Más contenido relacionado
Pr quiz
- 1. PR QUIZ BY: PR2(AW/SW ) K. HART
- 14. HOW OFTEN ARE THE FUNCTIONAL AND PULL CABLE PROOF LOAD TEST PERFORMED?
- 24. HOW MUCH FORCE IS PLACED BETWEEN THE BALL AND TOGGLE DURING THE PROOF LOAD TEST?
- 28. WHAT CAN BE USED AS A SUBSTITUTE FOR AIR DURING THE VISUAL INSPECTION?
- 30. WHAT WEIGHT OF CO 2 IS USED IN THE FLOATATION ASSEMBLY OF AND LR-1 LIFERAFT?
- 36. AFTER THE INTIAL INFLATION, HOW LONG SHOULD YOU WAIT BEFORE ADJUSTING THE PRESSURE?
- 38. AFTER READJUSTING THE PRESSURE HOW LONG SHOULD THE LIFERAFT BE LEFT UNDISTURBED BEFORE TAKING THE PRESSURE READING?
- 40. WHAT SHOULD THE PRESSURE BE IN THE LIFERAFT AFTER THE TEST AND CHECK PERIOD?
- 43. ¼ TO ½ oz : 1 gal OF WATER
- 44. WHAT IS THE PREFFERED METHOD OF CLEANING AN AREA BEFORE PATCHING?
- 46. WHAT IS THE LEAST PREFERRED METHOD OF CLEANING BEFORE PATCHING?
- 56. WHAT IS DONE TO THE LIFERAFT AFTER THE PATCHING AND WAITING TIME ARE OVER?
- 65. 2 SEA DYE MARKERS, 2 MK-124, 1 URT-33, 1 POWER SUPPLY, 3 BAGGED WATERS, 50’ OF NYLON CORD, SRU-31, EMERGENCY CODE MANUAL, TYPE II, 3oz, COMBAT CASUALTY BLANKET, BAILING SPONGE, PERSONAL LOWERING DEVICE
- 83. WHAT IS THE IDEAL TEMPERATURE OF THE SHOP WHEN PERFORMING MAINTENANCE ON THE LRU-23?
- 89. THE LIFERAFT MUST BE REMOVED FROM SERVICE IF THERE ARE MORE THAN HOW MANY SQUARE INCHES OF PATCHES?
- 91. WHAT TYPE OF INFLATION ASSEMBLY IS USED IN THE LRU-23/P?
- 95. IN WHAT ORDER ARE THE LEAK TESTS PERFORMED ON THE CANOPY AND FLOOR?
- 102. WHAT TYPE OF MATERIAL IS USED IN THE CONSTRUCTION OF THE LRU-18/U?
- 112. HOW OFTEN ARE LRU-18’S USED IN HELOS INSPECTED BY I-LEVEL PR’S?
- 127. THE LRU-33/A HAS HOW MANY WATER ACTIVATED LIGHTS AND WHERE ARE THEY LOCATED?
- 131. HOW OFTEN IS THE LRU-33/A REPACKED AND BY WHOM IS IT REPACKED?
- 151. IN WHAT MANUAL IS THE MAINTENANCE AND INSPECTION PROCEDURES FOR THE TRI-SAR FLOATATION LOCATED?
- 163. HOW LONG MUST THE FLOATATION BE LEFT UNDISTURBED DURING THE LEAKAGE TEST?
- 168. IN WHAT TYPE OF AIRCRAFT IS THE LPU-23/P SERIES LIFE PRESERVER USED?
- 171. FLU-8A/P (BEING REPLACED WITH THE FLU-8B/P)
- 178. WHAT ARE THE TWO MODES OF OPERATION OF THE INFLATION ASSEMBLY?
- 190. THE LPU-23 IS SUBJECTED TO A SPECIAL INSPECTION, PERFORMED AT I-LEVEL, HOW OFTEN?
- 198. HOW LONG ARE THE BATTERIES USED IN THE FLU-8B/P SERVICABLE?
- 201. FALSE, IF THE SILVER INDICATOR IS VISIBLE IT MEANS THE FLU-8 HAS BEEN USED AND SHOULD BE REMOVED FROM SERVICE
- 202. WHAT TYPE OF MULTIMETER SHOULD BE USED TO TEST THE BATTERIES INSTALLED IN THE FLU-8?
- 204. WHEN TESTING THE BATTERIES INSTALLED IN THE FLU-8, HOW LONG SHOULD YOU WAIT BEFORE TAKING A READING?
- 211. ONE BATTERY IS INSTALLED BACKWARDS, THERE IS A FAULTY CONTACT, OR NO BATTERIES ARE INSTALLED
- 214. WHEN PERFORMING THE BEADED HANDLE PULL TEST, THE PRESERVER SHOULD INFLATE WITH WHAT AMOUNT OF FORCE?
- 220. WHAT IS THE MAXIMUM WATER TEMPERATURE WHEN WASHING A PARACHUTE?
- 222. WHAT IS THE MAXIMUM TEMPERATURE OF THE DRYER WHEN DRYING A PARACHUTE?
- 224. WHEN WASHING A PARACHUTE, YOU SHOULD GATHER AND TIE SUSPENSION LINES EVERY HOW MANY FEET?
- 229. DURING THE PLACE IN SERVICE, WHAT SHOULD BE STENCILED ONTO THE HARNESS? ( IT CAN BE FOUND ON THE CONTAINER)
- 250. THE NES-12 HAS AN OPTIONAL LUMBER SUPPORT THAT IS USED IN WHAT AIRCRAFT?
- 260. THE AUTOMATIC PARACHUTE RIPCORD RELEASE (APRR), INSTALLED IN THE NES-12 IS SET TO AUTOMATICALLY DEPLOY AT WHAT ALTITUDE?
- 262. THE FOUR-LINE RELEASE ASSEMBLY AUTOMATICALLY RELEASES THE SUSPENSION LINES WHEN IMMERSED IN WHAT TYPE OF WATER?
- 282. THE O 2 CYLINDER SUPPLIES HOW MANY MINUTES OF AIR?
- 310. IN WHAT MANUAL WOULD YOU FIND THE PROCEDURES TO CLEAN OXYGEN COMPONENTS?
- 321. O 2 COMPONENT CLEANER AND DISTILLED WATER (50/50)
- 330. YOU SHOULD SAMPLE THE WATER USING Ph TEST PAPER, THE RESULTS SHOULD BE IN WHAT RANGE?
- 332. HOW LONG DOES IT TAKE FOR THE WATER TEMPERATURE IN THE TANK TO REACH 150°F?
- 339. IN WHAT MANUAL WOULD YOU FIND THE MAINTENANCE AND INSPECTION PROCEDURES FOR THE CRU-103/P?
- 355. WHAT TYPE OF PRESSURE DOES THE SAFETY PRESSURE FEATURE MAINTAIN?
- 361. OXYGEN IN WHAT PRESSURE RANGE IS SUPPLIED TO THE REGULATOR BY THE LOX SYSTEM OR OBOGS?
- 368. 2 3” BLACK LINES “ NITROGEN OIL FREE ” IN WHITE
- 371. WHAT MANUAL WOULD YOU USE TO PERFORM INSPECTION ON GENERAL PURPOSE FLIGHT CLOTHING?
- 373. THE TOTAL SURFACE AREA OF PATCHES ON A FLIGHT SUIT SHALL NOT EXCEED HOW MANY INCHES?
- 377. ARAMID CLOTH WILL NOT SUPPORT COMBUSTION BUT WILL BEGIN TO CHAR BETWEEEN WHAT TEMPERATURES?
- 383. HOW OFTEN IS THE CWU-27/P SUBJECTED TO A CALENDAR INSPECTION?
- 426. WHAT ARE THE TWO ANTI-G GARMENTS MOST COMMONLY USED BY THE NAVY?
- 432. HOW OFTEN IS THE ANTI-G GARMENT SUBJECTED TO CALENDAR INSPECTIONS?
- 436. DURING THE LEAK TEST THE PRESSURE SHALL NOT DROP HOW MANY psig IN THE FIRST 30 SECONDS?
- 440. HOW OFTEN IS THE CSU-21/P22P-16 SUBJECTED TO SPECIAL INSPECTIONS?
- 447. WHERE CAN A PR FIND INFORMATION ABOUT ANTI-EXPOSURE ASSEMBLIES?
- 459. HOW OFTEN IS THE CWU-79/P SUBJECTED TO SPECIAL INSPECTIONS?
- 495. IN WHAT MANUAL WOULD YOU FIND MAINTENANCE AND INSPECTION PROCEDURES FOR HELMETS?
- 501. WHAT PART OF THE HELMET ABSORBS MOST OF THE IMPACT FORCE?
- 526. HOW OFTEN ARE MBU-23(V)/P SUBJECTED TO CALENDAR INSPECTIONS?
- 529. A 1/3 CUP OF BLEACH MIXED W/ 1 gal OF WATER