Lean
 Manufacturing
        CALGARY MAIL PROCESSING PLANT

             •Built in 1975
             •350,000 sq.ft
             •430 employees on three shifts daily and weekends
             •Processes 425 million pieces of mail annually
             •One of two mechanized processing plants in Alberta



“I used to think that we weren’t a manufacturing company; we didn’t produce
anything,”
“but you can lean out mail operations. What we’re looking for is flow; in one door and
out another.”
said Don McLellan, director, mail operations, at the Calgary facility.


Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                         3/10/2013                   2
b.s.abdur rahman university.
Lean
Manufacturing Traditional manufacturing
                                        WITH
                                    Postal operation

       CUSTOMER ORDER &                         CUSTOMER SUPPLIES
        RECEIVE PRODUCT                         MATERIAL/PRODUCT




    MANUFACTURING PLANT                        MAIL PROCESSING PLANT




          RAW MATERIAL                            END CUSTOMER



Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                        3/10/2013      3
b.s.abdur rahman university.
Lean
Manufacturing
        Major problems

             • More Takt time
             • More Cycle time
             • More Conveyor system
             • More maintainance
             • Back injuries to employees
             • Jammed parcels




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                            3/10/2013   4
b.s.abdur rahman university.
Lean
Manufacturing
        Closer Look :

             • Batch and Queue postal operation had many waste
             • Like wait time of letters and parcel to be transported and
             processed.
             • Large batches of mail require excess space, equipment and
             handling.
             • Moving mail faster doesn’t improve cash flow, but it does reduce
             the number of containers, forklifts and conveyors.
             • Waste motion.
             • Missorted letters of parcels are equivalent to defects and
             rework.
             • “We look more at flow because we have no control over what
             comes in at any point in time.” Flow between processes is
             maintained by FIFO (first-in, first-out) lanes., said Carli
             Sanderson, manager projects, at Calgary.
Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                      3/10/2013                   5
b.s.abdur rahman university.
Lean
Manufacturing
        Four stream:

             • Letters
             • Parcels
             • Express mail
             • Publications and advertising mail




      “Each value stream has had success with applying lean,” said McLellan.
      Here’s a look at how it was done in pubs and ad mail.




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                   3/10/2013                   6
b.s.abdur rahman university.
Lean
Manufacturing
        Sweating the details:

             • Value stream
                      Action required to bring a product from concept to
             Launch and from order to delivery.

             • Value stream mapping
                      Previous-state map
                      Current-state map
                      Future-state map

             • Operator balance chart (OBC)
             • Standard Work Document




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                     3/10/2013             7
b.s.abdur rahman university.
Lean
Manufacturing
        Sample Current-state map:




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   8
b.s.abdur rahman university.
Lean
Manufacturing
        Sample Current-state map:




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   9
b.s.abdur rahman university.
Lean
Manufacturing
        TAKT TIME:


        `




   Team members observed and timed operators lifting bags, reading destination
   tags, opening bags, dumping out the bundles of mail, reading addresses,
   tossing bundles of mail into containers, etc.          T=24Sec

Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                      3/10/2013                  10
b.s.abdur rahman university.
Lean
Manufacturing
        Operator Balance Chart (OBC):




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                        3/10/2013   11
b.s.abdur rahman university.
Lean
Manufacturing
    Conveyor system:




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   12
b.s.abdur rahman university.
Lean
Manufacturing
        STANDARD WORK DOCUMENT:




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   13
b.s.abdur rahman university.
Lean
Manufacturing
        Lift assist arm :




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   14
b.s.abdur rahman university.
Lean
Manufacturing
 Score for publications and
 Advertising Mail cell:




Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                    3/10/2013   15
b.s.abdur rahman university.
Lean
Manufacturing
        RESOLVED PROBLEMS:

    • 3.2 million square feet of space freed-up for consolidation,
      reducing reliance on leases
    • 10 years of consecutive profitability
    • Returned dividends to the Canadian government each year, including
    $59 million in 2005
    • Reduced reliance on material handling equipment, overhead conveyors,
    forklifts, etc.
    • Dramatically reduced on-floor inventories, reducing lead time, and
    improving quality
    • Freed-up capacity and an increase in available machine time
    • Improved labor relations –no labor disruptions since starting lean (The
    company said no one would lost their employment because of lean.)


Mohammed Ajmal Sheriff.F
m.Tech-manufacturing engineering.
                                                   3/10/2013                16
b.s.abdur rahman university.
TRIP Steel




                       Thank You

 Mohammed Ajmal Sheriff.F
 m.Tech-manufacturing engineering.
                                     3/10/2013   17
 b.s.abdur rahman university.

Más contenido relacionado

Similar a Lean manufacturing

Additive manufacturing.pptx
Additive manufacturing.pptxAdditive manufacturing.pptx
Additive manufacturing.pptxbinitranjan8
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Incalmodian
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Incalmodian
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentationsimmco
 
John Reddel 2009 Final
John Reddel 2009 FinalJohn Reddel 2009 Final
John Reddel 2009 Finaljmr15601
 
CV - MA Scholtz - Updated
CV - MA Scholtz - UpdatedCV - MA Scholtz - Updated
CV - MA Scholtz - UpdatedMauritz Scholtz
 
DISCOMB Presentation
DISCOMB PresentationDISCOMB Presentation
DISCOMB PresentationIbrahim Kazi
 
Andrew R Martino Resume 2016
Andrew R Martino Resume 2016Andrew R Martino Resume 2016
Andrew R Martino Resume 2016Andrew Martino
 
CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016Anthony Campbell
 
Cv update wasim 06-04-2015
Cv update wasim 06-04-2015Cv update wasim 06-04-2015
Cv update wasim 06-04-2015Wasim Ahmad
 
Resume_(June 2015) Industrial Engineering
Resume_(June 2015) Industrial EngineeringResume_(June 2015) Industrial Engineering
Resume_(June 2015) Industrial EngineeringOmar El Maghraby
 
2015 - Anand Rooplal
2015 - Anand Rooplal2015 - Anand Rooplal
2015 - Anand RooplalAnand Rooplal
 
2015 - Anand Rooplal
2015 - Anand Rooplal2015 - Anand Rooplal
2015 - Anand RooplalAnand Rooplal
 

Similar a Lean manufacturing (20)

waleed_hassan_(new)
waleed_hassan_(new)waleed_hassan_(new)
waleed_hassan_(new)
 
Sayed Resume
Sayed ResumeSayed Resume
Sayed Resume
 
Additive manufacturing.pptx
Additive manufacturing.pptxAdditive manufacturing.pptx
Additive manufacturing.pptx
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Inc
 
Custom Molds Inc
Custom  Molds  IncCustom  Molds  Inc
Custom Molds Inc
 
Simmco Presentation
Simmco PresentationSimmco Presentation
Simmco Presentation
 
John Reddel 2009 Final
John Reddel 2009 FinalJohn Reddel 2009 Final
John Reddel 2009 Final
 
CV - MA Scholtz - Updated
CV - MA Scholtz - UpdatedCV - MA Scholtz - Updated
CV - MA Scholtz - Updated
 
Carel du Plessis CV (1)
Carel du Plessis CV (1)Carel du Plessis CV (1)
Carel du Plessis CV (1)
 
DISCOMB Presentation
DISCOMB PresentationDISCOMB Presentation
DISCOMB Presentation
 
resume skills
resume skillsresume skills
resume skills
 
Nadeem CV
Nadeem CVNadeem CV
Nadeem CV
 
Andrew R Martino Resume 2016
Andrew R Martino Resume 2016Andrew R Martino Resume 2016
Andrew R Martino Resume 2016
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Purchase Mngr., Store,Projects
Purchase Mngr., Store,ProjectsPurchase Mngr., Store,Projects
Purchase Mngr., Store,Projects
 
CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016CV Anthony Campbell Revamped-2016
CV Anthony Campbell Revamped-2016
 
Cv update wasim 06-04-2015
Cv update wasim 06-04-2015Cv update wasim 06-04-2015
Cv update wasim 06-04-2015
 
Resume_(June 2015) Industrial Engineering
Resume_(June 2015) Industrial EngineeringResume_(June 2015) Industrial Engineering
Resume_(June 2015) Industrial Engineering
 
2015 - Anand Rooplal
2015 - Anand Rooplal2015 - Anand Rooplal
2015 - Anand Rooplal
 
2015 - Anand Rooplal
2015 - Anand Rooplal2015 - Anand Rooplal
2015 - Anand Rooplal
 

Último

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxPooja Bhuva
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxAreebaZafar22
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17Celine George
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structuredhanjurrannsibayan2
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - Englishneillewis46
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 

Último (20)

Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 

Lean manufacturing

  • 1. LEAN LEAN MANUFACTURING MANUFACTURING Canada Post Puts Its Stamp on a Lean Transformation Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 1 b.s.abdur rahman university.
  • 2. Lean Manufacturing CALGARY MAIL PROCESSING PLANT •Built in 1975 •350,000 sq.ft •430 employees on three shifts daily and weekends •Processes 425 million pieces of mail annually •One of two mechanized processing plants in Alberta “I used to think that we weren’t a manufacturing company; we didn’t produce anything,” “but you can lean out mail operations. What we’re looking for is flow; in one door and out another.” said Don McLellan, director, mail operations, at the Calgary facility. Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 2 b.s.abdur rahman university.
  • 3. Lean Manufacturing Traditional manufacturing WITH Postal operation CUSTOMER ORDER & CUSTOMER SUPPLIES RECEIVE PRODUCT MATERIAL/PRODUCT MANUFACTURING PLANT MAIL PROCESSING PLANT RAW MATERIAL END CUSTOMER Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 3 b.s.abdur rahman university.
  • 4. Lean Manufacturing Major problems • More Takt time • More Cycle time • More Conveyor system • More maintainance • Back injuries to employees • Jammed parcels Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 4 b.s.abdur rahman university.
  • 5. Lean Manufacturing Closer Look : • Batch and Queue postal operation had many waste • Like wait time of letters and parcel to be transported and processed. • Large batches of mail require excess space, equipment and handling. • Moving mail faster doesn’t improve cash flow, but it does reduce the number of containers, forklifts and conveyors. • Waste motion. • Missorted letters of parcels are equivalent to defects and rework. • “We look more at flow because we have no control over what comes in at any point in time.” Flow between processes is maintained by FIFO (first-in, first-out) lanes., said Carli Sanderson, manager projects, at Calgary. Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 5 b.s.abdur rahman university.
  • 6. Lean Manufacturing Four stream: • Letters • Parcels • Express mail • Publications and advertising mail “Each value stream has had success with applying lean,” said McLellan. Here’s a look at how it was done in pubs and ad mail. Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 6 b.s.abdur rahman university.
  • 7. Lean Manufacturing Sweating the details: • Value stream Action required to bring a product from concept to Launch and from order to delivery. • Value stream mapping Previous-state map Current-state map Future-state map • Operator balance chart (OBC) • Standard Work Document Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 7 b.s.abdur rahman university.
  • 8. Lean Manufacturing Sample Current-state map: Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 8 b.s.abdur rahman university.
  • 9. Lean Manufacturing Sample Current-state map: Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 9 b.s.abdur rahman university.
  • 10. Lean Manufacturing TAKT TIME: ` Team members observed and timed operators lifting bags, reading destination tags, opening bags, dumping out the bundles of mail, reading addresses, tossing bundles of mail into containers, etc. T=24Sec Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 10 b.s.abdur rahman university.
  • 11. Lean Manufacturing Operator Balance Chart (OBC): Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 11 b.s.abdur rahman university.
  • 12. Lean Manufacturing Conveyor system: Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 12 b.s.abdur rahman university.
  • 13. Lean Manufacturing STANDARD WORK DOCUMENT: Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 13 b.s.abdur rahman university.
  • 14. Lean Manufacturing Lift assist arm : Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 14 b.s.abdur rahman university.
  • 15. Lean Manufacturing Score for publications and Advertising Mail cell: Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 15 b.s.abdur rahman university.
  • 16. Lean Manufacturing RESOLVED PROBLEMS: • 3.2 million square feet of space freed-up for consolidation, reducing reliance on leases • 10 years of consecutive profitability • Returned dividends to the Canadian government each year, including $59 million in 2005 • Reduced reliance on material handling equipment, overhead conveyors, forklifts, etc. • Dramatically reduced on-floor inventories, reducing lead time, and improving quality • Freed-up capacity and an increase in available machine time • Improved labor relations –no labor disruptions since starting lean (The company said no one would lost their employment because of lean.) Mohammed Ajmal Sheriff.F m.Tech-manufacturing engineering. 3/10/2013 16 b.s.abdur rahman university.