1. Dear Sir,
Please find the attached (PDF) files that enclose the following:
1. My up-to-date detailed curriculum vitae,
2. PMI® Project Management Professional (PMP) Certificate of achievement.
3. & my approval as HVAC QC inspector from SADARA (ARAMCO & DOW
Chemicals project).
Please note that I have:
1. A total of 9 years of experience in contracting / construction field, 2 years out
of them were invested in the Saudi Arabian market for Saudi
ARAMCO projects,
2. And a Saudi Arabian transferable sponsorship (Iqama).
I wish that my experiences meet the requirements of any job vacancy in your
honored company, and if not yet; I am confident that I can develop myself in a brief time
in order to be capable to fulfill my responsibilities to the fullest.
Looking forward to hearing from you very soon.
Yours faithfully,
Eng. Ayham Sami
+966 54 6362272
+962 79 5831600
2. +966-54-6362272Mobile:P.O. Box: 541027
Amman 11937
Jordan
Ayham Sami +962-79-5831600
eng_ayham82@yahoo.comE-mail:
: Ayham Sami Salem Bani-Mustafa
: Transferable.
Full Name
Sponsorship
(Iqama) Status
PMI® Project Management Professional (PMP)
Certificate of achievement for attending a 35 credit hours course in
preparation of the certificate exam, December 2015
Approved by:
1. Saudi Council of Engineers (SCE)
2. Technical & Vocational Training Corp (TVTC) with No.
(11593587).
The Hashemite University Zarqa, Jordan
Bachelor of Mechanical engineering, June 2007
Graduation project: Geothermal Assisted Heat Pump.
Education
3/2014 – NowAL-ALWAN CONTRACTING & MAINTENANCE CO.LTD,
Khobar, KSA
Project dealt with:
REPLACEMENT OF 42 PACUs AT SABGSD
Schools (3 Schools):
Phase 9: Khobar KHGS-03, KHBS-01 & KHGI-
05)
Project Engineer
REPLACEMENT OF PACKAGED A/C UNITS
AT SABGD SCHOOLS (11 Schools):
Mechanical Projects Engineer
Phase 5: KHOBAR, DAMMAM, QATIF &
RAHIMAH (RAS TANURA).
Phase 6: ABQIAQ.
Phase 7: HOFUF & MAHASIN.
Client:
Saudi Aramco
Responsibilities:
Studying and preparation all the engineering
documents required by all of the activities
including but not limited to: Lifting Plan, Lay
down Area, Work procedures and methods,
Experience
3. Fabrication and installation details, CAD shop
drawings, etc.
Monitor the duct measuring and workshop
fabrication.
Preparation of material purchase orders.
Following up the ordered material delivery.
Inspecting at receiving and installation of
equipment and duct as per the approved
submittals, approved drawings, and
standards.
Following up, attending and troubleshooting
the site activities on a daily basis.
Preparation of construction reports.
Observing the construction activities daily to
identify and report any deviations, or non-
conformities, and then supervise the
rectification.
SADARA CHEMICAL III PETROCHEMICAL
PLANT (3 Packages):
JUBAIL – KSA
HVAC QC Engineer
EO/ESS: Ethylene oxide & enveloped shared
system
EOD : Ethylene oxide derivatives.
POD : Propylene oxide derivatives.
Client:
SADARA CHEMICAL COMPANY
(Join venture Saudi ARAMCO & DOW Chemicals)
Responsibilities:
Revising of the material submittals as per the
tender specification, the project
requirements, and the method of statements
for any HVAC activity.
Review of Method Statement for HVAC
activities.
Maintaining the quality of work by assuring
that all work activities are executed in
accordance with the approved IFC drawings,
material submittals, standards, project’s
specifications, and the method of statements,
by means of daily monitoring of site
construction activities and instructing the
construction team to rectify any improper
execution or preservation.
Identify problems, deviations & non
conformities & ensuring its proper disposition
with the assistance of the vendor, and rising
of NCR’s wherever the activity is violating the
approved IFC drawings, material submittals,
or the method of statements.
Preparation of daily, weekly & monthly
inspection program in coordination with the
procurement and the construction
departments.
Reviewing of the projects specification and
4. 6/2012 – 2/2014
any related standards prior to any inspection
activity.
Raising RFI’s logs.
Preparation of RFI’s, including the
preparation of all the required documents
(i.e. MRIR) and collecting of any needed
documents (i.e. delivery notes, MTC’s).
Executing all inspections as per the Inspection
Test Plan (ITP), and reacting to the client’s
inspectors notes.
Inspection of leak test in ducts by light test.
Assuring all the required equipment,
certificates, calibrations, materials are
available and ready by the time of inspection.
Preparation of daily brazing reports, and
brazing summaries.
Execution of Flushing, Pressure Test, and
Vacuum Test.
Managing and organizing all the returned
RFI’s.
Continuously updating the weekly & monthly
inspections reports stating clearly the status
of each RFI, and then raising them to the
client’s representative.
Inspection of receiving & installation of
exhaust fans (for the battery rooms), AHU’s,
hangers & supports, metal ducts (G.I. & S.S.),
duct insulation, air terminals, volume
dampers (manual and motorized), back draft
dampers, refrigerant, copper pipes & fittings,
DX pipes insulation, chemical filters, inertial
filters, bleed fans, ACCU’s, chillers,
combination fire & smoke dampers (FSD’s),
gas tight dampers.
Issam Khatib & Partners Real Estate Developers,
Injaz for Development & Investment Company
Amman, Jordan
Project Mechanical Engineer
Project dealing with:
Fairmont Hotel, Amman
Studying of mechanical systems BOQ & plans,
in order to coordinate them which each
other, and to determine the required sleeves
and boxes to be set by the surveyor before
pouring concrete for the slabs, and shear
walls or cores.
Leading a site team consisting of supervisors,
foremen, and technicians, and monitor their
execution of mechanical trades.
Leading a technical team that includes senior
and junior draftsmen and other mechanical
engineers in order to produce the shop
drawings and then submitting them to the
consultant.
5. 8/2010 – 6/2012
Taking-off drainage pipes and fittings in order
to collect suppliers’ quotations and compare
them.
Preparation, submitting, & following-up of
submittals.
Requesting & comparing quotations from their
appropriate vendors.
Preparation of P.O.’s.
Technically write of any required official
correspondences, reports, etc.
Making a study for sewage rain water
manholes that will serve the project.
Revising of the materials invoices, and
checking if they are according the purchasing
orders, the delivered materials, and as per
the prices offers.
Quantity Surveying and preparation of
invoices.
Babel Contracting Co.,
Amman, Jordan
Projects Mechanical Engineer
Projects dealt with:
JSP: USAID’s Jordanian Schools
Rehabilitation Project; Four Schools.
Installation of solar systems that equip the space
heating system with 40% of the needed energy
including all the required parts devices and
controllers, the job includes Designing, schematics
and shop drawings, calculations, selections, material
and drawing submittals, suppliers invoices revision,
auditing, material procurement, and inventory.
Babel 1: a private ten-apartment residential
building.
Zaid Huseinat Building: a private nine-
apartment residential building.
External Works: Installation of rain water and sewage
main networks, vents, and risers including manholes,
water well, two submersible pits, cold water pumps,
and the municipality main lines.
Internal Works: Supervision the installation of
radiators & heating cabinets, the internal drainage
networks, installation of water distribution cabinets
and all water piping.
Srouji Electromechanical Contracting Est.,
Amman, Jordan
Projects Mechanical Engineer
Projects dealt with:
The Jordanian Parliament – Extension of
the Senators' Offices.
8/2007 – 7/2010
6. HSS (Health System Strengthening – LOT2: Prince
Hashim, Nadeem, and Ghor Al-Safi Hospitals).
Tamleek Residence – Jabal Amman.
Al-DEASA Warehouse – Queen Alia Airport.
Zain telecom. Branch – City Mall.
Studying of BOQ and plans (HVAC, Drainage,
Plumbing, and Fire Fighting), then requesting
and comparing of quotations for the BOQ
items.
Preparation of the shop and the as-built
drawings.
Preparation and following-up of submittals.
Preparation of purchasing orders, and
supplying materials from their appropriate
suppliers.
Leading a technical team for installation and
maintenance.
Dealing with “Gantt Chart” in order to
produce a dedicated daily jobs schedule for
each team.
Preparation of any official letters that may be
needed.
Revising of the materials invoices, and
checking if they are according the purchasing
orders, the delivered materials, and as per
the quotations.
Quantity Surveying
Handing over of the project.
Jordanian Engineers Association (JEA).
Saudi Council of Engineers (SCE).
Memberships
Excellent communication and negotiation skills.
Having the ability of working under the highest pressures.
Pioneering; having an effective team leading and organizational skills.
Self-Motivated, dynamic, flexible, and having the spirit of team-work.
Well organized, good planner and quick learner.
Personal Skills
Excellent computer skills (DOS, Windows, MS Office (WORD, EXCEL,
OUTLOOK).
Drawing using Autodesk AutoCAD.
Computer Skills
Arabic: mother tongue.
English: excellent read, written and spoken.
Languages
Valid Saudi Arabian D/L.
Valid International D/L
Valid Jordanian D/L.
Driving license
Gender: Male.
Date & Place of Birth: 30th
of May, 1982, Amman.
Nationality: Jordanian.
Marital status: Married, having two kids.
Personal
Available upon request.References
7.
8.
9.
10. ..rt...._
.0' -.l
TECNICAS REUNIDAS
SADARA PROJECT
DISTRIBUTION SHEET
Date:
Distributed by :
16·Sep-2014
Reference: EOESS-TRJ.L-0339-2014
Sublect:
KEY PERSONNEL FOR APPROVAl (MR. AYHAM SAMI SAlEEM BANI MUSTAFA)
Primary Action Required:
@] For InformaUon
I]] For Action
(Include a date for completion of action)
Reply Required
Yes
o
No To be analyzed
@ D
Alberto Unares
Juan Pablo Serrano
Luis Alfonso Evisa
Femando Barahona
Jose Manuel Prieto
Alberto Una res Ibanez
Juan Pablo Serrano
Anonio Mateo Triquero
Joe Shaffer
Bona FontanQordo Rodriquez
Valmore Romero
Alvaro Bemabeu
Mauro Marcos Gaudio
Jenaro Ibanez Cano
Juan Emilio Garcia
Jose Luis Martinez Narganes
Manoel Fraga
AbidJan
FranCISco ReQuena Paredes
Franc isco Alexander Rivas Gonzalez
Cesar Bedoya
Francisco Jose Femandex Perez
TR FIELD CONSTRUCTION - JOC
....- Site Manager
~ Construction Manager - EO lESS
~ Construction Manager - EOD
~ Construction Manager - POD
~ Building Construction Manager
HSE Manager
tsz ac Manager
~ Commissioning Manager
Control Manager
t: Contract Manager
Administration Manager
~ Subcontract & Cost Control Manager
~ Subcont. Administration Manager
Subcon. Adm .(GCS-TF.CBI.OD.MENARD)
I- :Sullcon AOm. (AIC. SINOPEC) Ivan Jimenez Herranz
t sueeon Aom .(GCS·PRECAST. ZAMILPETRA Gonzalo Gonzalez Pena
I- suocon Aom (SINOPEC.SARENSJ Pedro M. Sola
~ MaterialS Manager Pedro Rodriguez Munoz
~
I- Handover Manager
~ Planning Manager
~ Interface POD
~ Interface EO
~ Interface EOD
I.-
~
BUilding Superintendent
Civil Superintedents
Structural Steel Superintendents
Ell Superintendents
Painting & Insulation Supenntendent
Tank Superintendent
FIELD ENGINEERING
I- Field Engineering Manager
~ EOD Project Engineer
~ EO Project Engineer
I- POD Project Engineer
~
~
I-
~
~
I-
~
~
L-
FIELD PROCUREMENT
Thibisay Vasquez
Miguel Ange l Pav6n
Andrew Goodwin
Laura de Quevedo
Antonio Garcia Gonzalez
Oscar Enrique Rosado
Patric ia Esplnosa
Andres Vergara
Carmen Adela Belmonte
Carlos Martin Saucedo
Jennilfer Pingarron
Dav id F. Dominguez
Oscar Rod riguez Pena
Juan Ignacio Rojo Blanco
Jul ia Puente Santamaria
Lucia Herrero de Andres
Maria Puga
Rosa Maria Femandez
Ana Mancebo
Mercedes Jimenez/Nadine Baanza
Alejandro Street
Manuel Piquero
David Garrote
Rosa de Coca
Jesus Utrilla
Rosendo Gudino
GustavoGonzalez/Marta Medina
Sanja Km ic
Alvaro Galan Nav ia
M. P. CapilialBelen
Carmen Marco
Carlos Martin Gramcko
Esther Baranda
Juan Carlos Losada
Miguel A. Cipolleti
Marce lino Ortegon
Eduardo Femandez
Elvira Soto
Anmarie Verde
Miguel Angel Garcia
Oscar Garcia Rubio
Carlos Mourelo
TR MADRID· MOe
.--
::: Project Manager EO
f-- Project Manager EOD
I-- Project Manager POD
~ Engineering Manager POD
_ Engineenng Manager EO
_ Project Engineer EOD
=Project Control Manager
Planning Manager
=Cost Control Manager
f-- Procurement Manager
Purchasing Coordinator
=QCManager
QA Coordinator
=Expediting Coordinator
_ Spare Parts Coordinator
_ Logistics
~
IT Manager
HSE Manager
QAManager
OAManager
- Process Engineer
=Diagrams Coordinator
- EO Piping Lead
=POD Piping Lead
_ EOD Piping Lead
_ Piping Matenal Coord inator
I- Pipe Support Coordinator
I- Instrument Engineer
Electrical Engineer
::: Civil! Structures Supervisor
I- Rotating & Package
PCS Lead
:: VesselslMetaliurgy
~ Document Control
r- H.O. Construction Cost Control
~ Senior Contracts Manager
Contracts Manager
~ Proj. Adm inistration Mgr .POD/EOD/EO/SS
~ Proj. Adm inistration EOD
t- Project Administrator EOIESS
r- Cost Control
~ Proiect Secretarv
TIl
~
procurement Director
TO Director
Constr. Director
Int. TKLS Director
Operations Director
Legal
Bp rocurement Engineer
Traffic I Logistic Coordinator
B
~
Document Control Manager
Lead Document Controller (QC)
Project I Executive Secretary
Archlvo
DocumentumiProject File
Hesham Anwar
Sam ir Soliman
Ahmed Mahmoud
Ruben Torres Medina
Kamran Shahzad I Rex J. Bandiola
Comments/ Remarks:
Updated 13 September, 2014
11. SADARA CHEMICALCOMPANY
Ethylene Oxide and Envelope Shc red Systems (EO/f')S )
P.o. Box77333 . Dhahran 31942· Kinqdorr: of Saudi Arabia
£:ontract No. lOl4QJlKl
September 16
th
, 2014
EOESS·TRJ·L·0339·2014
KEY PERSONNEL FOR APPROVAL' MR.
AYHAM SAMI SALEEM BANI MUSTAFA)
Mr Juan Emilio Garcia Marquez
Abdullah Fouad Building 6th Floor
Dammam-Khobar Highway
P.O. Box 77076 AI-Khobar 31952
KSA
Ref.: 02160-TRJ-SD-L-30201
Reference to the above mentioned letter, please be informed that Company has reviewed
the request for Approval of AYHAM SAMI SALEEM BANI MUSTAFA PETRA ac HVAC
INSPECTOR (EOESS) and has been Conditionally Approved for 90 days.
However, Company reserves the right to revoke the approval once found his performance
is unsatisfactory.
Best Regards,
~
MM/HNB/oga
cc:
Attachment:
Remarks:
o Urgent Response by _
[8J Response required
o For Information