Chaplin Station Construction Update
Activity Location Approx. Date & Duration
Dewatering System
Maintenance
Cleaning of tanks using hydro-
vacuum truck
Latimer Ave and Eglinton
Ave work zone and
Shoppers Drug Mart
parking lot
Weekly or as needed into
2021
5:00 a.m. – 8:00 a.m. for
one (1) hour
Extended Hours for Deep
Excavation of the Station
Box and Tunnel
Demolition
Station Box beneath
Eglinton Ave (access from
the Main Entrance work
zone)
Underway Monday –
Sunday, 24 hours through:
• Late May 2020 – Tunnel
Demo
• Mid-June 2020 – Excavation
Tertiary Entrance
Construction
Concrete works and rebar
installation
South side of Eglinton
Ave, east of Chaplin Cres
and adjacent Toronto Fire
Station 135
Underway into Winter 2021
Chaplin Station Construction Update
Activity Location Approx. Date & Duration
Main Entrance
Construction
Concrete works, mechanical
and electrical work
North side of Eglinton
Ave, between Chaplin
Cres and Gilgorm Ave
(former Chaplin Parkette)
Underway into Winter 2021
Tower Crane Installation Tertiary Entrance
May 6, 2020 from 4:00 a.m.
– 11:00 p.m.
Intersection Closure for
Traffic Bridge Removal
and Utility Reinstatement
Intersection of Chaplin
Cres and Eglinton Ave
Early June 2020 for approx.
one (1) month
Station Box Construction
Structural Works
Beneath Eglinton Ave Beginning June 2020
Current Construction Configuration
Until early June 2020
Upcoming Concrete Pours
• Several concrete pours will be conducted
between May and June 2020 at the Main
and Tertiary entrances
• The concrete will form the walls and slabs
of the Tertiary Entrance and Station Box
beneath Eglinton Ave
• Concrete pumps will be placed within work
zones and concrete trucks will queue in
traffic tapers before entering the work
zone; 10+ concrete trucks per hour
• Concrete pours will begin as early as 5:00
a.m. and last for five (5) or more hours
• Pours may be rescheduled due to inclement
weather
Main Entrance Tertiary Entrance
• May 6
• May 11
• May 20
• May 23
• May 27
• June 2
• May 12
• May 15
• May 22
Tower Crane Installation
• As early as May 6, a tower crane will be installed at the Tertiary Entrance
between 4:00 a.m. – 11:00 p.m.
• The crane will be used to lift equipment and material in-and-out of the
station box and shaft
• While the crane is installed, the following traffic changes will be in effect:
– Chaplin Cres will be closed b/w Eglinton Ave and Russell Hill Rd; emergency
service vehicles excepted
– The Chaplin-Russell Hill laneway will be closed; local access from east end of
laneway
– Parking on Russell Hill Rd will be prohibited to make way for TTC detour
• TTC bus route #14 Glencairn will detour on Russell Hill Rd
Tower Crane Installation
Crane Swing Diagram
Construction Progress Photos
Avenue Construction Updates
12
Avenue Station Construction Update
Activity Location
Approx. Date &
Duration
Impact
Mining Excavation
East of the Secondary
Entrance between Oriole
Parkway and Eastbourne
Avenue
Ongoing through July 2020
• Overnight noise from drilling
activity
• Road occupation on Eglinton Ave
Mining Excavation
East of the Secondary
Entrance between Oriole
Parkway and Eastbourne
Avenue
Underway throughout July
2020
• Overnight noise from drilling
activity
• Lane reductions on Eglinton Ave
Concrete Pours
Between Main and
Secondary Entrances
December 2019; beginning
at 3 a.m. for approx. 16
hours
• Southbound lane closure – one
lane in each direction on Avenue
Road.
• Truck Traffic
Activity Location
Approx. Date &
Duration
What to Expect
Mining
Excavation
East of the
Secondary close to
Lascelles Blvd
Will end mid-May
2020
• Noise from mining activity
• Road occupation on Eglinton Ave
Wall Demolition
Cavern
(underground)
Will end mid-May
2020
• Noise and vibration
Concrete Pours
Between Main and
Secondary
Entrances
Approx. three (3)
pours per week
beginning at 5:00
a.m. for 12-18 hours
• Concrete truck activity
• Occupation of the westbound curb lane
during some pours
Dewatering Well
Maintenance
Eglinton Ave
between Braemar
Ave and Lascelles
Blvd
Periodically through
2021; 9:00 a.m. –
4:00 p.m.
• Road occupancy around well
• Use of hydro-vac truck
Equipment
Monitoring
Eglinton Ave
between Braemar
Ave and Lascelles
Blvd
Periodically through
2021
• Short-term road occupancy
Avenue Station – Mining Information
Avenue Station Traffic Configuration
Through 2020
Avenue Station – Construction Progress Photos
Avenue Station – Construction Progress Photos

More Related Content

What's hot

Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
 
Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)Crosstown TO
 
Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018Crosstown TO
 
Chaplin - Avenue Construction Liaison Committee - July 2018
Chaplin - Avenue Construction Liaison Committee - July 2018Chaplin - Avenue Construction Liaison Committee - July 2018
Chaplin - Avenue Construction Liaison Committee - July 2018Crosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Crosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Crosstown TO
 
Cedarvale & Forest Hill Construction Update (September 30, 2020)
Cedarvale & Forest Hill Construction Update (September 30, 2020)Cedarvale & Forest Hill Construction Update (September 30, 2020)
Cedarvale & Forest Hill Construction Update (September 30, 2020)Crosstown TO
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Crosstown TO
 
Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Crosstown TO
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Crosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Crosstown TO
 
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingChaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingCrosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Crosstown TO
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Crosstown TO
 

What's hot (20)

Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)Central West Open House (Cedarvale to Eglinton Stations)
Central West Open House (Cedarvale to Eglinton Stations)
 
Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021Fairbank-Oakwood Construction Update - May 2021
Fairbank-Oakwood Construction Update - May 2021
 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - February 2018
 
Chaplin - Avenue Construction Liaison Committee - July 2018
Chaplin - Avenue Construction Liaison Committee - July 2018Chaplin - Avenue Construction Liaison Committee - July 2018
Chaplin - Avenue Construction Liaison Committee - July 2018
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018Cedarvale & Forest Hill Construction Liaison Committee - July 2018
Cedarvale & Forest Hill Construction Liaison Committee - July 2018
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
 
Cedarvale & Forest Hill Construction Update (September 30, 2020)
Cedarvale & Forest Hill Construction Update (September 30, 2020)Cedarvale & Forest Hill Construction Update (September 30, 2020)
Cedarvale & Forest Hill Construction Update (September 30, 2020)
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
 
Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)Cedarvale & Forest Hill Construction Update (May 28, 2021)
Cedarvale & Forest Hill Construction Update (May 28, 2021)
 
Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021Spring Virtual Open - Central West - April 21, 2021
Spring Virtual Open - Central West - April 21, 2021
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2019
 
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018
Cedarvale-Forest Hill Construction Liaison Committee Meeting - May 2018
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Chaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingChaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee Meeting
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Nov 2019
 
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
Chaplin-Avenue Construction Liaison Committee Meeting - May 2018
 

Similar to Avenue & Chaplin CLC - Construction Update: May 6, 2020

Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Crosstown TO
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Crosstown TO
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020Crosstown TO
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Crosstown TO
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Crosstown TO
 
CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Western Works Construction Liaison Committee Meeting - March 2018
Western Works Construction Liaison Committee Meeting - March 2018Western Works Construction Liaison Committee Meeting - March 2018
Western Works Construction Liaison Committee Meeting - March 2018Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Crosstown TO
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Crosstown TO
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Brittany Maxwell
 

Similar to Avenue & Chaplin CLC - Construction Update: May 6, 2020 (20)

Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
Cedarvale & Forest Hill Construction Liaison Committee Meeting - Jan 29, 2020
 
Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018Fairbank & Oakwood Construction Liaison Committee July 2018
Fairbank & Oakwood Construction Liaison Committee July 2018
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020Leaside laird clc - november 9, 2020
Leaside laird clc - november 9, 2020
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
 
Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018Chaplin & Avenue CLC - Construction Update - April 4, 2018
Chaplin & Avenue CLC - Construction Update - April 4, 2018
 
CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)CLC pharmacy to Kennedy (Nov24)
CLC pharmacy to Kennedy (Nov24)
 
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Western Works Construction Liaison Committee Meeting - March 2018
Western Works Construction Liaison Committee Meeting - March 2018Western Works Construction Liaison Committee Meeting - March 2018
Western Works Construction Liaison Committee Meeting - March 2018
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
 
Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018Chaplin & Avenue CLC - Construction Update - February 7, 2018
Chaplin & Avenue CLC - Construction Update - February 7, 2018
 

More from Crosstown TO

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfCrosstown TO
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023Crosstown TO
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Crosstown TO
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfCrosstown TO
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
 

More from Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Recently uploaded

researching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffffresearching client.pptxffffffffffffffffffffffffff
researching client.pptxfffffffffffffffffffffffffflolsDocherty
 
Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024FelixPerez547899
 
Near and Not Lost Yale Historical Review
Near and Not Lost Yale Historical ReviewNear and Not Lost Yale Historical Review
Near and Not Lost Yale Historical Reviewyalehistoricalreview
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxScottMeyers35
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolSERUDS INDIA
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...suryaaamsyah
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单enbam
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseTechSoup
 
“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.Christina Parmionova
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsStephen Abram
 
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanProposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanCity of Chesapeake
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单exuyk
 
OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024Energy for One World
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单enbam
 
#Bepartoftheplan on International Day For Biological Diversity 2024
#Bepartoftheplan on International Day For Biological Diversity 2024#Bepartoftheplan on International Day For Biological Diversity 2024
#Bepartoftheplan on International Day For Biological Diversity 2024Christina Parmionova
 
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)Energy for One World
 
IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024Energy for One World
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024Christina Parmionova
 

Recently uploaded (20)

researching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffffresearching client.pptxffffffffffffffffffffffffff
researching client.pptxffffffffffffffffffffffffff
 
Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024Effective Financial Reporting - May 2024
Effective Financial Reporting - May 2024
 
Near and Not Lost Yale Historical Review
Near and Not Lost Yale Historical ReviewNear and Not Lost Yale Historical Review
Near and Not Lost Yale Historical Review
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
Daftar Rumpun, Pohon, dan Cabang Ilmu (2024) - Daftar Rumpun, Pohon, dan Caba...
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
Advancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App HouseAdvancing Impact Measurement | Public Good App House
Advancing Impact Measurement | Public Good App House
 
“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.
 
Honeycomb for The Hive Design Inspirations
Honeycomb for The Hive Design InspirationsHoneycomb for The Hive Design Inspirations
Honeycomb for The Hive Design Inspirations
 
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanProposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
 
07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag
 
OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024OilChange: Big Oil Reality Check May 2024
OilChange: Big Oil Reality Check May 2024
 
一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单一比一原版(UWA毕业证)西澳大学毕业证成绩单
一比一原版(UWA毕业证)西澳大学毕业证成绩单
 
How to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation ProjectHow to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation Project
 
#Bepartoftheplan on International Day For Biological Diversity 2024
#Bepartoftheplan on International Day For Biological Diversity 2024#Bepartoftheplan on International Day For Biological Diversity 2024
#Bepartoftheplan on International Day For Biological Diversity 2024
 
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
EDI Executive Education Master Class- 15thMay 2024 (updated) (2)
 
IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024IEA Global Critical Minerals Outlook2024
IEA Global Critical Minerals Outlook2024
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024
 

Avenue & Chaplin CLC - Construction Update: May 6, 2020

  • 3. Chaplin Station Construction Update Activity Location Approx. Date & Duration Dewatering System Maintenance Cleaning of tanks using hydro- vacuum truck Latimer Ave and Eglinton Ave work zone and Shoppers Drug Mart parking lot Weekly or as needed into 2021 5:00 a.m. – 8:00 a.m. for one (1) hour Extended Hours for Deep Excavation of the Station Box and Tunnel Demolition Station Box beneath Eglinton Ave (access from the Main Entrance work zone) Underway Monday – Sunday, 24 hours through: • Late May 2020 – Tunnel Demo • Mid-June 2020 – Excavation Tertiary Entrance Construction Concrete works and rebar installation South side of Eglinton Ave, east of Chaplin Cres and adjacent Toronto Fire Station 135 Underway into Winter 2021
  • 4. Chaplin Station Construction Update Activity Location Approx. Date & Duration Main Entrance Construction Concrete works, mechanical and electrical work North side of Eglinton Ave, between Chaplin Cres and Gilgorm Ave (former Chaplin Parkette) Underway into Winter 2021 Tower Crane Installation Tertiary Entrance May 6, 2020 from 4:00 a.m. – 11:00 p.m. Intersection Closure for Traffic Bridge Removal and Utility Reinstatement Intersection of Chaplin Cres and Eglinton Ave Early June 2020 for approx. one (1) month Station Box Construction Structural Works Beneath Eglinton Ave Beginning June 2020
  • 6. Upcoming Concrete Pours • Several concrete pours will be conducted between May and June 2020 at the Main and Tertiary entrances • The concrete will form the walls and slabs of the Tertiary Entrance and Station Box beneath Eglinton Ave • Concrete pumps will be placed within work zones and concrete trucks will queue in traffic tapers before entering the work zone; 10+ concrete trucks per hour • Concrete pours will begin as early as 5:00 a.m. and last for five (5) or more hours • Pours may be rescheduled due to inclement weather Main Entrance Tertiary Entrance • May 6 • May 11 • May 20 • May 23 • May 27 • June 2 • May 12 • May 15 • May 22
  • 7. Tower Crane Installation • As early as May 6, a tower crane will be installed at the Tertiary Entrance between 4:00 a.m. – 11:00 p.m. • The crane will be used to lift equipment and material in-and-out of the station box and shaft • While the crane is installed, the following traffic changes will be in effect: – Chaplin Cres will be closed b/w Eglinton Ave and Russell Hill Rd; emergency service vehicles excepted – The Chaplin-Russell Hill laneway will be closed; local access from east end of laneway – Parking on Russell Hill Rd will be prohibited to make way for TTC detour • TTC bus route #14 Glencairn will detour on Russell Hill Rd
  • 12. 12 Avenue Station Construction Update Activity Location Approx. Date & Duration Impact Mining Excavation East of the Secondary Entrance between Oriole Parkway and Eastbourne Avenue Ongoing through July 2020 • Overnight noise from drilling activity • Road occupation on Eglinton Ave Mining Excavation East of the Secondary Entrance between Oriole Parkway and Eastbourne Avenue Underway throughout July 2020 • Overnight noise from drilling activity • Lane reductions on Eglinton Ave Concrete Pours Between Main and Secondary Entrances December 2019; beginning at 3 a.m. for approx. 16 hours • Southbound lane closure – one lane in each direction on Avenue Road. • Truck Traffic Activity Location Approx. Date & Duration What to Expect Mining Excavation East of the Secondary close to Lascelles Blvd Will end mid-May 2020 • Noise from mining activity • Road occupation on Eglinton Ave Wall Demolition Cavern (underground) Will end mid-May 2020 • Noise and vibration Concrete Pours Between Main and Secondary Entrances Approx. three (3) pours per week beginning at 5:00 a.m. for 12-18 hours • Concrete truck activity • Occupation of the westbound curb lane during some pours Dewatering Well Maintenance Eglinton Ave between Braemar Ave and Lascelles Blvd Periodically through 2021; 9:00 a.m. – 4:00 p.m. • Road occupancy around well • Use of hydro-vac truck Equipment Monitoring Eglinton Ave between Braemar Ave and Lascelles Blvd Periodically through 2021 • Short-term road occupancy
  • 13. Avenue Station – Mining Information
  • 14. Avenue Station Traffic Configuration Through 2020
  • 15. Avenue Station – Construction Progress Photos
  • 16. Avenue Station – Construction Progress Photos