SUBJECT: Operations and Information Management
NUMBER OF PAGES (excluding this page): 16
DUE        DATE:    Lecture   21:
                                    GROUP:MBA Modular 2012 E 1
17/04/2013
LECTURER: Martin Butler, Konrad von Leipzig
IS Improvement Project
IS Improvement Project
Content



                         Introduction

                         Vision and mission

                         Overview

                         Objective

                         Improvement Plan

                         Process Improvements

                         Financial Analysis

                         Controls
IS Improvement Project
Introduction – Business history and profile


     Company                                   Company
      History                                   Profile

                                              A project engineering company
   1990 Company founded by                    specializing in turnkey projects
        Manie Steyn                           of:
   1993 Mechanical manufacturing              • Automotive assembly facilities
        facility opened                       • Automotive trim line facilities
   1994 Electrical division opened            • Automotive water test facilities
                                              • Boiler installations
   1999 Manufacturing expansion               • Chemical process plants
                                              • Compressor installations
   2005 Merger and management                 • Manufacturing plants
        changes                               • Paint shop facilities
                                              • Piping installations
   2010 Company’s 20th anniversary
        / BEE Certification
IS Improvement Project
Introduction - Vision and mission


                                          Vision

           MC Design & Contracting’s vision is to be an industry leader
           and preferred partner to our clients by providing world-class
           industrial process facilities and components.


                                    Missions and Goals

           OUR MISSION is to focus on four primary principles:
           - We provide project-specific industrial process facilities that
             contribute to our growth and success.
           - We aim to provide an exclusive customer experience,
             through our actions, our products and our services.
           - We are people centred, but customer focussed.
           - We conduct our business in a manner of critical self-
             assessment and continual improvement
IS Improvement Project
Overview – Systems


                                                  Business
                      Software                   Operations
                                             Marketing & Sales
                      Packages                 Contracting
                       MS Office             Support services
                      MS Projects
                       Auotocad                                              MS SQL Server
                        Pastel                                                 Central storage
                                                                                 File Server

     ISO 9001
   Quality System,                   Existing
     Procedures
  Work instructions
                                     Systems
  Document control,                 misaligned                        Syspro
      records,
                                                                     Project Cost
                                                                 Financial Accounting
                                                                         MRP
                                                                     Scheduling
IS Improvement Project
Overview – Business operational flow chart
IS Improvement Project
Objectives

           What do we want to achieve?
                Improve current IS system so that we have …
                      • Alignment of systems
                      • Streamlining of systems
                      • Simple and easy processes
                … which provides an efficient operation that can be maintained with the
                minimal amount of errors, rework, and wasted effort.

           When do we want to achive this?
               Over a 9 week period in accordance with the estimated project plan


           How will we achive this?
                Through a dedicated project manager, utilising
                      • In-house work teams
                      • Syspro business solutions
                      • Management support

           How will we know we have achieve our objective?
                Measurement monitoring and taking actions.
                      • Project team reporting, Employee and Customer feedback
                      • Implement continous improvement projects
IS Improvement Project
                                                                         Alignment of Systems
Objectives
                                                                           to business needs
                                         Business
                                        Operations
                                       Marketing & Sales
                                         Contracting
                                       Support services


                Software
                Packages                                           MS SQL Server
                 MS Office                                           Central storage
                MS Projects                                            File Server
                 Auotocad
                  Pastel




                      ISO 9001                                  Syspro
                    Quality System,
                                                               Project Cost
                      Procedures
                                                           Financial Accounting
                   Work instructions
                                                                   MRP
                   Document control,
                                                               Scheduling
                       records,
IS Improvement Project
   Improvement Plan



       Step 1                    Step 2                Step 3                Step 4                 Step 5
        Initiate                  Identify             Identify               Project
                                                                                                   Close Out
        project                    issues           Improvements             Execution

Project Initiation:   Establish issues /     Identify              Execution of project   Monitoring of
• Obtain              problem areas,         improvement           including:             process:
  management          though detailed        Areas / Solutions     • Training of staff    • Customer
  approval            briefs from:                                                          feedback
                                             • Marketing           • Implement’n
• Kick off meetings   • Marketing                                                         • Employee
                                             • Quotation and       • Adjustments to
  with key staff      • Quotation and                                                       feedback
                                                Estimates             system
• Appoint PM             Estimates                                                        • Project reports
                                             • Projects and
• Engage IS partner   • Projects and            Contracts                                 • Continious
• Form project           Contracts           • “To Be” process                              Improvement
  teams               • “As Is” process         maps                                        Projects
                         maps
IS Improvement Project
Process Improvements


                                                                                                                                     Process improvements through teams
                                  Capture RFQ in
                                                                       Place all
                                                                     documents in
                                                                    projects on the
                                                                                                                                     1) Staff can work efficiently
        Receive RFQ
                                 quotation register /
                                 assign QE number
                                                                  server, open quote
                                                                    templates and
                                                                  notify manager by
                                                                   email of pending
                                                                                         Manager does
                                                                                           feasibility
                                                                                                           NO
                                                                                                                Send regret letter
                                                                                                                                     2) Early warning of shortcuts and risks.
                                         NO
                                                                         quote
                                                                                                   YES
                                                                                                                                     3) Staff buy in and commitment.
                                                                                                                                     4) Staff involvement results in quality,
                         YES           Manager                        Estimator
          Directors                   review and                  prepares detailed     Manager assigns
          Approval                     approves                   cost estimate on      RFQ to estimator
                                       estimate                    quote template

       YES
                         Negotiate
                                                            NO
                                                                                                                                         efficiency and customer satisfaction.
         Submit offer
       (quotation) and               Accept quote,      Decline   Change or quote
           support                    negotiate or                status to “decline”
        documents to                    decline                   on quote register
          customer
                                                                                                   END
                                                                   Change quote
                                                        Accept
                                                                      status to
                                                                  “accepted”, open
                                                                    job in Syspro                                                                                        Place all
                                                                                                                                                                      documents in
                                                                                                                                                                         projects
                                                                                                                                                                      folders on the
                                                                                                                                                                         server &
                                                                                                                                                                       hyperlink in
                                                                                                                                                                          Syspro




     From: Current “As Is” Process
                                                                                                                                                                      Capture RFQ in
                                                                                                                                                                     Syspro (quotation              Syspro sends                              NO   Syspro e-mails
                                                                                                                                                                                                                          Manager does
                                                                                                                                            Receive RFQ              module), system                   receipt                                     customer regret
                                                                                                                                                                                                                            feasibility
                                                                                                                                                                       assigns QE                   confirmation                                        letter
                                                                                                                                                                         number




        Before improvements
                                                                                                                                                                                                                                    YES



                                                                                                                                                               YES                          NO                           Assign estimator
                                                                                                                                                                        Manager &                      Estimator
                                                                                                                                                                                                                             in Syspro,
                                                                                                                                                                         directors                 prepares detailed
                                                                                                                                                                                                                            estimator is
                                                                                                                                                                        approval in                 cost estimate in
                                                                                                                                                                                                                        notified of pending
                                                                                                                                                                          Syspro                        Syspro
                                                                                                                                                                                                                                quote

                                                                                                                                                                                Negotiate

                                                                                                                                          Syspro generates
                                                                                                                                                                                         Decline   Change or quote
                                                                                                                                          & submits detailed          Accept quote,
                                                                                                                                                                                                       status to
                                                                                                                                             costing and               negotiate or
                                                                                                                                                                                                     “declined” in
                                                                                                                                              supporting                 decline
                                                                                                                                                                                                        Syspro
                                                                                                                                             documents
                                                                                                                                                                                                                                       END
                                                                                                                                                                                                   Enter sales order
                                                                                                                                                                                                     in Syspro, send
                                                                                                                                                                                         Accept
                                                                                                                                                                                                           out
                                                                                                                                                                                                    acknowledgment
                                                                                                                                                                                                   letter and convert
                                                                                                                                                                                                     quote to project




                                                                                                                                         To: Future “To Be” Process
                                                                                                                                             After improvements
IS Improvement Project
Process Improvement Implement a culture of continuous improvement

        You don’t fatten the pig with hope and by
                    weighing it alone!




     In other words wishing for improvements and simply measuring
       performance is fine, but it is what we do with the results that
                          makes the difference!
IS Improvement Project
Process Improvements / continuous improvement

  1- Measure                              2 - Analyze (Root Cause)

   What is happening?                       All Possible causes
   Why / when / where does the problem      Most likely root cause(s)
    happen?
   Who is involved with the problem?
                                             Verified root cause(s)
   How do we know we have a problem?




  4 - Sustain (Maintain)                  3 - Improve (Develop/Pilot/Implement)

        Permanent fix                             All Possible solutions
        Preventative measures                     Best solution
        Monitor effects of                        Implemented solution
         implementation
IS Improvement Project
Process Improvements




 Maintain the gains
  Ensure the ISO 9001 quality system does not inhibit change.
  Positive changes made are to be captured in the quality system.
IS Improvement Project
Financial Analysis
    Costs     Costs = R 900 000             vs                        Benefits
                                                   Benefits = R 1 774 500


      Software and people costs
      Licencing , Consulting & Project           Cost of Quality
      Managemet costs                                                     R 279 500
                                R 485 300
                                                 +Sales volume increase
                                                                          R 780 000
      Training + Other / Contingencies
      Quotes and Estimates                       +Reduction in COS
      Projects and Contracts                                              R715 000
                               R 275 195



      Additional Harware
      Server capability and memory               Payback period < 6
      upgrade.                                   Months if all benefits
                              R 157 505          are realised.
IS Improvement Project
Project Controls




                         Project controls achieved through

                          Project time schedule.

                          Project Feedback reports, from PM team.
                             o What is good?
                             o What has the potential to be bad?
                             o What is bad?
                          Feedback from other stakeholders.
                             o Employee feedback?
                             o Supplier feedback?
                             o Customer feedback?
IS Improvement Project

Más contenido relacionado

La actualidad más candente

1 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-11 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-1isabelmargarido
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareLeon Smiers
 
Creating A High Performance Operational Environment To Realise Measurable Per...
Creating A High Performance Operational Environment To Realise Measurable Per...Creating A High Performance Operational Environment To Realise Measurable Per...
Creating A High Performance Operational Environment To Realise Measurable Per...jadriaansen
 
Science Modernisation Strategy v1 0
Science  Modernisation  Strategy v1 0Science  Modernisation  Strategy v1 0
Science Modernisation Strategy v1 0Salim Sheikh
 
ITIL At Companies With Sap ItSMf Atlanta 2009
ITIL At Companies With Sap   ItSMf Atlanta 2009ITIL At Companies With Sap   ItSMf Atlanta 2009
ITIL At Companies With Sap ItSMf Atlanta 2009Robert Max
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008sissie1234
 
Developing An SOA Strategy V1
Developing An SOA Strategy V1Developing An SOA Strategy V1
Developing An SOA Strategy V1Salim Sheikh
 
Rebecca White, Pmp
Rebecca White, PmpRebecca White, Pmp
Rebecca White, PmpRebeccaWhite
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshotmelvinyou
 
Value Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtValue Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtArnaldo Colombo
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primersureshgk
 
Major Project Management
Major Project ManagementMajor Project Management
Major Project ManagementAssystem
 
Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Capgemini
 
SEC Presentation V2
SEC Presentation V2SEC Presentation V2
SEC Presentation V2Salim Sheikh
 
Case Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise ChangeCase Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise ChangeVincent Kwon
 
09 q7-itil 2011-overview-diagram-english_1111071
09 q7-itil 2011-overview-diagram-english_111107109 q7-itil 2011-overview-diagram-english_1111071
09 q7-itil 2011-overview-diagram-english_1111071bigwalker
 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasKathy (Kat) Mandelstein
 

La actualidad más candente (20)

1 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-11 eduardoespinheira-2confcmmiportugal-v1-1
1 eduardoespinheira-2confcmmiportugal-v1-1
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers share
 
Itil 2011 Mind Maps
Itil 2011 Mind MapsItil 2011 Mind Maps
Itil 2011 Mind Maps
 
Creating A High Performance Operational Environment To Realise Measurable Per...
Creating A High Performance Operational Environment To Realise Measurable Per...Creating A High Performance Operational Environment To Realise Measurable Per...
Creating A High Performance Operational Environment To Realise Measurable Per...
 
Science Modernisation Strategy v1 0
Science  Modernisation  Strategy v1 0Science  Modernisation  Strategy v1 0
Science Modernisation Strategy v1 0
 
Oracle BPM 11g Lesson 1
Oracle BPM 11g Lesson 1Oracle BPM 11g Lesson 1
Oracle BPM 11g Lesson 1
 
ITIL At Companies With Sap ItSMf Atlanta 2009
ITIL At Companies With Sap   ItSMf Atlanta 2009ITIL At Companies With Sap   ItSMf Atlanta 2009
ITIL At Companies With Sap ItSMf Atlanta 2009
 
Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008Upgrades and enhancement_packs_explained_mar_2008
Upgrades and enhancement_packs_explained_mar_2008
 
Developing An SOA Strategy V1
Developing An SOA Strategy V1Developing An SOA Strategy V1
Developing An SOA Strategy V1
 
Rebecca White, Pmp
Rebecca White, PmpRebecca White, Pmp
Rebecca White, Pmp
 
Aras PLM Software Integration Basics
Aras PLM Software Integration BasicsAras PLM Software Integration Basics
Aras PLM Software Integration Basics
 
Linkroad Corporate Snapshot
Linkroad Corporate SnapshotLinkroad Corporate Snapshot
Linkroad Corporate Snapshot
 
Value Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtValue Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge Mgt
 
ERP Project Management Primer
ERP Project Management PrimerERP Project Management Primer
ERP Project Management Primer
 
Major Project Management
Major Project ManagementMajor Project Management
Major Project Management
 
Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market Simplifying Work Order Management in the Utility Market
Simplifying Work Order Management in the Utility Market
 
SEC Presentation V2
SEC Presentation V2SEC Presentation V2
SEC Presentation V2
 
Case Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise ChangeCase Studies Using Process as the Lever for Enterprise Change
Case Studies Using Process as the Lever for Enterprise Change
 
09 q7-itil 2011-overview-diagram-english_1111071
09 q7-itil 2011-overview-diagram-english_111107109 q7-itil 2011-overview-diagram-english_1111071
09 q7-itil 2011-overview-diagram-english_1111071
 
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie ThomasIBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
IBM Rational Software Conference 2009 Day 1 Keynote: Jamie Thomas
 

Destacado

WatergatePRDisaster
WatergatePRDisasterWatergatePRDisaster
WatergatePRDisastermariannelouw
 
Pres conceptoplanificestratég
Pres conceptoplanificestratégPres conceptoplanificestratég
Pres conceptoplanificestratégluis.garrido
 
Hiubang Marketing Communication - Company Profile
Hiubang Marketing Communication - Company ProfileHiubang Marketing Communication - Company Profile
Hiubang Marketing Communication - Company ProfileIshak Tanoto
 
World Youth Day Maturitywork
World Youth Day MaturityworkWorld Youth Day Maturitywork
World Youth Day Maturityworkbenjy.a
 
BBA Diaster Relief Presentation
BBA Diaster Relief PresentationBBA Diaster Relief Presentation
BBA Diaster Relief PresentationToni Wall
 
Tarteeb - Company Profile
Tarteeb - Company ProfileTarteeb - Company Profile
Tarteeb - Company ProfileHisham Mohammad
 
Debugging: Love It, Hate It or Reverse It?
Debugging: Love It, Hate It or Reverse It?Debugging: Love It, Hate It or Reverse It?
Debugging: Love It, Hate It or Reverse It?Undo
 
Baba Indab Sandton Oct 2014 Show Magazine, South Africa
Baba Indab Sandton Oct 2014 Show Magazine, South AfricaBaba Indab Sandton Oct 2014 Show Magazine, South Africa
Baba Indab Sandton Oct 2014 Show Magazine, South AfricaMojoSeed1
 
RFHD Programme Summary South Africa 2016 v2
RFHD Programme Summary South Africa 2016 v2RFHD Programme Summary South Africa 2016 v2
RFHD Programme Summary South Africa 2016 v2rotaryeclubsa9400
 
Manual sispre
Manual sispreManual sispre
Manual sispreivan_ft
 
Rotary Newsletter - 30 January 2017
Rotary Newsletter - 30 January 2017Rotary Newsletter - 30 January 2017
Rotary Newsletter - 30 January 2017rotaryeclubsa9400
 

Destacado (20)

Goji Profile
Goji ProfileGoji Profile
Goji Profile
 
WatergatePRDisaster
WatergatePRDisasterWatergatePRDisaster
WatergatePRDisaster
 
900 a en15
900 a en15900 a en15
900 a en15
 
Pres conceptoplanificestratég
Pres conceptoplanificestratégPres conceptoplanificestratég
Pres conceptoplanificestratég
 
Hiubang Marketing Communication - Company Profile
Hiubang Marketing Communication - Company ProfileHiubang Marketing Communication - Company Profile
Hiubang Marketing Communication - Company Profile
 
World Youth Day Maturitywork
World Youth Day MaturityworkWorld Youth Day Maturitywork
World Youth Day Maturitywork
 
Boletín de ofertas de emprego.
Boletín de ofertas de emprego.Boletín de ofertas de emprego.
Boletín de ofertas de emprego.
 
Marygrace_Boado_CV (1)
Marygrace_Boado_CV (1)Marygrace_Boado_CV (1)
Marygrace_Boado_CV (1)
 
BBA Diaster Relief Presentation
BBA Diaster Relief PresentationBBA Diaster Relief Presentation
BBA Diaster Relief Presentation
 
Internet Marketing For New Businesses
Internet Marketing For New BusinessesInternet Marketing For New Businesses
Internet Marketing For New Businesses
 
SAGM 2014 November complete book
SAGM 2014 November complete bookSAGM 2014 November complete book
SAGM 2014 November complete book
 
Tarteeb - Company Profile
Tarteeb - Company ProfileTarteeb - Company Profile
Tarteeb - Company Profile
 
Debugging: Love It, Hate It or Reverse It?
Debugging: Love It, Hate It or Reverse It?Debugging: Love It, Hate It or Reverse It?
Debugging: Love It, Hate It or Reverse It?
 
Baba Indab Sandton Oct 2014 Show Magazine, South Africa
Baba Indab Sandton Oct 2014 Show Magazine, South AfricaBaba Indab Sandton Oct 2014 Show Magazine, South Africa
Baba Indab Sandton Oct 2014 Show Magazine, South Africa
 
Rotary africa June2016
Rotary africa June2016Rotary africa June2016
Rotary africa June2016
 
RFHD Programme Summary South Africa 2016 v2
RFHD Programme Summary South Africa 2016 v2RFHD Programme Summary South Africa 2016 v2
RFHD Programme Summary South Africa 2016 v2
 
Service Activity by Club
Service Activity by ClubService Activity by Club
Service Activity by Club
 
Rotary Africa Feb 2017
Rotary Africa Feb 2017Rotary Africa Feb 2017
Rotary Africa Feb 2017
 
Manual sispre
Manual sispreManual sispre
Manual sispre
 
Rotary Newsletter - 30 January 2017
Rotary Newsletter - 30 January 2017Rotary Newsletter - 30 January 2017
Rotary Newsletter - 30 January 2017
 

Similar a Final groupassignmentpresentation g4_mode1_2012

Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Mark Kromer
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Mark Kromer
 
Dynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study SealordDynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study SealordIntergen
 
The Project Gold Mine Services Short
The Project Gold Mine Services  ShortThe Project Gold Mine Services  Short
The Project Gold Mine Services ShortThe Project Gold Mine
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011FrankKooijmans
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycleMantavya Gajjar
 
Respond quickly to changing business needs–Business Process Management (BPM)
Respond quickly to changing business needs–Business Process Management (BPM)Respond quickly to changing business needs–Business Process Management (BPM)
Respond quickly to changing business needs–Business Process Management (BPM)Carly Snodgrass
 
BPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyBPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyMichael zur Muehlen
 
Portfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicPortfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicEPM Live
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Ray Glass
 
Process Documentation
Process DocumentationProcess Documentation
Process DocumentationJobaq
 
SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)Palisade Corporation
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsWynyard Group
 
¿Es cara la arquitectura empresarial?
¿Es cara la arquitectura empresarial?¿Es cara la arquitectura empresarial?
¿Es cara la arquitectura empresarial?Matersys
 

Similar a Final groupassignmentpresentation g4_mode1_2012 (20)

Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1Oracle primavera p6 analytics r1
Oracle primavera p6 analytics r1
 
Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1Oracle priamvera p6 analytics r1
Oracle priamvera p6 analytics r1
 
Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]Ams Webinar 25 March 2010 Jf Final[1]
Ams Webinar 25 March 2010 Jf Final[1]
 
Dynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study SealordDynamics Day '11 - NAV case study Sealord
Dynamics Day '11 - NAV case study Sealord
 
The Project Gold Mine Services Short
The Project Gold Mine Services  ShortThe Project Gold Mine Services  Short
The Project Gold Mine Services Short
 
Cadence Presentation Eng 2011
Cadence Presentation Eng 2011Cadence Presentation Eng 2011
Cadence Presentation Eng 2011
 
ERP Implementation cycle
ERP Implementation cycleERP Implementation cycle
ERP Implementation cycle
 
Success introduction 2012
Success introduction 2012Success introduction 2012
Success introduction 2012
 
Respond quickly to changing business needs–Business Process Management (BPM)
Respond quickly to changing business needs–Business Process Management (BPM)Respond quickly to changing business needs–Business Process Management (BPM)
Respond quickly to changing business needs–Business Process Management (BPM)
 
Business Modeling and the Business Analyst
Business Modeling and the Business AnalystBusiness Modeling and the Business Analyst
Business Modeling and the Business Analyst
 
SP_BTPM
SP_BTPMSP_BTPM
SP_BTPM
 
BPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of TechnologyBPM Courses and Certificates by Stevens Institute of Technology
BPM Courses and Certificates by Stevens Institute of Technology
 
Portfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It BasicPortfolio Planning for 2013 - Keeping It Basic
Portfolio Planning for 2013 - Keeping It Basic
 
Net@Work Client Presentation with Security
Net@Work Client Presentation with Security Net@Work Client Presentation with Security
Net@Work Client Presentation with Security
 
Process Documentation
Process DocumentationProcess Documentation
Process Documentation
 
SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)SAP Enterprise Modeling Applications (ARIS)
SAP Enterprise Modeling Applications (ARIS)
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Gathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business RequirementsGathering And Documenting Your Bi Business Requirements
Gathering And Documenting Your Bi Business Requirements
 
MCP4
MCP4MCP4
MCP4
 
¿Es cara la arquitectura empresarial?
¿Es cara la arquitectura empresarial?¿Es cara la arquitectura empresarial?
¿Es cara la arquitectura empresarial?
 

Último

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxtrishalcan8
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docxRodelinaLaud
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfOrient Homes
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 

Último (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptxSocio-economic-Impact-of-business-consumers-suppliers-and.pptx
Socio-economic-Impact-of-business-consumers-suppliers-and.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
DEPED Work From Home WORKWEEK-PLAN.docx
DEPED Work From Home  WORKWEEK-PLAN.docxDEPED Work From Home  WORKWEEK-PLAN.docx
DEPED Work From Home WORKWEEK-PLAN.docx
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdfCatalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
Catalogue ONG NƯỚC uPVC - HDPE DE NHAT.pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 

Final groupassignmentpresentation g4_mode1_2012

  • 1. Group 4: Fortuin, E, 11372567 Johnson, B, 17432421 Naidoo, T, 17425514 Schoeman, P, 17389003 Steenberg, G, 17355559 Steyn, E,17370345 Van Der Westhuizen, C, 13380761 E-MAIL ADDRESS: bryan.johnson@za.abb.com CONTACT NUMBER: 0826594511 SUBJECT: Operations and Information Management NUMBER OF PAGES (excluding this page): 16 DUE DATE: Lecture 21: GROUP:MBA Modular 2012 E 1 17/04/2013 LECTURER: Martin Butler, Konrad von Leipzig
  • 3. IS Improvement Project Content Introduction Vision and mission Overview Objective Improvement Plan Process Improvements Financial Analysis Controls
  • 4. IS Improvement Project Introduction – Business history and profile Company Company History Profile A project engineering company 1990 Company founded by specializing in turnkey projects Manie Steyn of: 1993 Mechanical manufacturing • Automotive assembly facilities facility opened • Automotive trim line facilities 1994 Electrical division opened • Automotive water test facilities • Boiler installations 1999 Manufacturing expansion • Chemical process plants • Compressor installations 2005 Merger and management • Manufacturing plants changes • Paint shop facilities • Piping installations 2010 Company’s 20th anniversary / BEE Certification
  • 5. IS Improvement Project Introduction - Vision and mission Vision MC Design & Contracting’s vision is to be an industry leader and preferred partner to our clients by providing world-class industrial process facilities and components. Missions and Goals OUR MISSION is to focus on four primary principles: - We provide project-specific industrial process facilities that contribute to our growth and success. - We aim to provide an exclusive customer experience, through our actions, our products and our services. - We are people centred, but customer focussed. - We conduct our business in a manner of critical self- assessment and continual improvement
  • 6. IS Improvement Project Overview – Systems Business Software Operations Marketing & Sales Packages Contracting MS Office Support services MS Projects Auotocad MS SQL Server Pastel Central storage File Server ISO 9001 Quality System, Existing Procedures Work instructions Systems Document control, misaligned Syspro records, Project Cost Financial Accounting MRP Scheduling
  • 7. IS Improvement Project Overview – Business operational flow chart
  • 8. IS Improvement Project Objectives What do we want to achieve? Improve current IS system so that we have … • Alignment of systems • Streamlining of systems • Simple and easy processes … which provides an efficient operation that can be maintained with the minimal amount of errors, rework, and wasted effort. When do we want to achive this? Over a 9 week period in accordance with the estimated project plan How will we achive this? Through a dedicated project manager, utilising • In-house work teams • Syspro business solutions • Management support How will we know we have achieve our objective? Measurement monitoring and taking actions. • Project team reporting, Employee and Customer feedback • Implement continous improvement projects
  • 9. IS Improvement Project Alignment of Systems Objectives to business needs Business Operations Marketing & Sales Contracting Support services Software Packages MS SQL Server MS Office Central storage MS Projects File Server Auotocad Pastel ISO 9001 Syspro Quality System, Project Cost Procedures Financial Accounting Work instructions MRP Document control, Scheduling records,
  • 10. IS Improvement Project Improvement Plan Step 1 Step 2 Step 3 Step 4 Step 5 Initiate Identify Identify Project Close Out project issues Improvements Execution Project Initiation: Establish issues / Identify Execution of project Monitoring of • Obtain problem areas, improvement including: process: management though detailed Areas / Solutions • Training of staff • Customer approval briefs from: feedback • Marketing • Implement’n • Kick off meetings • Marketing • Employee • Quotation and • Adjustments to with key staff • Quotation and feedback Estimates system • Appoint PM Estimates • Project reports • Projects and • Engage IS partner • Projects and Contracts • Continious • Form project Contracts • “To Be” process Improvement teams • “As Is” process maps Projects maps
  • 11. IS Improvement Project Process Improvements Process improvements through teams Capture RFQ in Place all documents in projects on the 1) Staff can work efficiently Receive RFQ quotation register / assign QE number server, open quote templates and notify manager by email of pending Manager does feasibility NO Send regret letter 2) Early warning of shortcuts and risks. NO quote YES 3) Staff buy in and commitment. 4) Staff involvement results in quality, YES Manager Estimator Directors review and prepares detailed Manager assigns Approval approves cost estimate on RFQ to estimator estimate quote template YES Negotiate NO efficiency and customer satisfaction. Submit offer (quotation) and Accept quote, Decline Change or quote support negotiate or status to “decline” documents to decline on quote register customer END Change quote Accept status to “accepted”, open job in Syspro Place all documents in projects folders on the server & hyperlink in Syspro From: Current “As Is” Process Capture RFQ in Syspro (quotation Syspro sends NO Syspro e-mails Manager does Receive RFQ module), system receipt customer regret feasibility assigns QE confirmation letter number Before improvements YES YES NO Assign estimator Manager & Estimator in Syspro, directors prepares detailed estimator is approval in cost estimate in notified of pending Syspro Syspro quote Negotiate Syspro generates Decline Change or quote & submits detailed Accept quote, status to costing and negotiate or “declined” in supporting decline Syspro documents END Enter sales order in Syspro, send Accept out acknowledgment letter and convert quote to project To: Future “To Be” Process After improvements
  • 12. IS Improvement Project Process Improvement Implement a culture of continuous improvement You don’t fatten the pig with hope and by weighing it alone! In other words wishing for improvements and simply measuring performance is fine, but it is what we do with the results that makes the difference!
  • 13. IS Improvement Project Process Improvements / continuous improvement 1- Measure 2 - Analyze (Root Cause)  What is happening?  All Possible causes  Why / when / where does the problem  Most likely root cause(s) happen?  Who is involved with the problem?  Verified root cause(s)  How do we know we have a problem? 4 - Sustain (Maintain) 3 - Improve (Develop/Pilot/Implement)  Permanent fix  All Possible solutions  Preventative measures  Best solution  Monitor effects of  Implemented solution implementation
  • 14. IS Improvement Project Process Improvements Maintain the gains  Ensure the ISO 9001 quality system does not inhibit change.  Positive changes made are to be captured in the quality system.
  • 15. IS Improvement Project Financial Analysis Costs Costs = R 900 000 vs Benefits Benefits = R 1 774 500 Software and people costs Licencing , Consulting & Project Cost of Quality Managemet costs R 279 500 R 485 300 +Sales volume increase R 780 000 Training + Other / Contingencies Quotes and Estimates +Reduction in COS Projects and Contracts R715 000 R 275 195 Additional Harware Server capability and memory Payback period < 6 upgrade. Months if all benefits R 157 505 are realised.
  • 16. IS Improvement Project Project Controls Project controls achieved through  Project time schedule.  Project Feedback reports, from PM team. o What is good? o What has the potential to be bad? o What is bad?  Feedback from other stakeholders. o Employee feedback? o Supplier feedback? o Customer feedback?