Electrical Systems:
Designing electrical rooms
Join the discussion about this Webcast on Twitter at #CSEelectricalroom
Sponsored by:
Brian Martin, PE, Portland Electrical Department Manager
CH2M Hill
Portland, Ore.
Brian Rener, PE, LEED AP, Associate
SmithgroupJJR,
Chicago, Ill.
Moderator: Jack Smith,
Consulting-Specifying Engineer and Pure Power,
CFE Media, LLC
Presenters:
Electrical Systems: Designing
electrical rooms
Brian Martin, PE, Portland Electrical
Department Manager
CH2M Hill
Portland, Ore.
Brian Rener, PE, LEED AP, Associate
SmithgroupJJR ,
Chicago, Ill.
Presentation scope
• NFPA 70 (NEC) 2014
• International Building Code (IBC)
• 800 A and Above
• Primary services
• No hazardous locations
• Good engineering practices
Electrical room design
• Needs a coordinated team:
• Electricals
• Architects
• Structural
• Mechanicals
• Fire protection
Room types
• Primary service rooms
• Electrical rooms
• UPS or battery rooms
• Generator rooms
• Computer rooms
• Utility vaults
Design issues
• Working vs. dedicated spaces
• Dedicated spaces and foreign systems
• Fire protection
• Fire ratings
• Ventilation
• Structural
• Building occupancy
• Lighting
Working vs. dedicated spaces
• Different spaces
– Worker vs. equipment
Working vs. dedicated spaces
• Different spaces
– Worker vs. equipment
Working space
• Applies to:
– “Equipment operating at 600 V, nominal, or less, to ground
and likely to require examination, adjustment, servicing, or
maintenance while energized.” NEC Article 110.26(A)
• Switchboards
• Switchgear (Added in 2014)
• Motor control centers
• Panelboards
• Disconnect switches
• Circuit breakers
• Controllers
• Controls for HVAC equipment
• Transformers sometimes fall into this category
Working space: table
Working space: elevations
Nonelectrical parts
“Where rear access is
required to work on
nonelectrical parts on the
back of enclosed
equipment, a minimum
horizontal working space
of 30 in. shall be
provided.” NEC Article
110.26(A)(1)a
Dedicated spaces
• Applies to:
• “All switchboards, switchgear, panelboards, and
motor control centers shall be located in dedicated
spaces and protected from damage.” NEC Article
110.26(E)
• Switchboards
• Switchgear (Added in 2014)
• Panelboards
• Motor control centers
Dedicated spaces and foreign systems
• Can you have foreign
systems (mechanical
ducts and/or plumbing)
in your electrical room?
– Yes and no
• Understand dedicated
space
Foreign systems (MP)
• NEC: above, if protected
• What about sprinklers?
• NEC: okay in dedicated space
2014 NEC change
• Outdoor spaces
– New requirement now calls
for the same basic
dedicated equipment or
electrical space for outdoor
installations that has been
in effect for indoor
installations
– This space above and
below the electrical
equipment should be
dedicated
Primary equipment
• Switchboard vs. switchgear
• Switchboards: UL 891
– Front access
– Rear access
– Primarily fixed mounted
Primary equipment
• Switchboard Vs Switchgear
• Switchgear - ANSI C37
– Rear Access
– Primarily Drawout Construction
Access
• 1200 amps & 6 feet in width
– Two doors on opposite ends
– Doors 6’ 1/2’’ x 24”
– One door if working clearance
doubled
– Doors Swing Out
• 800 A (New to NEC 2014)
– Listed Panic Hardware on Doors
Access: plan examples
Beyond NEC: working space and access
• Doors: at least 36 in. wide or double 36 in., 9 ft. high
• Access to drawout devices
• Would you want to work in only 3½ ft?
• Breaker truck access
• NFPA 70E: Standard for Electrical Safety in the
Workplace - arc flash zones
• Arc flash gear, venting
• Height above switchboards
• Space planning: work with your architect
Fire protection
• Sprinklers
– NFPA 13: yes, or 2 hr rating
– Some cities: preaction
• Fire detection
– Smoke detectors in electrical rooms
– Recommend heat and flame detection in generator
rooms
Fire ratings
• Do electrical rooms need to be fire rated?
– NEC
• Not if sprinklered
– What about dry type transformers?
• 112.5 kVA, 155 C or higher insulation
• Emergency systems (NEC Article 700)
– NEC high rise or high occupancy
• Approved fire suppression
• 2-hr systems
Fire ratings
• NFPA 110
– EPS installed in a separate room for Level 1 systems
– Room must have a 2-hr rating
• Know your local codes
– Example: City of Chicago
• Generator room rating: 3 hr
• Fuel storage: 550-gal limit
• Not located more 2 floors up or down from grade.
• Insurance carrier requirements
Ventilation
• Required?
• General rating of equipment: 104 F
• Recommend: 86 F
• Electrical rooms
– Without transformer: 1 cfm/sq. ft.
– With transformer: 1.0% to 2.0% of kVA (3 cfm/kVA)
• Generator rooms
– Cooling vs. combustion air
– After engine shuts down
– Remote radiator
– 2,500 Btu/hr/kVA
Ventilation
• Battery/UPS rooms
– Keep temperature around 77 F
– What about hydrogen?
• Flooded (vented) batteries
• Valve regulated, sealed
• Conflicting codes: NEC, UFC, IFC
– Safe rules
• 1 cfm/sq. ft.
• Fan failure relay
Structural
• Often overlooked
– Switchboards and switchgear
– Generators
– Vibration isolation
– Computer rooms
– Raised floors
– Miscellaneous
• Pads
• Penetrations
• Fire sealing
• Path of delivery
Lighting
• Recommended lighting levels
– IES and NFPA 70E: 30 foot-candles
• Emergency lighting
– 1 foot-candle is not enough
• Switching
– Must include nonautomatic means
Miscellaneous room issues
• EMI
• Noise
Codes and Standards References from
Today’s Webcast
• NFPA 70 (NEC) 2014
• International Building Code (IBC)
• UL 891
• ANSI C37
• NFPA 70E: Standard for Electrical Safety in the
Workplace
• NFPA 110
• IES
Brian Martin, PE, Portland Electrical Department Manager
CH2M Hill
Portland, Ore.
Brian Rener, PE, LEED AP, Associate
SmithgroupJJR,
Chicago, Ill.
Moderator: Jack Smith,
Consulting-Specifying Engineer and Pure Power,
CFE Media, LLC
Presenters:
Webcasts and Research
• Smart Electrical Systems: Meters, submeters
and smart meters
• 2013 Electrical and Power study
Electrical Systems:
Designing electrical rooms
Join the discussion about this Webcast on Twitter at #CSEelectricalroom
Sponsored by:

Más contenido relacionado

La actualidad más candente

Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)Manoj Mawle
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of buildingniraj2510
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Ritesh Ambadkar
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Mahesh Chandra Manav
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systemsjosebolis
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsAarti Rani
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildingsHetvi Trada
 
Building Services II (Group assignment) - Semester 3
Building Services II (Group assignment) - Semester 3 Building Services II (Group assignment) - Semester 3
Building Services II (Group assignment) - Semester 3 Yee Len Wan
 
MEP services in High rise buildings.pptx
MEP services in High rise buildings.pptxMEP services in High rise buildings.pptx
MEP services in High rise buildings.pptxShahRukhKhan969617
 
Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)Dhrumil Maniar
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm systemsingh1515
 
Electrical services design ppt pdf
Electrical services design ppt pdfElectrical services design ppt pdf
Electrical services design ppt pdfPrashantMalagi
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildingsramnathpanwar
 
Lighting Design - Theory and Calculations
Lighting Design - Theory and CalculationsLighting Design - Theory and Calculations
Lighting Design - Theory and CalculationsIsham Rashik
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation systemMohamed Hashish
 
Building Management Services
Building Management Services Building Management Services
Building Management Services Aroh Thombre
 

La actualidad más candente (20)

Presentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation systemPresentation mechanical car parking ventilation system
Presentation mechanical car parking ventilation system
 
Building Services Electrical (MEP)
Building Services Electrical (MEP)Building Services Electrical (MEP)
Building Services Electrical (MEP)
 
Calculation of electrical load of building
Calculation of electrical load of buildingCalculation of electrical load of building
Calculation of electrical load of building
 
ADVANCE SERVICES BUILDING
ADVANCE SERVICES BUILDINGADVANCE SERVICES BUILDING
ADVANCE SERVICES BUILDING
 
Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)Building Services Engg. (Electrical installations)
Building Services Engg. (Electrical installations)
 
Electrical System Design
Electrical System Design Electrical System Design
Electrical System Design
 
Lifts
LiftsLifts
Lifts
 
Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...Follow India national building code(NBC2016) for electrical installation and ...
Follow India national building code(NBC2016) for electrical installation and ...
 
Fire sprinkler systems
Fire sprinkler systemsFire sprinkler systems
Fire sprinkler systems
 
Provision for fire protection in high rise buildings
Provision for fire protection in high rise buildingsProvision for fire protection in high rise buildings
Provision for fire protection in high rise buildings
 
Fire fighting system in buildings
Fire fighting system  in buildingsFire fighting system  in buildings
Fire fighting system in buildings
 
Building Services II (Group assignment) - Semester 3
Building Services II (Group assignment) - Semester 3 Building Services II (Group assignment) - Semester 3
Building Services II (Group assignment) - Semester 3
 
MEP services in High rise buildings.pptx
MEP services in High rise buildings.pptxMEP services in High rise buildings.pptx
MEP services in High rise buildings.pptx
 
Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)Electrical Installation PPT (Basic Electrical Engineering)
Electrical Installation PPT (Basic Electrical Engineering)
 
fire detection and alarm system
fire detection and alarm systemfire detection and alarm system
fire detection and alarm system
 
Electrical services design ppt pdf
Electrical services design ppt pdfElectrical services design ppt pdf
Electrical services design ppt pdf
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildings
 
Lighting Design - Theory and Calculations
Lighting Design - Theory and CalculationsLighting Design - Theory and Calculations
Lighting Design - Theory and Calculations
 
Underground car parking ventilation system
Underground car parking ventilation systemUnderground car parking ventilation system
Underground car parking ventilation system
 
Building Management Services
Building Management Services Building Management Services
Building Management Services
 

Similar a Electrical Systems: Designing electrical rooms

Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Roommichaeljmack
 
Installing a Physical Network. Chapter 8.pdf
Installing a Physical Network. Chapter 8.pdfInstalling a Physical Network. Chapter 8.pdf
Installing a Physical Network. Chapter 8.pdfTuqaAliAbdulRahman
 
Electrical installation for commercial & public building
Electrical installation for commercial & public buildingElectrical installation for commercial & public building
Electrical installation for commercial & public buildingddsshukla
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centersInternap
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and InstalltionEli Israeli
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastAli Shoaee
 
Commercial Overview SCS Session 1 Server Rack Strategies
Commercial Overview   SCS Session 1   Server Rack StrategiesCommercial Overview   SCS Session 1   Server Rack Strategies
Commercial Overview SCS Session 1 Server Rack Strategiespaul_mathews
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power ConsultingSpecifyingEngineer
 
Photovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installationPhotovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installationLeonardo ENERGY
 
Physical Security Presentation
Physical Security PresentationPhysical Security Presentation
Physical Security PresentationWajahat Rajab
 
Physicalsecuritypresentation 130630193821-phpapp01
Physicalsecuritypresentation 130630193821-phpapp01Physicalsecuritypresentation 130630193821-phpapp01
Physicalsecuritypresentation 130630193821-phpapp01brijesh singh
 
C harold d12124981 systems presentation
C harold d12124981 systems presentationC harold d12124981 systems presentation
C harold d12124981 systems presentationColette Harold
 
Critical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesCritical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesConsultingSpecifyingEngineer
 
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesElectrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesLiving Online
 

Similar a Electrical Systems: Designing electrical rooms (20)

Getting the Most out of your Electrical Room
Getting the Most out of your Electrical RoomGetting the Most out of your Electrical Room
Getting the Most out of your Electrical Room
 
Installing a Physical Network. Chapter 8.pdf
Installing a Physical Network. Chapter 8.pdfInstalling a Physical Network. Chapter 8.pdf
Installing a Physical Network. Chapter 8.pdf
 
Electrical installation for commercial & public building
Electrical installation for commercial & public buildingElectrical installation for commercial & public building
Electrical installation for commercial & public building
 
Critical design elements for high power density data centers
Critical design elements for high power density data centersCritical design elements for high power density data centers
Critical design elements for high power density data centers
 
PV solar Design and Installtion
PV solar Design and InstalltionPV solar Design and Installtion
PV solar Design and Installtion
 
07. datacenters
07. datacenters07. datacenters
07. datacenters
 
Datwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle eastDatwyler data center presentation info tech middle east
Datwyler data center presentation info tech middle east
 
Commercial Overview SCS Session 1 Server Rack Strategies
Commercial Overview   SCS Session 1   Server Rack StrategiesCommercial Overview   SCS Session 1   Server Rack Strategies
Commercial Overview SCS Session 1 Server Rack Strategies
 
Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power Critical Power: NFPA 110: Standard for Emergency and Standby Power
Critical Power: NFPA 110: Standard for Emergency and Standby Power
 
Photovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installationPhotovoltaic Training Course - Module 2.3 - Electrical installation
Photovoltaic Training Course - Module 2.3 - Electrical installation
 
Design computerroom
Design computerroomDesign computerroom
Design computerroom
 
Physical Security Presentation
Physical Security PresentationPhysical Security Presentation
Physical Security Presentation
 
Physicalsecuritypresentation 130630193821-phpapp01
Physicalsecuritypresentation 130630193821-phpapp01Physicalsecuritypresentation 130630193821-phpapp01
Physicalsecuritypresentation 130630193821-phpapp01
 
Cabos_5.1.pdf
Cabos_5.1.pdfCabos_5.1.pdf
Cabos_5.1.pdf
 
C harold d12124981 systems presentation
C harold d12124981 systems presentationC harold d12124981 systems presentation
C harold d12124981 systems presentation
 
Critical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care FacilitiesCritical Power: Circuit Protection in Health Care Facilities
Critical Power: Circuit Protection in Health Care Facilities
 
Process
Process Process
Process
 
Critical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgearCritical power: Transfer switches and switchgear
Critical power: Transfer switches and switchgear
 
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas FacilitiesElectrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
Electrical and Instrumentation (E&I) Engineering for Oil and Gas Facilities
 
Phase 4
Phase 4Phase 4
Phase 4
 

Más de ConsultingSpecifyingEngineer

Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...ConsultingSpecifyingEngineer
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignConsultingSpecifyingEngineer
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsConsultingSpecifyingEngineer
 
Fire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsFire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsConsultingSpecifyingEngineer
 
Industrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceIndustrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceConsultingSpecifyingEngineer
 
Creating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsCreating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsConsultingSpecifyingEngineer
 
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...ConsultingSpecifyingEngineer
 
Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...ConsultingSpecifyingEngineer
 
The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry ConsultingSpecifyingEngineer
 

Más de ConsultingSpecifyingEngineer (13)

Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
Fire and Life Safety: Integration: Building Automation Systems and Fire/Life ...
 
HVAC: New chiller requirements
HVAC: New chiller requirementsHVAC: New chiller requirements
HVAC: New chiller requirements
 
HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
 
Critical Power: Generators and Generator System Design
Critical Power: Generators and Generator System DesignCritical Power: Generators and Generator System Design
Critical Power: Generators and Generator System Design
 
Critical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into BuildingsCritical Power: Integrating Renewable Power into Buildings
Critical Power: Integrating Renewable Power into Buildings
 
Modular Data Center Design
Modular Data Center DesignModular Data Center Design
Modular Data Center Design
 
Fire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication SystemsFire and Life Safety: Notification and Emergency Communication Systems
Fire and Life Safety: Notification and Emergency Communication Systems
 
Create Marketing Engineers Love
Create Marketing Engineers LoveCreate Marketing Engineers Love
Create Marketing Engineers Love
 
Industrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial MarketplaceIndustrial Branding: The Lost Art in the Industrial Marketplace
Industrial Branding: The Lost Art in the Industrial Marketplace
 
Creating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and ResultsCreating an Integrated Marketing Campaign for Impact and Results
Creating an Integrated Marketing Campaign for Impact and Results
 
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
Marketing New Product Introductions in Mobility & SaaS: Ideation to Marketing...
 
Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...Integrating the Marketing and Engineering Points of View in Marketing Communi...
Integrating the Marketing and Engineering Points of View in Marketing Communi...
 
The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry The State of the Electrical/Power Engineering Industry
The State of the Electrical/Power Engineering Industry
 

Último

EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...liera silvan
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmStan Meyer
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxRosabel UA
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptxiammrhaywood
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 

Último (20)

EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
EmpTech Lesson 18 - ICT Project for Website Traffic Statistics and Performanc...
 
Oppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and FilmOppenheimer Film Discussion for Philosophy and Film
Oppenheimer Film Discussion for Philosophy and Film
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Presentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptxPresentation Activity 2. Unit 3 transv.pptx
Presentation Activity 2. Unit 3 transv.pptx
 
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptxAUDIENCE THEORY -CULTIVATION THEORY -  GERBNER.pptx
AUDIENCE THEORY -CULTIVATION THEORY - GERBNER.pptx
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 

Electrical Systems: Designing electrical rooms

  • 1. Electrical Systems: Designing electrical rooms Join the discussion about this Webcast on Twitter at #CSEelectricalroom Sponsored by:
  • 2. Brian Martin, PE, Portland Electrical Department Manager CH2M Hill Portland, Ore. Brian Rener, PE, LEED AP, Associate SmithgroupJJR, Chicago, Ill. Moderator: Jack Smith, Consulting-Specifying Engineer and Pure Power, CFE Media, LLC Presenters:
  • 3. Electrical Systems: Designing electrical rooms Brian Martin, PE, Portland Electrical Department Manager CH2M Hill Portland, Ore. Brian Rener, PE, LEED AP, Associate SmithgroupJJR , Chicago, Ill.
  • 4. Presentation scope • NFPA 70 (NEC) 2014 • International Building Code (IBC) • 800 A and Above • Primary services • No hazardous locations • Good engineering practices
  • 5. Electrical room design • Needs a coordinated team: • Electricals • Architects • Structural • Mechanicals • Fire protection
  • 6. Room types • Primary service rooms • Electrical rooms • UPS or battery rooms • Generator rooms • Computer rooms • Utility vaults
  • 7. Design issues • Working vs. dedicated spaces • Dedicated spaces and foreign systems • Fire protection • Fire ratings • Ventilation • Structural • Building occupancy • Lighting
  • 8. Working vs. dedicated spaces • Different spaces – Worker vs. equipment
  • 9. Working vs. dedicated spaces • Different spaces – Worker vs. equipment
  • 10. Working space • Applies to: – “Equipment operating at 600 V, nominal, or less, to ground and likely to require examination, adjustment, servicing, or maintenance while energized.” NEC Article 110.26(A) • Switchboards • Switchgear (Added in 2014) • Motor control centers • Panelboards • Disconnect switches • Circuit breakers • Controllers • Controls for HVAC equipment • Transformers sometimes fall into this category
  • 13. Nonelectrical parts “Where rear access is required to work on nonelectrical parts on the back of enclosed equipment, a minimum horizontal working space of 30 in. shall be provided.” NEC Article 110.26(A)(1)a
  • 14. Dedicated spaces • Applies to: • “All switchboards, switchgear, panelboards, and motor control centers shall be located in dedicated spaces and protected from damage.” NEC Article 110.26(E) • Switchboards • Switchgear (Added in 2014) • Panelboards • Motor control centers
  • 15. Dedicated spaces and foreign systems • Can you have foreign systems (mechanical ducts and/or plumbing) in your electrical room? – Yes and no • Understand dedicated space
  • 16. Foreign systems (MP) • NEC: above, if protected • What about sprinklers? • NEC: okay in dedicated space
  • 17. 2014 NEC change • Outdoor spaces – New requirement now calls for the same basic dedicated equipment or electrical space for outdoor installations that has been in effect for indoor installations – This space above and below the electrical equipment should be dedicated
  • 18. Primary equipment • Switchboard vs. switchgear • Switchboards: UL 891 – Front access – Rear access – Primarily fixed mounted
  • 19. Primary equipment • Switchboard Vs Switchgear • Switchgear - ANSI C37 – Rear Access – Primarily Drawout Construction
  • 20. Access • 1200 amps & 6 feet in width – Two doors on opposite ends – Doors 6’ 1/2’’ x 24” – One door if working clearance doubled – Doors Swing Out • 800 A (New to NEC 2014) – Listed Panic Hardware on Doors
  • 22. Beyond NEC: working space and access • Doors: at least 36 in. wide or double 36 in., 9 ft. high • Access to drawout devices • Would you want to work in only 3½ ft? • Breaker truck access • NFPA 70E: Standard for Electrical Safety in the Workplace - arc flash zones • Arc flash gear, venting • Height above switchboards • Space planning: work with your architect
  • 23. Fire protection • Sprinklers – NFPA 13: yes, or 2 hr rating – Some cities: preaction • Fire detection – Smoke detectors in electrical rooms – Recommend heat and flame detection in generator rooms
  • 24. Fire ratings • Do electrical rooms need to be fire rated? – NEC • Not if sprinklered – What about dry type transformers? • 112.5 kVA, 155 C or higher insulation • Emergency systems (NEC Article 700) – NEC high rise or high occupancy • Approved fire suppression • 2-hr systems
  • 25. Fire ratings • NFPA 110 – EPS installed in a separate room for Level 1 systems – Room must have a 2-hr rating • Know your local codes – Example: City of Chicago • Generator room rating: 3 hr • Fuel storage: 550-gal limit • Not located more 2 floors up or down from grade. • Insurance carrier requirements
  • 26. Ventilation • Required? • General rating of equipment: 104 F • Recommend: 86 F • Electrical rooms – Without transformer: 1 cfm/sq. ft. – With transformer: 1.0% to 2.0% of kVA (3 cfm/kVA) • Generator rooms – Cooling vs. combustion air – After engine shuts down – Remote radiator – 2,500 Btu/hr/kVA
  • 27. Ventilation • Battery/UPS rooms – Keep temperature around 77 F – What about hydrogen? • Flooded (vented) batteries • Valve regulated, sealed • Conflicting codes: NEC, UFC, IFC – Safe rules • 1 cfm/sq. ft. • Fan failure relay
  • 28. Structural • Often overlooked – Switchboards and switchgear – Generators – Vibration isolation – Computer rooms – Raised floors – Miscellaneous • Pads • Penetrations • Fire sealing • Path of delivery
  • 29. Lighting • Recommended lighting levels – IES and NFPA 70E: 30 foot-candles • Emergency lighting – 1 foot-candle is not enough • Switching – Must include nonautomatic means
  • 31. Codes and Standards References from Today’s Webcast • NFPA 70 (NEC) 2014 • International Building Code (IBC) • UL 891 • ANSI C37 • NFPA 70E: Standard for Electrical Safety in the Workplace • NFPA 110 • IES
  • 32. Brian Martin, PE, Portland Electrical Department Manager CH2M Hill Portland, Ore. Brian Rener, PE, LEED AP, Associate SmithgroupJJR, Chicago, Ill. Moderator: Jack Smith, Consulting-Specifying Engineer and Pure Power, CFE Media, LLC Presenters:
  • 33. Webcasts and Research • Smart Electrical Systems: Meters, submeters and smart meters • 2013 Electrical and Power study
  • 34. Electrical Systems: Designing electrical rooms Join the discussion about this Webcast on Twitter at #CSEelectricalroom Sponsored by:

Notas del editor

  1. Jack Smith
  2. Jack Smith
  3. Title Slide for Brian Rener to begin the presentation
  4. Mr. Rener
  5. Using smithgroup internal teaming photo – rights approved.
  6. Mr. Rener
  7. Mr. Martin
  8. Mr. Rener
  9. Mr. Rener
  10. Mr. Rener
  11. Mr. Rener
  12. Mr. Rener
  13. Mr. Martin
  14. Mr. Martin
  15. Mr. Martin
  16. Mr. Martin
  17. Mr. Rener
  18. Mr. Rener
  19. Mr. Rener
  20. Mr. Martin
  21. Mr. Martin
  22. Mr. Martin
  23. Mr. Rener
  24. Mr. Rener
  25. Mr. Martin: where is the 3 hr room requirement?
  26. Mr. Rener
  27. Mr. Rener
  28. Mr. Martin
  29. Mr. Martin
  30. Mr. Rener
  31. Jack Smith
  32. Jack Smith
  33. Jack Smith
  34. Jack Smith