This document outlines the process by which the US Army Corps of Engineers ERDC accepts projects over $50k from customers. It establishes that the PI works with the Lab Director to develop a proposal and PSWA form documenting the project scope and costs. If accepted, the PSWA and proposal are approved and funding can be accepted to develop a formal PMP and complete the work. If a project is outside ERDC's mission, the Director is notified to decline the work.
2. Purpose
Process
► USACE PMBP – Work Acceptance
► ERDC PROC 1000
PSWA
BUILDING STRONG® Innovative solutions for a safer, better world
3. This procedure establishes the process by
which U.S. Army Corps of Engineers
(USACE) ERDC will accept a project of
greater than $50K requested by a customer.
BUILDING STRONG® Innovative solutions for a safer, better world
5. PI initiates a draft proposal and forwards to
Lab Director designee
Lab Director designee will follow the same
guidelines as SWEPRS
<$500K Branch Chief
$500K-$1M Division Chief
>$1M Lab Director
BUILDING STRONG® Innovative solutions for a safer, better world
6. Lab Director designee makes final determination on
work scope/appropriateness for Lab’ and ERDC’s
mission and coordinates with other ERDC labs. (4)
If work is outside of ERDC’s mission, work request
and draft proposal sent to ERDC Director or
designee for final assessment and customer contact
to decline work.
BUILDING STRONG® Innovative solutions for a safer, better world
7. Lab Director designee
Determine appropriate agreements, i.e., MOA, MOU, Interagency Agreement, CRADA,
etc. working with Office of Counsel.
Coordinate with ERDC partners
Develop PDT
Determine all anticipated costs for work project
PSWA part 1 complete
Approves proposal for submission to Customer (SWEPRS)
BUILDING STRONG® Innovative solutions for a safer, better world
8. Upon notification by customer of intent to fund
If burden exemption is required, approval
must be obtained from the ERDC Director
PSWA part 2 completed, providing
documentation for actions and information
to this point
Lab management chain of command
approval of the completed proposal, and
documented in the completed PSWA,
provides authority to accept work and
funding.
BUILDING STRONG® Innovative solutions for a safer, better world
9. Lab Director designee
notifies the customer of
capability to perform
work, and notifies
responsible parties that
funding may be accepted
and programmed.
Once work and funds
acceptance has taken
place, formal Project
Management Plan (PMP)
will be developed from
PSWA information
BUILDING STRONG® Innovative solutions for a safer, better world
10. If proposed work is determined to be outside of the ERDC
mission, insufficient ERDC or ERDC-contracted resources are
available, or if no Agreement Document is available to provide
legal and agreeable authorities between the proposed
sponsoring agency and the ERDC, the ERDC Director or their
designee will be notified and provided the proposal and PWSA,
for determination to decline the work request. The ERDC
Director or designee will decline work request and notify
proposed sponsoring agency of this decision.
BUILDING STRONG® Innovative solutions for a safer, better world
11. A template incorporated into the ERDC Work
Acceptance process and PROC 1000 for
standardized documentation of initial data on
potential projects for acceptance.
BUILDING STRONG® Innovative solutions for a safer, better world
14. Add capability to include PSWA as an
attachment in SWEPRS
Determine overlap with PSWA/PMP/SOW and
determine ways to combine requirements to
minimize burden on team
Work with PSWA designer to improve form
BUILDING STRONG® Innovative solutions for a safer, better world
15. DPW-Vicksburg: Primary POC - Craig Prevost, Alternate
POC - Tony King, Generic email address -
DPWv@usace.army.mil
Safety-Primary POC: Jerry Haskins:
Jerry.W.Haskins@usace.army.mil, Alternate POC: John
Lindigrin: John.A.Lindigrin@usace.army.mil, Generic
email address(es): Safety@erdc.usace.army.mil
Security-Primary POC: Linda D. McGowan, Alternate
POC: Billy R. Crabtree, Email Address:
SecurityERDC@usace.army.mil
ERDC Contracting-Primary POC: Deannda Sontag,
Alternative POC: Greg Denman, Generic email address
(ContractERDC@usace.army.mil)
BUILDING STRONG® Innovative solutions for a safer, better world
16. Related Procedures
USACE PMBP – Work Acceptance
(PROC1000)
QMS Procedure for Request for Service
Contract Approval (Draft)
ERDC QMS 11500 Overhead Burden
Exemptions
BUILDING STRONG® Innovative solutions for a safer, better world
17. References
ERDC Standard Operating Procedure (SOP): Laboratory
Projects Statements of Work (CP 70-1-1), February 2012
The Geotechnical and Structures Laboratory (GSL) Project
Management Process Guide Project Management Guidance for
GSL Project Managers and Principal Investigators, November 2010
ER 5-1-10, Corps-Wide Areas of Work Responsibility
ER 5-1-11, U.S. Army Corps of Engineers Business Process
CR 37-1-4 SOP: Overhead Burden Exemptions
BUILDING STRONG® Innovative solutions for a safer, better world