SlideShare una empresa de Scribd logo
1 de 26
Project Portfolio Presentation
Overview Consultancy Services for the
Abu Dhabi Sewerage Services Company
(ADSSC)
By: Benyamin Setiadi Tedjakusuma, MASc,
BEng
Presentation Outline
 Speaker Profile
• Academic Qualification
• Work Experience
 List of Undertaken Projects
 ADSSC Contract O-1427
• Project Introduction
• Project Stakeholders
• Types of Projects
• Phasing of Projects
• Project Deliverables
• Project Management
• List of Managed Developments
 Question and Answer Session
Speaker Profile
 Name:
Benyamin Setiadi Tedjakusuma, MASc,
Beng
 Academic Qualification:
• Bachelor of Engineering in Civil Engineering
Ryerson University, Toronto, Canada, 2004
• Master of Applied Science in Civil
Engineering
Ryerson University, Toronto, Canada, 2007
• Master Thesis:
“PSM: A New Approach to Probabilistic
Scheduling”
Speaker Profile
 Work Experience:
• Intern at PT Archi Metric, 2004
• Intern at PT Prambanan Dwipaka, 2005
• Teaching Assistant at Ryerson University, 2006 –
2007
• Junior Structural Engineer at Mott MacDonald
Indonesia, 2008
• Site Inspector at Mott MacDonald Dubai,
2008 – 2010
• Structural Engineering Inspector at Mott
MacDonald Dubai, 2010 – 2011
• Civil Engineer at Mott MacDonald Abu Dhabi,
2011 – Present
List of Undertaken Projects
 Construction Supervision of Entertain Pavillion,
Surabaya, 2004
 Construction of Office Park II, Surabaya, 2005
 Construction Supervision of Community Health
Nutrition and Early Childhood Development
“Taman Posyandu” and Community Based
Childhood Protection Project for UNICEF, Aceh,
2008
 Design of Rural Water Supply and Sanitation
Systems Project for American Red Cross, Aceh,
2008
 Design of Pulau Laut Tank Civil Works Project for
Shell, Kotabaru, 2008
List of Undertaken Projects
 Construction Supervision of New Oil Terminal for
Shell, Gresik, 2008
 Design and Construction Supervision of Jumeirah
Golf Estates Project, Dubai, UAE, 2008 – 2010
 Construction Supervision of Strategic Grain
Reserve Project, Fujairah, UAE, 2010 – 2011
 Construction Supervision for South Shamkha
Infrastructure Lot 3, Abu Dhabi, UAE, 2012
 Licensing Labour Camp Sewerage Services
Project for the Regulation & Supervision Bureau,
Abu Dhabi, 2014
List of Undertaken Projects
 Design Overview for Potable Water Supply to North
Al Wathba for the Abu Dhabi Distribution Company,
UAE, 2014 – Present
 Contracts O-1427 & O-1053 – Overview
Consultancy Services for the Abu Dhabi Sewerage
Services Company, UAE, 2011 – Present
Project Introduction
 Project Location
ADSSC Contract O-1427
United Arab Emirates
Project Introduction
 Project Location
ADSSC Contract O-1427
Abu Dhabi – Dubai Border
Project Introduction
 Client:
Abu Dhabi Sewerage Services Company (ADSSC) is an
established Public or Government Authority who is
responsible to manage wastewater infrastructure assets in
Abu Dhabi Emirate
 Nature of Contract:
• Framework Agreement between the Client and Mott
MacDonald
• Projects are awarded at Client’s discretion (e.g. usually
when there is a new development)
• Fees are calculated based on agreed pricing schedule and
may vary between projects
ADSSC Contract O-1427
Project Stakeholders
 ADSSC – Client/End User:
• Projects Division (Employer)
• Mott MacDonald (ADSSC Representative)
• Other Divisions of ADSSC (Assets Management; Operation
& Maintenance)
 Developer – Project Owner/Sponsor:
• Owner’s Representative(s)
• Design Consultant(s)
• Supervision Consultant(s)
• Contractor(s)
 Other Government Authorities
ADSSC Contract O-1427
Project Stakeholders
 Typical Contractual Relationship between
Stakeholders
ADSSC Contract O-1427
Types of Projects
 Sewerage Network (gravity, vacuum, pressure)
 Pumping Station
 Sewage Treatment Plant
ADSSC Contract O-1427
Types of Projects
 Layout of Sewage Treatment Plant
ADSSC Contract O-1427
Phasing of Projects
 Stage 1:
Concept/Preliminary Design Review
 Stage 2:
Detailed Design and Tendering Documents Review
 Stage 3:
Tender Evaluation Review
 Stage 4:
Construction Overview
ADSSC Contract O-1427
Project Deliverables
 Progress Reports (Monthly and Bi-Weekly)
 Stage 1 – 3 Deliverables:
• Technical/Tender Review Reports
 Stage 4 Deliverables:
• Site Reports
• Site Inspections
• As Built Drawings and Documents
• Handing Over of Completed Works
ADSSC Contract O-1427
Project Management
 Human Resources Management
• Head Office Resources:
• Project Director
• Project Manager
• Project Coordinator
• Project Administrator
• Technical Reviewers (Civil, MEICA and Process Engineers)
• Quantity Surveyor
• QHSE Advisors
• Site Resources:
• Resident Engineer
• Assistant Resident Engineer
• Inspectors
• Driver
ADSSC Contract O-1427
• Activities:
• Leave Management
• Tasks Management
• Monitoring Resources
Requirements
Project Management
 Cost Management
• Labour Cost (time based)
• Direct Cost (staffs expenses, finance charges)
• Invoicing:
• Design Review Fees:
Calculated from Percent rate of Project Construction Cost
• Home Office Support Fees (Technical Review Fees during
Construction):
Lump Sum Fixed Price for each type of projects (e.g. AED90,000 for
network)
• Site Supervision Fees:
Monthly rates for each site resources (e.g. AED47,000 for Resident
Engineer)
• Activities:
• Yearly budget planning
• Monthly cost and billing monitoring and control
ADSSC Contract O-1427
Project Management
 Schedule Management
• Technical Submission Review Duration:
• Ten business days per submission
• Integration with Human Resources Management
 Quality Management
• Resources Selection & Performance Evaluation
• Checking & Approval of Project Deliverables
 Risk Management
• Maintaining Risk Register
ADSSC Contract O-1427
Project Management
 Communication Management
• Communication Media:
• Letter, email, meeting, telephone
• Communication Protocol:
• Authorised staff to communicate externally
• Checking & Approval
• Agreed Company & Client Standard Format
• File Managemenet:
• File Numbering
• File Storage
ADSSC Contract O-1427
List of Managed
Developments
 Abu Dhabi International Airport
ADSSC Contract O-1427
List of Managed
Developments
 Zayed City Development
ADSSC Contract O-1427
List of Managed
Developments
 North Al Wathba Development
ADSSC Contract O-1427
List of Managed
Developments
 Sheikh Khalifa Medical City Hospital
ADSSC Contract O-1427
List of Managed
Developments
 Al Ghadeer Development
ADSSC Contract O-1427
Question & Answer Session

Más contenido relacionado

La actualidad más candente (8)

Asif QS CV
Asif QS CVAsif QS CV
Asif QS CV
 
CV john philbert supan
CV john philbert supanCV john philbert supan
CV john philbert supan
 
Atteeq c.v -
Atteeq c.v -Atteeq c.v -
Atteeq c.v -
 
Ibrahim C.V
Ibrahim C.VIbrahim C.V
Ibrahim C.V
 
mathy 2015
mathy 2015mathy 2015
mathy 2015
 
MARIA_ Resume_Material_Engineer_2016 (1)
MARIA_ Resume_Material_Engineer_2016 (1)MARIA_ Resume_Material_Engineer_2016 (1)
MARIA_ Resume_Material_Engineer_2016 (1)
 
Curriculum Vitae QS
Curriculum Vitae QSCurriculum Vitae QS
Curriculum Vitae QS
 
Template 11
Template 11Template 11
Template 11
 

Similar a ADSSC O-1427 (20)

Project Engineer
Project EngineerProject Engineer
Project Engineer
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume
ResumeResume
Resume
 
Amjad CV Updated
Amjad CV UpdatedAmjad CV Updated
Amjad CV Updated
 
CV
CVCV
CV
 
CV
CVCV
CV
 
jihad CV
jihad CVjihad CV
jihad CV
 
Civil Engineer - CV
Civil Engineer - CVCivil Engineer - CV
Civil Engineer - CV
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 
Osama-CV-uni
Osama-CV-uniOsama-CV-uni
Osama-CV-uni
 
CV Kamran Haider
CV Kamran HaiderCV Kamran Haider
CV Kamran Haider
 
Deepak Kumar_Project
Deepak Kumar_ProjectDeepak Kumar_Project
Deepak Kumar_Project
 
Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15Curriculum_Vitate 20.09.15
Curriculum_Vitate 20.09.15
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
Hanin qreis 2018 cv
Hanin qreis 2018 cvHanin qreis 2018 cv
Hanin qreis 2018 cv
 
Ahmad Abuzaid CV 1 Feb 2017
Ahmad Abuzaid CV 1 Feb 2017Ahmad Abuzaid CV 1 Feb 2017
Ahmad Abuzaid CV 1 Feb 2017
 
nancyevangelista CV
nancyevangelista CVnancyevangelista CV
nancyevangelista CV
 
imran syed
imran syed imran syed
imran syed
 

ADSSC O-1427

  • 1. Project Portfolio Presentation Overview Consultancy Services for the Abu Dhabi Sewerage Services Company (ADSSC) By: Benyamin Setiadi Tedjakusuma, MASc, BEng
  • 2. Presentation Outline  Speaker Profile • Academic Qualification • Work Experience  List of Undertaken Projects  ADSSC Contract O-1427 • Project Introduction • Project Stakeholders • Types of Projects • Phasing of Projects • Project Deliverables • Project Management • List of Managed Developments  Question and Answer Session
  • 3. Speaker Profile  Name: Benyamin Setiadi Tedjakusuma, MASc, Beng  Academic Qualification: • Bachelor of Engineering in Civil Engineering Ryerson University, Toronto, Canada, 2004 • Master of Applied Science in Civil Engineering Ryerson University, Toronto, Canada, 2007 • Master Thesis: “PSM: A New Approach to Probabilistic Scheduling”
  • 4. Speaker Profile  Work Experience: • Intern at PT Archi Metric, 2004 • Intern at PT Prambanan Dwipaka, 2005 • Teaching Assistant at Ryerson University, 2006 – 2007 • Junior Structural Engineer at Mott MacDonald Indonesia, 2008 • Site Inspector at Mott MacDonald Dubai, 2008 – 2010 • Structural Engineering Inspector at Mott MacDonald Dubai, 2010 – 2011 • Civil Engineer at Mott MacDonald Abu Dhabi, 2011 – Present
  • 5. List of Undertaken Projects  Construction Supervision of Entertain Pavillion, Surabaya, 2004  Construction of Office Park II, Surabaya, 2005  Construction Supervision of Community Health Nutrition and Early Childhood Development “Taman Posyandu” and Community Based Childhood Protection Project for UNICEF, Aceh, 2008  Design of Rural Water Supply and Sanitation Systems Project for American Red Cross, Aceh, 2008  Design of Pulau Laut Tank Civil Works Project for Shell, Kotabaru, 2008
  • 6. List of Undertaken Projects  Construction Supervision of New Oil Terminal for Shell, Gresik, 2008  Design and Construction Supervision of Jumeirah Golf Estates Project, Dubai, UAE, 2008 – 2010  Construction Supervision of Strategic Grain Reserve Project, Fujairah, UAE, 2010 – 2011  Construction Supervision for South Shamkha Infrastructure Lot 3, Abu Dhabi, UAE, 2012  Licensing Labour Camp Sewerage Services Project for the Regulation & Supervision Bureau, Abu Dhabi, 2014
  • 7. List of Undertaken Projects  Design Overview for Potable Water Supply to North Al Wathba for the Abu Dhabi Distribution Company, UAE, 2014 – Present  Contracts O-1427 & O-1053 – Overview Consultancy Services for the Abu Dhabi Sewerage Services Company, UAE, 2011 – Present
  • 8. Project Introduction  Project Location ADSSC Contract O-1427 United Arab Emirates
  • 9. Project Introduction  Project Location ADSSC Contract O-1427 Abu Dhabi – Dubai Border
  • 10. Project Introduction  Client: Abu Dhabi Sewerage Services Company (ADSSC) is an established Public or Government Authority who is responsible to manage wastewater infrastructure assets in Abu Dhabi Emirate  Nature of Contract: • Framework Agreement between the Client and Mott MacDonald • Projects are awarded at Client’s discretion (e.g. usually when there is a new development) • Fees are calculated based on agreed pricing schedule and may vary between projects ADSSC Contract O-1427
  • 11. Project Stakeholders  ADSSC – Client/End User: • Projects Division (Employer) • Mott MacDonald (ADSSC Representative) • Other Divisions of ADSSC (Assets Management; Operation & Maintenance)  Developer – Project Owner/Sponsor: • Owner’s Representative(s) • Design Consultant(s) • Supervision Consultant(s) • Contractor(s)  Other Government Authorities ADSSC Contract O-1427
  • 12. Project Stakeholders  Typical Contractual Relationship between Stakeholders ADSSC Contract O-1427
  • 13. Types of Projects  Sewerage Network (gravity, vacuum, pressure)  Pumping Station  Sewage Treatment Plant ADSSC Contract O-1427
  • 14. Types of Projects  Layout of Sewage Treatment Plant ADSSC Contract O-1427
  • 15. Phasing of Projects  Stage 1: Concept/Preliminary Design Review  Stage 2: Detailed Design and Tendering Documents Review  Stage 3: Tender Evaluation Review  Stage 4: Construction Overview ADSSC Contract O-1427
  • 16. Project Deliverables  Progress Reports (Monthly and Bi-Weekly)  Stage 1 – 3 Deliverables: • Technical/Tender Review Reports  Stage 4 Deliverables: • Site Reports • Site Inspections • As Built Drawings and Documents • Handing Over of Completed Works ADSSC Contract O-1427
  • 17. Project Management  Human Resources Management • Head Office Resources: • Project Director • Project Manager • Project Coordinator • Project Administrator • Technical Reviewers (Civil, MEICA and Process Engineers) • Quantity Surveyor • QHSE Advisors • Site Resources: • Resident Engineer • Assistant Resident Engineer • Inspectors • Driver ADSSC Contract O-1427 • Activities: • Leave Management • Tasks Management • Monitoring Resources Requirements
  • 18. Project Management  Cost Management • Labour Cost (time based) • Direct Cost (staffs expenses, finance charges) • Invoicing: • Design Review Fees: Calculated from Percent rate of Project Construction Cost • Home Office Support Fees (Technical Review Fees during Construction): Lump Sum Fixed Price for each type of projects (e.g. AED90,000 for network) • Site Supervision Fees: Monthly rates for each site resources (e.g. AED47,000 for Resident Engineer) • Activities: • Yearly budget planning • Monthly cost and billing monitoring and control ADSSC Contract O-1427
  • 19. Project Management  Schedule Management • Technical Submission Review Duration: • Ten business days per submission • Integration with Human Resources Management  Quality Management • Resources Selection & Performance Evaluation • Checking & Approval of Project Deliverables  Risk Management • Maintaining Risk Register ADSSC Contract O-1427
  • 20. Project Management  Communication Management • Communication Media: • Letter, email, meeting, telephone • Communication Protocol: • Authorised staff to communicate externally • Checking & Approval • Agreed Company & Client Standard Format • File Managemenet: • File Numbering • File Storage ADSSC Contract O-1427
  • 21. List of Managed Developments  Abu Dhabi International Airport ADSSC Contract O-1427
  • 22. List of Managed Developments  Zayed City Development ADSSC Contract O-1427
  • 23. List of Managed Developments  North Al Wathba Development ADSSC Contract O-1427
  • 24. List of Managed Developments  Sheikh Khalifa Medical City Hospital ADSSC Contract O-1427
  • 25. List of Managed Developments  Al Ghadeer Development ADSSC Contract O-1427
  • 26. Question & Answer Session