SlideShare una empresa de Scribd logo
1 de 18
Descargar para leer sin conexión
Inmet’s Balboa Copper Gold Discovery
        June 1st, 2011 Webcast

“Balboa grades and copper gold ratios are
  getting significantly better at depth”
2
Colina
 Cobre Panama Resources 2010                                                                        Botija



                        Measured and Indicated
                        Resources*

                        Inferred
                        Resources*
            * from 2010 FEED report

                                                            Valle Grande

                                million      Cu      Au          Ag        Mo    Cu Eq      Cu           Au       Cu Eq
                                tonnes       (%)    (g/t)       (g/t)      (%)   (%)(a)   (b lbs)      (m ozs)   (b lbs)(a)
       Proven                    245         0.59   0.14        1.61    0.010    0.70      3.2           1.1        3.8
       Probable                  1,897       0.39   0.06        1.41    0.007    0.46      16.3          3.7       19.1
 Proven and probable*            2,143       0.41   0.07        1.43    0.008    0.49      19.5          4.8       23.1

                                million      Cu      Au          Ag        Mo    Cu Eq      Cu           Au       Cu Eq
                                tonnes       (%)    (g/t)       (g/t)      (%)    (%)     (b lbs)      (m ozs)    (b lbs)
      Measured                   261         0.56   0.13        1.5     0.009     0.67     3.2           1.1        3.8
       Indicated                 3,010       0.34   0.06        1.2     0.006     0.40     22.6          5.8       26.6
Measured and indicated           3,271       0.36   0.06        1.3     0.007     0.43     25.8          6.9       30.7
       Inferred                  3,194       0.24   0.04        1.0     0.005     0.29     16.9          4.1       20.2
Cu P+P Reserves   Cu Eq P+P Reserves


                                       4
5
Measured &




  BALBOA
DISCOVERY



            Second Crusher Site   Plant Site
                                               Botija Crusher Site




                                                                             6
Holes previously reported

                             New holes



0.95 % Cu and 0.43 g/t Au (1.3 % CuEq)(b)
over 200 m




2.32 % Cu and 2.28 g/t Au (3.9 % CuEq)(b)
over 124 m


                                                         7
W                                                                             0.39% Cu
                                                                              0.11 g/t Au
                                                                                                     0.26% Cu
                                                                                                     0.07 g/t Au
                                                                                                      -------------
                                                                                                                                    E
                                                                                                        221 m
                                                                               -------------
                                                                                 317 m

                                                            0.55% Cu
                                                            0.19 g/t Au
                     0.41% Cu              0.49% Cu          -------------                                            0.63% Cu
                     0.06 g/t Au           0.14 g/t Au         277 m                                                  0.24g/t Au
                      -------------         -------------                                         0.85% Cu               37 m
                        317 m                 313 m                                              0.26 g/t Au
                                                                                                    36 m


                                                                              0.92% Cu
1.41% Cu                                                                     0.40 g/t Au
1.29 g/t Au                                                                     113 m
 -------------
   222 m
                                       0.61% Cu
                                                             0.67% Cu
                                      0.11 g/t Au
                                                            0.21 g/t Au
                                         108 m
                                                               196m


                  2.32% Cu
                 2.28 g/t Au
                    124 m                                                                                                          > 0.50% Cu


                                              0                      200                       400                                 > 0.15% Cu

                                                                  metres

                                                                                                                                         8
S                                                                                                              N
                          0.45% Cu
                          0.04 g/t Au
                           -------------
    0.41% Cu                 455 m
    0.06 g/t Au                                          0.65% Cu
     -------------                                       0.26 g/t Au
       317 m                                              -------------
                                                            364 m
                                                                           0.30% Cu
                                                                           0.04 g/t Au
                                                                            -------------
                                                                              320 m
                                           0.58% Cu
                                           0.05 g/t Au
                     0.61% Cu                239 m
                     0.11 g/t Au
                       108 m




                                                                          0.95% Cu
                                                                          0.43 g/t Au
                                                                            200 m


                                                                                            0.54% Cu
                                                                                            0.09 g/t Au
                                                                                               32 m

                0               200                400                                                    > 0.50% Cu

                            metres                                                                        > 0.15% Cu
                                                                                                                   9
Intense stockworks




Classic A veins in porphyry   Bornite
                                        10
Contained      Contained      Contained
                Tonnes                                           (1)
Cu % Cutoff                    Cu %         Au g/t     Cu Eq %                Cu            Au            CuEq
               (millions)
                                                                       (billions lbs) (millions ozs) (billions lbs)
greater than
               500 to 600   0.40 to 0.50 0.15 to 0.19 0.50 to 0.60      4.4 to 6.6     2.4 to 3.6      5.5 to 8.2
    0.15

greater than
               300 to 360   0.55 to 0.65 0.20 to 0.30 0.70 to 0.85      3.6 to 5.4     2.1 to 3.2      4.5 to 6.7
    0.30

greater than
               130 to 170   0.80 to 1.00 0.40 to 0.50 1.00 to 1.30      2.4 to 3.6     1.8 to 2.7      3.0 to 5.0
    0.50



(1) Copper
         Equivalent calculated using US $2.25/lb Cu, US $1000/oz Au, US $13.50/lb Mo and US
$15.00/oz Ag and is not adjusted for metallurgical recoveries as these remain uncertain. The
formula used is as follows Cu Eq = Cu %+ (Au g/t x 0.65) + (Mo ppm / 1667) + (Ag g/t x 0.01)
(2) UnderNational Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-
101), these potential tonnage and grade estimates are conceptual in nature, as there has
been insufficient exploration to define a mineral resource, and it is uncertain if further
exploration will result in the targeted deposit being delineated as a mineral resource.
                                                                                                               11
Balboa Contour Plan Map
0.15% Cu cut-off
CuEq grade X thickness metres
                                12
Oyu Tolgoi                                   1.5
100 B lbs CuEq(c)                                km




Cobre Panama
  50+ B lbs
   CuEq(d)                                      1.5
Not including                                    km
                                   11 km
   Balboa

                    Hole CC11-10
     Pebble
160 B lbs CuEq(e)                               1.5
                                                 km



                                           13
14
Cu      Au
                                                  %       g/t

   First 10 year Feed in Current Mine Plan       0.55    0.11

0.30% Cu Cutoff Potential Mineralization Grade   0.60    0.25

                 Difference                      1.1 X   2.3 X




                                                                 15
16
17
18

Más contenido relacionado

Más de Dogger2000

Cobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanCobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanDogger2000
 
Cobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportCobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportDogger2000
 
2012 Inmet Presentation
2012 Inmet Presentation2012 Inmet Presentation
2012 Inmet PresentationDogger2000
 
Cobre Panama CR Commitment
Cobre Panama CR CommitmentCobre Panama CR Commitment
Cobre Panama CR CommitmentDogger2000
 
Inmet Presentation
Inmet PresentationInmet Presentation
Inmet PresentationDogger2000
 
Proyecto Cobre Panama
Proyecto Cobre PanamaProyecto Cobre Panama
Proyecto Cobre PanamaDogger2000
 
2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama Project2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama ProjectDogger2000
 

Más de Dogger2000 (7)

Cobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing PlanCobre Panama Basic Engineering & Financing Plan
Cobre Panama Basic Engineering & Financing Plan
 
Cobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary ReportCobre Panama Basic Engineering Summary Report
Cobre Panama Basic Engineering Summary Report
 
2012 Inmet Presentation
2012 Inmet Presentation2012 Inmet Presentation
2012 Inmet Presentation
 
Cobre Panama CR Commitment
Cobre Panama CR CommitmentCobre Panama CR Commitment
Cobre Panama CR Commitment
 
Inmet Presentation
Inmet PresentationInmet Presentation
Inmet Presentation
 
Proyecto Cobre Panama
Proyecto Cobre PanamaProyecto Cobre Panama
Proyecto Cobre Panama
 
2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama Project2010 Feed Study - Cobre Panama Project
2010 Feed Study - Cobre Panama Project
 

Último

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 

Último (20)

Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 

Balboa Copper Gold Discovery in Panama - June 2011

  • 1. Inmet’s Balboa Copper Gold Discovery June 1st, 2011 Webcast “Balboa grades and copper gold ratios are getting significantly better at depth”
  • 2. 2
  • 3. Colina Cobre Panama Resources 2010 Botija Measured and Indicated Resources* Inferred Resources* * from 2010 FEED report Valle Grande million Cu Au Ag Mo Cu Eq Cu Au Cu Eq tonnes (%) (g/t) (g/t) (%) (%)(a) (b lbs) (m ozs) (b lbs)(a) Proven 245 0.59 0.14 1.61 0.010 0.70 3.2 1.1 3.8 Probable 1,897 0.39 0.06 1.41 0.007 0.46 16.3 3.7 19.1 Proven and probable* 2,143 0.41 0.07 1.43 0.008 0.49 19.5 4.8 23.1 million Cu Au Ag Mo Cu Eq Cu Au Cu Eq tonnes (%) (g/t) (g/t) (%) (%) (b lbs) (m ozs) (b lbs) Measured 261 0.56 0.13 1.5 0.009 0.67 3.2 1.1 3.8 Indicated 3,010 0.34 0.06 1.2 0.006 0.40 22.6 5.8 26.6 Measured and indicated 3,271 0.36 0.06 1.3 0.007 0.43 25.8 6.9 30.7 Inferred 3,194 0.24 0.04 1.0 0.005 0.29 16.9 4.1 20.2
  • 4. Cu P+P Reserves Cu Eq P+P Reserves 4
  • 5. 5
  • 6. Measured & BALBOA DISCOVERY Second Crusher Site Plant Site Botija Crusher Site 6
  • 7. Holes previously reported New holes 0.95 % Cu and 0.43 g/t Au (1.3 % CuEq)(b) over 200 m 2.32 % Cu and 2.28 g/t Au (3.9 % CuEq)(b) over 124 m 7
  • 8. W 0.39% Cu 0.11 g/t Au 0.26% Cu 0.07 g/t Au ------------- E 221 m ------------- 317 m 0.55% Cu 0.19 g/t Au 0.41% Cu 0.49% Cu ------------- 0.63% Cu 0.06 g/t Au 0.14 g/t Au 277 m 0.24g/t Au ------------- ------------- 0.85% Cu 37 m 317 m 313 m 0.26 g/t Au 36 m 0.92% Cu 1.41% Cu 0.40 g/t Au 1.29 g/t Au 113 m ------------- 222 m 0.61% Cu 0.67% Cu 0.11 g/t Au 0.21 g/t Au 108 m 196m 2.32% Cu 2.28 g/t Au 124 m > 0.50% Cu 0 200 400 > 0.15% Cu metres 8
  • 9. S N 0.45% Cu 0.04 g/t Au ------------- 0.41% Cu 455 m 0.06 g/t Au 0.65% Cu ------------- 0.26 g/t Au 317 m ------------- 364 m 0.30% Cu 0.04 g/t Au ------------- 320 m 0.58% Cu 0.05 g/t Au 0.61% Cu 239 m 0.11 g/t Au 108 m 0.95% Cu 0.43 g/t Au 200 m 0.54% Cu 0.09 g/t Au 32 m 0 200 400 > 0.50% Cu metres > 0.15% Cu 9
  • 10. Intense stockworks Classic A veins in porphyry Bornite 10
  • 11. Contained Contained Contained Tonnes (1) Cu % Cutoff Cu % Au g/t Cu Eq % Cu Au CuEq (millions) (billions lbs) (millions ozs) (billions lbs) greater than 500 to 600 0.40 to 0.50 0.15 to 0.19 0.50 to 0.60 4.4 to 6.6 2.4 to 3.6 5.5 to 8.2 0.15 greater than 300 to 360 0.55 to 0.65 0.20 to 0.30 0.70 to 0.85 3.6 to 5.4 2.1 to 3.2 4.5 to 6.7 0.30 greater than 130 to 170 0.80 to 1.00 0.40 to 0.50 1.00 to 1.30 2.4 to 3.6 1.8 to 2.7 3.0 to 5.0 0.50 (1) Copper Equivalent calculated using US $2.25/lb Cu, US $1000/oz Au, US $13.50/lb Mo and US $15.00/oz Ag and is not adjusted for metallurgical recoveries as these remain uncertain. The formula used is as follows Cu Eq = Cu %+ (Au g/t x 0.65) + (Mo ppm / 1667) + (Ag g/t x 0.01) (2) UnderNational Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43- 101), these potential tonnage and grade estimates are conceptual in nature, as there has been insufficient exploration to define a mineral resource, and it is uncertain if further exploration will result in the targeted deposit being delineated as a mineral resource. 11
  • 12. Balboa Contour Plan Map 0.15% Cu cut-off CuEq grade X thickness metres 12
  • 13. Oyu Tolgoi 1.5 100 B lbs CuEq(c) km Cobre Panama 50+ B lbs CuEq(d) 1.5 Not including km 11 km Balboa Hole CC11-10 Pebble 160 B lbs CuEq(e) 1.5 km 13
  • 14. 14
  • 15. Cu Au % g/t First 10 year Feed in Current Mine Plan 0.55 0.11 0.30% Cu Cutoff Potential Mineralization Grade 0.60 0.25 Difference 1.1 X 2.3 X 15
  • 16. 16
  • 17. 17
  • 18. 18