BUEN GUIDO, BSME, ASQ-CQE
QA MANAGER
CASE STUDY – ZERO STOCK OUT
NewGen Construction
Case Study
• Shortage of Hardware Category C at the
Construction Site
• Installers having to source or buy parts at local
hardware store to fill shortage
• Having to pay premium from buying at local
hardware store – Increased Labor cost
• Having to take special trips to hardware store -
Causes delay
• COPQ high
CASE #1 – ZERO STOCK OUT
What?
Problem Statement
CASE #1 – ZERO STOCK OUT
Shortage:
Category C
Hardware at
Construction
Site
DELAYS &
INCREASED
LABOR COST
=
COPQ
Installers
having to buy
from local
hardware
store to fill
shortage!
Possible Causes
CASE #1 – ZERO STOCK OUT
BOM Error:
Wrong
Quantity,
Wrong P/N
Callout
Kitting Error:
Wrong
Quantity
Wrong P/N,
etc.
Misplaced
Hardware at
Construction
Site
Why?
Proposed Solutions
CASE #1 – ZERO STOCK OUT
Assembly
BOM & Final
Design
Signoff at
NewGen
Implement
In-Process &
Final Audit at
Supplier
Use KANBAN
at
Construction
Site Store
How?
Assembly BOM & Final
Design Signoff at
NewGen Construction
CASE #1 – ZERO STOCK OUT
AssemblyBOM&FinalDesign
SignoffatNewGenConstruction  Assembly BOM Production Release Review
 Signoff
 Engineering – Design Complete
 Supply Chain – Purchase Quantity
 QA – Package Complete & Accuracy
Implement
In-Process & Final Audit
at Supplier
CASE #1 – ZERO STOCK OUT
ImplementIn-Process&Final
AuditatSupplier
 Develop In-process Audit of Category-C
Hardware Kits per Part Number
 Incoming material inspection
 Quantities checked per hardware part
number
Incoming
Material
QC Ok!
Check MFR. P/N
Check Material
Check QTY
2nd Tier
Hardware
Supplier
Move parts
to Inventory
Location
Yes
No
ImplementIn-Process&Final
AuditatSupplier
 Develop Final Inspection of Category-C
Hardware Job Site Kits
 Final Audit of Job Site BOM hardware
Quantities
Pull needed
parts for Job
Site Store
QC Ok!
Check P/N
Check QTY
Move parts
to shipping
Yes
No
Planner
Use KANBAN (Zero Stock
Out) at Construction Site
Store
CASE #1 – ZERO STOCK OUT
UseKANBANatConstruction
SiteStore
KANBAN is Japanese word that means
card you can see, posters, signs, etc. and
is a visual signal used to trigger an action.
KANBAN was one of several tools Toyota
developed to ensure that inventory was
based on actual customer orders rather
than managerial forecasts.
What is KANBAN
UseKANBANatConstruction
SiteStore
Hardware Store at the Job Site using KANBAN
Method for “Zero Stock Out”.
Hardware Store
at Job Site
Installers pull parts
from store
Replenishment-
Supplier to Job Site
Low stock triggers
Replenishment
Usage being
monitored
UseKANBANatConstruction
SiteStore How does KANBAN work?
UseKANBANatConstruction
SiteStore
How are parts replenished or pulled from
Supplier?
When container is empty,
Signal to source to replenish Kanban
Wait until minimum order
Quantity is reached
When order minimum is
reached, a Job, PO or
Move Order is created
When received, KANBAN status
is updated and container is
moved to usage area
Planner determines
when to add/remove
cards
 NewGen Construction to work with LSS
Black Belt in monitoring Hardware Stores
performance (KPI) – Min. weekly report at
start of program and less frequent when
program achieves it’s “Zero stock out”
objective.
 Develop a learning organization (NewGen
– Supplier) that will find ways to reduce
the number of KANBAN and thereby
reduce and ultimately eliminate the
inventory buffer.
Continuous
Improvement

Más contenido relacionado

La actualidad más candente

ERPNext Open Day - March / April 2015
ERPNext Open Day - March / April 2015ERPNext Open Day - March / April 2015
ERPNext Open Day - March / April 2015rushabh_mehta
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case StudyRamkumar Arumugam
 
Contingent Worker Integration in a Professional Services Company
Contingent Worker Integration in a Professional Services CompanyContingent Worker Integration in a Professional Services Company
Contingent Worker Integration in a Professional Services CompanyRolta
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata PresentationDynamic Systems
 
Frappé / ERPNext Open Day January 2016
Frappé / ERPNext Open Day January 2016Frappé / ERPNext Open Day January 2016
Frappé / ERPNext Open Day January 2016Anand Doshi
 
Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Anand Doshi
 
2015 Sage Summit IIG session- Product Lifecycle Management
2015 Sage Summit IIG session-  Product Lifecycle Management 2015 Sage Summit IIG session-  Product Lifecycle Management
2015 Sage Summit IIG session- Product Lifecycle Management Information Integration Group
 
Sap vendor invoice management reporting final
Sap vendor invoice management reporting finalSap vendor invoice management reporting final
Sap vendor invoice management reporting finalArghadip Kar
 
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988Kartik Shrivastava
 
Frappe Open Day - June 2015
Frappe Open Day - June 2015Frappe Open Day - June 2015
Frappe Open Day - June 2015Anand Doshi
 
Threefold integration: CMS, TMS, and CAT — UTIC 2016
Threefold integration: CMS, TMS, and CAT — UTIC 2016Threefold integration: CMS, TMS, and CAT — UTIC 2016
Threefold integration: CMS, TMS, and CAT — UTIC 2016Jose Palomares
 
Tactical Machining - Marking Variance Process
Tactical Machining - Marking Variance ProcessTactical Machining - Marking Variance Process
Tactical Machining - Marking Variance ProcessNick Olko
 
Sage HRMS 2017 Walkthrough
Sage HRMS 2017 WalkthroughSage HRMS 2017 Walkthrough
Sage HRMS 2017 WalkthroughNet at Work
 
Sage HRMS 2017 Walk Through
Sage HRMS 2017 Walk ThroughSage HRMS 2017 Walk Through
Sage HRMS 2017 Walk ThroughNet at Work
 
Three Trigger-Ready Flows You Can Build Today
Three Trigger-Ready Flows You Can Build TodayThree Trigger-Ready Flows You Can Build Today
Three Trigger-Ready Flows You Can Build TodayPatrick Sheil
 
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement Packs
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement PacksMastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement Packs
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement PacksJan Coetzee
 
Sap Tips and Tricks Training for End user
Sap Tips and Tricks Training for End userSap Tips and Tricks Training for End user
Sap Tips and Tricks Training for End userArghadip Kar
 

La actualidad más candente (20)

ERPNext Open Day - March / April 2015
ERPNext Open Day - March / April 2015ERPNext Open Day - March / April 2015
ERPNext Open Day - March / April 2015
 
Kanban for Automation - Case Study
Kanban for Automation  - Case StudyKanban for Automation  - Case Study
Kanban for Automation - Case Study
 
Contingent Worker Integration in a Professional Services Company
Contingent Worker Integration in a Professional Services CompanyContingent Worker Integration in a Professional Services Company
Contingent Worker Integration in a Professional Services Company
 
Abingo
AbingoAbingo
Abingo
 
Checkmate Jobdata Presentation
Checkmate  Jobdata PresentationCheckmate  Jobdata Presentation
Checkmate Jobdata Presentation
 
Frappé / ERPNext Open Day January 2016
Frappé / ERPNext Open Day January 2016Frappé / ERPNext Open Day January 2016
Frappé / ERPNext Open Day January 2016
 
Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016Frappé / ERPNext Open Day February 2016
Frappé / ERPNext Open Day February 2016
 
Other Tool
Other ToolOther Tool
Other Tool
 
2015 Sage Summit IIG session- Product Lifecycle Management
2015 Sage Summit IIG session-  Product Lifecycle Management 2015 Sage Summit IIG session-  Product Lifecycle Management
2015 Sage Summit IIG session- Product Lifecycle Management
 
Sap vendor invoice management reporting final
Sap vendor invoice management reporting finalSap vendor invoice management reporting final
Sap vendor invoice management reporting final
 
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988
DNS ERP - CLOUD BASED ERP SOFTWARE, PUNE, INDIA - + 91 8805008988
 
Frappe Open Day - June 2015
Frappe Open Day - June 2015Frappe Open Day - June 2015
Frappe Open Day - June 2015
 
Threefold integration: CMS, TMS, and CAT — UTIC 2016
Threefold integration: CMS, TMS, and CAT — UTIC 2016Threefold integration: CMS, TMS, and CAT — UTIC 2016
Threefold integration: CMS, TMS, and CAT — UTIC 2016
 
Tactical Machining - Marking Variance Process
Tactical Machining - Marking Variance ProcessTactical Machining - Marking Variance Process
Tactical Machining - Marking Variance Process
 
Sage HRMS 2017 Walkthrough
Sage HRMS 2017 WalkthroughSage HRMS 2017 Walkthrough
Sage HRMS 2017 Walkthrough
 
Sage HRMS 2017 Walk Through
Sage HRMS 2017 Walk ThroughSage HRMS 2017 Walk Through
Sage HRMS 2017 Walk Through
 
Tips To Fill Up The CBAP® Form
Tips To Fill Up The CBAP® FormTips To Fill Up The CBAP® Form
Tips To Fill Up The CBAP® Form
 
Three Trigger-Ready Flows You Can Build Today
Three Trigger-Ready Flows You Can Build TodayThree Trigger-Ready Flows You Can Build Today
Three Trigger-Ready Flows You Can Build Today
 
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement Packs
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement PacksMastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement Packs
Mastering SAP Technologies 2013 - Jan Coetzee - PCS - Enhancement Packs
 
Sap Tips and Tricks Training for End user
Sap Tips and Tricks Training for End userSap Tips and Tricks Training for End user
Sap Tips and Tricks Training for End user
 

Destacado

Keynote martin valcke
Keynote martin valckeKeynote martin valcke
Keynote martin valckemkuiten
 
Top 10 demand manager interview questions and answers
Top 10 demand manager interview questions and answersTop 10 demand manager interview questions and answers
Top 10 demand manager interview questions and answerscadderlux
 
How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?Charles Rathmann
 
Petty Cash Management - How To Record Transactions
Petty Cash Management - How To Record TransactionsPetty Cash Management - How To Record Transactions
Petty Cash Management - How To Record TransactionsDavid Olson
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development modelZachar Prychoda
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planningArushi Verma
 
Kanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen CultureKanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen CultureAcquate
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Muljati Muli
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distributionHammaduddin
 
3patry and 4 party logistics
3patry and 4 party logistics3patry and 4 party logistics
3patry and 4 party logisticsArun Kumar
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management Siddhi Suthar
 
Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Khaoula Marai
 
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Sabio Bernard
 

Destacado (14)

Keynote martin valcke
Keynote martin valckeKeynote martin valcke
Keynote martin valcke
 
Top 10 demand manager interview questions and answers
Top 10 demand manager interview questions and answersTop 10 demand manager interview questions and answers
Top 10 demand manager interview questions and answers
 
How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?How Well Does ERP Facilitate Project Based Business Models?
How Well Does ERP Facilitate Project Based Business Models?
 
Petty Cash Management - How To Record Transactions
Petty Cash Management - How To Record TransactionsPetty Cash Management - How To Record Transactions
Petty Cash Management - How To Record Transactions
 
Kaizen software development model
Kaizen software development modelKaizen software development model
Kaizen software development model
 
Production planning techniques- aggregate planning
Production planning techniques- aggregate planningProduction planning techniques- aggregate planning
Production planning techniques- aggregate planning
 
Kanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen CultureKanban for Software Development and Kaizen Culture
Kanban for Software Development and Kaizen Culture
 
Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2Lean manufacturing toyota indonesia 2011_2
Lean manufacturing toyota indonesia 2011_2
 
Milk run distribution
Milk run distributionMilk run distribution
Milk run distribution
 
Toyota logistics
Toyota logisticsToyota logistics
Toyota logistics
 
3patry and 4 party logistics
3patry and 4 party logistics3patry and 4 party logistics
3patry and 4 party logistics
 
Toyota Supply chain Management
Toyota Supply chain Management Toyota Supply chain Management
Toyota Supply chain Management
 
Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2
 
Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.Supply Chain Management of TOYOTA.......case study by sabio bernard.
Supply Chain Management of TOYOTA.......case study by sabio bernard.
 

Similar a ZERO STOCK OUT CASE STUDY

Streamlining the mfg process webinar
Streamlining the mfg process webinarStreamlining the mfg process webinar
Streamlining the mfg process webinarHarry Mosesian
 
Industrial manufacturing and IFS Applications 8: customer case
Industrial manufacturing and IFS Applications 8: customer caseIndustrial manufacturing and IFS Applications 8: customer case
Industrial manufacturing and IFS Applications 8: customer caseIFS
 
Manufacturing: SAP Sub Contracting Process
Manufacturing: SAP Sub Contracting ProcessManufacturing: SAP Sub Contracting Process
Manufacturing: SAP Sub Contracting ProcessPraxis Info Solutions
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentationBijo Joseph
 
MFTBC Operation Development Plan
MFTBC Operation Development PlanMFTBC Operation Development Plan
MFTBC Operation Development PlanTharanga Jayalal
 
Accounting entries from production to finished stock
Accounting entries from production to finished stockAccounting entries from production to finished stock
Accounting entries from production to finished stockRavindra Jain
 
Archana Joshi Aug 2013 Kanban Spin Pune
Archana Joshi Aug 2013 Kanban Spin Pune Archana Joshi Aug 2013 Kanban Spin Pune
Archana Joshi Aug 2013 Kanban Spin Pune Archana Joshi
 
EP_LE_E2611_Debagging Process And Differences for Debagging WH
EP_LE_E2611_Debagging Process And Differences for Debagging  WHEP_LE_E2611_Debagging Process And Differences for Debagging  WH
EP_LE_E2611_Debagging Process And Differences for Debagging WHRonen Madar
 
How to maintain a perfect product architecture in a non-stop start-up
How to maintain a perfect product architecture in a non-stop start-upHow to maintain a perfect product architecture in a non-stop start-up
How to maintain a perfect product architecture in a non-stop start-upAdam Kariv
 
Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersRootstock Software
 
How does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh AroraHow does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 

Similar a ZERO STOCK OUT CASE STUDY (20)

Streamlining the mfg process webinar
Streamlining the mfg process webinarStreamlining the mfg process webinar
Streamlining the mfg process webinar
 
Kanban siom
Kanban   siomKanban   siom
Kanban siom
 
Industrial manufacturing and IFS Applications 8: customer case
Industrial manufacturing and IFS Applications 8: customer caseIndustrial manufacturing and IFS Applications 8: customer case
Industrial manufacturing and IFS Applications 8: customer case
 
Manufacturing: SAP Sub Contracting Process
Manufacturing: SAP Sub Contracting ProcessManufacturing: SAP Sub Contracting Process
Manufacturing: SAP Sub Contracting Process
 
Kanban presentation
Kanban presentationKanban presentation
Kanban presentation
 
MFTBC Operation Development Plan
MFTBC Operation Development PlanMFTBC Operation Development Plan
MFTBC Operation Development Plan
 
just in time
just in timejust in time
just in time
 
Accounting entries from production to finished stock
Accounting entries from production to finished stockAccounting entries from production to finished stock
Accounting entries from production to finished stock
 
Archana Joshi Aug 2013 Kanban Spin Pune
Archana Joshi Aug 2013 Kanban Spin Pune Archana Joshi Aug 2013 Kanban Spin Pune
Archana Joshi Aug 2013 Kanban Spin Pune
 
04 decentralized pull systems
04 decentralized pull systems04 decentralized pull systems
04 decentralized pull systems
 
EP_LE_E2611_Debagging Process And Differences for Debagging WH
EP_LE_E2611_Debagging Process And Differences for Debagging  WHEP_LE_E2611_Debagging Process And Differences for Debagging  WH
EP_LE_E2611_Debagging Process And Differences for Debagging WH
 
Connectivity Solutions SAP Kanban Training
Connectivity Solutions SAP Kanban Training Connectivity Solutions SAP Kanban Training
Connectivity Solutions SAP Kanban Training
 
Agile Methodologies
Agile MethodologiesAgile Methodologies
Agile Methodologies
 
Product Development
Product DevelopmentProduct Development
Product Development
 
Pete's Resume
Pete's ResumePete's Resume
Pete's Resume
 
How to maintain a perfect product architecture in a non-stop start-up
How to maintain a perfect product architecture in a non-stop start-upHow to maintain a perfect product architecture in a non-stop start-up
How to maintain a perfect product architecture in a non-stop start-up
 
Project Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many ManufacturersProject Control - A Vital ERP Tool for Many Manufacturers
Project Control - A Vital ERP Tool for Many Manufacturers
 
How does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh AroraHow does Kanban work? - ADDVALUE - Nilesh Arora
How does Kanban work? - ADDVALUE - Nilesh Arora
 
Michael Rigby CV 2
Michael Rigby CV 2Michael Rigby CV 2
Michael Rigby CV 2
 
Hand shake points.ppt
Hand  shake points.pptHand  shake points.ppt
Hand shake points.ppt
 

ZERO STOCK OUT CASE STUDY

  • 1. BUEN GUIDO, BSME, ASQ-CQE QA MANAGER CASE STUDY – ZERO STOCK OUT NewGen Construction
  • 2. Case Study • Shortage of Hardware Category C at the Construction Site • Installers having to source or buy parts at local hardware store to fill shortage • Having to pay premium from buying at local hardware store – Increased Labor cost • Having to take special trips to hardware store - Causes delay • COPQ high CASE #1 – ZERO STOCK OUT What?
  • 3. Problem Statement CASE #1 – ZERO STOCK OUT Shortage: Category C Hardware at Construction Site DELAYS & INCREASED LABOR COST = COPQ Installers having to buy from local hardware store to fill shortage!
  • 4. Possible Causes CASE #1 – ZERO STOCK OUT BOM Error: Wrong Quantity, Wrong P/N Callout Kitting Error: Wrong Quantity Wrong P/N, etc. Misplaced Hardware at Construction Site Why?
  • 5. Proposed Solutions CASE #1 – ZERO STOCK OUT Assembly BOM & Final Design Signoff at NewGen Implement In-Process & Final Audit at Supplier Use KANBAN at Construction Site Store How?
  • 6. Assembly BOM & Final Design Signoff at NewGen Construction CASE #1 – ZERO STOCK OUT
  • 7. AssemblyBOM&FinalDesign SignoffatNewGenConstruction  Assembly BOM Production Release Review  Signoff  Engineering – Design Complete  Supply Chain – Purchase Quantity  QA – Package Complete & Accuracy
  • 8. Implement In-Process & Final Audit at Supplier CASE #1 – ZERO STOCK OUT
  • 9. ImplementIn-Process&Final AuditatSupplier  Develop In-process Audit of Category-C Hardware Kits per Part Number  Incoming material inspection  Quantities checked per hardware part number Incoming Material QC Ok! Check MFR. P/N Check Material Check QTY 2nd Tier Hardware Supplier Move parts to Inventory Location Yes No
  • 10. ImplementIn-Process&Final AuditatSupplier  Develop Final Inspection of Category-C Hardware Job Site Kits  Final Audit of Job Site BOM hardware Quantities Pull needed parts for Job Site Store QC Ok! Check P/N Check QTY Move parts to shipping Yes No Planner
  • 11. Use KANBAN (Zero Stock Out) at Construction Site Store CASE #1 – ZERO STOCK OUT
  • 12. UseKANBANatConstruction SiteStore KANBAN is Japanese word that means card you can see, posters, signs, etc. and is a visual signal used to trigger an action. KANBAN was one of several tools Toyota developed to ensure that inventory was based on actual customer orders rather than managerial forecasts. What is KANBAN
  • 13. UseKANBANatConstruction SiteStore Hardware Store at the Job Site using KANBAN Method for “Zero Stock Out”. Hardware Store at Job Site Installers pull parts from store Replenishment- Supplier to Job Site Low stock triggers Replenishment Usage being monitored
  • 15. UseKANBANatConstruction SiteStore How are parts replenished or pulled from Supplier? When container is empty, Signal to source to replenish Kanban Wait until minimum order Quantity is reached When order minimum is reached, a Job, PO or Move Order is created When received, KANBAN status is updated and container is moved to usage area Planner determines when to add/remove cards
  • 16.  NewGen Construction to work with LSS Black Belt in monitoring Hardware Stores performance (KPI) – Min. weekly report at start of program and less frequent when program achieves it’s “Zero stock out” objective.  Develop a learning organization (NewGen – Supplier) that will find ways to reduce the number of KANBAN and thereby reduce and ultimately eliminate the inventory buffer. Continuous Improvement

Notas del editor

  1. Root cause analysis usually starts out looking at Product Specifications. In this case, BOM which is part of Product Specs.