : PT TRUBA JURONG ENG Project : Kertas Kraff Aceh Location : Jamuan Lhokseumawe Position : Piping Foreman  November 17 / 1987 – July 31 / 1989 Company : HITACHI ZOSEN Project : Kertas Kraff Aceh Location : Jamuan Lhokseumawe Position : Piping Foreman
  • 7. 22 CURRICULUM VITAE Company : PT TIMUR SENTOSA PURNAMA Project : KODECO Project Location : Tanjung Priok Jakarta Utara Position : Foreman Piping  August 18 / 1990 – December 26 / 1990 Company : PT TRUBA JURONG ENG Project : PT Inco Project 105 Soroako Location : Soroako South Sulawesi Position : Piping Lead Hand  March 03 / 1990 – June 26 / 1990 Company : PT NIPPON STEEL CONSTRUCTION Project : Maxsus Pabelokan Project Location : Pabelokan Kepulauan Seribu Position : Pipe Fitter  November 17 / 1987 – July 31 / 1989 Company : PT TRUBA JURONG ENG Project : Kertas Kraff Aceh Location : Jamuan Lhokseumawe Position : Piping Foreman  November 17 / 1987 – July 31 / 1989 Company : HITACHI ZOSEN Project : Kertas Kraff Aceh Location : Jamuan Lhokseumawe Position : Piping Foreman