ID Task Name Duration Start Finish PredecesResource Names Notes
1 Carolinas Core Lab Implementation 
Project ‐ Beckman Coulter Schedule
5040 Airport Center Parkway  
Charlotte, NC
2
3
4 Pre‐Installation Activities 1 day? Mon 10/6/14 Mon 10/6/14
12
13
14 REMISOL and IT
15 Remisol Middleware System 127 days? Mon 10/6/14 Fri 3/27/15
16 Customer Acceptance of support docs 1 day? Mon 10/6/14 Mon 10/6/14
17 Bomgar Ann Sheehe,Chris Gray
18 ProService Ann Sheehe,Chris Gray
19 Networking review and discussions Ann Sheehe,Chris Gray
20 Hardware review Ann Sheehe,Chris Gray
21 Hardware Delivery 35 days Mon 11/3/14 Fri 12/19/14
22 Inventory check (servers only) 1 day Mon 11/3/14 Mon 11/3/14 Alvera Stevens,Bin Kallan Need Dongle IDs
23 Centralized Server PMFs 4 days Tue 11/4/14 Fri 11/7/14 22 Toby Reimers
24 Hardware Installation 5 days Mon 12/15/14 Fri 12/19/14 22 Paul Reischmann
25 C.O.N. Ready 0 days Tue 12/16/14 Tue 12/16/14 Paul Reischmann
26 Applications Testing through GoLive 40 days Mon 2/2/15 Wed 3/25/15 Steve Johnson,Cindy Friedman GoLive and Post‐GoLive
27 Command Central Install and Test 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman
28 New Analyzers and Equipment Testing 30 days Mon 2/2/15 Fri 3/13/15
29 AU5822 (x2) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test
30 DxI800 (x2) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test
31 DxH (new analyzer) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test
32 Cennexus Track Computer 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test
33 Existing Equipment Testing 2 days Sat 3/14/15 Sun 3/15/15
34 DxH800 (from Main Lab) 2 days Sat 3/14/15 Sun 3/15/15 CMC LIS? Apps needed over this weekend?
35 SMS (from Main Lab) 2 days Sat 3/14/15 Sun 3/15/15 CMC LIS? Apps needed over this weekend?
36 Customer Offsite Training for Remisol 5 days Mon 1/19/15 Fri 1/23/15 CMC need to check with Leadership
37 Customer onsite Training 10 days Mon 2/23/15 Fri 3/6/15 Steve Johnson,Cindy Friedman need names of Key Ops and if they 
went to school
38 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15 Steve Johnson,Cindy Friedman Work with CMC LIS team on testing 
plan
39 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Steve Johnson,Cindy Friedman
40 Post GoLive support 5 days Mon 3/23/15 Fri 3/27/15 Steve Johnson,Cindy Friedman
41
42
43 AUTOMATION
44 Power Express Track System 172 days Mon 8/4/14 Fri 3/27/15
45 Pre‐installation Utilities 75 days Mon 8/4/14 Fri 11/14/14
46 Power   75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan
S M
Aug 3
Page 1
ID Task Name Duration Start Finish PredecesResource Names Notes
47 Air 75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan
48 Data 75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan
49 Hardware Delivery 13 days Thu 11/13/14 Mon 12/1/14
50 Delivery of Track System 1 day Thu 11/13/14 Thu 11/13/14 Bin Kallan,Labor Team 8am delivery, 8 man team, tractor 
trailers, impact drills with 10mm 
socket adapters
51 Inventory check 1 day Fri 11/14/14 Fri 11/14/14 Bin Kallan,Labor Team
52 Cennexus delivery from IT 1 day Mon 12/1/14 Mon 12/1/14 Alvera Stevens,Justin Deardorff
53 Hardware Installation ‐ Phase 1 25 days Mon 11/17/14 Fri 12/19/14 Randy Prella,Phil Cantrell,Local Service
54 Hardware Installation ‐ Phase 2 ‐ continued 30 days Mon 2/2/15 Fri 3/13/15 Randy Prella,Phil Cantrell,Local Service
55 Applications Testing ‐ Phase 1 15 days Mon 12/1/14 Fri 12/19/14 Angela Briones,Justin Deardorff Angela starts 12/8 week through 
week of 2/16
56 Applications Testing ‐ Phase 2 ‐ continued 62 days Mon 1/5/15 Fri 3/27/15 Justin Deardorff,Angela Briones Angela as needed ‐ GoLive
57 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 Randy Prella,Phil Cantrell
58 Onsite Staff Training 5 days Mon 3/2/15 Fri 3/6/15 Onsite Brea Staff Need Key Ops from all 3 shifts.  Line 
is technically ready for GoLive at this 
point.
59 Integration Testing 30 days Mon 2/2/15 Fri 3/13/15 Angela Briones,Alvera Stevens,Justin 
Deardorff
Angela only until week of 2/16.  Then
returns for GoLive.
60 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Randy Prella,Phil Cantrell,Angela Brione
61
62
63 Automate 2500 (x2) 66 days Mon 9/1/14 Mon 12/1/14
64 Pre‐site activities 60 days Mon 9/1/14 Fri 11/21/14 Bin Kallan,B&G,CMC
65 Baseframes 41 days Mon 10/6/14 Mon 12/1/14 Matt Gates,CMC
66 IT discussions 41 days Mon 10/6/14 Mon 12/1/14 Alvera Stevens,Ann Sheehe
67 Hardware delivery 1 day Tue 12/2/14 Tue 12/2/14 KJ Masseke‐Harvey,David Kester 9am delivery, forklift, Impact drills, 
size20 Torx Bits, Adjustable wrenches
68 Hardware Installation 9 days Tue 12/2/14 Fri 12/12/14 KJ Masseke‐Harvey,David Kester
69 Hardware installation continued 10 days Mon 2/9/15 Fri 2/20/15 KJ Masseke‐Harvey,Mike Wagner
70 Applications Testing 10 days Mon 12/8/14 Fri 12/19/14 Matt Gates
71 Applications Testing continued 10 days Mon 3/2/15 Fri 3/13/15 Matt Gates Work with Remisol and PE teams to 
test EVERYTHING
72 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14
73 Customer Training 3 days Mon 2/2/15 Wed 2/4/15 ???
74 Integration Testing 10 days Mon 3/2/15 Fri 3/13/15 Matt Gates
75 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Matt Gates
76
77
78 CHEMISTRY ANALYZERS
79 AU5822 (x2) 102 days Mon 11/10/14 Fri 3/27/15
80 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B&G,CMC
81 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team
S M
Aug 3
Page 2
ID Task Name Duration Start Finish PredecesResource Names Notes
82 Hardware Installation 10 days Mon 11/17/14 Fri 11/28/14 David Kester,National Specialist
83 Applications Testing 50 days Mon 1/5/15 Fri 3/13/15 Mitzi Cassell Need permanent refrigerators ready
84 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14
85 Staff OFFSITE training 5 days Mon 2/23/15 Fri 2/27/15 CMC need to send staff in Dec, Jan or Feb?
86 Staff onsite training 10 days Mon 2/23/15 Fri 3/6/15 Mitzi Cassell,CMC
87 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15 Mitzi Cassell
88 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Mitzi Cassell
89 Post GoLive support 5 days Mon 3/23/15 Fri 3/27/15 Mitzi Cassell
90
91 DxI800 (x2) 92 days Mon 11/10/14 Mon 3/16/15
92 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC
93 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team
94 Hardware Installation 15 days Mon 11/17/14 Fri 12/5/14 Local Service (outside)
95 Applications Testing 25 days Mon 1/5/15 Fri 2/6/15 Barbara Jones need permanent refrigerators ready
96 C.O.N. Ready 0 days Mon 11/10/14 Mon 11/10/14
97 Staff OFFSITE training 1 day Thu 1/1/15 Thu 1/1/15 CMC
98 Staff onsite training 5 days Mon 2/9/15 Fri 2/13/15
99 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15 Remisol Team
100 GoLive 0 days Mon 3/16/15 Mon 3/16/15
101
102
103 HEMATOLOGY ANALYZERS
104 DxH800 (NEW Analyzer) 92 days Mon 11/10/14 Mon 3/16/15
105 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC
106 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team
107 Hardware Installation 10 days Mon 11/17/14 Fri 11/28/14 Local Service
108 Applications Testing 5 days Mon 1/5/15 Fri 1/9/15 Teri Nevel need permanent refrigerators ready
109 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14
110 Staff OFFSITE training 5 days Thu 1/1/15 Wed 1/7/15
111 Staff onsite training 0 days Mon 2/9/15 Mon 2/9/15
112 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15
113 GoLive 0 days Mon 3/16/15 Mon 3/16/15
114
115 DxH800+SMS (from Main Lab) 93 days Mon 11/10/14 Mon 3/16/15
116 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC
117 Hardware Delivery 1 day Sat 3/14/15 Sat 3/14/15 Local Service,CMC Labor Team CMC will transport, Local FSE to 
supervise
118 Hardware Installation 2 days Sat 3/14/15 Sun 3/15/15 Local Service Local FSE to receive and reinstall
119 Applications Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC LIS,CMC Full validation or just QC?  
120 Integration Testing 2 days Sun 3/15/15 Mon 3/16/15 CMC LIS CMC LIS team or our team?  
121 GoLive 0 days Mon 3/16/15 Mon 3/16/15
122
S M
Aug 3
Page 3
ID Task Name Duration Start Finish PredecesResource Names Notes
123 Cellavision (from NE Lab) 87 days Mon 11/17/14 Mon 3/16/15
124 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14 B&G,CMC
125 Hardware Delivery 1 day Mon 2/9/15 Mon 2/9/15 CMC CMC will transport   
126 Hardware Installation 5 days Mon 2/16/15 Fri 2/20/15 Local Service Local FSE to receive and reinstall
127 Applications Testing 5 days Mon 2/23/15 Fri 2/27/15 Full validation or just QC?  
128 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15 CMC LIS team may need help 
mounting onto network for remote 
129 GoLive 0 days Mon 3/16/15 Mon 3/16/15
130
131
132 COAGULATION ANALYZERS
133 IRIScell (NEW Analyzer) 90 days Wed 11/12/14 Mon 3/16/15
134 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14
135 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team
136 Hardware Installation 10 days Mon 12/8/14 Fri 12/19/14 Local Service (outside)
137 Applications Testing 5 days Mon 2/2/15 Fri 2/6/15 Terry Lyons need permanent refrigerators ready
138 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14
139 Staff OFFSITE training 1 day Thu 1/1/15 Thu 1/1/15
140 Staff onsite training 5 days Mon 2/9/15 Fri 2/13/15
141 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15
142 GoLive 0 days Mon 3/16/15 Mon 3/16/15
143
144 IRIScell (from CMC Main Lab) 88 days Mon 11/17/14 Mon 3/16/15
145 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14 B&G Contractors
146 Hardware Delivery 1 day Sat 3/14/15 Sat 3/14/15 CMC
147 Hardware Installation 1 day Sat 3/14/15 Sat 3/14/15 CMC
148 Applications Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC
149 Integration Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC
150 GoLive 1 day Mon 3/16/15 Mon 3/16/15
S M
Aug 3
Page 4

Más contenido relacionado

Destacado

[Done] star theory
[Done] star theory[Done] star theory
[Done] star theoryvren88
 
complete sumit resume
complete sumit resumecomplete sumit resume
complete sumit resumeSumit Rijal
 
Medialogue no Social Analytics Summit 2014
Medialogue no Social Analytics Summit 2014Medialogue no Social Analytics Summit 2014
Medialogue no Social Analytics Summit 2014Alexandre Secco
 
Enterprise Solutions
Enterprise SolutionsEnterprise Solutions
Enterprise SolutionsGetty Images
 
J azmin presentacion
J azmin presentacionJ azmin presentacion
J azmin presentacionjoe_unix
 
Jacosta ensayo etel 602
Jacosta ensayo etel 602Jacosta ensayo etel 602
Jacosta ensayo etel 602Jose Acosta
 
Medialogue: Quem somos e o que fazemos
Medialogue: Quem somos e o que fazemosMedialogue: Quem somos e o que fazemos
Medialogue: Quem somos e o que fazemosAlexandre Secco
 
Popcorn market in india
Popcorn market in indiaPopcorn market in india
Popcorn market in indiaSophia Jones
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14Bin Kallan
 
30 hechos del conflicto armadoppt
30 hechos del conflicto armadoppt30 hechos del conflicto armadoppt
30 hechos del conflicto armadopptjoe_unix
 
Dionisio Cimarelli Catalogue. Sculture e disegni
Dionisio Cimarelli Catalogue. Sculture e disegni Dionisio Cimarelli Catalogue. Sculture e disegni
Dionisio Cimarelli Catalogue. Sculture e disegni Dionisio Cimarelli
 

Destacado (15)

BRECHA DIGITAL
BRECHA DIGITALBRECHA DIGITAL
BRECHA DIGITAL
 
[Done] star theory
[Done] star theory[Done] star theory
[Done] star theory
 
complete sumit resume
complete sumit resumecomplete sumit resume
complete sumit resume
 
Medialogue no Social Analytics Summit 2014
Medialogue no Social Analytics Summit 2014Medialogue no Social Analytics Summit 2014
Medialogue no Social Analytics Summit 2014
 
Enterprise Solutions
Enterprise SolutionsEnterprise Solutions
Enterprise Solutions
 
J azmin presentacion
J azmin presentacionJ azmin presentacion
J azmin presentacion
 
JW News Portfolio
JW News PortfolioJW News Portfolio
JW News Portfolio
 
Jacosta ensayo etel 602
Jacosta ensayo etel 602Jacosta ensayo etel 602
Jacosta ensayo etel 602
 
Medialogue: Quem somos e o que fazemos
Medialogue: Quem somos e o que fazemosMedialogue: Quem somos e o que fazemos
Medialogue: Quem somos e o que fazemos
 
JW Sports Portfolio
JW Sports PortfolioJW Sports Portfolio
JW Sports Portfolio
 
Popcorn market in india
Popcorn market in indiaPopcorn market in india
Popcorn market in india
 
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
Carolinas Core Lab BCI Timeline - Rev 4  12-08-14Carolinas Core Lab BCI Timeline - Rev 4  12-08-14
Carolinas Core Lab BCI Timeline - Rev 4 12-08-14
 
20161206CJRogers
20161206CJRogers20161206CJRogers
20161206CJRogers
 
30 hechos del conflicto armadoppt
30 hechos del conflicto armadoppt30 hechos del conflicto armadoppt
30 hechos del conflicto armadoppt
 
Dionisio Cimarelli Catalogue. Sculture e disegni
Dionisio Cimarelli Catalogue. Sculture e disegni Dionisio Cimarelli Catalogue. Sculture e disegni
Dionisio Cimarelli Catalogue. Sculture e disegni
 

Similar a Carolinas Core Lab BCI Timeline - Rev 4 12-08-14

Northwestern AU+Automation Timeline REV6 6-15-12
Northwestern AU+Automation Timeline REV6  6-15-12Northwestern AU+Automation Timeline REV6  6-15-12
Northwestern AU+Automation Timeline REV6 6-15-12Bin Kallan
 
Hotel opening checklist
Hotel opening checklistHotel opening checklist
Hotel opening checklisttuan nguyen
 
Proposed Implementation Schedule for Chint.pdf
Proposed Implementation Schedule for Chint.pdfProposed Implementation Schedule for Chint.pdf
Proposed Implementation Schedule for Chint.pdfMarkGeraldCuadra1
 
Performance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisPerformance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisDeborah Obasogie
 
Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project ScheduleVirginia Kam
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Bin Kallan
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Bin Kallan
 
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)  WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015) Ali Yousef
 
carta gantt projek nazeq.pdf
carta gantt projek nazeq.pdfcarta gantt projek nazeq.pdf
carta gantt projek nazeq.pdfnazeqhaikal666
 
Gantt chart final
Gantt chart finalGantt chart final
Gantt chart finalDan Palmer
 
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleFitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleGary Hayes
 

Similar a Carolinas Core Lab BCI Timeline - Rev 4 12-08-14 (17)

Northwestern AU+Automation Timeline REV6 6-15-12
Northwestern AU+Automation Timeline REV6  6-15-12Northwestern AU+Automation Timeline REV6  6-15-12
Northwestern AU+Automation Timeline REV6 6-15-12
 
MS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation ScheduleMS Projects - 10 MW Implementation Schedule
MS Projects - 10 MW Implementation Schedule
 
Popop
PopopPopop
Popop
 
Project master schedule daughter station cng mini plant
Project master schedule daughter station cng mini plantProject master schedule daughter station cng mini plant
Project master schedule daughter station cng mini plant
 
Hotel opening checklist
Hotel opening checklistHotel opening checklist
Hotel opening checklist
 
Proposed Implementation Schedule for Chint.pdf
Proposed Implementation Schedule for Chint.pdfProposed Implementation Schedule for Chint.pdf
Proposed Implementation Schedule for Chint.pdf
 
Performance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value AnalysisPerformance Analaysis - Earned Value Analysis
Performance Analaysis - Earned Value Analysis
 
Engineering Design Center Project Schedule
Engineering Design Center Project ScheduleEngineering Design Center Project Schedule
Engineering Design Center Project Schedule
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12
 
Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12Rockford Memorial v5 3-28-12
Rockford Memorial v5 3-28-12
 
program
programprogram
program
 
MS project Sample gantt chart
MS project Sample  gantt chartMS project Sample  gantt chart
MS project Sample gantt chart
 
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)  WC-14-NXE-007-00-Sch Rev 0.0  (29 May,2015)
WC-14-NXE-007-00-Sch Rev 0.0 (29 May,2015)
 
carta gantt projek nazeq.pdf
carta gantt projek nazeq.pdfcarta gantt projek nazeq.pdf
carta gantt projek nazeq.pdf
 
Gantt chart final
Gantt chart finalGantt chart final
Gantt chart final
 
Overhaul plan example
Overhaul plan exampleOverhaul plan example
Overhaul plan example
 
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design ScheduleFitzroy-Gladestone Pipeline EPC Project - Design Schedule
Fitzroy-Gladestone Pipeline EPC Project - Design Schedule
 

Carolinas Core Lab BCI Timeline - Rev 4 12-08-14

  • 1. ID Task Name Duration Start Finish PredecesResource Names Notes 1 Carolinas Core Lab Implementation  Project ‐ Beckman Coulter Schedule 5040 Airport Center Parkway   Charlotte, NC 2 3 4 Pre‐Installation Activities 1 day? Mon 10/6/14 Mon 10/6/14 12 13 14 REMISOL and IT 15 Remisol Middleware System 127 days? Mon 10/6/14 Fri 3/27/15 16 Customer Acceptance of support docs 1 day? Mon 10/6/14 Mon 10/6/14 17 Bomgar Ann Sheehe,Chris Gray 18 ProService Ann Sheehe,Chris Gray 19 Networking review and discussions Ann Sheehe,Chris Gray 20 Hardware review Ann Sheehe,Chris Gray 21 Hardware Delivery 35 days Mon 11/3/14 Fri 12/19/14 22 Inventory check (servers only) 1 day Mon 11/3/14 Mon 11/3/14 Alvera Stevens,Bin Kallan Need Dongle IDs 23 Centralized Server PMFs 4 days Tue 11/4/14 Fri 11/7/14 22 Toby Reimers 24 Hardware Installation 5 days Mon 12/15/14 Fri 12/19/14 22 Paul Reischmann 25 C.O.N. Ready 0 days Tue 12/16/14 Tue 12/16/14 Paul Reischmann 26 Applications Testing through GoLive 40 days Mon 2/2/15 Wed 3/25/15 Steve Johnson,Cindy Friedman GoLive and Post‐GoLive 27 Command Central Install and Test 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman 28 New Analyzers and Equipment Testing 30 days Mon 2/2/15 Fri 3/13/15 29 AU5822 (x2) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test 30 DxI800 (x2) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test 31 DxH (new analyzer) 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test 32 Cennexus Track Computer 30 days Mon 2/2/15 Fri 3/13/15 Steve Johnson,Cindy Friedman work with instrument Apps to test 33 Existing Equipment Testing 2 days Sat 3/14/15 Sun 3/15/15 34 DxH800 (from Main Lab) 2 days Sat 3/14/15 Sun 3/15/15 CMC LIS? Apps needed over this weekend? 35 SMS (from Main Lab) 2 days Sat 3/14/15 Sun 3/15/15 CMC LIS? Apps needed over this weekend? 36 Customer Offsite Training for Remisol 5 days Mon 1/19/15 Fri 1/23/15 CMC need to check with Leadership 37 Customer onsite Training 10 days Mon 2/23/15 Fri 3/6/15 Steve Johnson,Cindy Friedman need names of Key Ops and if they  went to school 38 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15 Steve Johnson,Cindy Friedman Work with CMC LIS team on testing  plan 39 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Steve Johnson,Cindy Friedman 40 Post GoLive support 5 days Mon 3/23/15 Fri 3/27/15 Steve Johnson,Cindy Friedman 41 42 43 AUTOMATION 44 Power Express Track System 172 days Mon 8/4/14 Fri 3/27/15 45 Pre‐installation Utilities 75 days Mon 8/4/14 Fri 11/14/14 46 Power   75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan S M Aug 3 Page 1
  • 2. ID Task Name Duration Start Finish PredecesResource Names Notes 47 Air 75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan 48 Data 75 days Mon 8/4/14 Fri 11/14/14 B&G Contractors,Bin Kallan 49 Hardware Delivery 13 days Thu 11/13/14 Mon 12/1/14 50 Delivery of Track System 1 day Thu 11/13/14 Thu 11/13/14 Bin Kallan,Labor Team 8am delivery, 8 man team, tractor  trailers, impact drills with 10mm  socket adapters 51 Inventory check 1 day Fri 11/14/14 Fri 11/14/14 Bin Kallan,Labor Team 52 Cennexus delivery from IT 1 day Mon 12/1/14 Mon 12/1/14 Alvera Stevens,Justin Deardorff 53 Hardware Installation ‐ Phase 1 25 days Mon 11/17/14 Fri 12/19/14 Randy Prella,Phil Cantrell,Local Service 54 Hardware Installation ‐ Phase 2 ‐ continued 30 days Mon 2/2/15 Fri 3/13/15 Randy Prella,Phil Cantrell,Local Service 55 Applications Testing ‐ Phase 1 15 days Mon 12/1/14 Fri 12/19/14 Angela Briones,Justin Deardorff Angela starts 12/8 week through  week of 2/16 56 Applications Testing ‐ Phase 2 ‐ continued 62 days Mon 1/5/15 Fri 3/27/15 Justin Deardorff,Angela Briones Angela as needed ‐ GoLive 57 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 Randy Prella,Phil Cantrell 58 Onsite Staff Training 5 days Mon 3/2/15 Fri 3/6/15 Onsite Brea Staff Need Key Ops from all 3 shifts.  Line  is technically ready for GoLive at this  point. 59 Integration Testing 30 days Mon 2/2/15 Fri 3/13/15 Angela Briones,Alvera Stevens,Justin  Deardorff Angela only until week of 2/16.  Then returns for GoLive. 60 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Randy Prella,Phil Cantrell,Angela Brione 61 62 63 Automate 2500 (x2) 66 days Mon 9/1/14 Mon 12/1/14 64 Pre‐site activities 60 days Mon 9/1/14 Fri 11/21/14 Bin Kallan,B&G,CMC 65 Baseframes 41 days Mon 10/6/14 Mon 12/1/14 Matt Gates,CMC 66 IT discussions 41 days Mon 10/6/14 Mon 12/1/14 Alvera Stevens,Ann Sheehe 67 Hardware delivery 1 day Tue 12/2/14 Tue 12/2/14 KJ Masseke‐Harvey,David Kester 9am delivery, forklift, Impact drills,  size20 Torx Bits, Adjustable wrenches 68 Hardware Installation 9 days Tue 12/2/14 Fri 12/12/14 KJ Masseke‐Harvey,David Kester 69 Hardware installation continued 10 days Mon 2/9/15 Fri 2/20/15 KJ Masseke‐Harvey,Mike Wagner 70 Applications Testing 10 days Mon 12/8/14 Fri 12/19/14 Matt Gates 71 Applications Testing continued 10 days Mon 3/2/15 Fri 3/13/15 Matt Gates Work with Remisol and PE teams to  test EVERYTHING 72 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 73 Customer Training 3 days Mon 2/2/15 Wed 2/4/15 ??? 74 Integration Testing 10 days Mon 3/2/15 Fri 3/13/15 Matt Gates 75 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Matt Gates 76 77 78 CHEMISTRY ANALYZERS 79 AU5822 (x2) 102 days Mon 11/10/14 Fri 3/27/15 80 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B&G,CMC 81 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team S M Aug 3 Page 2
  • 3. ID Task Name Duration Start Finish PredecesResource Names Notes 82 Hardware Installation 10 days Mon 11/17/14 Fri 11/28/14 David Kester,National Specialist 83 Applications Testing 50 days Mon 1/5/15 Fri 3/13/15 Mitzi Cassell Need permanent refrigerators ready 84 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 85 Staff OFFSITE training 5 days Mon 2/23/15 Fri 2/27/15 CMC need to send staff in Dec, Jan or Feb? 86 Staff onsite training 10 days Mon 2/23/15 Fri 3/6/15 Mitzi Cassell,CMC 87 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15 Mitzi Cassell 88 GoLive 0 days Mon 3/16/15 Mon 3/16/15 Mitzi Cassell 89 Post GoLive support 5 days Mon 3/23/15 Fri 3/27/15 Mitzi Cassell 90 91 DxI800 (x2) 92 days Mon 11/10/14 Mon 3/16/15 92 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC 93 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team 94 Hardware Installation 15 days Mon 11/17/14 Fri 12/5/14 Local Service (outside) 95 Applications Testing 25 days Mon 1/5/15 Fri 2/6/15 Barbara Jones need permanent refrigerators ready 96 C.O.N. Ready 0 days Mon 11/10/14 Mon 11/10/14 97 Staff OFFSITE training 1 day Thu 1/1/15 Thu 1/1/15 CMC 98 Staff onsite training 5 days Mon 2/9/15 Fri 2/13/15 99 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15 Remisol Team 100 GoLive 0 days Mon 3/16/15 Mon 3/16/15 101 102 103 HEMATOLOGY ANALYZERS 104 DxH800 (NEW Analyzer) 92 days Mon 11/10/14 Mon 3/16/15 105 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC 106 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team 107 Hardware Installation 10 days Mon 11/17/14 Fri 11/28/14 Local Service 108 Applications Testing 5 days Mon 1/5/15 Fri 1/9/15 Teri Nevel need permanent refrigerators ready 109 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 110 Staff OFFSITE training 5 days Thu 1/1/15 Wed 1/7/15 111 Staff onsite training 0 days Mon 2/9/15 Mon 2/9/15 112 Integration Testing 20 days Mon 2/16/15 Fri 3/13/15 113 GoLive 0 days Mon 3/16/15 Mon 3/16/15 114 115 DxH800+SMS (from Main Lab) 93 days Mon 11/10/14 Mon 3/16/15 116 Utilities Ready 1 day Mon 11/10/14 Mon 11/10/14 B & G,CMC 117 Hardware Delivery 1 day Sat 3/14/15 Sat 3/14/15 Local Service,CMC Labor Team CMC will transport, Local FSE to  supervise 118 Hardware Installation 2 days Sat 3/14/15 Sun 3/15/15 Local Service Local FSE to receive and reinstall 119 Applications Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC LIS,CMC Full validation or just QC?   120 Integration Testing 2 days Sun 3/15/15 Mon 3/16/15 CMC LIS CMC LIS team or our team?   121 GoLive 0 days Mon 3/16/15 Mon 3/16/15 122 S M Aug 3 Page 3
  • 4. ID Task Name Duration Start Finish PredecesResource Names Notes 123 Cellavision (from NE Lab) 87 days Mon 11/17/14 Mon 3/16/15 124 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14 B&G,CMC 125 Hardware Delivery 1 day Mon 2/9/15 Mon 2/9/15 CMC CMC will transport    126 Hardware Installation 5 days Mon 2/16/15 Fri 2/20/15 Local Service Local FSE to receive and reinstall 127 Applications Testing 5 days Mon 2/23/15 Fri 2/27/15 Full validation or just QC?   128 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15 CMC LIS team may need help  mounting onto network for remote  129 GoLive 0 days Mon 3/16/15 Mon 3/16/15 130 131 132 COAGULATION ANALYZERS 133 IRIScell (NEW Analyzer) 90 days Wed 11/12/14 Mon 3/16/15 134 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14 135 Hardware Delivery 1 day Wed 11/12/14 Wed 11/12/14 Bin Kallan,Labor Team 136 Hardware Installation 10 days Mon 12/8/14 Fri 12/19/14 Local Service (outside) 137 Applications Testing 5 days Mon 2/2/15 Fri 2/6/15 Terry Lyons need permanent refrigerators ready 138 C.O.N. Ready 0 days Mon 12/15/14 Mon 12/15/14 139 Staff OFFSITE training 1 day Thu 1/1/15 Thu 1/1/15 140 Staff onsite training 5 days Mon 2/9/15 Fri 2/13/15 141 Integration Testing 15 days Mon 2/23/15 Fri 3/13/15 142 GoLive 0 days Mon 3/16/15 Mon 3/16/15 143 144 IRIScell (from CMC Main Lab) 88 days Mon 11/17/14 Mon 3/16/15 145 Utilities Ready 1 day Mon 11/17/14 Mon 11/17/14 B&G Contractors 146 Hardware Delivery 1 day Sat 3/14/15 Sat 3/14/15 CMC 147 Hardware Installation 1 day Sat 3/14/15 Sat 3/14/15 CMC 148 Applications Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC 149 Integration Testing 1 day Sun 3/15/15 Sun 3/15/15 CMC 150 GoLive 1 day Mon 3/16/15 Mon 3/16/15 S M Aug 3 Page 4