1. Project title: Construction of the ‘ & Safe’
2. Location: The project is situated in Taylor’s Lakeside University, just beside the block
D staircase where it’s near the Design studio and also beside the car park near the
basketball and futsal court. It is a piece of land with area ( plans and pics )
Our site
3. Sector: Entertainment and Guard house
4. State of preparation: Project aim: The aim of this project is to create a better student
life center, café and also security guard house. A better student life center would help
students to relax themselves whenever they need to. Café allows students to chill while
waiting or having a meeting. Not only that, the security guard house can also provide a
higher security level to protect students, making the students feel safe.
5. Project background: This project is to make use of unused land and enhance it to
make it better and more useful
6. Project justification: Once completed, this building would help to:
a. Provide a place for students to relax
With the facilities in the student central at the first floor and also café at the ground
floor, students will get to enjoy their time whenever they are free and wish to chill a
little. That will be the best place to do so.
b. Increase the security level
In Taylor’s Lakeside University, there are a lot of parking and that makes student walk
very far to their classes. Of course, most of the students do stay back until night time or
even later to finish up their work, so it is dangerous to walk alone to the car park.
Planning the guard house at the third level gives the guards a good vision at the car
parks.
c. Increase in number of students
With all these great facilities and also high security level, I believe parents are most
likely to send their children to Taylor’s Lakeside University to further their studies.
7. Project objective:
- Improve the security level
- Create a place for students to relax
- A better student central
- To make full use of that piece of land
8. Project description: The works shall be executed in an area of ( ) and shall
comprise:
- Earthworks
- Construction of pillar to support the balcony at the first floor
- Drainage works
- Construction of 3 floor high building
9. Project merits: Once completed, the project would help to:
- Avoid from bad cases fromhappening
- Provide safety to students while leaving school
- Give students to enjoy their breakfast or lunch at the cafe
10. Cost estimate: xxxxx
11. Duration: xxxxxx
12. Needs for technical assistance: Assistance to the Project Owner for the award of
contracts and monitoring of execution works.
13. Problems and proposed actions: Secure relevant financing and issue the relevant
invitations to tender.
14. Current situation of project: The construction works has not started yet as would
probably start in January 2014
15. Hypothesis/Risks:
- Controllable environmental risks.
16. Environmental categorisation: This project is listed as
17. Actions required for the execution of project:
Contact information:

Más contenido relacionado

Destacado

Building plan approval oksodasdasd
Building plan approval oksodasdasdBuilding plan approval oksodasdasd
Building plan approval oksodasdasdEelyn Cheong
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part BPang Shuen
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final ProjectPeishann97
 
CL Final Assignment Report Part A
 CL Final Assignment Report Part A CL Final Assignment Report Part A
CL Final Assignment Report Part APang Shuen
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscapingTeck Wei
 

Destacado (8)

Building plan approval oksodasdasd
Building plan approval oksodasdasdBuilding plan approval oksodasdasd
Building plan approval oksodasdasd
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
 
ICI Final Project
ICI Final ProjectICI Final Project
ICI Final Project
 
Building process
Building  processBuilding  process
Building process
 
CL Final Assignment Report Part A
 CL Final Assignment Report Part A CL Final Assignment Report Part A
CL Final Assignment Report Part A
 
ICI FINAL
ICI FINALICI FINAL
ICI FINAL
 
Ici final pdf
Ici final  pdfIci final  pdf
Ici final pdf
 
Company profile tw landscaping
Company profile tw landscapingCompany profile tw landscaping
Company profile tw landscaping
 

Similar a Project brief

Project brief
Project briefProject brief
Project briefszelun
 
Project brief
Project briefProject brief
Project briefkerneng
 
Site visit report
Site visit reportSite visit report
Site visit reportwleying
 
Project brief
Project brief Project brief
Project brief Haziq1511
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential areaJamie Lee
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compiledddDarrenTofu
 
bqs Site report
bqs Site reportbqs Site report
bqs Site reportFelix Vong
 
Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)Rohan Dasgupta
 
ARCH122 PLATE 3_ay2019.pdf
ARCH122 PLATE 3_ay2019.pdfARCH122 PLATE 3_ay2019.pdf
ARCH122 PLATE 3_ay2019.pdfMardzzJumuad
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)DarrenTofu
 

Similar a Project brief (20)

Project brief
Project briefProject brief
Project brief
 
Project brief
Project briefProject brief
Project brief
 
Project brief
Project briefProject brief
Project brief
 
Project brief
Project briefProject brief
Project brief
 
Group Component
Group ComponentGroup Component
Group Component
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Project brief
Project brief Project brief
Project brief
 
Proposal of residential area
Proposal of residential areaProposal of residential area
Proposal of residential area
 
Project Name
 Project Name                                       Project Name
Project Name
 
1.P-Zone Charter
1.P-Zone Charter1.P-Zone Charter
1.P-Zone Charter
 
Ici report (1)
Ici report (1)Ici report (1)
Ici report (1)
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
Project brief
Project briefProject brief
Project brief
 
Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)Principles of Planning of School (Public Building)
Principles of Planning of School (Public Building)
 
Ici report
Ici reportIci report
Ici report
 
ARCH122 PLATE 3_ay2019.pdf
ARCH122 PLATE 3_ay2019.pdfARCH122 PLATE 3_ay2019.pdf
ARCH122 PLATE 3_ay2019.pdf
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 

Más de Eelyn Cheong

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Eelyn Cheong
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete printEelyn Cheong
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to printEelyn Cheong
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposalEelyn Cheong
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Eelyn Cheong
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Eelyn Cheong
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businessesEelyn Cheong
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888Eelyn Cheong
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888Eelyn Cheong
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888Eelyn Cheong
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888Eelyn Cheong
 

Más de Eelyn Cheong (20)

Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01Mathanalyse 140213082023-phpapp01
Mathanalyse 140213082023-phpapp01
 
Psy final report
Psy final reportPsy final report
Psy final report
 
Psy journal 02 complete print
Psy journal 02 complete printPsy journal 02 complete print
Psy journal 02 complete print
 
Psy ready to print
Psy ready to printPsy ready to print
Psy ready to print
 
Psy research proposal
Psy research proposalPsy research proposal
Psy research proposal
 
Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02Penangbiscuits 140128145447-phpapp02
Penangbiscuits 140128145447-phpapp02
 
Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02Latestbusinesspowerpoint 140215075604-phpapp02
Latestbusinesspowerpoint 140215075604-phpapp02
 
A comparative analysis of businesses
A comparative analysis of businessesA comparative analysis of businesses
A comparative analysis of businesses
 
Animated films done888888888
Animated films done888888888Animated films done888888888
Animated films done888888888
 
The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888The hidden love in the lip 8888888888888888888888888888888888888888888888888
The hidden love in the lip 8888888888888888888888888888888888888888888888888
 
20 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation88888888888820 nov 13 cnc presentation888888888888
20 nov 13 cnc presentation888888888888
 
The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888The man in the iron mask.pptxxxxxxxxxx.pptx888888
The man in the iron mask.pptxxxxxxxxxx.pptx888888
 
Cnc p2 meeting
Cnc p2 meetingCnc p2 meeting
Cnc p2 meeting
 
Ici
IciIci
Ici
 
Ecsy card
Ecsy cardEcsy card
Ecsy card
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 
Ecs ycomprofile
Ecs ycomprofileEcs ycomprofile
Ecs ycomprofile
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Tj0111111
Tj0111111Tj0111111
Tj0111111
 
Ecsy envelope
Ecsy envelopeEcsy envelope
Ecsy envelope
 

Project brief

  • 1. PROJECT BRIEF 1. Project title: Construction of the ‘ & Safe’ 2. Location: The project is situated in Taylor’s Lakeside University, just beside the block D staircase where it’s near the Design studio and also beside the car park near the basketball and futsal court. It is a piece of land with area ( plans and pics ) Our site 3. Sector: Entertainment and Guard house 4. State of preparation: Project aim: The aim of this project is to create a better student life center, café and also security guard house. A better student life center would help students to relax themselves whenever they need to. Café allows students to chill while waiting or having a meeting. Not only that, the security guard house can also provide a higher security level to protect students, making the students feel safe. 5. Project background: This project is to make use of unused land and enhance it to make it better and more useful 6. Project justification: Once completed, this building would help to: a. Provide a place for students to relax With the facilities in the student central at the first floor and also café at the ground floor, students will get to enjoy their time whenever they are free and wish to chill a little. That will be the best place to do so. b. Increase the security level In Taylor’s Lakeside University, there are a lot of parking and that makes student walk very far to their classes. Of course, most of the students do stay back until night time or even later to finish up their work, so it is dangerous to walk alone to the car park. Planning the guard house at the third level gives the guards a good vision at the car parks.
  • 2. c. Increase in number of students With all these great facilities and also high security level, I believe parents are most likely to send their children to Taylor’s Lakeside University to further their studies. 7. Project objective: - Improve the security level - Create a place for students to relax - A better student central - To make full use of that piece of land 8. Project description: The works shall be executed in an area of ( ) and shall comprise: - Earthworks - Construction of pillar to support the balcony at the first floor - Drainage works - Construction of 3 floor high building 9. Project merits: Once completed, the project would help to: - Avoid from bad cases fromhappening - Provide safety to students while leaving school - Give students to enjoy their breakfast or lunch at the cafe 10. Cost estimate: xxxxx 11. Duration: xxxxxx 12. Needs for technical assistance: Assistance to the Project Owner for the award of contracts and monitoring of execution works. 13. Problems and proposed actions: Secure relevant financing and issue the relevant invitations to tender. 14. Current situation of project: The construction works has not started yet as would probably start in January 2014 15. Hypothesis/Risks:
  • 3. - Controllable environmental risks. 16. Environmental categorisation: This project is listed as 17. Actions required for the execution of project: Contact information: