UML Activity Diagrams
Activity Diagram
• Activity is a particular operation of the system.
• An Activity diagram is a dynamic diagram that shows
the activity and the event that causes the object to
be in the particular state.
• The diagrams describe the state of activities by
showing the sequence of activities performed.
• Activity diagrams can show activities that are
conditional or parallel.
Activity Diagram
• The purposes of Activity diagram can
be described as:
–Draw the activity flow of a system.
–Describe the sequence from one
activity to another.
–Describe the parallel, branched and
concurrent flow of the system.
Elements in Activity Diagram
Initial Activity: This shows the starting
point or first activity of the flow. Denoted
by a solid circle. This is similar to the
notation used for Initial State.
Activity: Represented by a rectangle with
rounded (almost oval) edges.
Decisions: Similar to flowcharts, a logic
where a decision is to be made is
depicted by a diamond, with the options
written on either sides of the arrows
emerging from the diamond, within box
brackets.
Elements in Activity Diagram
Concurrent Activities: Some
activities occur simultaneously
or in parallel. Such activities are
called concurrent activities. For
example, listening to the
lecturer and looking at the
blackboard is a parallel activity.
This is represented by a
horizontal split (thick dark line)
and the two concurrent
activities next to each other, and
the horizontal line again to show
the end of the parallel activity.
Elements in Activity Diagram
• Fork and Join Nodes
Forks and joins have the same notation: either a horizontal or
vertical bar (the orientation is dependent on whether the
control flow is running left to right or top to bottom). They
indicate the start and end of concurrent threads of control.
The following diagram shows an example of their use.
Elements in Activity Diagram
• Decision and Merge Nodes
Decision nodes and merge nodes have the same notation: a
diamond shape. They can both be named. The control flows
coming away from a decision node will have guard conditions
which will allow control to flow if the guard condition is met.
The following diagram shows use of a decision node and a
merge node.
Join node vs Merge node
• A join is different from a merge in that the join
synchronizes two inflows and produces a
single outflow. The outflow from a join cannot
execute until all inflows have been received. A
merge passes any control flows straight
through it.
• The following diagram is drawn with the four main
activities:
• Send order by the customer
• Receipt of the order
• Confirm order
• Dispatch order
• After receiving the order request condition checks
are performed to check if it is normal or special
order. After the type of order is identified dispatch
activity is performed and that is marked as the
termination of the process.
Activity Diagram vs. Other Diagrams
• Other diagrams are used to show the message flow
from one object to another but activity diagram is
used to show message flow from one activity to
another.
• Activity diagrams are mainly used as a flow chart
consists of activities performed by the system. But
activity diagram are not exactly a flow chart as they
have some additional capabilities. These additional
capabilities include branching, parallel flow etc.
Sequence diagram vs. Activity Diagram
Sequence diagrams describe interactions among
objects in terms of an exchange of messages over time.
Sequence diagrams show a detailed flow for a specific
use case or even just part of a specific use case.
Activity diagrams illustrate the dynamic nature of a
system by modeling the flow of control from activity to
activity. An activity represents an operation on some
class in the system that results in a change in the state
of the system.

Más contenido relacionado

La actualidad más candente

15. Transactions in DBMS
15. Transactions in DBMS15. Transactions in DBMS
15. Transactions in DBMS
koolkampus
 

La actualidad más candente (20)

Waterfall model
Waterfall modelWaterfall model
Waterfall model
 
Serializability
SerializabilitySerializability
Serializability
 
15. Transactions in DBMS
15. Transactions in DBMS15. Transactions in DBMS
15. Transactions in DBMS
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
Data Flow Diagram
Data Flow DiagramData Flow Diagram
Data Flow Diagram
 
Concurrency
ConcurrencyConcurrency
Concurrency
 
Software project management- Software Engineering
Software project management- Software EngineeringSoftware project management- Software Engineering
Software project management- Software Engineering
 
integration testing.pptx
integration testing.pptxintegration testing.pptx
integration testing.pptx
 
LALR Parser Presentation ppt
LALR Parser Presentation pptLALR Parser Presentation ppt
LALR Parser Presentation ppt
 
Software Configuration Management (SCM)
Software Configuration Management (SCM)Software Configuration Management (SCM)
Software Configuration Management (SCM)
 
Project Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software DevelopmentProject Evaluation and Estimation in Software Development
Project Evaluation and Estimation in Software Development
 
Software Engineering - Software Models
Software Engineering - Software ModelsSoftware Engineering - Software Models
Software Engineering - Software Models
 
Software Architecture Design for Begginers
Software Architecture Design for BegginersSoftware Architecture Design for Begginers
Software Architecture Design for Begginers
 
Lecture6 activity diagrams
Lecture6 activity diagramsLecture6 activity diagrams
Lecture6 activity diagrams
 
Chapter1 - Introduction to Object-Oriented Programming and Software Development
Chapter1 - Introduction to Object-Oriented Programming and Software DevelopmentChapter1 - Introduction to Object-Oriented Programming and Software Development
Chapter1 - Introduction to Object-Oriented Programming and Software Development
 
Traditional Process Models
Traditional Process ModelsTraditional Process Models
Traditional Process Models
 
Activity Diagram
Activity DiagramActivity Diagram
Activity Diagram
 
Integrated Project Management
Integrated Project ManagementIntegrated Project Management
Integrated Project Management
 
Student record
Student recordStudent record
Student record
 
Object Oriented Approach for Software Development
Object Oriented Approach for Software DevelopmentObject Oriented Approach for Software Development
Object Oriented Approach for Software Development
 

Similar a Slide 6 Activity Diagram

An introduction to uml
An introduction to umlAn introduction to uml
An introduction to uml
Tony Huynh
 
Unit III Dynamic and Implementation UML Diagrams.pptx
Unit III Dynamic and Implementation UML Diagrams.pptxUnit III Dynamic and Implementation UML Diagrams.pptx
Unit III Dynamic and Implementation UML Diagrams.pptx
anguraju1
 

Similar a Slide 6 Activity Diagram (20)

08 state diagram and activity diagram
08 state diagram and activity diagram08 state diagram and activity diagram
08 state diagram and activity diagram
 
ACTIVITY DIAGRAM.pptx
ACTIVITY DIAGRAM.pptxACTIVITY DIAGRAM.pptx
ACTIVITY DIAGRAM.pptx
 
Activity diagram model
Activity diagram modelActivity diagram model
Activity diagram model
 
CS8592-OOAD Lecture Notes Unit-3
CS8592-OOAD Lecture Notes Unit-3CS8592-OOAD Lecture Notes Unit-3
CS8592-OOAD Lecture Notes Unit-3
 
Activity Diagram part8
Activity Diagram part8Activity Diagram part8
Activity Diagram part8
 
LECTURE 9 (Week 5) - Behavioral Diagrams.pptx
LECTURE 9 (Week 5) - Behavioral Diagrams.pptxLECTURE 9 (Week 5) - Behavioral Diagrams.pptx
LECTURE 9 (Week 5) - Behavioral Diagrams.pptx
 
Java
Java   Java
Java
 
Uml diagrams
Uml diagramsUml diagrams
Uml diagrams
 
Activity diag
Activity diagActivity diag
Activity diag
 
An introduction to uml
An introduction to umlAn introduction to uml
An introduction to uml
 
Unit three Advanced State Modelling
Unit three Advanced State ModellingUnit three Advanced State Modelling
Unit three Advanced State Modelling
 
Unit 3(advanced state modeling & interaction meodelling)
Unit  3(advanced state modeling & interaction meodelling)Unit  3(advanced state modeling & interaction meodelling)
Unit 3(advanced state modeling & interaction meodelling)
 
Diagrams
DiagramsDiagrams
Diagrams
 
SE_Lec 09_ UML Behaviour Diagrams
SE_Lec 09_ UML Behaviour DiagramsSE_Lec 09_ UML Behaviour Diagrams
SE_Lec 09_ UML Behaviour Diagrams
 
Uml
UmlUml
Uml
 
Uml
UmlUml
Uml
 
Unit III Dynamic and Implementation UML Diagrams.pptx
Unit III Dynamic and Implementation UML Diagrams.pptxUnit III Dynamic and Implementation UML Diagrams.pptx
Unit III Dynamic and Implementation UML Diagrams.pptx
 
State chart diagram
State chart diagramState chart diagram
State chart diagram
 
3 interaction and_state_modeling
3 interaction and_state_modeling3 interaction and_state_modeling
3 interaction and_state_modeling
 
Intoduction to uml
Intoduction to umlIntoduction to uml
Intoduction to uml
 

Último

Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Último (20)

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Third Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptxThird Battle of Panipat detailed notes.pptx
Third Battle of Panipat detailed notes.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 

Slide 6 Activity Diagram

  • 2. Activity Diagram • Activity is a particular operation of the system. • An Activity diagram is a dynamic diagram that shows the activity and the event that causes the object to be in the particular state. • The diagrams describe the state of activities by showing the sequence of activities performed. • Activity diagrams can show activities that are conditional or parallel.
  • 3. Activity Diagram • The purposes of Activity diagram can be described as: –Draw the activity flow of a system. –Describe the sequence from one activity to another. –Describe the parallel, branched and concurrent flow of the system.
  • 4. Elements in Activity Diagram Initial Activity: This shows the starting point or first activity of the flow. Denoted by a solid circle. This is similar to the notation used for Initial State. Activity: Represented by a rectangle with rounded (almost oval) edges. Decisions: Similar to flowcharts, a logic where a decision is to be made is depicted by a diamond, with the options written on either sides of the arrows emerging from the diamond, within box brackets.
  • 5. Elements in Activity Diagram Concurrent Activities: Some activities occur simultaneously or in parallel. Such activities are called concurrent activities. For example, listening to the lecturer and looking at the blackboard is a parallel activity. This is represented by a horizontal split (thick dark line) and the two concurrent activities next to each other, and the horizontal line again to show the end of the parallel activity.
  • 6. Elements in Activity Diagram • Fork and Join Nodes Forks and joins have the same notation: either a horizontal or vertical bar (the orientation is dependent on whether the control flow is running left to right or top to bottom). They indicate the start and end of concurrent threads of control. The following diagram shows an example of their use.
  • 7. Elements in Activity Diagram • Decision and Merge Nodes Decision nodes and merge nodes have the same notation: a diamond shape. They can both be named. The control flows coming away from a decision node will have guard conditions which will allow control to flow if the guard condition is met. The following diagram shows use of a decision node and a merge node.
  • 8. Join node vs Merge node • A join is different from a merge in that the join synchronizes two inflows and produces a single outflow. The outflow from a join cannot execute until all inflows have been received. A merge passes any control flows straight through it.
  • 9.
  • 10.
  • 11. • The following diagram is drawn with the four main activities: • Send order by the customer • Receipt of the order • Confirm order • Dispatch order • After receiving the order request condition checks are performed to check if it is normal or special order. After the type of order is identified dispatch activity is performed and that is marked as the termination of the process.
  • 12.
  • 13.
  • 14.
  • 15. Activity Diagram vs. Other Diagrams • Other diagrams are used to show the message flow from one object to another but activity diagram is used to show message flow from one activity to another. • Activity diagrams are mainly used as a flow chart consists of activities performed by the system. But activity diagram are not exactly a flow chart as they have some additional capabilities. These additional capabilities include branching, parallel flow etc.
  • 16. Sequence diagram vs. Activity Diagram Sequence diagrams describe interactions among objects in terms of an exchange of messages over time. Sequence diagrams show a detailed flow for a specific use case or even just part of a specific use case. Activity diagrams illustrate the dynamic nature of a system by modeling the flow of control from activity to activity. An activity represents an operation on some class in the system that results in a change in the state of the system.

Notas del editor

  1. The diagram below shows a super-state.  Both the Checking and Dispatching states can transition into the Canceled state, so a transition is shown  from a super-state named Active to the state Cancel.  By contrast, the state Dispatching can only transition to the Delivered state, so we show an arrow only from the Dispatching state to the Delivered state.  
  2. the first activity is to get dressed to leave for the lecture. A decision then has to be made, depending on the time available for the lecture to start, and the timings of the public trains (metra). If there is sufficient time to catch the train, then take the train; else, flag down a cab to the University. The final activity is to actually attend the lecture, after which the Activity diagram terminates.
  3. A possible activity diagram for processing an order.  The diagram shows the flow of actions in the system's workflow.  Once the order is received the activities split into two parallel sets of activities.  One side fills and sends the order while the other handles the billing.  On the Fill Order side, the method of delivery is decided conditionally.  Depending on the condition either the Overnight Delivery activity or the Regular Delivery activity is performed.  Finally the parallel activities combine to close the order. 
  4. First, you enter the dates. Once you submit your desired flight plan, you can enter your personal information and at the same time the system could be searching availability. The system flow then joins back into one and you can select the specific flight on the dates you want to fly. This activity diagram gives you two different paths dependent on whether you are using reward points. After entering payment information, the system performs two processes at the same time and then sends out a confirmation email.
  5. The activity diagram shows a typical event or class registration process for a client. This diagram uses notes to give more details about the initial and final states. After filling out the registration form, the client submits the form to a validation loop that is represented as a decision in the flow. If the information is correct, the system creates an account for the client and lets the client know about the creation of the account.