Project Methodology Using
PRINCE2 (Maximo Upgrade
Project)
Balasubramanian.C
Project Process in PRINCE2
1) Starting Up a Project
2) Directing a Project
3) Initiating a Project
4) Controlling a Stage
5) Managing Product Delivery
6) Managing Stage Boundary
7) Closing a Project
A) Project Mandate
A) Project Mandate
A.1)Project Mandate Input to Project
Startup produced by Corporate or Program
Management
1) Starting Up a Project
1.A)Activities Involved
1.A.1)Appoint the Executive and
Project Manager
1.A.2) Capture previous lessons
1.A.3) Design and appoint the project
management team
1.A.4) Prepare the outline Business
Case
1.A.5) Select the project approach and
assemble the Project Brief
1.A.6) Plan the initiation stage
1.B)Management
Products
1.B.1)Daily Log created
1.B.2)Lessons Log created
1.B.3)Outline Business Case
created
1.B.4)Project Product Description
created
1.B.5)Project Brief created
1.B.6)Initiation Stage Plan created
DP1
2) Directing a Project
Authorize Initiation
Authorize Project
Authorize Stage Plan or Exception Plan
Give Adhoc Direction
Authorize Project Closure
1.C)Activities Involved
DP1
DP2
DP3
DP4
DP5
Project Board Activities (Senior User + Senior
Supplier + Executive)
3) Initiating a Project
1.D)Activities Involved
1.D.1) Prepare the Risk Management
Strategy
1.D.2) Prepare Configuration
Management Strategy
1.D.3) Prepare Quality Management
Strategy
1.D.4) Prepare Communication
Management Strategy
1.D.5) Set up Project Controls
1.D.6) Create the project Plan
1.D.7) Refine the Business Case
1.D.8) Assemble the Project Initiation
Documentation
1.E)Management
Products
1.E.1) Risk Management Strategy
Created
1.E.2) Configuration Management
Strategy Created
1.E.3) Communication
Management Strategy Created
1.E.4) Project Plan Created
1.E.5) (Detailed) Business Case
Created
1.E.6) Risk Register created
1.E.7) Configuration Items Records
Created
1.E.8) Issue Register Created
1.E.9) Quality Register Created
1.E.10) Benefits Review Plan
Created
1.F)Themes : Plan
1.F.1) Product Breakdown Structure
Created
1.F.2) Product Descriptions Created
1.F.3) Product Flow Diagram Created
DP2 DP4
4) Controlling a Stage
1.G)Activities Involved
1.G.1)Authorize a Work package
1.G.2)Review Work Package status
1.G.3)Receive completed Work
Packages
1.G.4)Review the stage status
1.G.5)Report Highlights
1.G.6)Capture and examine issues
and risks
1.G.7)Escalate issues and risks
1.G.8)Take corrective action
1.H)Management
Products
1.H.1) Work Packages created
1.H.2) Highlight Report(s) created
1.H.3) Issue Report(s) created
1.H.4) Exception Report(s)
created
1.H.5) Stage Plan updated
1.H.6) Configuration Item
Records updated
1.H.7) Risk Register updated
1.H.8) Issue Register updated
1.H.9) Quality Register updated
1.H.10) Work Package(s)
updated
1.H.11) Lessons log updated
1.H.12) Issue Report updated
1.H.13) Daily Log updated
DP4
5) Managing Product Delivery
1.I)Activities Involved
1.1.1) Accept a Work Package
1.1.2) Execute a Work Package
1.1.3) Deliver a Work Package
1.J)Management
Products
1.J.1) Quality Register updated
1.J.2) Configuration Item Records
updated
1.J.3) Team Plan created
1.J.4) Checkpoint Reports created
6) Managing Stage Boundary
1.K)Activities Involved
1.K.1) Plan the next stage
1.K.2) Update the Project Plan
1.K.3) Update the Business Case
1.K.4) Report stage end
1.K.5) Produce an Exception Plan
1.L)Management
Products
1.L.1) Project Initiation
Documentation updated
1.L.2) Configuration Item
Records updated
1.L.3) Risk Register updated
1.L.4) Issue Register updated
1.L.5) Quality Register updated
1.L.6) Project Plan updated
1.L.7) Business Case updated
1.L.8) Benefits Review Plan
updated
1.L.9) Stage or Exception Plan
created
1.L.10) Product Descriptions
(next stage) created
1.L.11) End Stage Report created
1.L.12) Lessons Report created
DP3 DP4
7) Closing a Project
1.M)Activities Involved
1.M.1) Prepare planned closure
1.M.2) Prepare premature closure
1.M.3) Hand over products
1.M.4) Evaluate the project
1.M.5) Recommend project closure
1.N)Management
Products
1.N.1) Follow-on action
recommendations created
1.N.2) Lessons Report created
1.N.3) Project Initiation
Documentation updated
1.N.4) Project Plan updated
1.N.5) Issue Register updated
1.N.6) Configuration Item
Records updated
1.N.7) Benefits Review Plan
updated
1.N.8) Risk Register closed
1.N.9) Issue Register closed
1.N.10) Quality Register closed
1.N.11) Daily Log closed
1.N.12) Lessons Log closed
DP5
Maximo Upgrade using PRINCE2 Project Process
Starting Up a Project
1.1) Appoint Executive and Project Manager
1.2) Capture Previous Lessons
1.3) Design and Appoint Project Management Team
1.4) Prepare Outline Business Case
1.5) Select Project Approach and Assemble the Project Brief
1.6) Plan the Initiation Stage
DP1
A.1)Project Mandate Input to Project
Startup produced by Corporate or Program
Management
Directing a Project
2.2) Authorize Project
2.3) Authorize Stage or Exception Plan
2.4) Give Adhoc Direction
2.5) Authorize Closure
2.1) Authorize Initiation DP1
DP2
DP3
DP4
DP5
Project Board Activities (Senior User + Senior Supplier +
Executive)
Initiating a Project
DP2 DP4
3.2) Core Team Assembly
3.3) Product Orientation
3.4) Training Strategy
3.5) Cutover Strategy
3.1) Kickoff Meeting
3.D.1) Prepare the Risk Management
Strategy
3.D.2) Prepare Configuration
Management Strategy
3.D.3) Prepare Quality Management
Strategy
3.D.4) Prepare Communication
Management Strategy
3.D.5) Set up Project Controls
3.D.6) Create the project Plan
3.D.7) Refine the Business Case
3.D.8) Assemble the Project Initiation
Documentation
Controlling a Stage- Gap Analysis
4.1) Business Process Review
4.2) Fit Gap Analysis
4.3)Data Source Review
4.4) Initial Data Mapping
4.5) New Requirements
Carry Out Managing Stage Boundary Process
DP3 DP4
Controlling a Stage – Design
5.1) Design CRP(Conference Room Pilots)
5.2) Workflow Analysis and Design
5.3) SOP Development
5.4) Data Mapping
Carry Out Managing Stage Boundary Process
DP3 DP4
Controlling a Stage- Build
6.1) Server Infrastructure Build
6.2) Maximo Install 7.x
6.3) Maximo Configuration
6.4) Customization
6.5) Reports / KPI’s
6.6) Security
6.7) Workflow Development
Carry Out Managing Stage Boundary Process
DP3 DP4
Controlling a Stage – Data Migration
7.1) Legacy Data Migration
7.2) Integration Framework
7.3) Data Load Development
7.4) Data Testing
Carry Out Managing Stage Boundary Process
DP3 DP4
Controlling a Stage - Testing
8.1) System Integration Testing
8.2) Data Migration Testing
8.3) Performance Testing
8.4) User Acceptance Testing
8.5) Cutover to Production Testing
DP3 DP4
Carry Out Managing Stage Boundary Process
Controlling a Stage - Training
9.1) End User Training
9.2) Systems Administrator Training
9.3) Reports Developer Training
DP3 DP4
Carry Out Closing a Project Process
Closing a Project
10.1) Execute Cutover Plan
10.2) Data Migration
10.3) Go Live
10.4) Stabilization
10.5) Post Implementation Review
DP5
Thank You
Balasubramanian.C,B.E,ITIL®V3,PRINCE2®
Project Manager

Más contenido relacionado

Similar a Maximo project approach using prince2

CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
Pamela Garrett
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
Aarti Dahiya PMP
 

Similar a Maximo project approach using prince2 (20)

CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)CCI PM Processes (within PMP Process Groups and Knowledge Areas)
CCI PM Processes (within PMP Process Groups and Knowledge Areas)
 
Itto pmbok guide 6th edition
Itto   pmbok guide 6th editionItto   pmbok guide 6th edition
Itto pmbok guide 6th edition
 
PMI Project Management Framework
PMI Project Management FrameworkPMI Project Management Framework
PMI Project Management Framework
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3 Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
Proses Manajemen Proyek - PMBOK Guide Fifth Edition Chapter 3
 
Leveraging Agile Project Management with Scrum
Leveraging Agile Project Management with ScrumLeveraging Agile Project Management with Scrum
Leveraging Agile Project Management with Scrum
 
Project managment 3
Project managment 3Project managment 3
Project managment 3
 
PM process groups and processes
PM process groups and processesPM process groups and processes
PM process groups and processes
 
Project management
Project managementProject management
Project management
 
PMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time managementPMP PMBOK 5TH Ch 6 time management
PMP PMBOK 5TH Ch 6 time management
 
Ch 8(spi)cm mi-pp
Ch 8(spi)cm mi-ppCh 8(spi)cm mi-pp
Ch 8(spi)cm mi-pp
 
PMP Material
PMP MaterialPMP Material
PMP Material
 
PMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration ManagementPMP Lecture 4: Project Integration Management
PMP Lecture 4: Project Integration Management
 
5.1 Plan Scope Management
5.1 Plan Scope Management5.1 Plan Scope Management
5.1 Plan Scope Management
 
Project Management
Project ManagementProject Management
Project Management
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
R&D Project Management
R&D Project ManagementR&D Project Management
R&D Project Management
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
MonitoringFrameWork
MonitoringFrameWorkMonitoringFrameWork
MonitoringFrameWork
 
PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2PECB Webinar: Aligning ISO 21500 and PRINCE2
PECB Webinar: Aligning ISO 21500 and PRINCE2
 

Último

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Último (20)

AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
A Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source MilvusA Beginners Guide to Building a RAG App Using Open Source Milvus
A Beginners Guide to Building a RAG App Using Open Source Milvus
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

Maximo project approach using prince2

  • 1. Project Methodology Using PRINCE2 (Maximo Upgrade Project) Balasubramanian.C
  • 2. Project Process in PRINCE2 1) Starting Up a Project 2) Directing a Project 3) Initiating a Project 4) Controlling a Stage 5) Managing Product Delivery 6) Managing Stage Boundary 7) Closing a Project A) Project Mandate
  • 3. A) Project Mandate A.1)Project Mandate Input to Project Startup produced by Corporate or Program Management
  • 4. 1) Starting Up a Project 1.A)Activities Involved 1.A.1)Appoint the Executive and Project Manager 1.A.2) Capture previous lessons 1.A.3) Design and appoint the project management team 1.A.4) Prepare the outline Business Case 1.A.5) Select the project approach and assemble the Project Brief 1.A.6) Plan the initiation stage 1.B)Management Products 1.B.1)Daily Log created 1.B.2)Lessons Log created 1.B.3)Outline Business Case created 1.B.4)Project Product Description created 1.B.5)Project Brief created 1.B.6)Initiation Stage Plan created DP1
  • 5. 2) Directing a Project Authorize Initiation Authorize Project Authorize Stage Plan or Exception Plan Give Adhoc Direction Authorize Project Closure 1.C)Activities Involved DP1 DP2 DP3 DP4 DP5 Project Board Activities (Senior User + Senior Supplier + Executive)
  • 6. 3) Initiating a Project 1.D)Activities Involved 1.D.1) Prepare the Risk Management Strategy 1.D.2) Prepare Configuration Management Strategy 1.D.3) Prepare Quality Management Strategy 1.D.4) Prepare Communication Management Strategy 1.D.5) Set up Project Controls 1.D.6) Create the project Plan 1.D.7) Refine the Business Case 1.D.8) Assemble the Project Initiation Documentation 1.E)Management Products 1.E.1) Risk Management Strategy Created 1.E.2) Configuration Management Strategy Created 1.E.3) Communication Management Strategy Created 1.E.4) Project Plan Created 1.E.5) (Detailed) Business Case Created 1.E.6) Risk Register created 1.E.7) Configuration Items Records Created 1.E.8) Issue Register Created 1.E.9) Quality Register Created 1.E.10) Benefits Review Plan Created 1.F)Themes : Plan 1.F.1) Product Breakdown Structure Created 1.F.2) Product Descriptions Created 1.F.3) Product Flow Diagram Created DP2 DP4
  • 7. 4) Controlling a Stage 1.G)Activities Involved 1.G.1)Authorize a Work package 1.G.2)Review Work Package status 1.G.3)Receive completed Work Packages 1.G.4)Review the stage status 1.G.5)Report Highlights 1.G.6)Capture and examine issues and risks 1.G.7)Escalate issues and risks 1.G.8)Take corrective action 1.H)Management Products 1.H.1) Work Packages created 1.H.2) Highlight Report(s) created 1.H.3) Issue Report(s) created 1.H.4) Exception Report(s) created 1.H.5) Stage Plan updated 1.H.6) Configuration Item Records updated 1.H.7) Risk Register updated 1.H.8) Issue Register updated 1.H.9) Quality Register updated 1.H.10) Work Package(s) updated 1.H.11) Lessons log updated 1.H.12) Issue Report updated 1.H.13) Daily Log updated DP4
  • 8. 5) Managing Product Delivery 1.I)Activities Involved 1.1.1) Accept a Work Package 1.1.2) Execute a Work Package 1.1.3) Deliver a Work Package 1.J)Management Products 1.J.1) Quality Register updated 1.J.2) Configuration Item Records updated 1.J.3) Team Plan created 1.J.4) Checkpoint Reports created
  • 9. 6) Managing Stage Boundary 1.K)Activities Involved 1.K.1) Plan the next stage 1.K.2) Update the Project Plan 1.K.3) Update the Business Case 1.K.4) Report stage end 1.K.5) Produce an Exception Plan 1.L)Management Products 1.L.1) Project Initiation Documentation updated 1.L.2) Configuration Item Records updated 1.L.3) Risk Register updated 1.L.4) Issue Register updated 1.L.5) Quality Register updated 1.L.6) Project Plan updated 1.L.7) Business Case updated 1.L.8) Benefits Review Plan updated 1.L.9) Stage or Exception Plan created 1.L.10) Product Descriptions (next stage) created 1.L.11) End Stage Report created 1.L.12) Lessons Report created DP3 DP4
  • 10. 7) Closing a Project 1.M)Activities Involved 1.M.1) Prepare planned closure 1.M.2) Prepare premature closure 1.M.3) Hand over products 1.M.4) Evaluate the project 1.M.5) Recommend project closure 1.N)Management Products 1.N.1) Follow-on action recommendations created 1.N.2) Lessons Report created 1.N.3) Project Initiation Documentation updated 1.N.4) Project Plan updated 1.N.5) Issue Register updated 1.N.6) Configuration Item Records updated 1.N.7) Benefits Review Plan updated 1.N.8) Risk Register closed 1.N.9) Issue Register closed 1.N.10) Quality Register closed 1.N.11) Daily Log closed 1.N.12) Lessons Log closed DP5
  • 11. Maximo Upgrade using PRINCE2 Project Process Starting Up a Project 1.1) Appoint Executive and Project Manager 1.2) Capture Previous Lessons 1.3) Design and Appoint Project Management Team 1.4) Prepare Outline Business Case 1.5) Select Project Approach and Assemble the Project Brief 1.6) Plan the Initiation Stage DP1 A.1)Project Mandate Input to Project Startup produced by Corporate or Program Management
  • 12. Directing a Project 2.2) Authorize Project 2.3) Authorize Stage or Exception Plan 2.4) Give Adhoc Direction 2.5) Authorize Closure 2.1) Authorize Initiation DP1 DP2 DP3 DP4 DP5 Project Board Activities (Senior User + Senior Supplier + Executive)
  • 13. Initiating a Project DP2 DP4 3.2) Core Team Assembly 3.3) Product Orientation 3.4) Training Strategy 3.5) Cutover Strategy 3.1) Kickoff Meeting 3.D.1) Prepare the Risk Management Strategy 3.D.2) Prepare Configuration Management Strategy 3.D.3) Prepare Quality Management Strategy 3.D.4) Prepare Communication Management Strategy 3.D.5) Set up Project Controls 3.D.6) Create the project Plan 3.D.7) Refine the Business Case 3.D.8) Assemble the Project Initiation Documentation
  • 14. Controlling a Stage- Gap Analysis 4.1) Business Process Review 4.2) Fit Gap Analysis 4.3)Data Source Review 4.4) Initial Data Mapping 4.5) New Requirements Carry Out Managing Stage Boundary Process DP3 DP4
  • 15. Controlling a Stage – Design 5.1) Design CRP(Conference Room Pilots) 5.2) Workflow Analysis and Design 5.3) SOP Development 5.4) Data Mapping Carry Out Managing Stage Boundary Process DP3 DP4
  • 16. Controlling a Stage- Build 6.1) Server Infrastructure Build 6.2) Maximo Install 7.x 6.3) Maximo Configuration 6.4) Customization 6.5) Reports / KPI’s 6.6) Security 6.7) Workflow Development Carry Out Managing Stage Boundary Process DP3 DP4
  • 17. Controlling a Stage – Data Migration 7.1) Legacy Data Migration 7.2) Integration Framework 7.3) Data Load Development 7.4) Data Testing Carry Out Managing Stage Boundary Process DP3 DP4
  • 18. Controlling a Stage - Testing 8.1) System Integration Testing 8.2) Data Migration Testing 8.3) Performance Testing 8.4) User Acceptance Testing 8.5) Cutover to Production Testing DP3 DP4 Carry Out Managing Stage Boundary Process
  • 19. Controlling a Stage - Training 9.1) End User Training 9.2) Systems Administrator Training 9.3) Reports Developer Training DP3 DP4 Carry Out Closing a Project Process
  • 20. Closing a Project 10.1) Execute Cutover Plan 10.2) Data Migration 10.3) Go Live 10.4) Stabilization 10.5) Post Implementation Review DP5