Dear Sir,
Please find the attached (PDF) files that enclose the following:
1. My up-to-date detailed curriculum vitae,
2. PMI® Project Management Professional (PMP) Certificate of achievement.
3. & my approval as HVAC QC inspector from SADARA (ARAMCO & DOW
Chemicals project).
Please note that I have:
1. A total of 9 years of experience in contracting / construction field, 2 years out
of them were invested in the Saudi Arabian market for Saudi
ARAMCO projects,
2. And a Saudi Arabian transferable sponsorship (Iqama).
I wish that my experiences meet the requirements of any job vacancy in your
honored company, and if not yet; I am confident that I can develop myself in a brief time
in order to be capable to fulfill my responsibilities to the fullest.
Looking forward to hearing from you very soon.
Yours faithfully,
Eng. Ayham Sami
+966 54 6362272
+962 79 5831600
+966-54-6362272Mobile:P.O. Box: 541027
Amman 11937
Jordan
Ayham Sami +962-79-5831600
eng_ayham82@yahoo.comE-mail:
: Ayham Sami Salem Bani-Mustafa
: Transferable.
Full Name
Sponsorship
(Iqama) Status
PMI® Project Management Professional (PMP)
Certificate of achievement for attending a 35 credit hours course in
preparation of the certificate exam, December 2015
Approved by:
1. Saudi Council of Engineers (SCE)
2. Technical & Vocational Training Corp (TVTC) with No.
(11593587).
The Hashemite University Zarqa, Jordan
Bachelor of Mechanical engineering, June 2007
Graduation project: Geothermal Assisted Heat Pump.
Education
3/2014 – NowAL-ALWAN CONTRACTING & MAINTENANCE CO.LTD,
Khobar, KSA
Project dealt with:
REPLACEMENT OF 42 PACUs AT SABGSD
Schools (3 Schools):
 Phase 9: Khobar KHGS-03, KHBS-01 & KHGI-
05)
Project Engineer
REPLACEMENT OF PACKAGED A/C UNITS
AT SABGD SCHOOLS (11 Schools):
Mechanical Projects Engineer
 Phase 5: KHOBAR, DAMMAM, QATIF &
RAHIMAH (RAS TANURA).
 Phase 6: ABQIAQ.
 Phase 7: HOFUF & MAHASIN.
Client:
Saudi Aramco
Responsibilities:
 Studying and preparation all the engineering
documents required by all of the activities
including but not limited to: Lifting Plan, Lay
down Area, Work procedures and methods,
Experience
Fabrication and installation details, CAD shop
drawings, etc.
 Monitor the duct measuring and workshop
fabrication.
 Preparation of material purchase orders.
 Following up the ordered material delivery.
 Inspecting at receiving and installation of
equipment and duct as per the approved
submittals, approved drawings, and
standards.
 Following up, attending and troubleshooting
the site activities on a daily basis.
 Preparation of construction reports.
 Observing the construction activities daily to
identify and report any deviations, or non-
conformities, and then supervise the
rectification.
SADARA CHEMICAL III PETROCHEMICAL
PLANT (3 Packages):
JUBAIL – KSA
HVAC QC Engineer
 EO/ESS: Ethylene oxide & enveloped shared
system
 EOD : Ethylene oxide derivatives.
 POD : Propylene oxide derivatives.
Client:
SADARA CHEMICAL COMPANY
(Join venture Saudi ARAMCO & DOW Chemicals)
Responsibilities:
 Revising of the material submittals as per the
tender specification, the project
requirements, and the method of statements
for any HVAC activity.
 Review of Method Statement for HVAC
activities.
 Maintaining the quality of work by assuring
that all work activities are executed in
accordance with the approved IFC drawings,
material submittals, standards, project’s
specifications, and the method of statements,
by means of daily monitoring of site
construction activities and instructing the
construction team to rectify any improper
execution or preservation.
 Identify problems, deviations & non
conformities & ensuring its proper disposition
with the assistance of the vendor, and rising
of NCR’s wherever the activity is violating the
approved IFC drawings, material submittals,
or the method of statements.
 Preparation of daily, weekly & monthly
inspection program in coordination with the
procurement and the construction
departments.
 Reviewing of the projects specification and
6/2012 – 2/2014
any related standards prior to any inspection
activity.
 Raising RFI’s logs.
 Preparation of RFI’s, including the
preparation of all the required documents
(i.e. MRIR) and collecting of any needed
documents (i.e. delivery notes, MTC’s).
 Executing all inspections as per the Inspection
Test Plan (ITP), and reacting to the client’s
inspectors notes.
 Inspection of leak test in ducts by light test.
 Assuring all the required equipment,
certificates, calibrations, materials are
available and ready by the time of inspection.
 Preparation of daily brazing reports, and
brazing summaries.
 Execution of Flushing, Pressure Test, and
Vacuum Test.
 Managing and organizing all the returned
RFI’s.
 Continuously updating the weekly & monthly
inspections reports stating clearly the status
of each RFI, and then raising them to the
client’s representative.
 Inspection of receiving & installation of
exhaust fans (for the battery rooms), AHU’s,
hangers & supports, metal ducts (G.I. & S.S.),
duct insulation, air terminals, volume
dampers (manual and motorized), back draft
dampers, refrigerant, copper pipes & fittings,
DX pipes insulation, chemical filters, inertial
filters, bleed fans, ACCU’s, chillers,
combination fire & smoke dampers (FSD’s),
gas tight dampers.
Issam Khatib & Partners Real Estate Developers,
Injaz for Development & Investment Company
Amman, Jordan
Project Mechanical Engineer
Project dealing with:
Fairmont Hotel, Amman
 Studying of mechanical systems BOQ & plans,
in order to coordinate them which each
other, and to determine the required sleeves
and boxes to be set by the surveyor before
pouring concrete for the slabs, and shear
walls or cores.
 Leading a site team consisting of supervisors,
foremen, and technicians, and monitor their
execution of mechanical trades.
 Leading a technical team that includes senior
and junior draftsmen and other mechanical
engineers in order to produce the shop
drawings and then submitting them to the
consultant.
8/2010 – 6/2012
 Taking-off drainage pipes and fittings in order
to collect suppliers’ quotations and compare
them.
 Preparation, submitting, & following-up of
submittals.
 Requesting & comparing quotations from their
appropriate vendors.
 Preparation of P.O.’s.
 Technically write of any required official
correspondences, reports, etc.
 Making a study for sewage rain water
manholes that will serve the project.
 Revising of the materials invoices, and
checking if they are according the purchasing
orders, the delivered materials, and as per
the prices offers.
 Quantity Surveying and preparation of
invoices.
Babel Contracting Co.,
Amman, Jordan
Projects Mechanical Engineer
Projects dealt with:
JSP: USAID’s Jordanian Schools
Rehabilitation Project; Four Schools.
Installation of solar systems that equip the space
heating system with 40% of the needed energy
including all the required parts devices and
controllers, the job includes Designing, schematics
and shop drawings, calculations, selections, material
and drawing submittals, suppliers invoices revision,
auditing, material procurement, and inventory.
Babel 1: a private ten-apartment residential
building.
Zaid Huseinat Building: a private nine-
apartment residential building.
External Works: Installation of rain water and sewage
main networks, vents, and risers including manholes,
water well, two submersible pits, cold water pumps,
and the municipality main lines.
Internal Works: Supervision the installation of
radiators & heating cabinets, the internal drainage
networks, installation of water distribution cabinets
and all water piping.
Srouji Electromechanical Contracting Est.,
Amman, Jordan
Projects Mechanical Engineer
Projects dealt with:
The Jordanian Parliament – Extension of
the Senators' Offices.
8/2007 – 7/2010
HSS (Health System Strengthening – LOT2: Prince
Hashim, Nadeem, and Ghor Al-Safi Hospitals).
Tamleek Residence – Jabal Amman.
Al-DEASA Warehouse – Queen Alia Airport.
Zain telecom. Branch – City Mall.
 Studying of BOQ and plans (HVAC, Drainage,
Plumbing, and Fire Fighting), then requesting
and comparing of quotations for the BOQ
items.
 Preparation of the shop and the as-built
drawings.
 Preparation and following-up of submittals.
 Preparation of purchasing orders, and
supplying materials from their appropriate
suppliers.
 Leading a technical team for installation and
maintenance.
 Dealing with “Gantt Chart” in order to
produce a dedicated daily jobs schedule for
each team.
 Preparation of any official letters that may be
needed.
 Revising of the materials invoices, and
checking if they are according the purchasing
orders, the delivered materials, and as per
the quotations.
 Quantity Surveying
 Handing over of the project.
 Jordanian Engineers Association (JEA).
 Saudi Council of Engineers (SCE).
Memberships
 Excellent communication and negotiation skills.
 Having the ability of working under the highest pressures.
 Pioneering; having an effective team leading and organizational skills.
 Self-Motivated, dynamic, flexible, and having the spirit of team-work.
 Well organized, good planner and quick learner.
Personal Skills
 Excellent computer skills (DOS, Windows, MS Office (WORD, EXCEL,
OUTLOOK).
 Drawing using Autodesk AutoCAD.
Computer Skills
 Arabic: mother tongue.
 English: excellent read, written and spoken.
Languages
 Valid Saudi Arabian D/L.
 Valid International D/L
 Valid Jordanian D/L.
Driving license
 Gender: Male.
 Date & Place of Birth: 30th
of May, 1982, Amman.
 Nationality: Jordanian.
 Marital status: Married, having two kids.
Personal
Available upon request.References
..rt...._
.0' -.l
TECNICAS REUNIDAS
SADARA PROJECT
DISTRIBUTION SHEET
Date:
Distributed by :
16·Sep-2014
Reference: EOESS-TRJ.L-0339-2014
Sublect:
KEY PERSONNEL FOR APPROVAl (MR. AYHAM SAMI SAlEEM BANI MUSTAFA)
Primary Action Required:
@] For InformaUon
I]] For Action
(Include a date for completion of action)
Reply Required
Yes
o
No To be analyzed
@ D
Alberto Unares
Juan Pablo Serrano
Luis Alfonso Evisa
Femando Barahona
Jose Manuel Prieto
Alberto Una res Ibanez
Juan Pablo Serrano
Anonio Mateo Triquero
Joe Shaffer
Bona FontanQordo Rodriquez
Valmore Romero
Alvaro Bemabeu
Mauro Marcos Gaudio
Jenaro Ibanez Cano
Juan Emilio Garcia
Jose Luis Martinez Narganes
Manoel Fraga
AbidJan
FranCISco ReQuena Paredes
Franc isco Alexander Rivas Gonzalez
Cesar Bedoya
Francisco Jose Femandex Perez
TR FIELD CONSTRUCTION - JOC
....- Site Manager
~ Construction Manager - EO lESS
~ Construction Manager - EOD
~ Construction Manager - POD
~ Building Construction Manager
HSE Manager
tsz ac Manager
~ Commissioning Manager
Control Manager
t: Contract Manager
Administration Manager
~ Subcontract & Cost Control Manager
~ Subcont. Administration Manager
Subcon. Adm .(GCS-TF.CBI.OD.MENARD)
I- :Sullcon AOm. (AIC. SINOPEC) Ivan Jimenez Herranz
t sueeon Aom .(GCS·PRECAST. ZAMILPETRA Gonzalo Gonzalez Pena
I- suocon Aom (SINOPEC.SARENSJ Pedro M. Sola
~ MaterialS Manager Pedro Rodriguez Munoz
~
I- Handover Manager
~ Planning Manager
~ Interface POD
~ Interface EO
~ Interface EOD
I.-
~
BUilding Superintendent
Civil Superintedents
Structural Steel Superintendents
Ell Superintendents
Painting & Insulation Supenntendent
Tank Superintendent
FIELD ENGINEERING
I- Field Engineering Manager
~ EOD Project Engineer
~ EO Project Engineer
I- POD Project Engineer
~
~
I-
~
~
I-
~
~
L-
FIELD PROCUREMENT
Thibisay Vasquez
Miguel Ange l Pav6n
Andrew Goodwin
Laura de Quevedo
Antonio Garcia Gonzalez
Oscar Enrique Rosado
Patric ia Esplnosa
Andres Vergara
Carmen Adela Belmonte
Carlos Martin Saucedo
Jennilfer Pingarron
Dav id F. Dominguez
Oscar Rod riguez Pena
Juan Ignacio Rojo Blanco
Jul ia Puente Santamaria
Lucia Herrero de Andres
Maria Puga
Rosa Maria Femandez
Ana Mancebo
Mercedes Jimenez/Nadine Baanza
Alejandro Street
Manuel Piquero
David Garrote
Rosa de Coca
Jesus Utrilla
Rosendo Gudino
GustavoGonzalez/Marta Medina
Sanja Km ic
Alvaro Galan Nav ia
M. P. CapilialBelen
Carmen Marco
Carlos Martin Gramcko
Esther Baranda
Juan Carlos Losada
Miguel A. Cipolleti
Marce lino Ortegon
Eduardo Femandez
Elvira Soto
Anmarie Verde
Miguel Angel Garcia
Oscar Garcia Rubio
Carlos Mourelo
TR MADRID· MOe
.--
::: Project Manager EO
f-- Project Manager EOD
I-- Project Manager POD
~ Engineering Manager POD
_ Engineenng Manager EO
_ Project Engineer EOD
=Project Control Manager
Planning Manager
=Cost Control Manager
f-- Procurement Manager
Purchasing Coordinator
=QCManager
QA Coordinator
=Expediting Coordinator
_ Spare Parts Coordinator
_ Logistics
~
IT Manager
HSE Manager
QAManager
OAManager
- Process Engineer
=Diagrams Coordinator
- EO Piping Lead
=POD Piping Lead
_ EOD Piping Lead
_ Piping Matenal Coord inator
I- Pipe Support Coordinator
I- Instrument Engineer
Electrical Engineer
::: Civil! Structures Supervisor
I- Rotating & Package
PCS Lead
:: VesselslMetaliurgy
~ Document Control
r- H.O. Construction Cost Control
~ Senior Contracts Manager
Contracts Manager
~ Proj. Adm inistration Mgr .POD/EOD/EO/SS
~ Proj. Adm inistration EOD
t- Project Administrator EOIESS
r- Cost Control
~ Proiect Secretarv
TIl
~
procurement Director
TO Director
Constr. Director
Int. TKLS Director
Operations Director
Legal
Bp rocurement Engineer
Traffic I Logistic Coordinator
B
~
Document Control Manager
Lead Document Controller (QC)
Project I Executive Secretary
Archlvo
DocumentumiProject File
Hesham Anwar
Sam ir Soliman
Ahmed Mahmoud
Ruben Torres Medina
Kamran Shahzad I Rex J. Bandiola
Comments/ Remarks:
Updated 13 September, 2014
SADARA CHEMICALCOMPANY
Ethylene Oxide and Envelope Shc red Systems (EO/f')S )
P.o. Box77333 . Dhahran 31942· Kinqdorr: of Saudi Arabia
£:ontract No. lOl4QJlKl
September 16
th
, 2014
EOESS·TRJ·L·0339·2014
KEY PERSONNEL FOR APPROVAL' MR.
AYHAM SAMI SALEEM BANI MUSTAFA)
Mr Juan Emilio Garcia Marquez
Abdullah Fouad Building 6th Floor
Dammam-Khobar Highway
P.O. Box 77076 AI-Khobar 31952
KSA
Ref.: 02160-TRJ-SD-L-30201
Reference to the above mentioned letter, please be informed that Company has reviewed
the request for Approval of AYHAM SAMI SALEEM BANI MUSTAFA PETRA ac HVAC
INSPECTOR (EOESS) and has been Conditionally Approved for 90 days.
However, Company reserves the right to revoke the approval once found his performance
is unsatisfactory.
Best Regards,
~
MM/HNB/oga
cc:
Attachment:
Remarks:
o Urgent Response by _
[8J Response required
o For Information

More Related Content

What's hot

SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERjaved hazari
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMonikandan .B
 
Faheem Mech Engr- Sr.Insp
Faheem Mech Engr- Sr.InspFaheem Mech Engr- Sr.Insp
Faheem Mech Engr- Sr.InspFaheem Ahmed
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVMOHAMMED ABDUL AZEEM
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docNguyenvan Trang
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer MechanicalFaizan Raza
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiBùi Minh Hải
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1John Raj BE, MBA
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CVBINH MAI
 
Makbul Cv
Makbul CvMakbul Cv
Makbul CvMakbul
 
Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector  Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector SYED MUQTAAR AHAMED
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leonardo David
 

What's hot (20)

SYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEERSYED JAVED HAZARI HVAC DESIGN ENGINEER
SYED JAVED HAZARI HVAC DESIGN ENGINEER
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
MONIKANDAN-RESUME - B
MONIKANDAN-RESUME - BMONIKANDAN-RESUME - B
MONIKANDAN-RESUME - B
 
Faheem Mech Engr- Sr.Insp
Faheem Mech Engr- Sr.InspFaheem Mech Engr- Sr.Insp
Faheem Mech Engr- Sr.Insp
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
CV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.docCV of Mr. NGUYEN VAN TRANG.doc
CV of Mr. NGUYEN VAN TRANG.doc
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
QA QC Engineer Mechanical
QA QC Engineer MechanicalQA QC Engineer Mechanical
QA QC Engineer Mechanical
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Mechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh HaiMechanical and Piping Engineer_Bui Minh Hai
Mechanical and Piping Engineer_Bui Minh Hai
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
MaiVanBinh_CV
MaiVanBinh_CVMaiVanBinh_CV
MaiVanBinh_CV
 
resume piping
resume pipingresume piping
resume piping
 
Makbul Cv
Makbul CvMakbul Cv
Makbul Cv
 
Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector  Senior HVAC & Plumbing Engineer & QC Inspector
Senior HVAC & Plumbing Engineer & QC Inspector
 
Ghullam murtaza cv (1)
Ghullam murtaza cv (1)Ghullam murtaza cv (1)
Ghullam murtaza cv (1)
 
Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)Leo Doc (CV)A(Mechanical Supervisor)
Leo Doc (CV)A(Mechanical Supervisor)
 

Similar to Eng. Ayham Sami C.V. Feb 2016 AIO

Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation EngineerZafar Ali
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziMohamed S. Hegazi
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manageryasir arafath
 
Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015mohammad shamim
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1Farhan Morai
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) Mudassir Nazar Dabilkar
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot
 
HVAC Estimation engineer
HVAC Estimation engineerHVAC Estimation engineer
HVAC Estimation engineerAhamed Falil
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docxZiyad Zaidi
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedasim siraj
 

Similar to Eng. Ayham Sami C.V. Feb 2016 AIO (20)

updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
C.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif HegaziC.V. of Mohamed Sherif Hegazi
C.V. of Mohamed Sherif Hegazi
 
Estimation&Proposal Manager
Estimation&Proposal  ManagerEstimation&Proposal  Manager
Estimation&Proposal Manager
 
UPDATED RESUME 2016
UPDATED RESUME 2016UPDATED RESUME 2016
UPDATED RESUME 2016
 
Mohamed khairy CV
Mohamed khairy CVMohamed khairy CV
Mohamed khairy CV
 
Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015Muhammad Shamim up date CV 30-11-2015
Muhammad Shamim up date CV 30-11-2015
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Updated NEW SECCC1
Updated  NEW SECCC1Updated  NEW SECCC1
Updated NEW SECCC1
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdfJefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
Jefferson Tomas Tulabot - Civil Engineer Resume - 26 June 2022.pdf
 
Sr. Estimation engineer
Sr. Estimation engineerSr. Estimation engineer
Sr. Estimation engineer
 
HVAC Estimation engineer
HVAC Estimation engineerHVAC Estimation engineer
HVAC Estimation engineer
 
Anson 090316
Anson 090316Anson 090316
Anson 090316
 
Project procurement Management final report.docx
Project procurement Management final report.docxProject procurement Management final report.docx
Project procurement Management final report.docx
 
EL-SAYES_CV
EL-SAYES_CV EL-SAYES_CV
EL-SAYES_CV
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Nazaqat Ali-Updated CV
Nazaqat Ali-Updated CVNazaqat Ali-Updated CV
Nazaqat Ali-Updated CV
 
Asim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updatedAsim_Siraj__Mechanical_updated
Asim_Siraj__Mechanical_updated
 

Eng. Ayham Sami C.V. Feb 2016 AIO

  • 1. Dear Sir, Please find the attached (PDF) files that enclose the following: 1. My up-to-date detailed curriculum vitae, 2. PMI® Project Management Professional (PMP) Certificate of achievement. 3. & my approval as HVAC QC inspector from SADARA (ARAMCO & DOW Chemicals project). Please note that I have: 1. A total of 9 years of experience in contracting / construction field, 2 years out of them were invested in the Saudi Arabian market for Saudi ARAMCO projects, 2. And a Saudi Arabian transferable sponsorship (Iqama). I wish that my experiences meet the requirements of any job vacancy in your honored company, and if not yet; I am confident that I can develop myself in a brief time in order to be capable to fulfill my responsibilities to the fullest. Looking forward to hearing from you very soon. Yours faithfully, Eng. Ayham Sami +966 54 6362272 +962 79 5831600
  • 2. +966-54-6362272Mobile:P.O. Box: 541027 Amman 11937 Jordan Ayham Sami +962-79-5831600 eng_ayham82@yahoo.comE-mail: : Ayham Sami Salem Bani-Mustafa : Transferable. Full Name Sponsorship (Iqama) Status PMI® Project Management Professional (PMP) Certificate of achievement for attending a 35 credit hours course in preparation of the certificate exam, December 2015 Approved by: 1. Saudi Council of Engineers (SCE) 2. Technical & Vocational Training Corp (TVTC) with No. (11593587). The Hashemite University Zarqa, Jordan Bachelor of Mechanical engineering, June 2007 Graduation project: Geothermal Assisted Heat Pump. Education 3/2014 – NowAL-ALWAN CONTRACTING & MAINTENANCE CO.LTD, Khobar, KSA Project dealt with: REPLACEMENT OF 42 PACUs AT SABGSD Schools (3 Schools):  Phase 9: Khobar KHGS-03, KHBS-01 & KHGI- 05) Project Engineer REPLACEMENT OF PACKAGED A/C UNITS AT SABGD SCHOOLS (11 Schools): Mechanical Projects Engineer  Phase 5: KHOBAR, DAMMAM, QATIF & RAHIMAH (RAS TANURA).  Phase 6: ABQIAQ.  Phase 7: HOFUF & MAHASIN. Client: Saudi Aramco Responsibilities:  Studying and preparation all the engineering documents required by all of the activities including but not limited to: Lifting Plan, Lay down Area, Work procedures and methods, Experience
  • 3. Fabrication and installation details, CAD shop drawings, etc.  Monitor the duct measuring and workshop fabrication.  Preparation of material purchase orders.  Following up the ordered material delivery.  Inspecting at receiving and installation of equipment and duct as per the approved submittals, approved drawings, and standards.  Following up, attending and troubleshooting the site activities on a daily basis.  Preparation of construction reports.  Observing the construction activities daily to identify and report any deviations, or non- conformities, and then supervise the rectification. SADARA CHEMICAL III PETROCHEMICAL PLANT (3 Packages): JUBAIL – KSA HVAC QC Engineer  EO/ESS: Ethylene oxide & enveloped shared system  EOD : Ethylene oxide derivatives.  POD : Propylene oxide derivatives. Client: SADARA CHEMICAL COMPANY (Join venture Saudi ARAMCO & DOW Chemicals) Responsibilities:  Revising of the material submittals as per the tender specification, the project requirements, and the method of statements for any HVAC activity.  Review of Method Statement for HVAC activities.  Maintaining the quality of work by assuring that all work activities are executed in accordance with the approved IFC drawings, material submittals, standards, project’s specifications, and the method of statements, by means of daily monitoring of site construction activities and instructing the construction team to rectify any improper execution or preservation.  Identify problems, deviations & non conformities & ensuring its proper disposition with the assistance of the vendor, and rising of NCR’s wherever the activity is violating the approved IFC drawings, material submittals, or the method of statements.  Preparation of daily, weekly & monthly inspection program in coordination with the procurement and the construction departments.  Reviewing of the projects specification and
  • 4. 6/2012 – 2/2014 any related standards prior to any inspection activity.  Raising RFI’s logs.  Preparation of RFI’s, including the preparation of all the required documents (i.e. MRIR) and collecting of any needed documents (i.e. delivery notes, MTC’s).  Executing all inspections as per the Inspection Test Plan (ITP), and reacting to the client’s inspectors notes.  Inspection of leak test in ducts by light test.  Assuring all the required equipment, certificates, calibrations, materials are available and ready by the time of inspection.  Preparation of daily brazing reports, and brazing summaries.  Execution of Flushing, Pressure Test, and Vacuum Test.  Managing and organizing all the returned RFI’s.  Continuously updating the weekly & monthly inspections reports stating clearly the status of each RFI, and then raising them to the client’s representative.  Inspection of receiving & installation of exhaust fans (for the battery rooms), AHU’s, hangers & supports, metal ducts (G.I. & S.S.), duct insulation, air terminals, volume dampers (manual and motorized), back draft dampers, refrigerant, copper pipes & fittings, DX pipes insulation, chemical filters, inertial filters, bleed fans, ACCU’s, chillers, combination fire & smoke dampers (FSD’s), gas tight dampers. Issam Khatib & Partners Real Estate Developers, Injaz for Development & Investment Company Amman, Jordan Project Mechanical Engineer Project dealing with: Fairmont Hotel, Amman  Studying of mechanical systems BOQ & plans, in order to coordinate them which each other, and to determine the required sleeves and boxes to be set by the surveyor before pouring concrete for the slabs, and shear walls or cores.  Leading a site team consisting of supervisors, foremen, and technicians, and monitor their execution of mechanical trades.  Leading a technical team that includes senior and junior draftsmen and other mechanical engineers in order to produce the shop drawings and then submitting them to the consultant.
  • 5. 8/2010 – 6/2012  Taking-off drainage pipes and fittings in order to collect suppliers’ quotations and compare them.  Preparation, submitting, & following-up of submittals.  Requesting & comparing quotations from their appropriate vendors.  Preparation of P.O.’s.  Technically write of any required official correspondences, reports, etc.  Making a study for sewage rain water manholes that will serve the project.  Revising of the materials invoices, and checking if they are according the purchasing orders, the delivered materials, and as per the prices offers.  Quantity Surveying and preparation of invoices. Babel Contracting Co., Amman, Jordan Projects Mechanical Engineer Projects dealt with: JSP: USAID’s Jordanian Schools Rehabilitation Project; Four Schools. Installation of solar systems that equip the space heating system with 40% of the needed energy including all the required parts devices and controllers, the job includes Designing, schematics and shop drawings, calculations, selections, material and drawing submittals, suppliers invoices revision, auditing, material procurement, and inventory. Babel 1: a private ten-apartment residential building. Zaid Huseinat Building: a private nine- apartment residential building. External Works: Installation of rain water and sewage main networks, vents, and risers including manholes, water well, two submersible pits, cold water pumps, and the municipality main lines. Internal Works: Supervision the installation of radiators & heating cabinets, the internal drainage networks, installation of water distribution cabinets and all water piping. Srouji Electromechanical Contracting Est., Amman, Jordan Projects Mechanical Engineer Projects dealt with: The Jordanian Parliament – Extension of the Senators' Offices. 8/2007 – 7/2010
  • 6. HSS (Health System Strengthening – LOT2: Prince Hashim, Nadeem, and Ghor Al-Safi Hospitals). Tamleek Residence – Jabal Amman. Al-DEASA Warehouse – Queen Alia Airport. Zain telecom. Branch – City Mall.  Studying of BOQ and plans (HVAC, Drainage, Plumbing, and Fire Fighting), then requesting and comparing of quotations for the BOQ items.  Preparation of the shop and the as-built drawings.  Preparation and following-up of submittals.  Preparation of purchasing orders, and supplying materials from their appropriate suppliers.  Leading a technical team for installation and maintenance.  Dealing with “Gantt Chart” in order to produce a dedicated daily jobs schedule for each team.  Preparation of any official letters that may be needed.  Revising of the materials invoices, and checking if they are according the purchasing orders, the delivered materials, and as per the quotations.  Quantity Surveying  Handing over of the project.  Jordanian Engineers Association (JEA).  Saudi Council of Engineers (SCE). Memberships  Excellent communication and negotiation skills.  Having the ability of working under the highest pressures.  Pioneering; having an effective team leading and organizational skills.  Self-Motivated, dynamic, flexible, and having the spirit of team-work.  Well organized, good planner and quick learner. Personal Skills  Excellent computer skills (DOS, Windows, MS Office (WORD, EXCEL, OUTLOOK).  Drawing using Autodesk AutoCAD. Computer Skills  Arabic: mother tongue.  English: excellent read, written and spoken. Languages  Valid Saudi Arabian D/L.  Valid International D/L  Valid Jordanian D/L. Driving license  Gender: Male.  Date & Place of Birth: 30th of May, 1982, Amman.  Nationality: Jordanian.  Marital status: Married, having two kids. Personal Available upon request.References
  • 7.
  • 8.
  • 9.
  • 10. ..rt...._ .0' -.l TECNICAS REUNIDAS SADARA PROJECT DISTRIBUTION SHEET Date: Distributed by : 16·Sep-2014 Reference: EOESS-TRJ.L-0339-2014 Sublect: KEY PERSONNEL FOR APPROVAl (MR. AYHAM SAMI SAlEEM BANI MUSTAFA) Primary Action Required: @] For InformaUon I]] For Action (Include a date for completion of action) Reply Required Yes o No To be analyzed @ D Alberto Unares Juan Pablo Serrano Luis Alfonso Evisa Femando Barahona Jose Manuel Prieto Alberto Una res Ibanez Juan Pablo Serrano Anonio Mateo Triquero Joe Shaffer Bona FontanQordo Rodriquez Valmore Romero Alvaro Bemabeu Mauro Marcos Gaudio Jenaro Ibanez Cano Juan Emilio Garcia Jose Luis Martinez Narganes Manoel Fraga AbidJan FranCISco ReQuena Paredes Franc isco Alexander Rivas Gonzalez Cesar Bedoya Francisco Jose Femandex Perez TR FIELD CONSTRUCTION - JOC ....- Site Manager ~ Construction Manager - EO lESS ~ Construction Manager - EOD ~ Construction Manager - POD ~ Building Construction Manager HSE Manager tsz ac Manager ~ Commissioning Manager Control Manager t: Contract Manager Administration Manager ~ Subcontract & Cost Control Manager ~ Subcont. Administration Manager Subcon. Adm .(GCS-TF.CBI.OD.MENARD) I- :Sullcon AOm. (AIC. SINOPEC) Ivan Jimenez Herranz t sueeon Aom .(GCS·PRECAST. ZAMILPETRA Gonzalo Gonzalez Pena I- suocon Aom (SINOPEC.SARENSJ Pedro M. Sola ~ MaterialS Manager Pedro Rodriguez Munoz ~ I- Handover Manager ~ Planning Manager ~ Interface POD ~ Interface EO ~ Interface EOD I.- ~ BUilding Superintendent Civil Superintedents Structural Steel Superintendents Ell Superintendents Painting & Insulation Supenntendent Tank Superintendent FIELD ENGINEERING I- Field Engineering Manager ~ EOD Project Engineer ~ EO Project Engineer I- POD Project Engineer ~ ~ I- ~ ~ I- ~ ~ L- FIELD PROCUREMENT Thibisay Vasquez Miguel Ange l Pav6n Andrew Goodwin Laura de Quevedo Antonio Garcia Gonzalez Oscar Enrique Rosado Patric ia Esplnosa Andres Vergara Carmen Adela Belmonte Carlos Martin Saucedo Jennilfer Pingarron Dav id F. Dominguez Oscar Rod riguez Pena Juan Ignacio Rojo Blanco Jul ia Puente Santamaria Lucia Herrero de Andres Maria Puga Rosa Maria Femandez Ana Mancebo Mercedes Jimenez/Nadine Baanza Alejandro Street Manuel Piquero David Garrote Rosa de Coca Jesus Utrilla Rosendo Gudino GustavoGonzalez/Marta Medina Sanja Km ic Alvaro Galan Nav ia M. P. CapilialBelen Carmen Marco Carlos Martin Gramcko Esther Baranda Juan Carlos Losada Miguel A. Cipolleti Marce lino Ortegon Eduardo Femandez Elvira Soto Anmarie Verde Miguel Angel Garcia Oscar Garcia Rubio Carlos Mourelo TR MADRID· MOe .-- ::: Project Manager EO f-- Project Manager EOD I-- Project Manager POD ~ Engineering Manager POD _ Engineenng Manager EO _ Project Engineer EOD =Project Control Manager Planning Manager =Cost Control Manager f-- Procurement Manager Purchasing Coordinator =QCManager QA Coordinator =Expediting Coordinator _ Spare Parts Coordinator _ Logistics ~ IT Manager HSE Manager QAManager OAManager - Process Engineer =Diagrams Coordinator - EO Piping Lead =POD Piping Lead _ EOD Piping Lead _ Piping Matenal Coord inator I- Pipe Support Coordinator I- Instrument Engineer Electrical Engineer ::: Civil! Structures Supervisor I- Rotating & Package PCS Lead :: VesselslMetaliurgy ~ Document Control r- H.O. Construction Cost Control ~ Senior Contracts Manager Contracts Manager ~ Proj. Adm inistration Mgr .POD/EOD/EO/SS ~ Proj. Adm inistration EOD t- Project Administrator EOIESS r- Cost Control ~ Proiect Secretarv TIl ~ procurement Director TO Director Constr. Director Int. TKLS Director Operations Director Legal Bp rocurement Engineer Traffic I Logistic Coordinator B ~ Document Control Manager Lead Document Controller (QC) Project I Executive Secretary Archlvo DocumentumiProject File Hesham Anwar Sam ir Soliman Ahmed Mahmoud Ruben Torres Medina Kamran Shahzad I Rex J. Bandiola Comments/ Remarks: Updated 13 September, 2014
  • 11. SADARA CHEMICALCOMPANY Ethylene Oxide and Envelope Shc red Systems (EO/f')S ) P.o. Box77333 . Dhahran 31942· Kinqdorr: of Saudi Arabia £:ontract No. lOl4QJlKl September 16 th , 2014 EOESS·TRJ·L·0339·2014 KEY PERSONNEL FOR APPROVAL' MR. AYHAM SAMI SALEEM BANI MUSTAFA) Mr Juan Emilio Garcia Marquez Abdullah Fouad Building 6th Floor Dammam-Khobar Highway P.O. Box 77076 AI-Khobar 31952 KSA Ref.: 02160-TRJ-SD-L-30201 Reference to the above mentioned letter, please be informed that Company has reviewed the request for Approval of AYHAM SAMI SALEEM BANI MUSTAFA PETRA ac HVAC INSPECTOR (EOESS) and has been Conditionally Approved for 90 days. However, Company reserves the right to revoke the approval once found his performance is unsatisfactory. Best Regards, ~ MM/HNB/oga cc: Attachment: Remarks: o Urgent Response by _ [8J Response required o For Information