Droisys is an internationally recognized leader helping mankind advance and businesses grow through cost effective technology. Our focus is on creating secure applications to simplify people’s lives so they become raving fans.
4. Definitions
Product Backlog
• User requirements ( stories )
• Prioritized by product owner
Sprint
• 1 to 4 weeks iterations
Sprint Backlog
• list of tasks that to be completed in a sprint
Sprint Planning Meeting
• Meet before every Sprint
• Break down stories into tasks
Daily Scrum Meeting
• Scrum Team Member meeting
• 15 minutes
4
7. Benefits
Scrum allows for better communication
Scrum helps with transparency
Scrum helps for quality
Scrum exposes existing problems and surfaces new problems as soon as they
come up.
Scrum helps to learn from the past
7
8. QA Process
Project Bug / issue tracker
Issues priority
Issues Status
15
10
Closed
5 Fix Not Confirmed
0 Open
High
Medium
Low
Critical
8
9. QA Process
Requirement gathering template
Requirement validation template
Code review process
Coding Guidelines and Standards
Configuration management tool
Unit test checklist
Casual analysis for quality improvement
Release note
Change request template
Etc.
9
10. Droisys Business continuity plan
• Work Locations
• Hardware & Software
• Configuration Management
• Resources
• Process Management and Auditing
• IT Security
1
0
11. Droisys Server’s and Version control system
• Win server (windows 2003 R2 Server )
Active directory
• Hyper-V (windows hyper-v 2008)
Alfresco & Bugzilla
SVN Backup server
Ubuntu server- OpenERP
• Firewall mgmt (Server 2003 R2)
• Symantec (Windows server 2008)
• Intranet App (Ubuntu server 8.04)
• SharePoint (Windows Server 2003 R2 )
• Buffalo NAS (Network Storage )
• Firewall (Sonic Wall)
1
1