DeltaV Version 10.3.1
 Upgrade in 24hrs
  Version 8.4.2 – Version 10.3.1
Presenters

 Gus Dionne, Automation ARI
 Dan DiMatteo, IS ARI
 Josh Gangl, OIS Platform Lead




 David Maglaya, Emerson LBP
Introduction
             DeltaV Version Upgrade
   Planning the Upgrade
    – Objectives, Deliverables, Schedule, Resources
   Executing the Plan
    – Developing a Team, Direct and Manage the Execution
   Monitoring and Controlling
    – Verify scope, Integrate Changes
   Closing the Project
    – Lessons Learned


   These are all requirements of a successful upgrade.
ARI Mfg. Site 75 Acre Footprint
  At a site of this size, planning is key to success
Planning and Defining Our Scope

   Our goal was to upgrade two (2) DeltaV Systems with
   minimum impact to users
   Our constraints were Time (24hrs) , Resources, and
   Space
   We needed to upgrade not only the Software Application
   but we needed to upgrade most of the hardware that it
   would run on
   And we also needed to successfully complete these goals
   in the middle of a major project, which had extensive
   software impact
Additional Scope

   8 of our 18 Servers would need to be updated from Dell
   2850s to R710 (18 servers in the environment– 16 DV
   servers plus 2 dedicated domain controllers which were
   updated to PE2950 hardware)
   70 out of 92 controllers would need to be upgraded from
   MD’s to MD Plus and MX models
   All of our 65 OITs would need to be upgraded from 5 and
   6 year old models to Optiplex 780s
   Add an additional 19th server to manage Critical Data
   Backup Application (CDBA) as part of the upgrade
Tools and Resources

   We would need high performance tools to complete the
   upgrade in a 24hr window. The tool bag would have the
   following +
    –   Imaging tool for OITs
    –   A Broadcast Server for deploying images
    –   Racks for Server buildup and testing
    –   Spare OIT hardware for testing
    –   SI Dongles to turn all OITs to Development stations
    –   A team of Emerson Support Engineers
    –   Hard copy checklist for sequential steps
Tools and Resources (additional)


    – A (Time smart) detailed DeltaV Excel Add-in spreadsheet for
      saving and restoring critical controller online parameters
    – A controller map depicting model, new Mac address of hardware
      and installation location
    – A team of hands on Tech’s and Engineers was created
    – A timed schedule was created with each task for each person on
      the team
The DeltaV Excel Add In Tool example
   Having a spreadsheet with macros simplifies work and
   reduces risk.
The Controller Tracking ID Tool
Controller Tracker
The Simple Checklist goes a long way
Organized tasks with priorities are a must for capturing
essentials and ensuring nothing is missed.
The Early Execution
   Offline Migration Testing from 8.4.2 to 10.3.1 at LBP office
   60+ new OITs would be deployed with the 8.4.2 image
   prior to the upgrade day
   10.3.1 Images would be created and tested in plans for
   broadcasting to the new OITs on the upgrade day
   Each new controller to be deployed was labeled and Mac
   address recorded for its intended new location. This saved
   the light flashing process at each location for the new
   controllers during commissioning.
The Early Execution cont.
   A disk was pulled from the Domain Controller and used to
   copy the domain users onto the new DC box, (this was
   done for offline code development in the Dev
   environment, we used the live DC to migrate the Active
   Directory during the outage)
   Critical parameters that needed to be restored would be
   listed in Time Smart XL add in tool
   Server class boxes would be pre-built, racked, stacked
   and configured as far as possible prior to execution and
   left powered on until upgrade
   The Pro Plus Servers had Database imported at Version
   8.4.2 and then the 10.3.1 upgrade wizard run
The Execution prep(the night before)
  Critical parameters that needed to be restored would be
  uploaded to the XL add in tool with an individual time
  record for each time-sensitive value
  Controllers with outputs that needed to be maintained
  would have the manual field overrides enabled
  70 of the 92 controllers would be decommissioned and
  replaced with the new pre-labeled controllers
The Execution
   The execution started at 7:00am with the team
   concurrently working the plan from a central automation
   lab room, server room, and plant floor
   Servers previously racked and stacked are placed online
   starting with the Pro Plus boxes
    – Legacy DeltaV 8.4.2 PPS servers were “failed”
       • Metadata cleanup, FSMO roles seized by dedicated DC
    – New PPS R710 hardware racked & stacked
       • DCPROMO / DNS config, FSMO roles transferred to new PPS
The Execution

   10.3.1 Images are concurrently broadcasted to multiple
   OIT stations seven (7) at a time
   A team of IS engineers are running OIT configuration and
   Sys Prep at pre-scheduled OIT locations
The Execution continued

   As OITs became available controllers were commissioned
   with no field assistance due to Mac address reservation,
   then flashed, then downloaded
   Each OIT coming on line was used to RDP to field OITs to
   multiply the Flashing capacity of the automation lab (SI)
   Critical online controller parameters were restored using
   the DeltaV Time Smart Add-in tool. Online values that were
   time sensitive were updated from within Excel, based on
   the time the value was stored and the current time of
   restoration.
The Closing


   As Systems came back online they were turned over to
   Validation then manufacturing
   A Lessons Learned session was held shortly after
Lessons learned
 Some Good Points
   Have a well defined plan and schedule
   Trained resources
   Pre building and Server Prep is key to saving time
   RAID 1 (mirroring) with hot spare disk setup to support DC
   transfer (easily export Active Directory from dedicated
   domain controller – Pro Plus and other DeltaV servers use
   standard RAID10 config)
   DeltaV Excel Add-in was key in restoring online values
   quickly without manual calculations
   Broadcasting of OIT image saved time over upgrade
   wizard
Lessons learned cont.

  Some Bad Points
    We were overstaffed the morning of outage. Staffing
    schedule could be improved, (Pro Plus delay due to Active
    Directory DCPROMO issue added to this)
    VX dongles were needed and not known right away
    Some user accounts got corrupted due to Schema mis-
    match
    Servers pulled from service should have been left in racks
    for a week or two since some data configuration recovery
    was required
Lessons learned cont.


  Some more Bad Points
    Implementing an upgrade with concurrent complex
    software changes is extremely difficult
    (Requirements were changed by people outside of core
    project team – caused problems with keeping plan locked
    down) – point here is to get everyone to commit to
    providing requirements up-front and early in the planning
Business Results Achieved
 1.   There were no Safety related incidents due to any
      upgrade associated actions
 2.   The DeltaV System went from running version 8.4.2 one
      evening to running version 10.3.1 the following evening
 3.   18 Servers, 65 OITs, and 70 Controllers were upgraded
      (8 R710 replacements and 8 PE2950s were upgraded in
      place using Upgrade Wizard, 2 DCs were upgraded to
      PE2950 hardware)
 4.   There was no loss of production outside the planned
      outage due to the upgrade
 5.   There was no loss of utility access due to the upgrade
Summary

  We have done our best to share how we planned,
  managed, and executed a successful DeltaV software and
  hardware upgrade within a large scale Bio-Tech
  manufacturing Facility
  Our benefits are faster, better performing, and more
  capable software and hardware to the end user as well as
  a more robust system for the administrators
Questions

 I’d like to take this time to ask if anyone has any questions
    that pertain to the project upgrade?
Feedback

 If any of you would not mind sharing any feedback you might
     have we would all like to know if you enjoyed the
     presentation or not?




 Thank you all so much for attending.
Where To Get More Information

   Other training sessions
   List books, articles, electronic sources
   Consulting services, other sources

More Related Content

What's hot

Pre-Si Verification for Post-Si Validation
Pre-Si Verification for Post-Si ValidationPre-Si Verification for Post-Si Validation
Pre-Si Verification for Post-Si Validation
DVClub
 
DeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System OverviewDeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System Overview
Sumeet Goel
 
Ppt on rs logix 5000
Ppt on rs logix 5000Ppt on rs logix 5000
Ppt on rs logix 5000
Anil Maurya
 

What's hot (20)

YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3YOKOGAWA CENTUM CS 3000 R3
YOKOGAWA CENTUM CS 3000 R3
 
Dcs operator training
Dcs operator trainingDcs operator training
Dcs operator training
 
Pre-Si Verification for Post-Si Validation
Pre-Si Verification for Post-Si ValidationPre-Si Verification for Post-Si Validation
Pre-Si Verification for Post-Si Validation
 
DeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System OverviewDeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System Overview
 
Interesting and Useful Features of the DeltaV PID Controller
Interesting and Useful Features of the DeltaV PID ControllerInteresting and Useful Features of the DeltaV PID Controller
Interesting and Useful Features of the DeltaV PID Controller
 
Distributed Control System Basics
Distributed Control System BasicsDistributed Control System Basics
Distributed Control System Basics
 
Vt training plc_1
Vt training plc_1Vt training plc_1
Vt training plc_1
 
CENTUM CS300 R3
CENTUM CS300 R3CENTUM CS300 R3
CENTUM CS300 R3
 
Interesting and Useful Features of the DeltaV PID, Ratio and Bias/Gain Contro...
Interesting and Useful Features of the DeltaV PID, Ratio and Bias/Gain Contro...Interesting and Useful Features of the DeltaV PID, Ratio and Bias/Gain Contro...
Interesting and Useful Features of the DeltaV PID, Ratio and Bias/Gain Contro...
 
Alarm management at DeltaV
Alarm management at DeltaVAlarm management at DeltaV
Alarm management at DeltaV
 
Fieldbus Tutorial Part 1 - Fieldbus Overview
Fieldbus Tutorial Part 1 - Fieldbus OverviewFieldbus Tutorial Part 1 - Fieldbus Overview
Fieldbus Tutorial Part 1 - Fieldbus Overview
 
Ppt on rs logix 5000
Ppt on rs logix 5000Ppt on rs logix 5000
Ppt on rs logix 5000
 
Yokogawa Centum-VP-Engneering-Course.pptx
Yokogawa Centum-VP-Engneering-Course.pptxYokogawa Centum-VP-Engneering-Course.pptx
Yokogawa Centum-VP-Engneering-Course.pptx
 
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control PerformanceUtilizing DeltaV Advanced Control Innovations to Improve Control Performance
Utilizing DeltaV Advanced Control Innovations to Improve Control Performance
 
Honeywell PLC TRAINING GUIDE created by deepak gorai
Honeywell PLC TRAINING GUIDE created by deepak goraiHoneywell PLC TRAINING GUIDE created by deepak gorai
Honeywell PLC TRAINING GUIDE created by deepak gorai
 
DCS PRESENTATION
DCS PRESENTATIONDCS PRESENTATION
DCS PRESENTATION
 
can bus theory solution
can bus theory solutioncan bus theory solution
can bus theory solution
 
Ladder logic on Soft-Master Honeywell PLC ML50
Ladder logic on Soft-Master Honeywell PLC ML50Ladder logic on Soft-Master Honeywell PLC ML50
Ladder logic on Soft-Master Honeywell PLC ML50
 
Allen Bradley- Micrologix PLC Instructions
Allen Bradley- Micrologix PLC InstructionsAllen Bradley- Micrologix PLC Instructions
Allen Bradley- Micrologix PLC Instructions
 
Ch8 v70 os_en
Ch8 v70 os_enCh8 v70 os_en
Ch8 v70 os_en
 

Similar to One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Were Successfully Upgraded in One Day

Cooper, Mark Resume.Final.8.2.16
Cooper, Mark Resume.Final.8.2.16Cooper, Mark Resume.Final.8.2.16
Cooper, Mark Resume.Final.8.2.16
Mark Cooper
 
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
Preet Kamal Singh
 
Jde e1 technical change mgmt
Jde e1 technical change mgmtJde e1 technical change mgmt
Jde e1 technical change mgmt
InSync Conference
 

Similar to One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Were Successfully Upgraded in One Day (20)

Tyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support ProjectTyco IS Oracle Apps Support Project
Tyco IS Oracle Apps Support Project
 
Cooper, Mark Resume.Final.8.2.16
Cooper, Mark Resume.Final.8.2.16Cooper, Mark Resume.Final.8.2.16
Cooper, Mark Resume.Final.8.2.16
 
IUG ATL PC 9.5
IUG ATL PC 9.5IUG ATL PC 9.5
IUG ATL PC 9.5
 
Tips_Tricks_for_Oracle_E-Business Suite_Database_Upgrade.pdf
Tips_Tricks_for_Oracle_E-Business Suite_Database_Upgrade.pdfTips_Tricks_for_Oracle_E-Business Suite_Database_Upgrade.pdf
Tips_Tricks_for_Oracle_E-Business Suite_Database_Upgrade.pdf
 
Patterns and Pains of Migrating Legacy Applications to Kubernetes
Patterns and Pains of Migrating Legacy Applications to KubernetesPatterns and Pains of Migrating Legacy Applications to Kubernetes
Patterns and Pains of Migrating Legacy Applications to Kubernetes
 
Patterns and Pains of Migrating Legacy Applications to Kubernetes
Patterns and Pains of Migrating Legacy Applications to KubernetesPatterns and Pains of Migrating Legacy Applications to Kubernetes
Patterns and Pains of Migrating Legacy Applications to Kubernetes
 
Sitaram_Chalasani_CV
Sitaram_Chalasani_CVSitaram_Chalasani_CV
Sitaram_Chalasani_CV
 
CV_RishabhDixit
CV_RishabhDixitCV_RishabhDixit
CV_RishabhDixit
 
Siebel monitoring
Siebel monitoringSiebel monitoring
Siebel monitoring
 
50 migrations in 24 hours
50 migrations in 24 hours50 migrations in 24 hours
50 migrations in 24 hours
 
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPTCOLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
COLLABORATE 16 Demystifying secrets of R12.2 upgrade_PPT
 
Upgrading to Esri ArcGIS 10: Avoid the Pitfalls, Reap the Benefits
Upgrading to Esri ArcGIS 10: Avoid the Pitfalls, Reap the BenefitsUpgrading to Esri ArcGIS 10: Avoid the Pitfalls, Reap the Benefits
Upgrading to Esri ArcGIS 10: Avoid the Pitfalls, Reap the Benefits
 
Pivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First LookPivotal Cloud Foundry 2.6: A First Look
Pivotal Cloud Foundry 2.6: A First Look
 
Jde e1 technical change mgmt
Jde e1 technical change mgmtJde e1 technical change mgmt
Jde e1 technical change mgmt
 
Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.Over the last 25 years what have I done with my life.
Over the last 25 years what have I done with my life.
 
Pc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction DisplayPc Order To Installation Cycle Time Reduction Display
Pc Order To Installation Cycle Time Reduction Display
 
Improving DevOps through Cloud Automation and Management - Real-World Rocket ...
Improving DevOps through Cloud Automation and Management - Real-World Rocket ...Improving DevOps through Cloud Automation and Management - Real-World Rocket ...
Improving DevOps through Cloud Automation and Management - Real-World Rocket ...
 
Preparing for Neo - Singapore OutSystems User Group October 2022 Meetup
Preparing for Neo - Singapore OutSystems User Group October 2022 MeetupPreparing for Neo - Singapore OutSystems User Group October 2022 Meetup
Preparing for Neo - Singapore OutSystems User Group October 2022 Meetup
 
Marine Air Ground Task Force Command & Control Systems Software Deployment an...
Marine Air Ground Task Force Command & Control Systems Software Deployment an...Marine Air Ground Task Force Command & Control Systems Software Deployment an...
Marine Air Ground Task Force Command & Control Systems Software Deployment an...
 
Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.Allow me to show you what I have done over the last 25 years.
Allow me to show you what I have done over the last 25 years.
 

More from Emerson Exchange

DeltaV Security - Don’t Let Your Business Be Caught Without It
DeltaV Security - Don’t Let Your Business Be Caught Without ItDeltaV Security - Don’t Let Your Business Be Caught Without It
DeltaV Security - Don’t Let Your Business Be Caught Without It
Emerson Exchange
 

More from Emerson Exchange (20)

Using Wireless Measurements in Control Applications
Using Wireless Measurements in Control ApplicationsUsing Wireless Measurements in Control Applications
Using Wireless Measurements in Control Applications
 
Aplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unitAplication of on line data analytics to a continuous process polybetene unit
Aplication of on line data analytics to a continuous process polybetene unit
 
Process Education on Demand
Process Education on Demand Process Education on Demand
Process Education on Demand
 
Control using wireless measurements
Control using wireless measurementsControl using wireless measurements
Control using wireless measurements
 
Application of kalman filtering in delta v
Application of kalman filtering in delta vApplication of kalman filtering in delta v
Application of kalman filtering in delta v
 
Boot camp advanced tools and techniques
Boot camp   advanced tools and techniquesBoot camp   advanced tools and techniques
Boot camp advanced tools and techniques
 
Application of online data analytics to a continuous process polybutene unit
Application of online data analytics to a continuous process polybutene unitApplication of online data analytics to a continuous process polybutene unit
Application of online data analytics to a continuous process polybutene unit
 
Addressing control applications using wireless hart devices
Addressing control applications using wireless hart devicesAddressing control applications using wireless hart devices
Addressing control applications using wireless hart devices
 
Advanced control foundation tools and techniques
Advanced control foundation   tools and techniquesAdvanced control foundation   tools and techniques
Advanced control foundation tools and techniques
 
The semantic web an inside look at the creation of control loop foundation
The semantic web   an inside look at the creation of control loop foundationThe semantic web   an inside look at the creation of control loop foundation
The semantic web an inside look at the creation of control loop foundation
 
Device Revisions Management - Best Practices
Device Revisions Management - Best PracticesDevice Revisions Management - Best Practices
Device Revisions Management - Best Practices
 
Adventures in pH Control
Adventures in pH ControlAdventures in pH Control
Adventures in pH Control
 
Master the Mystery and Marvels of DeltaV MPC
Master the Mystery and Marvels of DeltaV MPCMaster the Mystery and Marvels of DeltaV MPC
Master the Mystery and Marvels of DeltaV MPC
 
PID Advances in Industrial Control
PID Advances in Industrial ControlPID Advances in Industrial Control
PID Advances in Industrial Control
 
Intelligent PID Product Design
Intelligent PID Product DesignIntelligent PID Product Design
Intelligent PID Product Design
 
Future Perspectives of PID Control
Future Perspectives of PID ControlFuture Perspectives of PID Control
Future Perspectives of PID Control
 
A Quick and Easy Way to Connect to FOUNDATION fieldbus using Emerson’s USB Fi...
A Quick and Easy Way to Connect to FOUNDATION fieldbus using Emerson’s USB Fi...A Quick and Easy Way to Connect to FOUNDATION fieldbus using Emerson’s USB Fi...
A Quick and Easy Way to Connect to FOUNDATION fieldbus using Emerson’s USB Fi...
 
Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...Calibration Excellence: Intelligent Application of Smart Technology is Just t...
Calibration Excellence: Intelligent Application of Smart Technology is Just t...
 
When the Heat is On, Control with Wireless
When the Heat is On, Control with WirelessWhen the Heat is On, Control with Wireless
When the Heat is On, Control with Wireless
 
DeltaV Security - Don’t Let Your Business Be Caught Without It
DeltaV Security - Don’t Let Your Business Be Caught Without ItDeltaV Security - Don’t Let Your Business Be Caught Without It
DeltaV Security - Don’t Let Your Business Be Caught Without It
 

Recently uploaded

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 

Recently uploaded (20)

Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

One Day Version 10.3 Upgrade - How a Large Biotech Plant's DeltaV Systems Were Successfully Upgraded in One Day

  • 1. DeltaV Version 10.3.1 Upgrade in 24hrs Version 8.4.2 – Version 10.3.1
  • 2. Presenters Gus Dionne, Automation ARI Dan DiMatteo, IS ARI Josh Gangl, OIS Platform Lead David Maglaya, Emerson LBP
  • 3. Introduction DeltaV Version Upgrade Planning the Upgrade – Objectives, Deliverables, Schedule, Resources Executing the Plan – Developing a Team, Direct and Manage the Execution Monitoring and Controlling – Verify scope, Integrate Changes Closing the Project – Lessons Learned These are all requirements of a successful upgrade.
  • 4. ARI Mfg. Site 75 Acre Footprint At a site of this size, planning is key to success
  • 5. Planning and Defining Our Scope Our goal was to upgrade two (2) DeltaV Systems with minimum impact to users Our constraints were Time (24hrs) , Resources, and Space We needed to upgrade not only the Software Application but we needed to upgrade most of the hardware that it would run on And we also needed to successfully complete these goals in the middle of a major project, which had extensive software impact
  • 6. Additional Scope 8 of our 18 Servers would need to be updated from Dell 2850s to R710 (18 servers in the environment– 16 DV servers plus 2 dedicated domain controllers which were updated to PE2950 hardware) 70 out of 92 controllers would need to be upgraded from MD’s to MD Plus and MX models All of our 65 OITs would need to be upgraded from 5 and 6 year old models to Optiplex 780s Add an additional 19th server to manage Critical Data Backup Application (CDBA) as part of the upgrade
  • 7. Tools and Resources We would need high performance tools to complete the upgrade in a 24hr window. The tool bag would have the following + – Imaging tool for OITs – A Broadcast Server for deploying images – Racks for Server buildup and testing – Spare OIT hardware for testing – SI Dongles to turn all OITs to Development stations – A team of Emerson Support Engineers – Hard copy checklist for sequential steps
  • 8. Tools and Resources (additional) – A (Time smart) detailed DeltaV Excel Add-in spreadsheet for saving and restoring critical controller online parameters – A controller map depicting model, new Mac address of hardware and installation location – A team of hands on Tech’s and Engineers was created – A timed schedule was created with each task for each person on the team
  • 9. The DeltaV Excel Add In Tool example Having a spreadsheet with macros simplifies work and reduces risk.
  • 10. The Controller Tracking ID Tool Controller Tracker
  • 11. The Simple Checklist goes a long way Organized tasks with priorities are a must for capturing essentials and ensuring nothing is missed.
  • 12. The Early Execution Offline Migration Testing from 8.4.2 to 10.3.1 at LBP office 60+ new OITs would be deployed with the 8.4.2 image prior to the upgrade day 10.3.1 Images would be created and tested in plans for broadcasting to the new OITs on the upgrade day Each new controller to be deployed was labeled and Mac address recorded for its intended new location. This saved the light flashing process at each location for the new controllers during commissioning.
  • 13. The Early Execution cont. A disk was pulled from the Domain Controller and used to copy the domain users onto the new DC box, (this was done for offline code development in the Dev environment, we used the live DC to migrate the Active Directory during the outage) Critical parameters that needed to be restored would be listed in Time Smart XL add in tool Server class boxes would be pre-built, racked, stacked and configured as far as possible prior to execution and left powered on until upgrade The Pro Plus Servers had Database imported at Version 8.4.2 and then the 10.3.1 upgrade wizard run
  • 14. The Execution prep(the night before) Critical parameters that needed to be restored would be uploaded to the XL add in tool with an individual time record for each time-sensitive value Controllers with outputs that needed to be maintained would have the manual field overrides enabled 70 of the 92 controllers would be decommissioned and replaced with the new pre-labeled controllers
  • 15. The Execution The execution started at 7:00am with the team concurrently working the plan from a central automation lab room, server room, and plant floor Servers previously racked and stacked are placed online starting with the Pro Plus boxes – Legacy DeltaV 8.4.2 PPS servers were “failed” • Metadata cleanup, FSMO roles seized by dedicated DC – New PPS R710 hardware racked & stacked • DCPROMO / DNS config, FSMO roles transferred to new PPS
  • 16. The Execution 10.3.1 Images are concurrently broadcasted to multiple OIT stations seven (7) at a time A team of IS engineers are running OIT configuration and Sys Prep at pre-scheduled OIT locations
  • 17. The Execution continued As OITs became available controllers were commissioned with no field assistance due to Mac address reservation, then flashed, then downloaded Each OIT coming on line was used to RDP to field OITs to multiply the Flashing capacity of the automation lab (SI) Critical online controller parameters were restored using the DeltaV Time Smart Add-in tool. Online values that were time sensitive were updated from within Excel, based on the time the value was stored and the current time of restoration.
  • 18. The Closing As Systems came back online they were turned over to Validation then manufacturing A Lessons Learned session was held shortly after
  • 19. Lessons learned Some Good Points Have a well defined plan and schedule Trained resources Pre building and Server Prep is key to saving time RAID 1 (mirroring) with hot spare disk setup to support DC transfer (easily export Active Directory from dedicated domain controller – Pro Plus and other DeltaV servers use standard RAID10 config) DeltaV Excel Add-in was key in restoring online values quickly without manual calculations Broadcasting of OIT image saved time over upgrade wizard
  • 20. Lessons learned cont. Some Bad Points We were overstaffed the morning of outage. Staffing schedule could be improved, (Pro Plus delay due to Active Directory DCPROMO issue added to this) VX dongles were needed and not known right away Some user accounts got corrupted due to Schema mis- match Servers pulled from service should have been left in racks for a week or two since some data configuration recovery was required
  • 21. Lessons learned cont. Some more Bad Points Implementing an upgrade with concurrent complex software changes is extremely difficult (Requirements were changed by people outside of core project team – caused problems with keeping plan locked down) – point here is to get everyone to commit to providing requirements up-front and early in the planning
  • 22. Business Results Achieved 1. There were no Safety related incidents due to any upgrade associated actions 2. The DeltaV System went from running version 8.4.2 one evening to running version 10.3.1 the following evening 3. 18 Servers, 65 OITs, and 70 Controllers were upgraded (8 R710 replacements and 8 PE2950s were upgraded in place using Upgrade Wizard, 2 DCs were upgraded to PE2950 hardware) 4. There was no loss of production outside the planned outage due to the upgrade 5. There was no loss of utility access due to the upgrade
  • 23. Summary We have done our best to share how we planned, managed, and executed a successful DeltaV software and hardware upgrade within a large scale Bio-Tech manufacturing Facility Our benefits are faster, better performing, and more capable software and hardware to the end user as well as a more robust system for the administrators
  • 24. Questions I’d like to take this time to ask if anyone has any questions that pertain to the project upgrade?
  • 25. Feedback If any of you would not mind sharing any feedback you might have we would all like to know if you enjoyed the presentation or not? Thank you all so much for attending.
  • 26. Where To Get More Information Other training sessions List books, articles, electronic sources Consulting services, other sources