SlideShare a Scribd company logo
1 of 2
Download to read offline
64618                       Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices

                                               Corridor Improvement Project,                            Watershed Project, To Implement                    to wetlands and stream channels. EPA
                                               Proposed Roadway Improvements on                         Fuel Reduction Activities, Bozeman                 recommends that WVDOH develop
                                               Route 101 between the Eureka Slough                      Ranger District, Gallatin National                 ways to further avoid and minimize
                                               Bridge and 11th St. Overcrossing in                      Forest, City of Bozeman Municipal                  impacts during the construction phase
                                               Arcata, Humbolt County, CA.                              Watershed, Gallatin County, MT.                    of the project.
                                               Summary: EPA expressed                                   Summary: EPA expressed                                Dated: November 13, 2007.
                                             environmental concerns about impacts                    environmental concerns about potential                Robert W. Hargrove,
                                             to air quality and noise. EPA encourages                effects to water quality and other                    Director, NEPA Compliance Division, Office
                                             continued interagency coordination to                   resources from the proposed action.                   of Federal Activities.
                                             mitigate impacts to wetlands and                        EPA requested additional information                  [FR Doc. E7–22498 Filed 11–15–07; 8:45 am]
                                             cumulative impacts. Rating EC2.                         on road and stream crossings and                      BILLING CODE 6560–50–P
                                             EIS No. 20070323, ERP No. D–FHW–                        provided suggestions for additional
                                               J40177–CO, US–36 Corridor, Multi-                     mitigation measures and monitoring.
                                               Modal Transportation Improvements                     Rating EC2.                                           ENVIRONMENTAL PROTECTION
                                               between I–25 in Adams County and                      Final EISs                                            AGENCY
                                               Foothills Parkway/Table Mesa Drive
                                                                                                     EIS No. 20070358, ERP No. F–AFS–                      [ER–FRL–6692–9]
                                               in Boulder, Adams, Denver,
                                               Broomfield, Boulder and Jefferson                        K65325–CA, Turntable Bay Marina
                                                                                                        Master Development Project,                        Environmental Impacts Statements;
                                               Counties, CO.                                                                                               Notice of Availability
                                               Summary: EPA expressed                                   Implementation, Shasta-Trinity
                                             environmental concerns about the                           National Forest, Special Use Permit,                 Responsible Agency: Office of Federal
                                             wetlands impacts and impacts to the                        Shasta and Trinity Counties, CA.                   Activities, General Information (202)
                                             Preble’s meadow jumping mouse and                          Summary: No formal comment letter                  564–7167 or http://www.epa.gov/
                                             Ute ladies’-tresses habitat. Rating EC1.                was sent to the preparing agency.                     compliance/nepa/.
                                             EIS No. 20070361, ERP No. D–FHW–                        EIS No. 20070413, ERP No. F–AFS–                      Weekly receipt of Environmental Impact
                                               K50015–CA, Schuyler Heim Bridge                          J65467–MT, Little Belt-Castle-North                  Statements.
                                               Replacement and SR–47 Expressway                         Half Crazy Mountains Travel                        Filed 11/05/2007 through 11/09/2007.
                                               Improvement Project, from Alameda                        Management Plan, To Change the                     Pursuant to 40 CFR 1506.9.
                                               Street to Pacific Coast Highway,                         Management of Motorized and Non-                   EIS No. 20070480, Draft EIS, AFS, UT,
                                               Funding, U.S. Coast Guard Bridge                         motorized Travel on the Road, Trails,                Pockets Resource Management
                                               Permit, U.S. Army COE Section 10                         and Areas within, Belt Creek, Judith,                Project, Proposes to Salvage Dead and
                                               and 404 Permits, Ports of Long Beach                     Musselshell, and White Sulphur                       Dying Spruce/Fir, Regenerate Aspen,
                                               and Los Angeles, Los Angeles County,                     Springs Ranger Districts, Lewis and                  and Manage Travel, Escalate Ranger
                                               CA.                                                      Clark National Forest, Cascade, Judith               District, Dixie National Forest,
                                                                                                        Basin, Meagher, Wheatland,                           Garfield County, UT, Comment Period
                                               Summary: EPA expressed
                                                                                                        Sweetgrass and Park Counties, MT.                    Ends: 12/31/2007, Contact: Georgina
                                             environmental concerns about the
                                             cumulative air and water quality                           Summary: EPA expressed                               Lampman 435–826–5401.
                                             impacts and their effects on low income                 environmental concerns about potential                EIS No. 20070481, Draft Supplement,
                                             and minority communities. EPA                           effects to water quality, fisheries, and                COE, NC, PCS Phosphate Mine
                                             recommends consistency with the Clean                   wildlife.                                               Continuation, New Information on
                                             Air Action Plan, mitigation to reduce                   EIS No. 20070414, ERP No. F–AFS–                        Additional Alternative ‘‘L’’ and ‘‘M’’,
                                             construction and mobile source air                         J65445–MT, Rocky Mountain Ranger                     Proposes to Expand its Existing Open
                                             toxics emissions, and additional best                      District Travel Management Plan,                     Pit Phosphate Mining Operation into
                                             management practices to contain                            Proposes to Change the Management                    a 3,412 Acre Tract, Pamlico River and
                                             resuspended sediments. Rating EC2.                         of Motorized and Non-Motorized                       South Creek, near Aurora, Beaufort
                                                                                                        Travel, Lewis and Clark National                     County, NC, Comment Period Ends:
                                             EIS No. 20070370, ERP No. D–AFS–
                                                                                                        Forest, Glacier, Pondera, Teton and                  12/31/2007, Contact: Tom Walker
                                               K65333–00, Sage Steppe Ecosystem
                                                                                                        Lewis and Clark Counties, MT.                        828–271–7980 Ext 222.
                                               Restoration Strategy, Implementation,
                                                                                                                                                           EIS No. 20070482, Draft EIS, FHW, UT,
                                               Modoc National Forest, Modoc,                            Summary: EPA expressed
                                                                                                                                                             UT–108 Transportation Improvement
                                               Lassen, Shasta Counties, CA and                       environmental concerns about potential
                                                                                                                                                             Project, To Improve Local and
                                               Washoe County, NV.                                    effects to water quality, fisheries, and
                                                                                                                                                             Regional Mobility from UT–108
                                               Summary: EPA expressed                                wildlife, based on the uncertainty of
                                                                                                                                                             between UT–127 (Antelope Drive) to
                                             environmental concerns about the scope                  receiving adequate funding for road and
                                                                                                                                                             UT–126 (1900 West) Located in
                                             of analysis in the document and the                     trail maintenance, road
                                                                                                                                                             Syracuse, West Point and Clinton in
                                             project’s impact on endangered species,                 decommissioning, and enforcement of
                                                                                                                                                             Dave County, and Roy and West
                                             water quality, wetlands, and air quality.               travel plan restrictions.
                                                                                                                                                             Haven in Weber County, UT.P≤
                                             Rating EC2.                                             EIS No. 20070069, ERP No. FA–FHW–                       Comment Period Ends: 01/05/2008,
                                             EIS No. 20070391, ERP No. D–NRC–                           D40118–00, Appalachian Corridor H                    Contact: Douglas Atkin 801–963–
                                               G09805–OK, Sequoyah Fuels                                Project, Construction of a 9-mile Long               0182.
                                               Corporation Site, Proposed                               Segment between the Termini of                     EIS No. 20070483, Draft Supplement,
                                               Reclamation Activities for the 243-                      Parsons and Davis, Updated                           FHW, TN, Kirby Parkway Project,
mstockstill on PROD1PC66 with NOTICES




                                               hectare (600 acre) Site, (NUREG–                         Information the Parsons-to-Davis                     Construction from Macon Road to
                                               1888) in Gore, OK.                                       Project, Funding and U.S. Army COE                   Walnut Grove Road, U.S. Army COE
                                               Summary: EPA does not object to the                      Section 404 Permit Issuance, Tucker                  Section 401 and 404 Permits, Shelby
                                             proposed action. Rating LO.                                County, WV.                                          County, TN, Comment Period Ends:
                                             EIS No. 20070392, ERP No. D–AFS–                           Summary: EPA continues to have                       12/31/2007, Contact:
                                               J65491–MT, Bozeman Municipal                          environmental concerns about impacts                    Laurie S. Leffler 615–781–5770.


                                        VerDate Aug<31>2005   21:48 Nov 15, 2007   Jkt 214001   PO 00000   Frm 00045   Fmt 4703   Sfmt 4703   E:FRFM16NON1.SGM   16NON1
Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices                                             64619

                                             EIS No. 20070484, Draft EIS, FHW, 00,                     Period Ends: 12/17/2007, Contact:                     for Snowy Grouper (Epinephelus
                                               Interstate-94, I–43, I–894, and WI–119                  Rodney J. Schwartz 402–221–4143.                      niveatus) and Red Porgy (Pagrus
                                               (Airport Spur) I–94/USH 41                            EIS No. 20070491, Final EIS, AFS, CO,                   pagrus), NC, SC, FL and GA,
                                               Interchange to Howard Avenue, To                        Bull Mountain Natural Gas Pipeline,                   Comment Period Ends: 01/11/2008,
                                               Address Freeway System’s                                Construct, Operate and Maintain                       Contact: Dr. Roy E. Crabtree 727–824–
                                               Deteriorated Conditions, Funding and                    Natural Gas Pipeline, Issuance of                     5301. Revision to FR Notice
                                               U.S. Army COE Section 404 Permit,                       Right-of-Way Grant and Temporary                      Published: 11/09/2007: Correction to
                                               Kenosha, Racine and Milwaukee                           Use Area Permits, Gunnison, Delta,                    Title.
                                               Counties, WI and Lake County, IL,                       Mesa, Garfield Counties, CO, Wait                      Dated: November 13, 2007.
                                               Comment Period Ends: 12/31/2007,                        Period Ends: 12/17/2007, Contact:
                                                                                                                                                           Robert W. Hargrove,
                                               Contact: David Scott 608–829–7522.                      Niccole Mortensen 970–874–6616.
                                             EIS No. 20070485, Final EIS, AFS, CA,                   EIS No. 20070492, Draft EIS, DHS, 00,                 Director, NEPA Compliance Division, Office
                                                                                                       Rio Grande Valley Sector Project,                   of Federal Activities.
                                               Kirkwood Mountain Resort, Proposed
                                               2003 Mountain Master Development                        Construction, Maintenance, and                      [FR Doc. 07–5713 Filed 11–15–07; 8:45 am]
                                               Plan, Implementation, Eldorado                          Operation of Tactical Infrastructure,               BILLING CODE 6560–50–P

                                               National Forest, Amador, Alpine and                     U.S./Mexico International Border in
                                               EL Dorado Counties, CA, Wait Period                     Southernmost Portions of Starr,
                                               Ends: 12/17/2007, Contact: Sue                          Hidalgo and Cameron Counties, TX,                   ENVIRONMENTAL PROTECTION
                                               Rodman 530–622–5061.                                    Comment Period Ends: 12/31/2007,                    AGENCY
                                             EIS No. 20070486, Final Supplement,                       Contact: Gregory Giddens 202–344–                   [FRL–8495–6]
                                               COE, 00, Yazoo Basin Reformulation                      2450.
                                               Study, Supplement No.1 to the 1982                    EIS No. 20070493, Final EIS, AFS, ID,                 Science Advisory Board Staff Office;
                                               Yazoo Area Pump Project, Flood                          Sun Valley Resort (Bald Mountain)                   Notification of a Public Teleconference
                                               Control, Mississippi River and                          2005 Master Plan—Phase I Project,                   of the Science Advisory Board; Panel
                                               Tributaries, Yazoo Basin, MS and LA,                    Implementation, Special-Use-Permits,                for the Review of EPA’s 2007 Report
                                               Wait Period Ends: 01/22/2008,                           Sawtooth National Forest, Blaine                    on the Environment
                                               Contact: Marvin Cannon 601–631–                         County, ID, Wait Period Ends: 12/17/                AGENCY: Environmental Protection
                                               5437.                                                   2007, Contact: Carol Brown 208–727–
                                             EIS No. 20070487, Second Final                                                                                Agency (EPA).
                                                                                                       5000.
                                               Supplement, COE, FL, Lake                             EIS No. 20070494, Legislative Final EIS,              ACTION: Notice.
                                               Okeechobee Regulation Schedule                          COE, LA, Mississippi River—Gulf                     SUMMARY:   The Environmental Protection
                                               Study, New Updated Information,                         Outlet (MRGO) Deep-Draft Navigation                 Agency (EPA or Agency) Science
                                               Evaluation of Three New Alternatives                    De-Authorization Study,                             Advisory Board (SAB) Staff Office
                                               on Operational Changes to the Current                   Implementation, St. Bernard Parish,                 announces a public teleconference of
                                               Water Control Plan, Lake Okeechobee                     LA, Wait Period Ends: 12/17/2007,                   the SAB Panel for the Review of EPA’s
                                               and the Everglades Agricultural Area,                   Contact: Sean Mickal 504–862–2319.                  2007 Report on the Environment. The
                                               Lake Okeechobee, Glades,                                                                                    teleconference is being held to discuss
                                               Okeechobee Hendry, Palm Beach and                     Amended Notices
                                                                                                                                                           the Panel’s draft advisory report.
                                               Martin Counties, FL, Wait Period                      EIS No. 20070373, Draft EIS, RUS, WY,
                                                                                                                                                           DATES: The teleconference will be held
                                               Ends: 12/17/2007, Contact: Yvonne L.                    WITHDRAWN—Dry Fork Station and
                                                                                                       Hughes Transmission Line, Construct                 on December 10, 2007 from 1 p.m. to 4
                                               Haberer 904–232–1701.
                                             EIS No. 20070488, Draft EIS, DOE, 00,                     Electric Generating Facilities,                     p.m. (Eastern Time).
                                               PROGRAMMATIC—Designation of                             Campbell and Sheridan Counties,                     FOR FURTHER INFORMATION CONTACT: Any
                                               Energy Corridors in 11 Western                          WY, Comment Period Ends: 10/15/                     member of the public wishing further
                                               States, Preferred Location of Future                    2007, Contact: Richard Fristik 202–                 information regarding the public
                                               Oil, Gas, and Hydrogen Pipelines and                    720–5093. Revision of FR Published                  teleconference may contact. Dr. Thomas
                                               Electricity Transmission and                            08/31/2007: Officially Withdrawn by                 Armitage, Designated Federal Officer
                                               Distribution Facilities on Federal                      the Preparing Agency.                               (DFO). Dr. Armitage may be contacted at
                                               Land, AZ, CA, CO, ID, MT, NV, NM,                     EIS No. 20070385, Draft EIS, FHW, 00,                 the EPA Science Advisory Board
                                               UT, WA and WY, Comment Period                           Peace Bridge Expansion Project,                     (1400F), U.S. Environmental Protection
                                               Ends: 02/14/2008, Contact: LaVerne                      Capacity Improvements to the Peace                  Agency, 1200 Pennsylvania Avenue,
                                               Kyriss 202–586–1056.                                    Bridge, Plazas and Connecting                       NW., Washington, DC 20460; or via
                                             EIS No. 20070489, Final EIS, DOE, 00,                     Roadways, U.S. Coast Guard Bridge                   telephone/voice mail: (202) 343–9995;
                                               FutureGen Project, Planning, Design,                    Permit, U.S. Army COE Section 10                    fax (202) 233–0643; or e-mail at:
                                               Construction and Operation of a Coal                    and 404 Permits. City of Buffalo, Erie              armitage.thomas@epa.gov. General
                                               Fueled Electric Power and Hydrogen                      County, NY and Town of Fort Erie,                   information about the EPA SAB, as well
                                               Gas Production Plant, Four                              Ontario, Canada, Comment Period                     as any updates concerning the
                                               Alternative Sites: Mattoon, IL,                         Ends: 11/30/2007, Contact: Amy                      teleconference announced in this notice,
                                               Tuscola, IL, Jewett, TX, and Odessa,                    Jackson-Grove 518–431–4131.                         may be found in the SAB Web site at:
                                               TX, Wait Period Ends: 12/17/2007,                       Revision of FR Notice Published 09/                 http://www.epa.gov/sab.
                                               Contact: Mark McKoy 304–285–4426.                       14/2007: Extending Comment Period                   SUPPLEMENTARY INFORMATION: Pursuant
                                             EIS No. 20070490, Final Supplement,                       from 11/13/2007 to 11/30/2007.                      to the Federal Advisory Committee Act,
                                               COE, CO, Rueter-Hess Reservoir                        EIS No. 20070469, Draft EIS, NOA, 00,                 Public Law 92–463, notice is hereby
mstockstill on PROD1PC66 with NOTICES




                                               Expansion Project , Enlarges Reservoir                  Snapper Grouper Amendment 15B,                      given that the SAB Panel for the Review
                                               to Provide Storage of Denver Basin                      Fishery Management Plan, To                         of EPA’s 2007 Report on the
                                               Groundwater for Meeting Peak                            Analyze the Effects of Updating                     Environment will hold a public
                                               Municipal Water Supply, U.S. Army                       Management Reference Points for                     teleconference to discuss a draft
                                               COE Section 404 Permit, Town of                         Golden Tilefish (Lopholatilus                       advisory report on EPA’s Report on the
                                               Parker, Douglas County, CO, Wait                        chamaeleonticeps); Define Allocations               Environment 2007: Science Report. The


                                        VerDate Aug<31>2005   21:48 Nov 15, 2007   Jkt 214001   PO 00000   Frm 00046   Fmt 4703   Sfmt 4703   E:FRFM16NON1.SGM   16NON1

More Related Content

What's hot

Australian Showcase: Theme 1: Australia and Waterined_v3
Australian Showcase:Theme 1:Australia and Waterined_v3Australian Showcase:Theme 1:Australia and Waterined_v3
Australian Showcase: Theme 1: Australia and Waterined_v3icidciid
 
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed LakesReconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed LakesSERC at Carleton College
 
California Coastal Commission revised staff report - Beach Chalet fields
California Coastal Commission revised staff report - Beach Chalet fieldsCalifornia Coastal Commission revised staff report - Beach Chalet fields
California Coastal Commission revised staff report - Beach Chalet fieldsSFOceanEdge
 
ADVANCED CARBONATE RESERVOIR ENGINEERING
ADVANCED CARBONATE RESERVOIR ENGINEERINGADVANCED CARBONATE RESERVOIR ENGINEERING
ADVANCED CARBONATE RESERVOIR ENGINEERINGpetroEDGE
 
2011 Annual Report Final main version
2011 Annual Report Final main version2011 Annual Report Final main version
2011 Annual Report Final main versionRob Hancock
 
Mills Maureen Joy Resume Rev01 04 Uav
Mills Maureen Joy Resume Rev01 04 UavMills Maureen Joy Resume Rev01 04 Uav
Mills Maureen Joy Resume Rev01 04 Uavmjmills
 
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...David Govoni
 
Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Phil Styles
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab ProjectsFairfax County
 
Seeing Southern Indiana
Seeing Southern IndianaSeeing Southern Indiana
Seeing Southern IndianaNSeivers
 
Gavin Cain Portfolio
Gavin Cain PortfolioGavin Cain Portfolio
Gavin Cain Portfoliolagdcain
 
Capability Statement
Capability StatementCapability Statement
Capability StatementPhil Styles
 
CARBONATE RESERVOIR GEOLOGY
CARBONATE RESERVOIR GEOLOGYCARBONATE RESERVOIR GEOLOGY
CARBONATE RESERVOIR GEOLOGYpetroEDGE
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resumekatebarnhart
 
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Alan Mössinger
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync
 
BBarton resume
BBarton resumeBBarton resume
BBarton resumeBen Barton
 

What's hot (20)

LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 
Australian Showcase: Theme 1: Australia and Waterined_v3
Australian Showcase:Theme 1:Australia and Waterined_v3Australian Showcase:Theme 1:Australia and Waterined_v3
Australian Showcase: Theme 1: Australia and Waterined_v3
 
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed LakesReconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
Reconstructing Water Levels in the Lake Michigan Basin from Embayed Lakes
 
California Coastal Commission revised staff report - Beach Chalet fields
California Coastal Commission revised staff report - Beach Chalet fieldsCalifornia Coastal Commission revised staff report - Beach Chalet fields
California Coastal Commission revised staff report - Beach Chalet fields
 
ADVANCED CARBONATE RESERVOIR ENGINEERING
ADVANCED CARBONATE RESERVOIR ENGINEERINGADVANCED CARBONATE RESERVOIR ENGINEERING
ADVANCED CARBONATE RESERVOIR ENGINEERING
 
2011 Annual Report Final main version
2011 Annual Report Final main version2011 Annual Report Final main version
2011 Annual Report Final main version
 
Mills Maureen Joy Resume Rev01 04 Uav
Mills Maureen Joy Resume Rev01 04 UavMills Maureen Joy Resume Rev01 04 Uav
Mills Maureen Joy Resume Rev01 04 Uav
 
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...
Suburban Land Use, Stormwater Best Management Practices, and Receiving Stream...
 
Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222Styles_Phil_Geotech (long) 20151222
Styles_Phil_Geotech (long) 20151222
 
2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects2017 Fairfax County Walkway Rehab Projects
2017 Fairfax County Walkway Rehab Projects
 
Seeing Southern Indiana
Seeing Southern IndianaSeeing Southern Indiana
Seeing Southern Indiana
 
Gavin Cain Portfolio
Gavin Cain PortfolioGavin Cain Portfolio
Gavin Cain Portfolio
 
Capability Statement
Capability StatementCapability Statement
Capability Statement
 
CARBONATE RESERVOIR GEOLOGY
CARBONATE RESERVOIR GEOLOGYCARBONATE RESERVOIR GEOLOGY
CARBONATE RESERVOIR GEOLOGY
 
Navy Region Southwest Water Conservation - U.S. Navy
Navy Region Southwest Water Conservation -  U.S. NavyNavy Region Southwest Water Conservation -  U.S. Navy
Navy Region Southwest Water Conservation - U.S. Navy
 
Kate Barnhart Resume
Kate Barnhart ResumeKate Barnhart Resume
Kate Barnhart Resume
 
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
Thesis - Exploration Phase: Deepwater Carbonate Reservoir Data Integration fo...
 
PetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir CharacterizationPetroSync - Carbonate Reservoir Characterization
PetroSync - Carbonate Reservoir Characterization
 
BBarton resume
BBarton resumeBBarton resume
BBarton resume
 
Civil Works
Civil WorksCivil Works
Civil Works
 

Viewers also liked

Social Media Content you should be sharing
Social Media Content you should be sharingSocial Media Content you should be sharing
Social Media Content you should be sharingMarketing professional
 
Digital graphics pro forma-1 dont deltletle
Digital graphics pro forma-1 dont deltletleDigital graphics pro forma-1 dont deltletle
Digital graphics pro forma-1 dont deltletleHannahMizen
 
Tddigitalday monétisation email
Tddigitalday monétisation emailTddigitalday monétisation email
Tddigitalday monétisation emailFrederic Prigent
 
Communications task force
Communications task forceCommunications task force
Communications task forcescstatelibrary
 
Mkt 421 guide 9 3) Which of the following statements best describes the mode...
Mkt 421 guide 9  3) Which of the following statements best describes the mode...Mkt 421 guide 9  3) Which of the following statements best describes the mode...
Mkt 421 guide 9 3) Which of the following statements best describes the mode...namithateja
 
Execrank 2012 Top Marketing Executives
Execrank 2012 Top Marketing ExecutivesExecrank 2012 Top Marketing Executives
Execrank 2012 Top Marketing ExecutivesVINCE FERRARO
 
Lecture#2 hardware
Lecture#2   hardwareLecture#2   hardware
Lecture#2 hardwarerasha3
 
Παρουσίαση στο Xinis Education Festival 2012
Παρουσίαση στο Xinis Education Festival 2012Παρουσίαση στο Xinis Education Festival 2012
Παρουσίαση στο Xinis Education Festival 2012Themis Sarantaenas
 
Why Car Dealers Should Choose Display Advertising Versus Paid Search Advertising
Why Car Dealers Should Choose Display Advertising Versus Paid Search AdvertisingWhy Car Dealers Should Choose Display Advertising Versus Paid Search Advertising
Why Car Dealers Should Choose Display Advertising Versus Paid Search AdvertisingRalph Paglia
 
Radio show order
Radio show orderRadio show order
Radio show orderferehiwot
 

Viewers also liked (20)

Social Media Content you should be sharing
Social Media Content you should be sharingSocial Media Content you should be sharing
Social Media Content you should be sharing
 
3305
33053305
3305
 
Media task 2 evaluation
Media task 2 evaluationMedia task 2 evaluation
Media task 2 evaluation
 
Digital graphics pro forma-1 dont deltletle
Digital graphics pro forma-1 dont deltletleDigital graphics pro forma-1 dont deltletle
Digital graphics pro forma-1 dont deltletle
 
Tddigitalday monétisation email
Tddigitalday monétisation emailTddigitalday monétisation email
Tddigitalday monétisation email
 
Communications task force
Communications task forceCommunications task force
Communications task force
 
Mkt 421 guide 9 3) Which of the following statements best describes the mode...
Mkt 421 guide 9  3) Which of the following statements best describes the mode...Mkt 421 guide 9  3) Which of the following statements best describes the mode...
Mkt 421 guide 9 3) Which of the following statements best describes the mode...
 
Pitch
PitchPitch
Pitch
 
Mis08
Mis08Mis08
Mis08
 
Yipit - AWS Start-Up Customer
Yipit - AWS Start-Up Customer Yipit - AWS Start-Up Customer
Yipit - AWS Start-Up Customer
 
Execrank 2012 Top Marketing Executives
Execrank 2012 Top Marketing ExecutivesExecrank 2012 Top Marketing Executives
Execrank 2012 Top Marketing Executives
 
Martela hoivayhteys
Martela hoivayhteys Martela hoivayhteys
Martela hoivayhteys
 
5471
54715471
5471
 
Panorama de la salud de la C.A. de Euskadi. 2008
Panorama de la salud de la C.A. de Euskadi. 2008Panorama de la salud de la C.A. de Euskadi. 2008
Panorama de la salud de la C.A. de Euskadi. 2008
 
Hwswb
HwswbHwswb
Hwswb
 
Lecture#2 hardware
Lecture#2   hardwareLecture#2   hardware
Lecture#2 hardware
 
Παρουσίαση στο Xinis Education Festival 2012
Παρουσίαση στο Xinis Education Festival 2012Παρουσίαση στο Xinis Education Festival 2012
Παρουσίαση στο Xinis Education Festival 2012
 
Why Car Dealers Should Choose Display Advertising Versus Paid Search Advertising
Why Car Dealers Should Choose Display Advertising Versus Paid Search AdvertisingWhy Car Dealers Should Choose Display Advertising Versus Paid Search Advertising
Why Car Dealers Should Choose Display Advertising Versus Paid Search Advertising
 
Political Polling Expertise
Political Polling ExpertisePolitical Polling Expertise
Political Polling Expertise
 
Radio show order
Radio show orderRadio show order
Radio show order
 

Similar to Future gen feis_noa_64618

Spring 2007 Friend to Friend Newsletter, Friends of the Foothills
Spring 2007 Friend to Friend Newsletter, Friends of the FoothillsSpring 2007 Friend to Friend Newsletter, Friends of the Foothills
Spring 2007 Friend to Friend Newsletter, Friends of the FoothillsFriends of the Foothills
 
Protecting Groundwater Resources - OH Clean Water Conference
Protecting Groundwater Resources - OH Clean Water ConferenceProtecting Groundwater Resources - OH Clean Water Conference
Protecting Groundwater Resources - OH Clean Water ConferenceOhio Environmental Council
 
Creating A Paradigm Shift, Putting the Buffalo River First - Jill Spisiak
Creating A Paradigm Shift, Putting the Buffalo River First - Jill SpisiakCreating A Paradigm Shift, Putting the Buffalo River First - Jill Spisiak
Creating A Paradigm Shift, Putting the Buffalo River First - Jill SpisiakHealthy Lakes, Healthy Lives
 
Dennis Lambert Diversions
Dennis Lambert DiversionsDennis Lambert Diversions
Dennis Lambert DiversionsDennis Lambert
 
160414 LLOYD LEVY CV (complete)
160414 LLOYD LEVY CV (complete)160414 LLOYD LEVY CV (complete)
160414 LLOYD LEVY CV (complete)Lloyd Levy
 
AK: Juneau Manual of Stormwater Best Management Practices
AK: Juneau Manual of Stormwater Best Management PracticesAK: Juneau Manual of Stormwater Best Management Practices
AK: Juneau Manual of Stormwater Best Management PracticesSotirakou964
 
Alaska Storm Water Guide
Alaska Storm Water GuideAlaska Storm Water Guide
Alaska Storm Water GuideSotirakou964
 
Bloise_Rose_rez_Jan2017_sorted
Bloise_Rose_rez_Jan2017_sortedBloise_Rose_rez_Jan2017_sorted
Bloise_Rose_rez_Jan2017_sortedRose Bloise
 
EPA Superfund Proposed Plan Cabot / Koppers Superfund Site
EPA Superfund Proposed Plan Cabot / Koppers Superfund SiteEPA Superfund Proposed Plan Cabot / Koppers Superfund Site
EPA Superfund Proposed Plan Cabot / Koppers Superfund SiteProtect Gainesville's Citizens
 

Similar to Future gen feis_noa_64618 (20)

NOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC ProjectNOA DEIS (EPA) - Kemper County IGCC Project
NOA DEIS (EPA) - Kemper County IGCC Project
 
Notice of Availability - Final EIS - Kemper Country IGCC Project
Notice of Availability - Final EIS - Kemper Country IGCC ProjectNotice of Availability - Final EIS - Kemper Country IGCC Project
Notice of Availability - Final EIS - Kemper Country IGCC Project
 
NOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC ProjectNOA FEIS (EPA) - Kemper County IGCC Project
NOA FEIS (EPA) - Kemper County IGCC Project
 
Spring 2007 Friend to Friend Newsletter, Friends of the Foothills
Spring 2007 Friend to Friend Newsletter, Friends of the FoothillsSpring 2007 Friend to Friend Newsletter, Friends of the Foothills
Spring 2007 Friend to Friend Newsletter, Friends of the Foothills
 
Protecting Groundwater Resources - OH Clean Water Conference
Protecting Groundwater Resources - OH Clean Water ConferenceProtecting Groundwater Resources - OH Clean Water Conference
Protecting Groundwater Resources - OH Clean Water Conference
 
Creating A Paradigm Shift, Putting the Buffalo River First - Jill Spisiak
Creating A Paradigm Shift, Putting the Buffalo River First - Jill SpisiakCreating A Paradigm Shift, Putting the Buffalo River First - Jill Spisiak
Creating A Paradigm Shift, Putting the Buffalo River First - Jill Spisiak
 
NOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa BiorefineryNOA DEIS (EPA) - Abengoa Biorefinery
NOA DEIS (EPA) - Abengoa Biorefinery
 
Sand island dlnr
Sand island dlnrSand island dlnr
Sand island dlnr
 
Municipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie BarkerMunicipal Wetland Initiatives by Frankie Barker
Municipal Wetland Initiatives by Frankie Barker
 
Delivering Mitigation Solutions for Natural Resource Extraction Projects: Ins...
Delivering Mitigation Solutions for Natural Resource Extraction Projects: Ins...Delivering Mitigation Solutions for Natural Resource Extraction Projects: Ins...
Delivering Mitigation Solutions for Natural Resource Extraction Projects: Ins...
 
Dennis Lambert Diversions
Dennis Lambert DiversionsDennis Lambert Diversions
Dennis Lambert Diversions
 
Final_Potter_Creek
Final_Potter_CreekFinal_Potter_Creek
Final_Potter_Creek
 
BSantelik_resume
BSantelik_resumeBSantelik_resume
BSantelik_resume
 
160414 LLOYD LEVY CV (complete)
160414 LLOYD LEVY CV (complete)160414 LLOYD LEVY CV (complete)
160414 LLOYD LEVY CV (complete)
 
AK: Juneau Manual of Stormwater Best Management Practices
AK: Juneau Manual of Stormwater Best Management PracticesAK: Juneau Manual of Stormwater Best Management Practices
AK: Juneau Manual of Stormwater Best Management Practices
 
Alaska Storm Water Guide
Alaska Storm Water GuideAlaska Storm Water Guide
Alaska Storm Water Guide
 
srjCV_Auditor1
srjCV_Auditor1srjCV_Auditor1
srjCV_Auditor1
 
Bloise_Rose_rez_Jan2017_sorted
Bloise_Rose_rez_Jan2017_sortedBloise_Rose_rez_Jan2017_sorted
Bloise_Rose_rez_Jan2017_sorted
 
EPA Superfund Proposed Plan Cabot / Koppers Superfund Site
EPA Superfund Proposed Plan Cabot / Koppers Superfund SiteEPA Superfund Proposed Plan Cabot / Koppers Superfund Site
EPA Superfund Proposed Plan Cabot / Koppers Superfund Site
 
Claire Robinson
Claire RobinsonClaire Robinson
Claire Robinson
 

More from DOE Office of NEPA Policy & Compliance

More from DOE Office of NEPA Policy & Compliance (20)

Dec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons LearnedDec. 2009 - DOE-NEPA Lessons Learned
Dec. 2009 - DOE-NEPA Lessons Learned
 
March 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons LearnedMarch 2010 - DOE-NEPA Lessons Learned
March 2010 - DOE-NEPA Lessons Learned
 
June 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons LearnedJune 2010 - DOE-NEPA Lessons Learned
June 2010 - DOE-NEPA Lessons Learned
 
Sept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons LearnedSept. 2010 - DOE-NEPA Lessons Learned
Sept. 2010 - DOE-NEPA Lessons Learned
 
NOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon CaptureNOI - Mountaineer Commercial Scale Carbon Capture
NOI - Mountaineer Commercial Scale Carbon Capture
 
NOI - Texas Clean Energy
NOI - Texas Clean EnergyNOI - Texas Clean Energy
NOI - Texas Clean Energy
 
NOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLCNOI - Hydrogen Energy California, LLC
NOI - Hydrogen Energy California, LLC
 
NOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy ProjectNOA DEIS (DOE) - Mesaba Energy Project
NOA DEIS (DOE) - Mesaba Energy Project
 
NOI - Mesaba Energy Project
NOI - Mesaba Energy ProjectNOI - Mesaba Energy Project
NOI - Mesaba Energy Project
 
NOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - MercuryNOA DEIS (DOE) - Mercury
NOA DEIS (DOE) - Mercury
 
NOI - Santa Susana
NOI - Santa SusanaNOI - Santa Susana
NOI - Santa Susana
 
ANOI - Santa Susana
ANOI - Santa SusanaANOI - Santa Susana
ANOI - Santa Susana
 
NOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive WasteNOI - GTCC Low Level Radioactive Waste
NOI - GTCC Low Level Radioactive Waste
 
ANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive WasteANOI - GTCC Low-Level Radioactive Waste
ANOI - GTCC Low-Level Radioactive Waste
 
NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)NOI - Tank Closure and Waste Management (Hanford)
NOI - Tank Closure and Waste Management (Hanford)
 
NOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa BiorefineryNOA DEIS (DOE) - Abengoa Biorefinery
NOA DEIS (DOE) - Abengoa Biorefinery
 
Amended NOI - Abengoa Biorefinery
Amended NOI - Abengoa BiorefineryAmended NOI - Abengoa Biorefinery
Amended NOI - Abengoa Biorefinery
 
NOI - Abengoa Biorefinery
NOI - Abengoa BiorefineryNOI - Abengoa Biorefinery
NOI - Abengoa Biorefinery
 
NOI - Solar Energy Development
NOI - Solar Energy DevelopmentNOI - Solar Energy Development
NOI - Solar Energy Development
 
NOI - Champlain Hudson Power
NOI - Champlain Hudson PowerNOI - Champlain Hudson Power
NOI - Champlain Hudson Power
 

Future gen feis_noa_64618

  • 1. 64618 Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices Corridor Improvement Project, Watershed Project, To Implement to wetlands and stream channels. EPA Proposed Roadway Improvements on Fuel Reduction Activities, Bozeman recommends that WVDOH develop Route 101 between the Eureka Slough Ranger District, Gallatin National ways to further avoid and minimize Bridge and 11th St. Overcrossing in Forest, City of Bozeman Municipal impacts during the construction phase Arcata, Humbolt County, CA. Watershed, Gallatin County, MT. of the project. Summary: EPA expressed Summary: EPA expressed Dated: November 13, 2007. environmental concerns about impacts environmental concerns about potential Robert W. Hargrove, to air quality and noise. EPA encourages effects to water quality and other Director, NEPA Compliance Division, Office continued interagency coordination to resources from the proposed action. of Federal Activities. mitigate impacts to wetlands and EPA requested additional information [FR Doc. E7–22498 Filed 11–15–07; 8:45 am] cumulative impacts. Rating EC2. on road and stream crossings and BILLING CODE 6560–50–P EIS No. 20070323, ERP No. D–FHW– provided suggestions for additional J40177–CO, US–36 Corridor, Multi- mitigation measures and monitoring. Modal Transportation Improvements Rating EC2. ENVIRONMENTAL PROTECTION between I–25 in Adams County and Final EISs AGENCY Foothills Parkway/Table Mesa Drive EIS No. 20070358, ERP No. F–AFS– [ER–FRL–6692–9] in Boulder, Adams, Denver, Broomfield, Boulder and Jefferson K65325–CA, Turntable Bay Marina Master Development Project, Environmental Impacts Statements; Counties, CO. Notice of Availability Summary: EPA expressed Implementation, Shasta-Trinity environmental concerns about the National Forest, Special Use Permit, Responsible Agency: Office of Federal wetlands impacts and impacts to the Shasta and Trinity Counties, CA. Activities, General Information (202) Preble’s meadow jumping mouse and Summary: No formal comment letter 564–7167 or http://www.epa.gov/ Ute ladies’-tresses habitat. Rating EC1. was sent to the preparing agency. compliance/nepa/. EIS No. 20070361, ERP No. D–FHW– EIS No. 20070413, ERP No. F–AFS– Weekly receipt of Environmental Impact K50015–CA, Schuyler Heim Bridge J65467–MT, Little Belt-Castle-North Statements. Replacement and SR–47 Expressway Half Crazy Mountains Travel Filed 11/05/2007 through 11/09/2007. Improvement Project, from Alameda Management Plan, To Change the Pursuant to 40 CFR 1506.9. Street to Pacific Coast Highway, Management of Motorized and Non- EIS No. 20070480, Draft EIS, AFS, UT, Funding, U.S. Coast Guard Bridge motorized Travel on the Road, Trails, Pockets Resource Management Permit, U.S. Army COE Section 10 and Areas within, Belt Creek, Judith, Project, Proposes to Salvage Dead and and 404 Permits, Ports of Long Beach Musselshell, and White Sulphur Dying Spruce/Fir, Regenerate Aspen, and Los Angeles, Los Angeles County, Springs Ranger Districts, Lewis and and Manage Travel, Escalate Ranger CA. Clark National Forest, Cascade, Judith District, Dixie National Forest, Basin, Meagher, Wheatland, Garfield County, UT, Comment Period Summary: EPA expressed Sweetgrass and Park Counties, MT. Ends: 12/31/2007, Contact: Georgina environmental concerns about the cumulative air and water quality Summary: EPA expressed Lampman 435–826–5401. impacts and their effects on low income environmental concerns about potential EIS No. 20070481, Draft Supplement, and minority communities. EPA effects to water quality, fisheries, and COE, NC, PCS Phosphate Mine recommends consistency with the Clean wildlife. Continuation, New Information on Air Action Plan, mitigation to reduce EIS No. 20070414, ERP No. F–AFS– Additional Alternative ‘‘L’’ and ‘‘M’’, construction and mobile source air J65445–MT, Rocky Mountain Ranger Proposes to Expand its Existing Open toxics emissions, and additional best District Travel Management Plan, Pit Phosphate Mining Operation into management practices to contain Proposes to Change the Management a 3,412 Acre Tract, Pamlico River and resuspended sediments. Rating EC2. of Motorized and Non-Motorized South Creek, near Aurora, Beaufort Travel, Lewis and Clark National County, NC, Comment Period Ends: EIS No. 20070370, ERP No. D–AFS– Forest, Glacier, Pondera, Teton and 12/31/2007, Contact: Tom Walker K65333–00, Sage Steppe Ecosystem Lewis and Clark Counties, MT. 828–271–7980 Ext 222. Restoration Strategy, Implementation, EIS No. 20070482, Draft EIS, FHW, UT, Modoc National Forest, Modoc, Summary: EPA expressed UT–108 Transportation Improvement Lassen, Shasta Counties, CA and environmental concerns about potential Project, To Improve Local and Washoe County, NV. effects to water quality, fisheries, and Regional Mobility from UT–108 Summary: EPA expressed wildlife, based on the uncertainty of between UT–127 (Antelope Drive) to environmental concerns about the scope receiving adequate funding for road and UT–126 (1900 West) Located in of analysis in the document and the trail maintenance, road Syracuse, West Point and Clinton in project’s impact on endangered species, decommissioning, and enforcement of Dave County, and Roy and West water quality, wetlands, and air quality. travel plan restrictions. Haven in Weber County, UT.P≤ Rating EC2. EIS No. 20070069, ERP No. FA–FHW– Comment Period Ends: 01/05/2008, EIS No. 20070391, ERP No. D–NRC– D40118–00, Appalachian Corridor H Contact: Douglas Atkin 801–963– G09805–OK, Sequoyah Fuels Project, Construction of a 9-mile Long 0182. Corporation Site, Proposed Segment between the Termini of EIS No. 20070483, Draft Supplement, Reclamation Activities for the 243- Parsons and Davis, Updated FHW, TN, Kirby Parkway Project, mstockstill on PROD1PC66 with NOTICES hectare (600 acre) Site, (NUREG– Information the Parsons-to-Davis Construction from Macon Road to 1888) in Gore, OK. Project, Funding and U.S. Army COE Walnut Grove Road, U.S. Army COE Summary: EPA does not object to the Section 404 Permit Issuance, Tucker Section 401 and 404 Permits, Shelby proposed action. Rating LO. County, WV. County, TN, Comment Period Ends: EIS No. 20070392, ERP No. D–AFS– Summary: EPA continues to have 12/31/2007, Contact: J65491–MT, Bozeman Municipal environmental concerns about impacts Laurie S. Leffler 615–781–5770. VerDate Aug<31>2005 21:48 Nov 15, 2007 Jkt 214001 PO 00000 Frm 00045 Fmt 4703 Sfmt 4703 E:FRFM16NON1.SGM 16NON1
  • 2. Federal Register / Vol. 72, No. 221 / Friday, November 16, 2007 / Notices 64619 EIS No. 20070484, Draft EIS, FHW, 00, Period Ends: 12/17/2007, Contact: for Snowy Grouper (Epinephelus Interstate-94, I–43, I–894, and WI–119 Rodney J. Schwartz 402–221–4143. niveatus) and Red Porgy (Pagrus (Airport Spur) I–94/USH 41 EIS No. 20070491, Final EIS, AFS, CO, pagrus), NC, SC, FL and GA, Interchange to Howard Avenue, To Bull Mountain Natural Gas Pipeline, Comment Period Ends: 01/11/2008, Address Freeway System’s Construct, Operate and Maintain Contact: Dr. Roy E. Crabtree 727–824– Deteriorated Conditions, Funding and Natural Gas Pipeline, Issuance of 5301. Revision to FR Notice U.S. Army COE Section 404 Permit, Right-of-Way Grant and Temporary Published: 11/09/2007: Correction to Kenosha, Racine and Milwaukee Use Area Permits, Gunnison, Delta, Title. Counties, WI and Lake County, IL, Mesa, Garfield Counties, CO, Wait Dated: November 13, 2007. Comment Period Ends: 12/31/2007, Period Ends: 12/17/2007, Contact: Robert W. Hargrove, Contact: David Scott 608–829–7522. Niccole Mortensen 970–874–6616. EIS No. 20070485, Final EIS, AFS, CA, EIS No. 20070492, Draft EIS, DHS, 00, Director, NEPA Compliance Division, Office Rio Grande Valley Sector Project, of Federal Activities. Kirkwood Mountain Resort, Proposed 2003 Mountain Master Development Construction, Maintenance, and [FR Doc. 07–5713 Filed 11–15–07; 8:45 am] Plan, Implementation, Eldorado Operation of Tactical Infrastructure, BILLING CODE 6560–50–P National Forest, Amador, Alpine and U.S./Mexico International Border in EL Dorado Counties, CA, Wait Period Southernmost Portions of Starr, Ends: 12/17/2007, Contact: Sue Hidalgo and Cameron Counties, TX, ENVIRONMENTAL PROTECTION Rodman 530–622–5061. Comment Period Ends: 12/31/2007, AGENCY EIS No. 20070486, Final Supplement, Contact: Gregory Giddens 202–344– [FRL–8495–6] COE, 00, Yazoo Basin Reformulation 2450. Study, Supplement No.1 to the 1982 EIS No. 20070493, Final EIS, AFS, ID, Science Advisory Board Staff Office; Yazoo Area Pump Project, Flood Sun Valley Resort (Bald Mountain) Notification of a Public Teleconference Control, Mississippi River and 2005 Master Plan—Phase I Project, of the Science Advisory Board; Panel Tributaries, Yazoo Basin, MS and LA, Implementation, Special-Use-Permits, for the Review of EPA’s 2007 Report Wait Period Ends: 01/22/2008, Sawtooth National Forest, Blaine on the Environment Contact: Marvin Cannon 601–631– County, ID, Wait Period Ends: 12/17/ AGENCY: Environmental Protection 5437. 2007, Contact: Carol Brown 208–727– EIS No. 20070487, Second Final Agency (EPA). 5000. Supplement, COE, FL, Lake EIS No. 20070494, Legislative Final EIS, ACTION: Notice. Okeechobee Regulation Schedule COE, LA, Mississippi River—Gulf SUMMARY: The Environmental Protection Study, New Updated Information, Outlet (MRGO) Deep-Draft Navigation Agency (EPA or Agency) Science Evaluation of Three New Alternatives De-Authorization Study, Advisory Board (SAB) Staff Office on Operational Changes to the Current Implementation, St. Bernard Parish, announces a public teleconference of Water Control Plan, Lake Okeechobee LA, Wait Period Ends: 12/17/2007, the SAB Panel for the Review of EPA’s and the Everglades Agricultural Area, Contact: Sean Mickal 504–862–2319. 2007 Report on the Environment. The Lake Okeechobee, Glades, teleconference is being held to discuss Okeechobee Hendry, Palm Beach and Amended Notices the Panel’s draft advisory report. Martin Counties, FL, Wait Period EIS No. 20070373, Draft EIS, RUS, WY, DATES: The teleconference will be held Ends: 12/17/2007, Contact: Yvonne L. WITHDRAWN—Dry Fork Station and Hughes Transmission Line, Construct on December 10, 2007 from 1 p.m. to 4 Haberer 904–232–1701. EIS No. 20070488, Draft EIS, DOE, 00, Electric Generating Facilities, p.m. (Eastern Time). PROGRAMMATIC—Designation of Campbell and Sheridan Counties, FOR FURTHER INFORMATION CONTACT: Any Energy Corridors in 11 Western WY, Comment Period Ends: 10/15/ member of the public wishing further States, Preferred Location of Future 2007, Contact: Richard Fristik 202– information regarding the public Oil, Gas, and Hydrogen Pipelines and 720–5093. Revision of FR Published teleconference may contact. Dr. Thomas Electricity Transmission and 08/31/2007: Officially Withdrawn by Armitage, Designated Federal Officer Distribution Facilities on Federal the Preparing Agency. (DFO). Dr. Armitage may be contacted at Land, AZ, CA, CO, ID, MT, NV, NM, EIS No. 20070385, Draft EIS, FHW, 00, the EPA Science Advisory Board UT, WA and WY, Comment Period Peace Bridge Expansion Project, (1400F), U.S. Environmental Protection Ends: 02/14/2008, Contact: LaVerne Capacity Improvements to the Peace Agency, 1200 Pennsylvania Avenue, Kyriss 202–586–1056. Bridge, Plazas and Connecting NW., Washington, DC 20460; or via EIS No. 20070489, Final EIS, DOE, 00, Roadways, U.S. Coast Guard Bridge telephone/voice mail: (202) 343–9995; FutureGen Project, Planning, Design, Permit, U.S. Army COE Section 10 fax (202) 233–0643; or e-mail at: Construction and Operation of a Coal and 404 Permits. City of Buffalo, Erie armitage.thomas@epa.gov. General Fueled Electric Power and Hydrogen County, NY and Town of Fort Erie, information about the EPA SAB, as well Gas Production Plant, Four Ontario, Canada, Comment Period as any updates concerning the Alternative Sites: Mattoon, IL, Ends: 11/30/2007, Contact: Amy teleconference announced in this notice, Tuscola, IL, Jewett, TX, and Odessa, Jackson-Grove 518–431–4131. may be found in the SAB Web site at: TX, Wait Period Ends: 12/17/2007, Revision of FR Notice Published 09/ http://www.epa.gov/sab. Contact: Mark McKoy 304–285–4426. 14/2007: Extending Comment Period SUPPLEMENTARY INFORMATION: Pursuant EIS No. 20070490, Final Supplement, from 11/13/2007 to 11/30/2007. to the Federal Advisory Committee Act, COE, CO, Rueter-Hess Reservoir EIS No. 20070469, Draft EIS, NOA, 00, Public Law 92–463, notice is hereby mstockstill on PROD1PC66 with NOTICES Expansion Project , Enlarges Reservoir Snapper Grouper Amendment 15B, given that the SAB Panel for the Review to Provide Storage of Denver Basin Fishery Management Plan, To of EPA’s 2007 Report on the Groundwater for Meeting Peak Analyze the Effects of Updating Environment will hold a public Municipal Water Supply, U.S. Army Management Reference Points for teleconference to discuss a draft COE Section 404 Permit, Town of Golden Tilefish (Lopholatilus advisory report on EPA’s Report on the Parker, Douglas County, CO, Wait chamaeleonticeps); Define Allocations Environment 2007: Science Report. The VerDate Aug<31>2005 21:48 Nov 15, 2007 Jkt 214001 PO 00000 Frm 00046 Fmt 4703 Sfmt 4703 E:FRFM16NON1.SGM 16NON1