 Purpose
 Process
      ► USACE       PMBP – Work Acceptance
      ► ERDC       PROC 1000

 PSWA




BUILDING STRONG®                      Innovative solutions for a safer, better world
 This procedure establishes the process by
  which U.S. Army Corps of Engineers
  (USACE) ERDC will accept a project of
  greater than $50K requested by a customer.




BUILDING STRONG®            Innovative solutions for a safer, better world
BUILDING STRONG®   Innovative solutions for a safer, better world
 PI initiates a draft proposal and forwards to
   Lab Director designee
  Lab Director designee will follow the same
   guidelines as SWEPRS
        <$500K Branch Chief
        $500K-$1M Division Chief
        >$1M Lab Director
BUILDING STRONG®               Innovative solutions for a safer, better world
 Lab Director designee makes final determination on
   work scope/appropriateness for Lab’ and ERDC’s
   mission and coordinates with other ERDC labs. (4)
  If work is outside of ERDC’s mission, work request
   and draft proposal sent to ERDC Director or
   designee for final assessment and customer contact
   to decline work.
BUILDING STRONG®                 Innovative solutions for a safer, better world
    Lab Director designee
          Determine appropriate agreements, i.e., MOA, MOU, Interagency Agreement, CRADA,
           etc. working with Office of Counsel.
          Coordinate with ERDC partners
          Develop PDT
          Determine all anticipated costs for work project
          PSWA part 1 complete
          Approves proposal for submission to Customer (SWEPRS)

BUILDING STRONG®                                              Innovative solutions for a safer, better world
 Upon notification by customer of intent to fund
    If burden exemption is required, approval
     must be obtained from the ERDC Director
    PSWA part 2 completed, providing
     documentation for actions and information
     to this point
    Lab management chain of command
     approval of the completed proposal, and
     documented in the completed PSWA,
     provides authority to accept work and
     funding.

 BUILDING STRONG®                          Innovative solutions for a safer, better world
 Lab Director designee
    notifies the customer of
    capability to perform
    work, and notifies
    responsible parties that
    funding may be accepted
    and programmed.
   Once work and funds
    acceptance has taken
    place, formal Project
    Management Plan (PMP)
    will be developed from
    PSWA information
BUILDING STRONG®               Innovative solutions for a safer, better world
   If proposed work is determined to be outside of the ERDC
          mission, insufficient ERDC or ERDC-contracted resources are
          available, or if no Agreement Document is available to provide
          legal and agreeable authorities between the proposed
          sponsoring agency and the ERDC, the ERDC Director or their
          designee will be notified and provided the proposal and PWSA,
          for determination to decline the work request. The ERDC
          Director or designee will decline work request and notify
          proposed sponsoring agency of this decision.

BUILDING STRONG®                               Innovative solutions for a safer, better world
 A template incorporated into the ERDC Work
  Acceptance process and PROC 1000 for
  standardized documentation of initial data on
  potential projects for acceptance.




BUILDING STRONG®             Innovative solutions for a safer, better world
BUILDING STRONG®   Innovative solutions for a safer, better world
 https://team.usace.army.mil/sites/ERDC/PDT/
  pswa/default.aspx




BUILDING STRONG®            Innovative solutions for a safer, better world
 Add capability to include PSWA as an
  attachment in SWEPRS
 Determine overlap with PSWA/PMP/SOW and
  determine ways to combine requirements to
  minimize burden on team
 Work with PSWA designer to improve form




BUILDING STRONG®            Innovative solutions for a safer, better world
 DPW-Vicksburg: Primary POC - Craig Prevost, Alternate
  POC - Tony King, Generic email address -
  DPWv@usace.army.mil
 Safety-Primary POC: Jerry Haskins:
  Jerry.W.Haskins@usace.army.mil, Alternate POC: John
  Lindigrin: John.A.Lindigrin@usace.army.mil, Generic
  email address(es): Safety@erdc.usace.army.mil
 Security-Primary POC: Linda D. McGowan, Alternate
  POC: Billy R. Crabtree, Email Address:
  SecurityERDC@usace.army.mil
 ERDC Contracting-Primary POC: Deannda Sontag,
  Alternative POC: Greg Denman, Generic email address
  (ContractERDC@usace.army.mil)
BUILDING STRONG®                  Innovative solutions for a safer, better world
Related Procedures

       USACE PMBP – Work Acceptance
      (PROC1000)

      QMS Procedure for Request for Service
      Contract Approval (Draft)

      ERDC QMS 11500 Overhead Burden
      Exemptions



BUILDING STRONG®               Innovative solutions for a safer, better world
References

       ERDC Standard Operating Procedure (SOP): Laboratory
      Projects Statements of Work (CP 70-1-1), February 2012

       The Geotechnical and Structures Laboratory (GSL) Project
      Management Process Guide Project Management Guidance for
      GSL Project Managers and Principal Investigators, November 2010

      ER 5-1-10, Corps-Wide Areas of Work Responsibility

      ER 5-1-11, U.S. Army Corps of Engineers Business Process

      CR 37-1-4 SOP: Overhead Burden Exemptions



BUILDING STRONG®                           Innovative solutions for a safer, better world
Questions




BUILDING STRONG®           Innovative solutions for a safer, better world

Más contenido relacionado

La actualidad más candente

CBSbutler Defence Overview
CBSbutler Defence OverviewCBSbutler Defence Overview
CBSbutler Defence OverviewRRENDELL
 
SOY Presentation-2016
SOY Presentation-2016SOY Presentation-2016
SOY Presentation-2016Eric Wong
 
Hydrogen - Power Division
Hydrogen - Power DivisionHydrogen - Power Division
Hydrogen - Power Divisionlpeters00
 
Newsletter_CovDev
Newsletter_CovDevNewsletter_CovDev
Newsletter_CovDevdCORE
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?ARMS Reliability
 
SgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering ConsultantSgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering ConsultantSgurrEnergyIndia
 
Jacobs CQV leadership
Jacobs CQV leadershipJacobs CQV leadership
Jacobs CQV leadershipDavid Tyrrell
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting BrochureAlessaquanta
 
Executiveprofilelsnowden
ExecutiveprofilelsnowdenExecutiveprofilelsnowden
ExecutiveprofilelsnowdenLaird Snowden
 
EMC PROFILE UPDATED (25-11-2015)_opt
EMC PROFILE UPDATED (25-11-2015)_optEMC PROFILE UPDATED (25-11-2015)_opt
EMC PROFILE UPDATED (25-11-2015)_optIbrahim Saeed
 
The SustainX Story
The SustainX StoryThe SustainX Story
The SustainX StoryDax Kepshire
 
Charlie Williams Resume 2015
Charlie Williams Resume 2015Charlie Williams Resume 2015
Charlie Williams Resume 2015Charlie Williams
 
Czero Engineering May 2011
Czero Engineering May 2011Czero Engineering May 2011
Czero Engineering May 2011Czero
 
Patrick Solomon Resume SAMPLE
Patrick Solomon Resume SAMPLEPatrick Solomon Resume SAMPLE
Patrick Solomon Resume SAMPLEPatrick Solomon
 

La actualidad más candente (20)

CBSbutler Defence Overview
CBSbutler Defence OverviewCBSbutler Defence Overview
CBSbutler Defence Overview
 
SOY Presentation-2016
SOY Presentation-2016SOY Presentation-2016
SOY Presentation-2016
 
Hydrogen - Power Division
Hydrogen - Power DivisionHydrogen - Power Division
Hydrogen - Power Division
 
Newsletter_CovDev
Newsletter_CovDevNewsletter_CovDev
Newsletter_CovDev
 
Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?Root Cause Analysis - When is a problem not a problem?
Root Cause Analysis - When is a problem not a problem?
 
SgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering ConsultantSgurrEnergy India - Leading Global Solar Engineering Consultant
SgurrEnergy India - Leading Global Solar Engineering Consultant
 
Jacobs CQV leadership
Jacobs CQV leadershipJacobs CQV leadership
Jacobs CQV leadership
 
jsm_resume
jsm_resumejsm_resume
jsm_resume
 
Veeraragavan-CV
Veeraragavan-CVVeeraragavan-CV
Veeraragavan-CV
 
Quanta Consulting Brochure
Quanta Consulting BrochureQuanta Consulting Brochure
Quanta Consulting Brochure
 
Cregannatactx
CregannatactxCregannatactx
Cregannatactx
 
Executiveprofilelsnowden
ExecutiveprofilelsnowdenExecutiveprofilelsnowden
Executiveprofilelsnowden
 
AllGen Profile 2016
AllGen Profile 2016AllGen Profile 2016
AllGen Profile 2016
 
Ianquinn
IanquinnIanquinn
Ianquinn
 
EMC PROFILE UPDATED (25-11-2015)_opt
EMC PROFILE UPDATED (25-11-2015)_optEMC PROFILE UPDATED (25-11-2015)_opt
EMC PROFILE UPDATED (25-11-2015)_opt
 
The SustainX Story
The SustainX StoryThe SustainX Story
The SustainX Story
 
Charlie Williams Resume 2015
Charlie Williams Resume 2015Charlie Williams Resume 2015
Charlie Williams Resume 2015
 
Czero Engineering May 2011
Czero Engineering May 2011Czero Engineering May 2011
Czero Engineering May 2011
 
Patrick Solomon Resume SAMPLE
Patrick Solomon Resume SAMPLEPatrick Solomon Resume SAMPLE
Patrick Solomon Resume SAMPLE
 
Chitnis Brochure
Chitnis BrochureChitnis Brochure
Chitnis Brochure
 

Destacado

Corcoran Seasonal Tree
Corcoran Seasonal TreeCorcoran Seasonal Tree
Corcoran Seasonal TreeERDC-GSL
 
Turkey trot 2012
Turkey trot 2012Turkey trot 2012
Turkey trot 2012ERDC-GSL
 
Fy12 studentsurveyfactsheet
Fy12 studentsurveyfactsheetFy12 studentsurveyfactsheet
Fy12 studentsurveyfactsheetERDC-GSL
 
Brochure Fall 2012
Brochure Fall 2012Brochure Fall 2012
Brochure Fall 2012ERDC-GSL
 
Un monde multipolire et des pôles de stabilité
Un monde multipolire et des pôles de stabilitéUn monde multipolire et des pôles de stabilité
Un monde multipolire et des pôles de stabilitéKclassroom
 
Summer 2013 brochure
Summer 2013 brochureSummer 2013 brochure
Summer 2013 brochureERDC-GSL
 
Mar 14 stem message
Mar 14  stem messageMar 14  stem message
Mar 14 stem messageERDC-GSL
 

Destacado (7)

Corcoran Seasonal Tree
Corcoran Seasonal TreeCorcoran Seasonal Tree
Corcoran Seasonal Tree
 
Turkey trot 2012
Turkey trot 2012Turkey trot 2012
Turkey trot 2012
 
Fy12 studentsurveyfactsheet
Fy12 studentsurveyfactsheetFy12 studentsurveyfactsheet
Fy12 studentsurveyfactsheet
 
Brochure Fall 2012
Brochure Fall 2012Brochure Fall 2012
Brochure Fall 2012
 
Un monde multipolire et des pôles de stabilité
Un monde multipolire et des pôles de stabilitéUn monde multipolire et des pôles de stabilité
Un monde multipolire et des pôles de stabilité
 
Summer 2013 brochure
Summer 2013 brochureSummer 2013 brochure
Summer 2013 brochure
 
Mar 14 stem message
Mar 14  stem messageMar 14  stem message
Mar 14 stem message
 

Similar a Work acceptancejan2013

Petrucci, helen resume 2012 paiii
Petrucci, helen resume 2012 paiiiPetrucci, helen resume 2012 paiii
Petrucci, helen resume 2012 paiiiHelenM64
 
Court 2009 transforming traditional m&e construction into a modern process of...
Court 2009 transforming traditional m&e construction into a modern process of...Court 2009 transforming traditional m&e construction into a modern process of...
Court 2009 transforming traditional m&e construction into a modern process of...Paul Ebbs
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdcAvi Grigorescu
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesAconex
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017Clemmie Crocker
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015ramiz reyad
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi
 
Resume_of_Christopher_Baker_SH_v1
Resume_of_Christopher_Baker_SH_v1Resume_of_Christopher_Baker_SH_v1
Resume_of_Christopher_Baker_SH_v1Chris Baker
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair
 

Similar a Work acceptancejan2013 (20)

My CV 09-07-15
My CV 09-07-15My CV 09-07-15
My CV 09-07-15
 
Petrucci, helen resume 2012 paiii
Petrucci, helen resume 2012 paiiiPetrucci, helen resume 2012 paiii
Petrucci, helen resume 2012 paiii
 
SPEC Process Engineering&Construction
SPEC Process Engineering&ConstructionSPEC Process Engineering&Construction
SPEC Process Engineering&Construction
 
Court 2009 transforming traditional m&e construction into a modern process of...
Court 2009 transforming traditional m&e construction into a modern process of...Court 2009 transforming traditional m&e construction into a modern process of...
Court 2009 transforming traditional m&e construction into a modern process of...
 
CV Claire McCann
CV Claire McCannCV Claire McCann
CV Claire McCann
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
Keep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slidesKeep your project moving with aconex contract administration webinar slides
Keep your project moving with aconex contract administration webinar slides
 
Centerre Brochure
Centerre BrochureCenterre Brochure
Centerre Brochure
 
My CV
My CVMy CV
My CV
 
PROPOSAL_FINAL
PROPOSAL_FINALPROPOSAL_FINAL
PROPOSAL_FINAL
 
Dwayne Davis resume June 2016
Dwayne Davis resume June 2016Dwayne Davis resume June 2016
Dwayne Davis resume June 2016
 
John Scrowston CV v11
John Scrowston CV v11John Scrowston CV v11
John Scrowston CV v11
 
Clemmie Crocker Resume 2-10-2017
Clemmie Crocker Resume  2-10-2017Clemmie Crocker Resume  2-10-2017
Clemmie Crocker Resume 2-10-2017
 
REEP[1]
REEP[1]REEP[1]
REEP[1]
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf8-koi_Construction & Design Engineering_20240209.pdf
8-koi_Construction & Design Engineering_20240209.pdf
 
CV17
CV17CV17
CV17
 
Resume_of_Christopher_Baker_SH_v1
Resume_of_Christopher_Baker_SH_v1Resume_of_Christopher_Baker_SH_v1
Resume_of_Christopher_Baker_SH_v1
 
John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15John Sinclair III Resume 2-18-15
John Sinclair III Resume 2-18-15
 
Kannan PEM
Kannan PEMKannan PEM
Kannan PEM
 

Más de ERDC-GSL

Hispanic Heritage
Hispanic HeritageHispanic Heritage
Hispanic HeritageERDC-GSL
 
Hh month 2010
Hh month 2010Hh month 2010
Hh month 2010ERDC-GSL
 
Corps day 2012 activity details
Corps day 2012 activity detailsCorps day 2012 activity details
Corps day 2012 activity detailsERDC-GSL
 
Gems balloon launch photos
Gems balloon launch photosGems balloon launch photos
Gems balloon launch photosERDC-GSL
 
Welcome to the Knowledge Hub
Welcome to the Knowledge HubWelcome to the Knowledge Hub
Welcome to the Knowledge HubERDC-GSL
 
Best Dates to Retire in 2013
Best Dates to Retire in 2013Best Dates to Retire in 2013
Best Dates to Retire in 2013ERDC-GSL
 
Lights, camera, action!
Lights, camera, action! Lights, camera, action!
Lights, camera, action! ERDC-GSL
 
GSLingo January 2012
GSLingo January 2012GSLingo January 2012
GSLingo January 2012ERDC-GSL
 
Setting up grammatical review
Setting up grammatical reviewSetting up grammatical review
Setting up grammatical reviewERDC-GSL
 
GSLingo October 2011
GSLingo October 2011GSLingo October 2011
GSLingo October 2011ERDC-GSL
 

Más de ERDC-GSL (10)

Hispanic Heritage
Hispanic HeritageHispanic Heritage
Hispanic Heritage
 
Hh month 2010
Hh month 2010Hh month 2010
Hh month 2010
 
Corps day 2012 activity details
Corps day 2012 activity detailsCorps day 2012 activity details
Corps day 2012 activity details
 
Gems balloon launch photos
Gems balloon launch photosGems balloon launch photos
Gems balloon launch photos
 
Welcome to the Knowledge Hub
Welcome to the Knowledge HubWelcome to the Knowledge Hub
Welcome to the Knowledge Hub
 
Best Dates to Retire in 2013
Best Dates to Retire in 2013Best Dates to Retire in 2013
Best Dates to Retire in 2013
 
Lights, camera, action!
Lights, camera, action! Lights, camera, action!
Lights, camera, action!
 
GSLingo January 2012
GSLingo January 2012GSLingo January 2012
GSLingo January 2012
 
Setting up grammatical review
Setting up grammatical reviewSetting up grammatical review
Setting up grammatical review
 
GSLingo October 2011
GSLingo October 2011GSLingo October 2011
GSLingo October 2011
 

Work acceptancejan2013

  • 1. + US Army Corps of Engineers BUILDING STRONG®
  • 2.  Purpose  Process ► USACE PMBP – Work Acceptance ► ERDC PROC 1000  PSWA BUILDING STRONG® Innovative solutions for a safer, better world
  • 3.  This procedure establishes the process by which U.S. Army Corps of Engineers (USACE) ERDC will accept a project of greater than $50K requested by a customer. BUILDING STRONG® Innovative solutions for a safer, better world
  • 4. BUILDING STRONG® Innovative solutions for a safer, better world
  • 5.  PI initiates a draft proposal and forwards to Lab Director designee  Lab Director designee will follow the same guidelines as SWEPRS  <$500K Branch Chief  $500K-$1M Division Chief  >$1M Lab Director BUILDING STRONG® Innovative solutions for a safer, better world
  • 6.  Lab Director designee makes final determination on work scope/appropriateness for Lab’ and ERDC’s mission and coordinates with other ERDC labs. (4)  If work is outside of ERDC’s mission, work request and draft proposal sent to ERDC Director or designee for final assessment and customer contact to decline work. BUILDING STRONG® Innovative solutions for a safer, better world
  • 7. Lab Director designee  Determine appropriate agreements, i.e., MOA, MOU, Interagency Agreement, CRADA, etc. working with Office of Counsel.  Coordinate with ERDC partners  Develop PDT  Determine all anticipated costs for work project  PSWA part 1 complete  Approves proposal for submission to Customer (SWEPRS) BUILDING STRONG® Innovative solutions for a safer, better world
  • 8.  Upon notification by customer of intent to fund  If burden exemption is required, approval must be obtained from the ERDC Director  PSWA part 2 completed, providing documentation for actions and information to this point  Lab management chain of command approval of the completed proposal, and documented in the completed PSWA, provides authority to accept work and funding. BUILDING STRONG® Innovative solutions for a safer, better world
  • 9.  Lab Director designee notifies the customer of capability to perform work, and notifies responsible parties that funding may be accepted and programmed.  Once work and funds acceptance has taken place, formal Project Management Plan (PMP) will be developed from PSWA information BUILDING STRONG® Innovative solutions for a safer, better world
  • 10. If proposed work is determined to be outside of the ERDC mission, insufficient ERDC or ERDC-contracted resources are available, or if no Agreement Document is available to provide legal and agreeable authorities between the proposed sponsoring agency and the ERDC, the ERDC Director or their designee will be notified and provided the proposal and PWSA, for determination to decline the work request. The ERDC Director or designee will decline work request and notify proposed sponsoring agency of this decision. BUILDING STRONG® Innovative solutions for a safer, better world
  • 11.  A template incorporated into the ERDC Work Acceptance process and PROC 1000 for standardized documentation of initial data on potential projects for acceptance. BUILDING STRONG® Innovative solutions for a safer, better world
  • 12. BUILDING STRONG® Innovative solutions for a safer, better world
  • 13.  https://team.usace.army.mil/sites/ERDC/PDT/ pswa/default.aspx BUILDING STRONG® Innovative solutions for a safer, better world
  • 14.  Add capability to include PSWA as an attachment in SWEPRS  Determine overlap with PSWA/PMP/SOW and determine ways to combine requirements to minimize burden on team  Work with PSWA designer to improve form BUILDING STRONG® Innovative solutions for a safer, better world
  • 15.  DPW-Vicksburg: Primary POC - Craig Prevost, Alternate POC - Tony King, Generic email address - DPWv@usace.army.mil  Safety-Primary POC: Jerry Haskins: Jerry.W.Haskins@usace.army.mil, Alternate POC: John Lindigrin: John.A.Lindigrin@usace.army.mil, Generic email address(es): Safety@erdc.usace.army.mil  Security-Primary POC: Linda D. McGowan, Alternate POC: Billy R. Crabtree, Email Address: SecurityERDC@usace.army.mil  ERDC Contracting-Primary POC: Deannda Sontag, Alternative POC: Greg Denman, Generic email address (ContractERDC@usace.army.mil) BUILDING STRONG® Innovative solutions for a safer, better world
  • 16. Related Procedures  USACE PMBP – Work Acceptance (PROC1000) QMS Procedure for Request for Service Contract Approval (Draft) ERDC QMS 11500 Overhead Burden Exemptions BUILDING STRONG® Innovative solutions for a safer, better world
  • 17. References  ERDC Standard Operating Procedure (SOP): Laboratory Projects Statements of Work (CP 70-1-1), February 2012  The Geotechnical and Structures Laboratory (GSL) Project Management Process Guide Project Management Guidance for GSL Project Managers and Principal Investigators, November 2010 ER 5-1-10, Corps-Wide Areas of Work Responsibility ER 5-1-11, U.S. Army Corps of Engineers Business Process CR 37-1-4 SOP: Overhead Burden Exemptions BUILDING STRONG® Innovative solutions for a safer, better world
  • 18. Questions BUILDING STRONG® Innovative solutions for a safer, better world