SlideShare una empresa de Scribd logo
1 de 39
Total Quality Management
This chapter explains the concepts,
principles, and philosophy of total quality
management.
Total Quality Management
 The way of managing organization to achieve
excellence
 Total – everything
 Quality – degree of excellence
 Management – art, act or way of organizing,
controlling, planning, directing to achieve
certain goals
Definition of TQM (BS4778:1991)
A management philosophy embracing all
activities through which the needs and
expectations of the CUSTOMER and
COMMUNITY, and the objectives of the
organization are satisfied in the most efficient
and cost effective manner by maximising the
potential of ALL employees in a continuing
drive for improvement.”
Total Quality Management
Quality element Previous state TQM
Definition Product-oriented Customer-oriented
Priorities Second to service and
cost
First among equals of
service and cost
Decisions Short-term Long-term
Emphasis Detection Prevention
Errors Operations System
Responsibility Quality Control Everyone
Problem solving Managers Teams
Procurement Price Life-cycle costs
Manager’s role Plan, assign, control,
and enforce
Delegate, coach,
facilitate, and mentor
Total Quality Management
 Requires cultural change – prevention not
detection, pro-active versus fire-fighting, life-
cycle costs not price, etc
 Many companies will not start this
transformation unless faced with
disaster/problems or forced by customers
Improve Quality (Product/Service)
Increase Productivity (less rejects, faster job)
Lower Costs and Higher Profit
Business Growth, Competitive, Jobs, Investment
Effect of Quality Improvement
Increase in productivity with improved quality
Item
Before Improvement
– 10%
nonconforming
After improvement –
5% nonconforming
Relative total costs of 20 units 1.00 1.00
Conforming units 18 19
Relative cost of non-conforming
units
0.10 0.05
Productivity increase 1/18(100)=5.6%
Capacity increase 1/18(100)=5.6%
Profit increase 1/18(100)=5.6%
Scope of the TQM activity
TQM
Principles &
Practices
Leadership
Customer
satisfaction
Employee
improvement
Continuous
improvement
Supplier
partnership
Performance
measures
Tools &
Techniques
Quantitative Non-quantitative
SPC ISO 9000
ISO 14000
Acceptance
Sampling
Reliability Benchmarking
Experimental
design
FMEA
QFD
Total
productive
maintenance
Management
tools
Concurrent
engineering
TQM Six Basic Concepts
1. Leadership
2. Customer Satisfaction
3. Employee Involvement
4. Continuous Process Improvement
5. Supplier Partnership
6. Performance Measures
(All these present an excellent way to run
a business)
Criteria 1
Leadership
 Top management must realize importance of
quality
 Quality is responsibility of everybody, but
ultimate responsibility is CEO
 Involvement and commitment to CQI
 Quality excellence becomes part of business
strategy
 Lead in the implementation process
Characteristics of Successful
Leaders
1. Give attention to external and internal customers
2. Empower, not control subordinates. Provide resources,
training, and work environment to help them do their jobs
3. Emphasize improvement rather than maintenance
4. Emphasize prevention
5. Encourage collaboration rather than competition
6. Train and coach, not direct and supervise
7. Learn from problems – opportunity for improvement
8. Continually try to improve communications
9. Continually demonstrate commitment to quality
10. Choose suppliers on the basis of quality, not price
11. Establish organisational systems that supports quality efforts
Implementation Process
 Must begin from top management, most important
CEO commitment
 Cannot be delegated (indifference, lack of involvement
cited as principle reason for failure)
 Top/senior management must be educated on TQM
philosophy and concepts, also visit successful
companies, read books, articles, attend seminars
 Timing of implementation – is the org ready, re-
organization, change in senior personnel, current crisis
– then need to postpone to favourable time
 Need a roadmap/framework for implementation
 Formation of Quality Council – policies, strategies,
programmes
Implementation Process
Quality council job–
1. Develop core values, vision statement, mission statement, and
quality policy statement
2. Develop strategic long-term plan with goals and annual quality
improvement program with objectives
3. Create total education and training plan
4. Determine and continually monitor cost of poor quality
5. Determine performance measures for the organization, approve
them for functional areas, and monitor them.
6. Continually determine projects that improve processes, particularly
those affect external and internal customer satisfaction
7. Establish multifunctional project and departmental or work group
teams and monitor progress
8. Establish or revise the recognition and reward system to account
new way of doing business. Must begin from top management, most
important CEO commitment
Implementation Process
Core values
- foster TQM behaviour and define the culture
- need to develop own values
Examples from Malcolm Baldrige National Quality Award
1. Customer-driven excellence
2. Visionary leadership
3. Organizational and personal learning
4. Valuing employees and partners
5. Agility
6. Management for innovation
7. Management by fact
8. Systems perspective
9. Social responsibility
10. Focus results and creating value
Criteria 2
Customer Satisfaction
 Customer is always right – in Japan customer is “King”
 Customer expectations constantly changing – 10 years
ago acceptable, now not any more!
 Delighting customers (Kano Model)
 Satisfaction is a function of total experience with
organization
 Must give customers a quality product or service,
reasonable price, on-time delivery, and outstanding
service
 Need to continually examine the quality systems and
practices to be responsive to ever – changing needs,
requirements and expectations – Retain and Win new
customers
Issues for customer satisfaction
Checklist for both internal and external customers
1. Who are my customers?
2. What do they need?
3. What are their measures and expectations?
4. Does my product/service exceed their
expectations?
5. How do I satisfy their needs?
6. What corrective action is necessary?
Customer Feedback
To focus on customer, an effective
feedback program is necessary,
objectives of program are to:
1. Discover customer dissatisfaction
2. Discover priorities of quality, price, delivery
3. Compare performance with competitors
4. Identify customer’s needs
5. Determine opportunities for improvement
Customer Feedback Tools/Method
 Warranty cards/Questionnaire
 Telephone/Mail Surveys
 Focus Groups
 Customer Complaints
 Customer Satisfaction Index
Good experience are told to 6 people while bad
experience are repeated to 15 people
Criteria 3
Employee Involvement
 People – most important resource/asset
 Quality comes from people
 Deming – 15% operator errors, 85%
management system
 Project teams – Quality Control Circles (QCC),
QIT
 Education and training – life long, continuous
both knowledge and skills
 Suggestion schemes; Kaizen, 5S teams
 Motivational programmes, incentive schemes
 Conducive work culture, right attitude,
commitment
Criteria 4
Continuous Process Improvement
 View all work as process – production and
business
 Process – purchasing, design, invoicing, etc.
 Inputs – PROCESS – outputs
 Process improvement – increased customer
satisfaction
 Improvement – 5 ways; Reduce resources,
Reduce errors, Meet expectations of
downstream customers, Make process safer,
make process more satisfying to the person
doing
Continuous Improvement
Inputs – processing – outputs
Input
Materials
Info, Data
People
Money
Process
Work methods
Procedures
Tools
Production – Cutting,
Welding, etc.
Bank –
deposit/withdrawal
process,
Kad Pintar Application
Process at NRD
Outputs
Products
Delivered service
In-process jobs –
forms signed,
drawing completed
Others
Also by-products,
wastes
Conditions
feedback
Problem – Solving Method
 Identify the opportunity (for improvement)
 Analyze the current process
 Develop the optimal solution(s)
 Implement changes
 Study the results
 Standardize the solution
 Plan for the future
Identify the opportunity (for
improvement)
 Phase 1 – Identify problems
 Use Pareto Analysis – external & internal
failures, returns
 Phase 2 – Form a team (same function of
multifunctional)
 Phase 3 – Define scope of problem (Paint
process – data collected for a week
showed high 30% ‘runs’ defect)
Pareto Diagram Example
Process Flow Chart – Ink filling process
2
3
3
4
5
Completed
1
7
8
2
Ink cartridge
assembly
1
2
1 Ink case
Degasification tank
Ink supply
BK/C/Y/M
Seal tape
Vacuum pressure inside ink case
(-550mmHg or lower)
Ink filling process
Welding on adapter/ air holes
Press for proper sealing
Excess seal tape cutting
•Inspection for leaking
•Ink weight checking
(sampling)
Effective date printing
Vacuum packing
Ink leakage check
(after 48 hours)
Analyze the current process
 Understand the current process, how it is
performed
 Develop process flow diagram
 Define target performance
 Collect data, information
 Determine causes not solution (use cause
and effect diagram)
 Root cause if possible
No Input Processes Output
1 Ink case ( INCOMING ) PROCESS #1
~ Pressure inside ink case Vacuum pressure inside ink case to ~ Vacuum pressure under control
~ Jig & clamping conditions (-550mmHg or lower) ( Pressure gauge)
~ Loading & handling method ~ No misallignment
~ Machine condition
~ Pallet accuracy
2 Ink case ( AFTER #1) PROCESS #2
~ Parts after #1 process Ink filling process ~ No overflow of ink
~ Jig & clamping condition ~ Adequate volume of ink
~ Machine condition ( Selfeeder ) ~ Electronic Scale (M3-31-010) ok
~ Ink filling head condition
~ Ink filling volume
3 Ink case ( AFTER #2) PROCESS #3
~ Part after #2 process Seal tape welding on adapter/ air holes ~ Every line: 215±10°C
~ Jig & clamping conditions ~ No misallignment
~ Loading & handling method
~ Machine condition ( Selfeeder )
~ Temperatue of seal tape heater
4 Ink case ( AFTER #3 ) PROCESS #4
~ Part after #2 process Press for proper sealing ~ Proper sealing
~ Jig & clamping conditions ~ No misallignment
~ Spring counterbalance
~ Machine condition
~ Seal plate allignment
5 Ink case ( AFTER #4) PROCESS #5
~ Parts after #3 process Excess seal tape cutting ~ No dented / scratches/ overcut
~ Jig & clamping condition ~ No left over burr
~ Loading & handling method
~ Machine condition ( Selfeeder )
~ Cutter condition
PROCESS MAPPING
Model: BH Model Ink Cartridges
Process: Ink Filling
Project Title: Reduce Seal Tape Wrinkle Defect To Increase Sigma
Affinity diagram Example
Bad maintenance
Old machine
No experienced
technical experts
Temporary
countermeasures
No time to focus on it
Will probably fail
just like most of
the improvement
done earlier
Untrained for
this machine
Doesn’t understand
the problem
No ongoing group to
focus on this
problem
Dun have the math
skills for this
Short term planning
mentality
Plan to solve
problem before
problem clearly
defined
Lack of follow-up
by management
PPeeoopplleeLLaacckk ooff
kknnoowwlleeddggee
MMaacchhiinnee
Issues in solving seal tape wrinkle problem
Develop the optimal solution(s)
 To establish solutions
 Recommended optimal solution to improve process
 Create new process, combine different process,
modify existing process
 Creativity (rubber pad adhesive, door trim)
 Brainstorming, Delphi, Nominal Group Technique
 Evaluate and testing of ideas/possible solutions
Implement changes
 To prepare implementation plan, obtain approval,
conduct process improvements, study results
 Why is it done? How, When, Who, When it will be
done?
OldOld NewNew
OldOld NewNew
Effects of Improvement
New improved palettes
(aluminium palettes)
0.74% Improvement
Old palettes (nylon)
Measure and evaluate results of changes
Standardize solution – certify process, operator,
done?
Next project/problem areas
Positron Control Wave Soldering Process
What Specs Who How Where When
A 880
Flux
0.864 g
0.008
Lab
technician
Specific
gravity
Lab Daily
Study the results/Standardize the
solution/Plan for the future
Criteria 5
Supplier Partnership
 40% product cost comes from purchased
materials, therefore Supplier Quality
Management important
 Substantial portion quality problems from
suppliers
 Need partnership to achieve quality
improvement – long-term purchase contract
 Supplier Management activities
Criteria 5
Supplier Partnership
 Define product/program requirements;
1. Evaluate potential and select the best suppliers
2. Conduct joint quality planning and execution
3. Require statistical evidence of quality
4. Certify suppliers, e.g. ISO 900, Ford Q1
5. Develop and apply Supplier Quality Ratings
 Defects/Percent non-conforming
 Price and Quality costs
 Delivery and Service
Criteria 6
Performance Measures
 Managing by fact rather than gut feelings
 Effective management requires measuring
 Use a baseline, to identify potential projects, to
asses results from improvement
 E.g. Production measures – defects per million,
inventory turns, on-time delivery
 Service – billing errors, sales, activity times
 Customer Satisfaction
 Methods for measuring
 Cost of poor quality
 Internal failure
 External failure
 Prevention costs
 Appraisal costs
Performance Measures
 Award Models (MBNQA, EFQM, PMQA)
 Benchmarking – grade to competitors,
or best practice
 Statistical measures – control charts,
Cpk
 Certifications
 ISO 9000:2000 Quality Mgt System
 ISO 14000 Environmental Mgt System,
 Underwriters Lab (UL), GMP
 QS 9000, ISO/TS 16949
Deming’s 14 Points for Management
1. Create constancy of purpose towards
improvement of product and service with aim
to be competitive, stay in business and
provide jobs.
2. Adopt a new philosophy – new economic
age, learn responsibilities and take on
leadership for future change.
3. Cease dependence on inspection to achieve
quality. Eliminate the need for inspection on a
mass basis by building quality into product in
the first palace.
Deming’s 14 Points for Management
4. End the practice of awarding business on the
basis of price, instead, minimize total costs.
5. Improve constantly and forever the system of
production and service, to improve quality and
productivity, thus decreasing costs.
6. Institute training on the job
7. Institute leadership, supervision to help do a
better job.
8. Drive out fear, everyone can work effectively
for company.
Deming’s 14 Points for Management
9. Breakdown barriers between departments.
Work as teams to foresee production problems.
10. Eliminate slogans, exhortations, and targets for
workforce.
11. Eliminate numerical quotas on the workforce.
12. Remove barriers that rob people pride of
workmanship.
13. Institute a vigorous program of education and
self-improvement.
14. Put everybody to work to accomplish the
transformation.

Más contenido relacionado

La actualidad más candente

Quality Slides
Quality SlidesQuality Slides
Quality Slides
RobbieA
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
knksmart
 
Malcolm baldrige Award
Malcolm baldrige AwardMalcolm baldrige Award
Malcolm baldrige Award
Aatmiki Singh
 
Tqm basic concepts-of_quality_comp_mode
Tqm basic concepts-of_quality_comp_modeTqm basic concepts-of_quality_comp_mode
Tqm basic concepts-of_quality_comp_mode
jamshidnikzad7
 

La actualidad más candente (20)

Quality Slides
Quality SlidesQuality Slides
Quality Slides
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Quality Function Deployment
Quality Function DeploymentQuality Function Deployment
Quality Function Deployment
 
Leadership and tqm
Leadership and tqmLeadership and tqm
Leadership and tqm
 
Tqm unit 2
Tqm unit 2Tqm unit 2
Tqm unit 2
 
Quality management
Quality managementQuality management
Quality management
 
Performance measures
Performance measuresPerformance measures
Performance measures
 
TQM
TQMTQM
TQM
 
TQM (Total Quality Management)
TQM (Total Quality Management)TQM (Total Quality Management)
TQM (Total Quality Management)
 
Introduction to Quality
Introduction to QualityIntroduction to Quality
Introduction to Quality
 
Feigenbaum's Philosophy on Total Quality Management
Feigenbaum's Philosophy on Total Quality ManagementFeigenbaum's Philosophy on Total Quality Management
Feigenbaum's Philosophy on Total Quality Management
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
TQM- History, Evolution & Growth
TQM- History, Evolution & GrowthTQM- History, Evolution & Growth
TQM- History, Evolution & Growth
 
TQM Unit 2
TQM Unit 2TQM Unit 2
TQM Unit 2
 
Malcolm baldrige Award
Malcolm baldrige AwardMalcolm baldrige Award
Malcolm baldrige Award
 
Tqm basic concepts-of_quality_comp_mode
Tqm basic concepts-of_quality_comp_modeTqm basic concepts-of_quality_comp_mode
Tqm basic concepts-of_quality_comp_mode
 
An introduction to tqm
An introduction to tqmAn introduction to tqm
An introduction to tqm
 
Total quality control
Total quality controlTotal quality control
Total quality control
 

Destacado

Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
Mudassar Salman
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
Naeem Hassan
 
The 7 step problem solving methodology
The 7 step problem solving methodologyThe 7 step problem solving methodology
The 7 step problem solving methodology
quest_pune
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
Zaheer Khawaja
 
Schuitema Leadership Transformation Program
Schuitema Leadership Transformation ProgramSchuitema Leadership Transformation Program
Schuitema Leadership Transformation Program
Shahbaz Aftab
 
Ch02 total quality management
Ch02 total quality managementCh02 total quality management
Ch02 total quality management
Sakib Anik
 
total quality management
total quality managementtotal quality management
total quality management
Dr. Sunil Kumar
 
Scope of leadership
Scope of leadershipScope of leadership
Scope of leadership
Pakhi Jain
 

Destacado (20)

Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Continuous process improvement
Continuous process improvementContinuous process improvement
Continuous process improvement
 
The 7 step problem solving methodology
The 7 step problem solving methodologyThe 7 step problem solving methodology
The 7 step problem solving methodology
 
Tqm ch 02
Tqm ch 02Tqm ch 02
Tqm ch 02
 
Total Quality Management
Total Quality ManagementTotal Quality Management
Total Quality Management
 
Introduction to Total Quality Management
Introduction to Total Quality ManagementIntroduction to Total Quality Management
Introduction to Total Quality Management
 
History of total quality management
History of total quality managementHistory of total quality management
History of total quality management
 
Tqm
TqmTqm
Tqm
 
Continuous process improvement (4)
Continuous process improvement (4)Continuous process improvement (4)
Continuous process improvement (4)
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Quality Assurance & Control
Quality Assurance & ControlQuality Assurance & Control
Quality Assurance & Control
 
Tqm power point
Tqm power pointTqm power point
Tqm power point
 
FLC Leadership
FLC LeadershipFLC Leadership
FLC Leadership
 
Schuitema Leadership Transformation Program
Schuitema Leadership Transformation ProgramSchuitema Leadership Transformation Program
Schuitema Leadership Transformation Program
 
اجراءات الاعتماد المدرسي
اجراءات الاعتماد المدرسياجراءات الاعتماد المدرسي
اجراءات الاعتماد المدرسي
 
Ch02 total quality management
Ch02 total quality managementCh02 total quality management
Ch02 total quality management
 
Me nature and scope
Me nature and scopeMe nature and scope
Me nature and scope
 
total quality management
total quality managementtotal quality management
total quality management
 
Scope of leadership
Scope of leadershipScope of leadership
Scope of leadership
 
الأيزو 90001
الأيزو 90001الأيزو 90001
الأيزو 90001
 

Similar a Ch02 total quality management ocka

Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2
akkie16
 
Heizer 06
Heizer 06Heizer 06
Heizer 06
shagitu
 
Session 7_OM
Session 7_OMSession 7_OM
Session 7_OM
thangv
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
thangv
 
A.Total-Quality-Management.pptx
A.Total-Quality-Management.pptxA.Total-Quality-Management.pptx
A.Total-Quality-Management.pptx
asegidhaile
 
1.introduction to quality & total quality management
1.introduction to quality & total quality management1.introduction to quality & total quality management
1.introduction to quality & total quality management
Hakeem-Ur- Rehman
 

Similar a Ch02 total quality management ocka (20)

Ch03 total quality management
Ch03 total quality managementCh03 total quality management
Ch03 total quality management
 
TQM.pptx
TQM.pptxTQM.pptx
TQM.pptx
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Tqm tpm kaizen
Tqm tpm kaizenTqm tpm kaizen
Tqm tpm kaizen
 
1.5. Basic concepts of TQM.pdf
1.5. Basic concepts of TQM.pdf1.5. Basic concepts of TQM.pdf
1.5. Basic concepts of TQM.pdf
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2Productivity and quality_mgmt_v2
Productivity and quality_mgmt_v2
 
3-Total-Quality-Management.pptx
3-Total-Quality-Management.pptx3-Total-Quality-Management.pptx
3-Total-Quality-Management.pptx
 
TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)TOTAL QUALITY MANAGEMENT (TQM)
TOTAL QUALITY MANAGEMENT (TQM)
 
Heizer 06
Heizer 06Heizer 06
Heizer 06
 
Session 7_OM
Session 7_OMSession 7_OM
Session 7_OM
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
Chapter 7_OM
Chapter 7_OMChapter 7_OM
Chapter 7_OM
 
A.Total-Quality-Management.pptx
A.Total-Quality-Management.pptxA.Total-Quality-Management.pptx
A.Total-Quality-Management.pptx
 
Total quality management (TQM)
Total quality management (TQM)Total quality management (TQM)
Total quality management (TQM)
 
1.introduction to quality & total quality management
1.introduction to quality & total quality management1.introduction to quality & total quality management
1.introduction to quality & total quality management
 
Tqm
TqmTqm
Tqm
 
Total quality management complete
Total quality management completeTotal quality management complete
Total quality management complete
 
Introduction to Total Quality Management[TQM]
Introduction to Total Quality Management[TQM]Introduction to Total Quality Management[TQM]
Introduction to Total Quality Management[TQM]
 
UAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality ManagementUAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
UAS Manajemen Kualitas dan Standar Mutu - Total Quality Management
 

Más de Ahmed Said

Management responsibility
Management responsibilityManagement responsibility
Management responsibility
Ahmed Said
 
Project management
Project managementProject management
Project management
Ahmed Said
 
Fundamentalsoffinancialplanning
FundamentalsoffinancialplanningFundamentalsoffinancialplanning
Fundamentalsoffinancialplanning
Ahmed Said
 
Benfit cost guide
Benfit cost guideBenfit cost guide
Benfit cost guide
Ahmed Said
 
Tvm review lecture
Tvm review lectureTvm review lecture
Tvm review lecture
Ahmed Said
 

Más de Ahmed Said (7)

Management responsibility
Management responsibilityManagement responsibility
Management responsibility
 
Project management
Project managementProject management
Project management
 
Fundamentalsoffinancialplanning
FundamentalsoffinancialplanningFundamentalsoffinancialplanning
Fundamentalsoffinancialplanning
 
Benfit cost guide
Benfit cost guideBenfit cost guide
Benfit cost guide
 
Assignmen (1)
Assignmen (1)Assignmen (1)
Assignmen (1)
 
Ocka
OckaOcka
Ocka
 
Tvm review lecture
Tvm review lectureTvm review lecture
Tvm review lecture
 

Ch02 total quality management ocka

  • 1. Total Quality Management This chapter explains the concepts, principles, and philosophy of total quality management.
  • 2. Total Quality Management  The way of managing organization to achieve excellence  Total – everything  Quality – degree of excellence  Management – art, act or way of organizing, controlling, planning, directing to achieve certain goals
  • 3. Definition of TQM (BS4778:1991) A management philosophy embracing all activities through which the needs and expectations of the CUSTOMER and COMMUNITY, and the objectives of the organization are satisfied in the most efficient and cost effective manner by maximising the potential of ALL employees in a continuing drive for improvement.”
  • 4. Total Quality Management Quality element Previous state TQM Definition Product-oriented Customer-oriented Priorities Second to service and cost First among equals of service and cost Decisions Short-term Long-term Emphasis Detection Prevention Errors Operations System Responsibility Quality Control Everyone Problem solving Managers Teams Procurement Price Life-cycle costs Manager’s role Plan, assign, control, and enforce Delegate, coach, facilitate, and mentor
  • 5. Total Quality Management  Requires cultural change – prevention not detection, pro-active versus fire-fighting, life- cycle costs not price, etc  Many companies will not start this transformation unless faced with disaster/problems or forced by customers
  • 6. Improve Quality (Product/Service) Increase Productivity (less rejects, faster job) Lower Costs and Higher Profit Business Growth, Competitive, Jobs, Investment Effect of Quality Improvement
  • 7. Increase in productivity with improved quality Item Before Improvement – 10% nonconforming After improvement – 5% nonconforming Relative total costs of 20 units 1.00 1.00 Conforming units 18 19 Relative cost of non-conforming units 0.10 0.05 Productivity increase 1/18(100)=5.6% Capacity increase 1/18(100)=5.6% Profit increase 1/18(100)=5.6%
  • 8. Scope of the TQM activity TQM Principles & Practices Leadership Customer satisfaction Employee improvement Continuous improvement Supplier partnership Performance measures Tools & Techniques Quantitative Non-quantitative SPC ISO 9000 ISO 14000 Acceptance Sampling Reliability Benchmarking Experimental design FMEA QFD Total productive maintenance Management tools Concurrent engineering
  • 9. TQM Six Basic Concepts 1. Leadership 2. Customer Satisfaction 3. Employee Involvement 4. Continuous Process Improvement 5. Supplier Partnership 6. Performance Measures (All these present an excellent way to run a business)
  • 10. Criteria 1 Leadership  Top management must realize importance of quality  Quality is responsibility of everybody, but ultimate responsibility is CEO  Involvement and commitment to CQI  Quality excellence becomes part of business strategy  Lead in the implementation process
  • 11. Characteristics of Successful Leaders 1. Give attention to external and internal customers 2. Empower, not control subordinates. Provide resources, training, and work environment to help them do their jobs 3. Emphasize improvement rather than maintenance 4. Emphasize prevention 5. Encourage collaboration rather than competition 6. Train and coach, not direct and supervise 7. Learn from problems – opportunity for improvement 8. Continually try to improve communications 9. Continually demonstrate commitment to quality 10. Choose suppliers on the basis of quality, not price 11. Establish organisational systems that supports quality efforts
  • 12. Implementation Process  Must begin from top management, most important CEO commitment  Cannot be delegated (indifference, lack of involvement cited as principle reason for failure)  Top/senior management must be educated on TQM philosophy and concepts, also visit successful companies, read books, articles, attend seminars  Timing of implementation – is the org ready, re- organization, change in senior personnel, current crisis – then need to postpone to favourable time  Need a roadmap/framework for implementation  Formation of Quality Council – policies, strategies, programmes
  • 13. Implementation Process Quality council job– 1. Develop core values, vision statement, mission statement, and quality policy statement 2. Develop strategic long-term plan with goals and annual quality improvement program with objectives 3. Create total education and training plan 4. Determine and continually monitor cost of poor quality 5. Determine performance measures for the organization, approve them for functional areas, and monitor them. 6. Continually determine projects that improve processes, particularly those affect external and internal customer satisfaction 7. Establish multifunctional project and departmental or work group teams and monitor progress 8. Establish or revise the recognition and reward system to account new way of doing business. Must begin from top management, most important CEO commitment
  • 14. Implementation Process Core values - foster TQM behaviour and define the culture - need to develop own values Examples from Malcolm Baldrige National Quality Award 1. Customer-driven excellence 2. Visionary leadership 3. Organizational and personal learning 4. Valuing employees and partners 5. Agility 6. Management for innovation 7. Management by fact 8. Systems perspective 9. Social responsibility 10. Focus results and creating value
  • 15. Criteria 2 Customer Satisfaction  Customer is always right – in Japan customer is “King”  Customer expectations constantly changing – 10 years ago acceptable, now not any more!  Delighting customers (Kano Model)  Satisfaction is a function of total experience with organization  Must give customers a quality product or service, reasonable price, on-time delivery, and outstanding service  Need to continually examine the quality systems and practices to be responsive to ever – changing needs, requirements and expectations – Retain and Win new customers
  • 16. Issues for customer satisfaction Checklist for both internal and external customers 1. Who are my customers? 2. What do they need? 3. What are their measures and expectations? 4. Does my product/service exceed their expectations? 5. How do I satisfy their needs? 6. What corrective action is necessary?
  • 17. Customer Feedback To focus on customer, an effective feedback program is necessary, objectives of program are to: 1. Discover customer dissatisfaction 2. Discover priorities of quality, price, delivery 3. Compare performance with competitors 4. Identify customer’s needs 5. Determine opportunities for improvement
  • 18. Customer Feedback Tools/Method  Warranty cards/Questionnaire  Telephone/Mail Surveys  Focus Groups  Customer Complaints  Customer Satisfaction Index Good experience are told to 6 people while bad experience are repeated to 15 people
  • 19. Criteria 3 Employee Involvement  People – most important resource/asset  Quality comes from people  Deming – 15% operator errors, 85% management system  Project teams – Quality Control Circles (QCC), QIT  Education and training – life long, continuous both knowledge and skills  Suggestion schemes; Kaizen, 5S teams  Motivational programmes, incentive schemes  Conducive work culture, right attitude, commitment
  • 20. Criteria 4 Continuous Process Improvement  View all work as process – production and business  Process – purchasing, design, invoicing, etc.  Inputs – PROCESS – outputs  Process improvement – increased customer satisfaction  Improvement – 5 ways; Reduce resources, Reduce errors, Meet expectations of downstream customers, Make process safer, make process more satisfying to the person doing
  • 21. Continuous Improvement Inputs – processing – outputs Input Materials Info, Data People Money Process Work methods Procedures Tools Production – Cutting, Welding, etc. Bank – deposit/withdrawal process, Kad Pintar Application Process at NRD Outputs Products Delivered service In-process jobs – forms signed, drawing completed Others Also by-products, wastes Conditions feedback
  • 22. Problem – Solving Method  Identify the opportunity (for improvement)  Analyze the current process  Develop the optimal solution(s)  Implement changes  Study the results  Standardize the solution  Plan for the future
  • 23. Identify the opportunity (for improvement)  Phase 1 – Identify problems  Use Pareto Analysis – external & internal failures, returns  Phase 2 – Form a team (same function of multifunctional)  Phase 3 – Define scope of problem (Paint process – data collected for a week showed high 30% ‘runs’ defect)
  • 25. Process Flow Chart – Ink filling process 2 3 3 4 5 Completed 1 7 8 2 Ink cartridge assembly 1 2 1 Ink case Degasification tank Ink supply BK/C/Y/M Seal tape Vacuum pressure inside ink case (-550mmHg or lower) Ink filling process Welding on adapter/ air holes Press for proper sealing Excess seal tape cutting •Inspection for leaking •Ink weight checking (sampling) Effective date printing Vacuum packing Ink leakage check (after 48 hours)
  • 26. Analyze the current process  Understand the current process, how it is performed  Develop process flow diagram  Define target performance  Collect data, information  Determine causes not solution (use cause and effect diagram)  Root cause if possible
  • 27. No Input Processes Output 1 Ink case ( INCOMING ) PROCESS #1 ~ Pressure inside ink case Vacuum pressure inside ink case to ~ Vacuum pressure under control ~ Jig & clamping conditions (-550mmHg or lower) ( Pressure gauge) ~ Loading & handling method ~ No misallignment ~ Machine condition ~ Pallet accuracy 2 Ink case ( AFTER #1) PROCESS #2 ~ Parts after #1 process Ink filling process ~ No overflow of ink ~ Jig & clamping condition ~ Adequate volume of ink ~ Machine condition ( Selfeeder ) ~ Electronic Scale (M3-31-010) ok ~ Ink filling head condition ~ Ink filling volume 3 Ink case ( AFTER #2) PROCESS #3 ~ Part after #2 process Seal tape welding on adapter/ air holes ~ Every line: 215±10°C ~ Jig & clamping conditions ~ No misallignment ~ Loading & handling method ~ Machine condition ( Selfeeder ) ~ Temperatue of seal tape heater 4 Ink case ( AFTER #3 ) PROCESS #4 ~ Part after #2 process Press for proper sealing ~ Proper sealing ~ Jig & clamping conditions ~ No misallignment ~ Spring counterbalance ~ Machine condition ~ Seal plate allignment 5 Ink case ( AFTER #4) PROCESS #5 ~ Parts after #3 process Excess seal tape cutting ~ No dented / scratches/ overcut ~ Jig & clamping condition ~ No left over burr ~ Loading & handling method ~ Machine condition ( Selfeeder ) ~ Cutter condition PROCESS MAPPING Model: BH Model Ink Cartridges Process: Ink Filling Project Title: Reduce Seal Tape Wrinkle Defect To Increase Sigma
  • 28. Affinity diagram Example Bad maintenance Old machine No experienced technical experts Temporary countermeasures No time to focus on it Will probably fail just like most of the improvement done earlier Untrained for this machine Doesn’t understand the problem No ongoing group to focus on this problem Dun have the math skills for this Short term planning mentality Plan to solve problem before problem clearly defined Lack of follow-up by management PPeeoopplleeLLaacckk ooff kknnoowwlleeddggee MMaacchhiinnee Issues in solving seal tape wrinkle problem
  • 29. Develop the optimal solution(s)  To establish solutions  Recommended optimal solution to improve process  Create new process, combine different process, modify existing process  Creativity (rubber pad adhesive, door trim)  Brainstorming, Delphi, Nominal Group Technique  Evaluate and testing of ideas/possible solutions Implement changes  To prepare implementation plan, obtain approval, conduct process improvements, study results  Why is it done? How, When, Who, When it will be done?
  • 31. Effects of Improvement New improved palettes (aluminium palettes) 0.74% Improvement Old palettes (nylon)
  • 32. Measure and evaluate results of changes Standardize solution – certify process, operator, done? Next project/problem areas Positron Control Wave Soldering Process What Specs Who How Where When A 880 Flux 0.864 g 0.008 Lab technician Specific gravity Lab Daily Study the results/Standardize the solution/Plan for the future
  • 33. Criteria 5 Supplier Partnership  40% product cost comes from purchased materials, therefore Supplier Quality Management important  Substantial portion quality problems from suppliers  Need partnership to achieve quality improvement – long-term purchase contract  Supplier Management activities
  • 34. Criteria 5 Supplier Partnership  Define product/program requirements; 1. Evaluate potential and select the best suppliers 2. Conduct joint quality planning and execution 3. Require statistical evidence of quality 4. Certify suppliers, e.g. ISO 900, Ford Q1 5. Develop and apply Supplier Quality Ratings  Defects/Percent non-conforming  Price and Quality costs  Delivery and Service
  • 35. Criteria 6 Performance Measures  Managing by fact rather than gut feelings  Effective management requires measuring  Use a baseline, to identify potential projects, to asses results from improvement  E.g. Production measures – defects per million, inventory turns, on-time delivery  Service – billing errors, sales, activity times  Customer Satisfaction  Methods for measuring  Cost of poor quality  Internal failure  External failure  Prevention costs  Appraisal costs
  • 36. Performance Measures  Award Models (MBNQA, EFQM, PMQA)  Benchmarking – grade to competitors, or best practice  Statistical measures – control charts, Cpk  Certifications  ISO 9000:2000 Quality Mgt System  ISO 14000 Environmental Mgt System,  Underwriters Lab (UL), GMP  QS 9000, ISO/TS 16949
  • 37. Deming’s 14 Points for Management 1. Create constancy of purpose towards improvement of product and service with aim to be competitive, stay in business and provide jobs. 2. Adopt a new philosophy – new economic age, learn responsibilities and take on leadership for future change. 3. Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into product in the first palace.
  • 38. Deming’s 14 Points for Management 4. End the practice of awarding business on the basis of price, instead, minimize total costs. 5. Improve constantly and forever the system of production and service, to improve quality and productivity, thus decreasing costs. 6. Institute training on the job 7. Institute leadership, supervision to help do a better job. 8. Drive out fear, everyone can work effectively for company.
  • 39. Deming’s 14 Points for Management 9. Breakdown barriers between departments. Work as teams to foresee production problems. 10. Eliminate slogans, exhortations, and targets for workforce. 11. Eliminate numerical quotas on the workforce. 12. Remove barriers that rob people pride of workmanship. 13. Institute a vigorous program of education and self-improvement. 14. Put everybody to work to accomplish the transformation.