FPSO in Australia and New Zealand
         Status and Future




                        Yoshihide Shimamura
             MODEC Offshore Production System
                      2009-11-9
                              WA Oil and Gas Facilities Group Meeting
FPSO โ€“ Over View
- Floating facility for Offshore Oil Field w/o Pipe Line
- Fit for Marginal Field
- Booming in West Africa, Brazil, S.E. Asia, incl. ANZ

Why?
  - Low CAPEX
  - Early Development
  - Adaptable for Deep Water
  - Flexible for Field Characteristics



                                                           2
GROWTH OF FLOATING PRODUCTION SYSTEMS
                                                                                             Between 1999 and 2009
                                                                                             - Number of FPSO increased from 67 units to 165 units (+ 98 units, + 146%)
                                                                                             - Number of TLP increased from 11 units to 22 units (+ 11 units, + 100%)


                                                                                                                                              FPSO          TLP           S par          S em i
                                                    250

                                                                                                                                                                                                                                                                                             44

                                                    200                                                                                                                                                                                                                                      17

                                                                                                                                                                                                                                                                                             22
                   (Num ber of Ins talled Units )




                                                    150



                                                                                                                                                                                                                       32
                                                    100
                                                                                                                                                                                                                        2                                                                    165
                                                                                                                                                                                                                       11

                                                     50
                                                                                                                                                                                                                       67


                                                      0
                                                          1977
                                                                 1978
                                                                        1979
                                                                               1980
                                                                                      1981
                                                                                             1982
                                                                                                    1983
                                                                                                           1984
                                                                                                                  1985
                                                                                                                         1986
                                                                                                                                1987
                                                                                                                                       1988
                                                                                                                                              1989
                                                                                                                                                     1990
                                                                                                                                                            1991
                                                                                                                                                                   1992
                                                                                                                                                                           1993
                                                                                                                                                                                  1994
                                                                                                                                                                                          1995
                                                                                                                                                                                                  1996
                                                                                                                                                                                                         1997
                                                                                                                                                                                                                1998
                                                                                                                                                                                                                       1999
                                                                                                                                                                                                                              2000
                                                                                                                                                                                                                                     2001
                                                                                                                                                                                                                                            2002
                                                                                                                                                                                                                                                   2003
                                                                                                                                                                                                                                                          2004
                                                                                                                                                                                                                                                                 2005
                                                                                                                                                                                                                                                                        2006
                                                                                                                                                                                                                                                                               2007
                                                                                                                                                                                                                                                                                      2008
                                                                                                                                                                                                                                                                                             2009
                                                                                                           as of end y ear (2009 inc ludes units on order to be delivered during the y ear)



Source: FLOATING PRODUCTION SYSTEMS assessment of the outlook for FPSOs, Semis, TLPs, Spars and FSOs โ€“ April 2009 (IMA)



                                                                                                                                                                                                                                                                                                    3
FLOATING PRODUCTION SYSTEMS IN OPERATION
                    22                                                                                   Projects in Operation as of July 2009
                                                                                                                                                                               151
                                                12
                                7

                                         2        SEM I
                                        T LP
                    F PSO

                                F SO




                                                                                                                                                                                                                                                          2
                                                                                                                      15
                             North Sea                                                                  40




                                                                                                                                                                                                                                                                                                                 SEM I
                                                                                                                                                                                                                                                                                    T LP
                                                                                                                                                                                                                                                          F PSO

                                                                                                                                                                                                                                                                      F SO



                                                                                                                                                                                                                                                                                                  Spar
                                         7                                                                                                                                                                                                                              Canada
                                4                                                                                              1                           1                                                                        15     15
                                                                                                                                                                                       88




                                                                                                                                                        SEM I
                                                                                                                      F PSO



                                                                                                                                             T LP
                                                                                                                                                                                                                                                  7




                                                                                                                               F SO
                                                          SEM I
                                F PSO



                                                   T LP
                                         F SO




                                                                                                17                                                                                                                  3
                                                                                                                               China                                                                                        1
                                      Mediterranean                       9




                                                                                                                                                                                                                                                  SEM I
                                                                                                                                                                                                                    F PSO



                                                                                                                                                                                                                                    T LP
                                                                                                                                                                                                                            F SO



                                                                                                                                                                                                                                           Spar
                    34                                            1                     1                      1         1      1                                                                                                  GOM

                                                                                                                                                                                                                                                              28
                                                                                        SEM I




                                                                                                                                SEM I
                                                                                                                                                                                                            43
                                                                                 T LP
                                                                  F PSO




                                                                                                               T LP
                                                                                                F PSO
                                                                          F SO




                                                                                                        F SO



                                                                                                                        Spar

                                                                            India                         SE A s ia
                                                                                                                                                                                                                                                                                                         18
                               15                                                                                                       15                                                    22
                                                                                                                                                                                                     16

                                        4                                                                                                                                                                                                                                    4
                                                                                                                                                    3
                                                SEM I




                                                                                                                                                                                                                                                                                                         SEM I
                                                                                                                                                                                                            SEM I
                     F PSO




                                                                                                                                                                                                                                                              F PSO
                                        T LP




                                                                                                                                                                                                                                                                                           T LP
                                                                                                                                                                       SEM I
                               F SO




                                                                                                                                                                                                                                                                             F SO
                                                                                                                                                                                              T LP
                                                                                                                                                                               F PSO
                                                                                                                                        F PSO



                                                                                                                                                                T LP




                                                                                                                                                                                       F SO
                                                                                                                                                    F SO




                                                                                                                                                                                                     Spar
                             W es t A f ric a                                                                                                   Pac if ic                              W orld Total                                                                      Braz il



Source: FLOATING PRODUCTION SYSTEMS assessment of the outlook for FPSOs, Semis, TLPs, Spars and FSOs โ€“ July 2009 (IMA)
*Not shown are 9 FPSOs and 3 production semis that are off-field and available for reuse.



                                                                                                                                                                                                                                                                                                  4
FPSO โ€“ In Australia/New Zealand
-18 FPSO are operating or under construction
-Lease (11) vs Operator Own (7) โ€“ average (54/46%)
-Lease/Operation period <10 years
-Disconnectable FPSO (13)
-Water Depth โ€“ no deep water
-Production rate - average 82,000BOPD/52mmscfd
-Storage Capacity โ€“ average 860kBBL
-Conversion case (13), new built case (5)
-Less Operation crew (<30)



                                                     5
FPSO in Australia/NZ
FPSO Operation in Australia/New Zealand

                                     Laminaria
                                    Buffalo        Elang/Kakatua


         Jabiru
                       Challis      Skua
        Griffin        Cossack
                                  Puffin            Darwin
             Vincent
                        Montara
     Van Gogh                           Karratha
                  Mutineer-Exeter
 Woolybutt
                Pyrenees
  Enfield
         Stybarrow                  Perth


                                                                     Maui-B

                                                                             Tui
                                                               BMG
                                                                     Maari




                                                                                   6
FPSO in Australia/NZ - Statistics
               Water Depth                              Production - Gas
   <100m                 3         17%      <50MMSCFD             7
 100m - 300m             10        56%         50-100             5
   >300m                 5         28%      >100MMSCFD            2
    total                18                     Max               115    Cossack
    Max            Pyrenees       850m          Min               2     Mutineer/Exeter
     Min            Montara       79m         Average             52


            Production - Oil                              Storage
<50KBOPD             5                     <1Mil BBL         12
 50-100              7                     >1Mil BBL         6
>100KBOPD            6                       Max           1.4Mil       Laminaria
   Max          170KBOPD       Laminaria     Min             42         BMG
   Min           40KBOD                    Average         0.86Mil
 Average         82KBOPD


                                                                                     7
Disconnectable FPSO โ€“ MV11




                             8
Disconnectable FPSO โ€“ MV1
MODEC Venture 1




                                              9
FPSO ex Buffalo Venture




                          10
Technical Challenges
 Last 10 years
- Continuous Challenges to
  - More Deep
  - Bigger Capacity
Coming 10 years
- New phase of Challenge
  - More complex crude
  - More efficient
  - More eco-friendly


                               11
Historical Change in Water Depth
                 1 ,6 0 0


                 1 ,4 0 0

                 1 ,2 0 0


                 1 ,0 0 0
W ate r De pth




                   800


                   600


                   400


                   200


                       0
                        1980   1985   1990   1995   2000   2005   2010



                                                                         12
Historical Change in Production Capacity
                          3 0 0 ,0 0 0


                          2 5 0 ,0 0 0
 Production Rate (BOPD)




                          2 0 0 ,0 0 0


                          1 5 0 ,0 0 0


                          1 0 0 ,0 0 0


                           5 0 ,0 0 0


                                    0
                                     1970   1975   1980   1985   1990   1995   2000   2005   2010



                                                                                                    13
Expanding Topside Footprint
                         80,000BOPD/2007
25,000BOPD/1986




                       100,000BOPD/2007




     31,000BOPD/1996



                                           14
Technical Challenges - Gas
 Last 10 years
- Continuous Challenges to
  - More Gas Handling
  - Efficient Use
Coming 10 years
- New phase of Challenge
  - More efficient
  - More eco-friendly
  - New technology โ€“ GTL/LNG


                                 15
Historical Change in Gas Handling Capacity
                                   700.0

                                   600.0
  Gas Handling Capacity (mmscfd)



                                   500.0

                                   400.0

                                   300.0

                                   200.0

                                   100.0

                                     0.0
                                        1970   1980   1990   2000   2010



                                                                           16
Disposition of Produced Gas

                      Flare


             Boiler            Turbine
Fuel Gas




                              Generator
                                          Elect Motor   Compressor

            Gas Turbine Generator


                                   Gas Turbine          Compressor



                                                                     Gas Lift

                                                                Gas Injection

                                                                 Export Gas
                                                                                17
FLNG




       18
GTL Plant with Micro Channel Reactor Technology




                                             19
FPSO Contractor โ€“ Lease Operation
Merit for Operator
- Saving of CAPEX
- Flexible charter period โ€“ minimize development risk
   - High Oil Price = Extent Lease Period
- Reduce OPEX โ€“ salary of crew (time charter case)

Merit for FPSO Contractor
- Constant revenue for long period
- Redeployment of facility
- Pool of resource




                                                        20
FPSO Lease Operation
        Contract          Facility Owner         O&M
 Bare Boat Charter       FPSO Contractor     Oil Company
 Time Charter Contract   FPSO Contractor    FPSO Provider
 Operation Contract       Oil Company      FPSO Contractor




       Multiple Fleet             Pool of Human Resource
        Synergy Effect                     Training
  Utilize for Multiple Fields   Mobilize to Multiple Facilities
Facility Management System



                                                             21
FPSO/FSO TIME CHARTER / O&M PERIOD
                                                                Time Charter Contract                                                          O&M Contract

                                                                      Fixed period                   Option period                               Fixed period   Option period
                                         1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
FPSO Cidade de A ngra dos Reis MV 22 ๏ผŠ                                                                                               15y

                Tullow Jubilee FPSO ๏ผŠ                                                                                           7y

       FPSO Cidade de Santos MV 20 ๏ผŠ                                                                                        12y

                BHP Py renees FPSO ๏ผ                                                                                      15y

        FPSO Cidade de Niteroi MV 18 ๏ผŠ                                                                               9y

              FSO Rang Dong MV 17 ๏ผŠ                                                                              9y

         FPSO Song Doc Pride MV 19 ๏ผŠ                                                                             5y

      FPSO Sty barrow V enture MV 16 ๏ผŠ                                                                    10y

         FSO Cidade de Mac ae MV 15 ๏ผŠ                                                                     20y

 FPSO Cidade do Rio de Janeiro MV 14 ๏ผŠ                                                              8y

                FSO Rong Doi MV 12 ๏ผŠ                                                                7y

         FPSO Baobab Iv oirien MV 10 ๏ผŠ                                                       10y

         FPSO Jas mine V enture MV 7 ๏ผŠ               3y    (FPSO Buf f alo V enture)         2.5y

            FPSO MODEC V enture 11 ๏ผŠ                                                    5y

                 FPSO Cuulong MV 9 ๏ผŠ                                          5y                                ๏ผˆ pu rc h ase d by th e c lie n t๏ผ‰

                   FPSO Fluminens e ๏ผ                                       13y

          FPSO MV 8 Langs a V enture ๏ผŠ                           1y                    2y

                     FSO Ta'Kuntah ๏ผŠ        10y                                                                 5y

             FPSO MODEC V enture 1 ๏ผŠ        2y

                                         1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
                                                                                                              Oct 2009
                                     * Consolidated Subsidiary                                  Time Charter: 11 FPSO/FSOs, O&M: 2 FPSO
                                     * Affiliates accounted for by the Equity Method


                                                                                                                                                                                22
Leased FPSO
Production Rate




                                                          Crude Price

                                                            High



                  Initial Period   Option Period


                                         Charter Period

                                                                        23
FPSO - Lease Operation
Before Financial Crisis โ€“ Win-Win
- Financial Support from Investor
- Raising Oil Price
- Technical maturity โ€“ lower barrier for new comer
- Speculation FPSO fleet

After Financial Crisis
- Conservative investor
- Lower Oil Price
- High Fuel Cost/High Wage


                                                     24
FPSO Ordered and Crude Oil Price
                       FPS O O rde re d / C ru de O il Pric e

20                        FPS O O rde re d                                                                       140
18                                                                                                               120
16                        C ru de O il Pric e
14                                                                                                               100
12                                                                                                               80
10
 8                                                                                                               60
 6                                                                                                               40
 4
 2                                                                                                               20
 0                                                                                                               0
     1997/9
              1998/9
                       1999/9
                                2000/9
                                         2001/9
                                                  2002/9
                                                           2003/9
                                                                    2004/9
                                                                             2005/9
                                                                                      2006/9
                                                                                               2007/9
                                                                                                        2008/9
                                                                                                                       25
Re-deployment Project

          Timing
          Compatibility of Facility
          Depreciation of CAPEX




                                      26
FPSO Operation
Short Term Issues
  - Increased fuel cost
  - Higher wage

Long Term Issues
  -   Aging of operator
  -   Lack of resources
  -   Impact to quality of operation (HSE)
  -   Industrial-wide recruit and training program


                                                27
Operation - Complement
          A n o a N atu n a
         K akap N atu n a
     N an H ai S h e n g L i
         C u u lo n g M V 9
        R u by P rin c e ss
      V ie tso vpe tro 0 1
                                                                            SE Asia
      R an D o n g M V 1 2
         P ath u m abah a
M V 8 L an gsa V e n tu re
   N an H ai S h e n g K ai
            F lu m in e n se
B ao bab Ivo rie n M V 1 0
             K o m e K ribi
              Ta'K u n tah                                                  Atlantic
                  M adie la
              S tybarro w
      B u ffalo V e n tu re
   M o de c V e n tu re 1 1
  M O D EC V e n tu re 1                                          Aus/NZ
           W h akaaro pai
                           0   10   20   30   40   50   60   70   80   90   100   110




                                                                                        28
Demographics of Operating Crew

                                                     20-29
                                     T o tal
                                                     30-39
                                                     40-49
                                     T h ailan d     50-59
                                                     60+
                                     Vie tn am


                                     In do n e sia


                                     Au stralia


 100%   80%   60%   40%   20%   0%



                                                             29
Thank You and
Any Question?
           30

More Related Content

What's hot

C4 Subsea Production
C4 Subsea ProductionC4 Subsea Production
C4 Subsea ProductionDavid Seow
ย 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
ย 
Pr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedurePr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedureRagul Selvam
ย 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptxmohdsuriamohdsuhaimi
ย 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004David Seow
ย 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesMohamed Elnagar
ย 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Emeka Ngwobia
ย 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
ย 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production FacilitiesInGu Lee
ย 
Oil and gas field development
Oil and gas field developmentOil and gas field development
Oil and gas field developmentShankar Lal Dangi
ย 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls IQPC
ย 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Giuseppe Moricca
ย 
Field Development Plan
Field Development PlanField Development Plan
Field Development PlanMahmood Ajabbar
ย 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO RedeploymentDan Benson
ย 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppeMuhammad Hanif
ย 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020David Seow
ย 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validationjpegd
ย 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development planGiuseppe Moricca
ย 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentationSunday Kanshio, PhD
ย 

What's hot (20)

C4 Subsea Production
C4 Subsea ProductionC4 Subsea Production
C4 Subsea Production
ย 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
ย 
Pr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedurePr 1159 - commissioning and start-up procedure
Pr 1159 - commissioning and start-up procedure
ย 
326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx326074628-FDP-Presentation-Slide.pptx
326074628-FDP-Presentation-Slide.pptx
ย 
C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004C9 FPSO Layout and Turret 2004
C9 FPSO Layout and Turret 2004
ย 
Oil & Gas Production and Surface Facilities
Oil & Gas Production and Surface FacilitiesOil & Gas Production and Surface Facilities
Oil & Gas Production and Surface Facilities
ย 
Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.Subsea Field Development for an ideal Green field.
Subsea Field Development for an ideal Green field.
ย 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
ย 
Oil Production Facilities
Oil Production FacilitiesOil Production Facilities
Oil Production Facilities
ย 
Oil and gas field development
Oil and gas field developmentOil and gas field development
Oil and gas field development
ย 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
ย 
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
Integrated Oil Field Development Plan - FDP. Criteria, strategy and process f...
ย 
Field Development Plan
Field Development PlanField Development Plan
Field Development Plan
ย 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
ย 
Workover job ppe
Workover job ppeWorkover job ppe
Workover job ppe
ย 
C3.2.2. Topside Gas Compression_2020
 C3.2.2. Topside Gas Compression_2020 C3.2.2. Topside Gas Compression_2020
C3.2.2. Topside Gas Compression_2020
ย 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
ย 
Manifold design, verification,_and_validation
Manifold design, verification,_and_validationManifold design, verification,_and_validation
Manifold design, verification,_and_validation
ย 
Guidelines for field development plan
Guidelines for field development planGuidelines for field development plan
Guidelines for field development plan
ย 
Subsea Separation presentation
Subsea Separation presentationSubsea Separation presentation
Subsea Separation presentation
ย 

Similar to FPSO In Australia And New Zealand By Yoshihide Shimamura

Carl Emmerson: The outlook for NHS funding to 2021/22
Carl Emmerson: The outlook for NHS funding to 2021/22Carl Emmerson: The outlook for NHS funding to 2021/22
Carl Emmerson: The outlook for NHS funding to 2021/22Nuffield Trust
ย 
Rayjay Ambekar on valuations, asset allocation and markets
Rayjay Ambekar on valuations, asset allocation and marketsRayjay Ambekar on valuations, asset allocation and markets
Rayjay Ambekar on valuations, asset allocation and marketsmoneyweb
ย 
Rowena Crawford: NHS and social care funding: the outlook to 2021-22
Rowena Crawford: NHS and social care funding: the outlook to 2021-22Rowena Crawford: NHS and social care funding: the outlook to 2021-22
Rowena Crawford: NHS and social care funding: the outlook to 2021-22Nuffield Trust
ย 
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANT
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANTPRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANT
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANTJames Halun
ย 
PowerPoint Slide Makeover #75: Transforming Data Dump Slides
PowerPoint Slide Makeover #75: Transforming Data Dump SlidesPowerPoint Slide Makeover #75: Transforming Data Dump Slides
PowerPoint Slide Makeover #75: Transforming Data Dump SlidesDave Paradi
ย 
12 ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€
12   ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€12   ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€
12 ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€GeoMedeelel
ย 
Amax introduction and-data-center-presentation082211
Amax introduction and-data-center-presentation082211Amax introduction and-data-center-presentation082211
Amax introduction and-data-center-presentation082211Mike Ballard
ย 
Tax hpf yussuf saloojee
Tax hpf   yussuf saloojeeTax hpf   yussuf saloojee
Tax hpf yussuf saloojeeNCAS1
ย 
Parkiteer Presentation
Parkiteer PresentationParkiteer Presentation
Parkiteer Presentationmartinse
ย 
Session4 developing re projects in the mena region authored and_or presented ...
Session4 developing re projects in the mena region authored and_or presented ...Session4 developing re projects in the mena region authored and_or presented ...
Session4 developing re projects in the mena region authored and_or presented ...RCREEE
ย 
Strat Importance Webinar 062509
Strat Importance Webinar 062509Strat Importance Webinar 062509
Strat Importance Webinar 062509globafone
ย 
Wwf file8 6-
Wwf file8 6-Wwf file8 6-
Wwf file8 6-y246ra
ย 

Similar to FPSO In Australia And New Zealand By Yoshihide Shimamura (12)

Carl Emmerson: The outlook for NHS funding to 2021/22
Carl Emmerson: The outlook for NHS funding to 2021/22Carl Emmerson: The outlook for NHS funding to 2021/22
Carl Emmerson: The outlook for NHS funding to 2021/22
ย 
Rayjay Ambekar on valuations, asset allocation and markets
Rayjay Ambekar on valuations, asset allocation and marketsRayjay Ambekar on valuations, asset allocation and markets
Rayjay Ambekar on valuations, asset allocation and markets
ย 
Rowena Crawford: NHS and social care funding: the outlook to 2021-22
Rowena Crawford: NHS and social care funding: the outlook to 2021-22Rowena Crawford: NHS and social care funding: the outlook to 2021-22
Rowena Crawford: NHS and social care funding: the outlook to 2021-22
ย 
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANT
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANTPRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANT
PRIMARY STRUCTURAL STEELWORKS MEMBERS - WATER TREATMENT PLANT
ย 
PowerPoint Slide Makeover #75: Transforming Data Dump Slides
PowerPoint Slide Makeover #75: Transforming Data Dump SlidesPowerPoint Slide Makeover #75: Transforming Data Dump Slides
PowerPoint Slide Makeover #75: Transforming Data Dump Slides
ย 
12 ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€
12   ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€12   ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€
12 ะณะฐะทั€ั‹ะฝ ะฑาฏั€ั…ัะฒั‡ะธะนะฝ ำฉำฉั€ั‡ะปำฉะปั‚ - ั.ั…ำฉะดำฉะปะผำฉั€
ย 
Amax introduction and-data-center-presentation082211
Amax introduction and-data-center-presentation082211Amax introduction and-data-center-presentation082211
Amax introduction and-data-center-presentation082211
ย 
Tax hpf yussuf saloojee
Tax hpf   yussuf saloojeeTax hpf   yussuf saloojee
Tax hpf yussuf saloojee
ย 
Parkiteer Presentation
Parkiteer PresentationParkiteer Presentation
Parkiteer Presentation
ย 
Session4 developing re projects in the mena region authored and_or presented ...
Session4 developing re projects in the mena region authored and_or presented ...Session4 developing re projects in the mena region authored and_or presented ...
Session4 developing re projects in the mena region authored and_or presented ...
ย 
Strat Importance Webinar 062509
Strat Importance Webinar 062509Strat Importance Webinar 062509
Strat Importance Webinar 062509
ย 
Wwf file8 6-
Wwf file8 6-Wwf file8 6-
Wwf file8 6-
ย 

More from Engineers Australia

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAEngineers Australia
ย 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Engineers Australia
ย 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDEEngineers Australia
ย 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonEngineers Australia
ย 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleEngineers Australia
ย 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Engineers Australia
ย 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Engineers Australia
ย 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Engineers Australia
ย 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1Engineers Australia
ย 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEPEngineers Australia
ย 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1Engineers Australia
ย 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksEngineers Australia
ย 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
ย 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...Engineers Australia
ย 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1Engineers Australia
ย 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEngineers Australia
ย 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Engineers Australia
ย 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...Engineers Australia
ย 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark BushEngineers Australia
ย 

More from Engineers Australia (20)

Where to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WAWhere to From Here - Oil and Gas in WA
Where to From Here - Oil and Gas in WA
ย 
Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...Jacobs Recent changes to transmission line design standards and the impact on...
Jacobs Recent changes to transmission line design standards and the impact on...
ย 
Cyber supply chain risk management ASDE
Cyber supply chain risk management   ASDECyber supply chain risk management   ASDE
Cyber supply chain risk management ASDE
ย 
Timber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff BoughtonTimber Connections reduced by Geoff Boughton
Timber Connections reduced by Geoff Boughton
ย 
Connecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of FremantleConnecting to the future: how transport will shape the City of Fremantle
Connecting to the future: how transport will shape the City of Fremantle
ย 
Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9Green schemes 2012_npe_eo_y lecture perth v9
Green schemes 2012_npe_eo_y lecture perth v9
ย 
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
Revised intensity frequency-duration (ifd) design rainfalls estimates for wa ...
ย 
Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1Pilbara rfa ea presentation v3.2 1
Pilbara rfa ea presentation v3.2 1
ย 
Smart grid - Do they fit into real networks ver 1
Smart grid  - Do they fit into real networks ver 1Smart grid  - Do they fit into real networks ver 1
Smart grid - Do they fit into real networks ver 1
ย 
Arc flash August 2012 IE Aust JEEP
Arc flash  August 2012   IE Aust JEEPArc flash  August 2012   IE Aust JEEP
Arc flash August 2012 IE Aust JEEP
ย 
121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1121108 MD smart grid and renewable energy integration 1
121108 MD smart grid and renewable energy integration 1
ย 
Pavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocksPavement materials and design in western australia by geoffrey cocks
Pavement materials and design in western australia by geoffrey cocks
ย 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
ย 
The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...The EPCM of writing tenders: How engineers can successfully build compelling ...
The EPCM of writing tenders: How engineers can successfully build compelling ...
ย 
Bid write presentation engineers australia & spe 7 feb12-1
Bid write presentation   engineers australia & spe 7 feb12-1Bid write presentation   engineers australia & spe 7 feb12-1
Bid write presentation engineers australia & spe 7 feb12-1
ย 
111125 IChemE Palmer
111125 IChemE Palmer111125 IChemE Palmer
111125 IChemE Palmer
ย 
EA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural EventsEA / ATSE joint seminar Engineering for Extreme Natural Events
EA / ATSE joint seminar Engineering for Extreme Natural Events
ย 
Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011Freight and public transport planning initiatives conference 24 november 2011
Freight and public transport planning initiatives conference 24 november 2011
ย 
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...How to write a research paper. By Gareth Forbes, Curtin University and Engine...
How to write a research paper. By Gareth Forbes, Curtin University and Engine...
ย 
How to write a research paper. By Mark Bush
How to write a research paper. By Mark BushHow to write a research paper. By Mark Bush
How to write a research paper. By Mark Bush
ย 

Recently uploaded

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
ย 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
ย 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
ย 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
ย 
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...lizamodels9
ย 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
ย 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
ย 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
ย 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
ย 
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
ย 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
ย 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
ย 
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...amitlee9823
ย 
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...amitlee9823
ย 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
ย 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
ย 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
ย 
VIP Call Girls In Saharaganj ( Lucknow ) ๐Ÿ” 8923113531 ๐Ÿ” Cash Payment (COD) ๐Ÿ‘’
VIP Call Girls In Saharaganj ( Lucknow  ) ๐Ÿ” 8923113531 ๐Ÿ”  Cash Payment (COD) ๐Ÿ‘’VIP Call Girls In Saharaganj ( Lucknow  ) ๐Ÿ” 8923113531 ๐Ÿ”  Cash Payment (COD) ๐Ÿ‘’
VIP Call Girls In Saharaganj ( Lucknow ) ๐Ÿ” 8923113531 ๐Ÿ” Cash Payment (COD) ๐Ÿ‘’anilsa9823
ย 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
ย 

Recently uploaded (20)

M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
ย 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
ย 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
ย 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
ย 
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon โค๏ธ8448577510 โŠนBest Escorts Service In 24/7 Delh...
ย 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
ย 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
ย 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
ย 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
ย 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
ย 
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit โ€“ 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
ย 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
ย 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
ย 
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Service Bang...
ย 
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...
Call Girls Electronic City Just Call ๐Ÿ‘— 7737669865 ๐Ÿ‘— Top Class Call Girl Servi...
ย 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
ย 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
ย 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
ย 
VIP Call Girls In Saharaganj ( Lucknow ) ๐Ÿ” 8923113531 ๐Ÿ” Cash Payment (COD) ๐Ÿ‘’
VIP Call Girls In Saharaganj ( Lucknow  ) ๐Ÿ” 8923113531 ๐Ÿ”  Cash Payment (COD) ๐Ÿ‘’VIP Call Girls In Saharaganj ( Lucknow  ) ๐Ÿ” 8923113531 ๐Ÿ”  Cash Payment (COD) ๐Ÿ‘’
VIP Call Girls In Saharaganj ( Lucknow ) ๐Ÿ” 8923113531 ๐Ÿ” Cash Payment (COD) ๐Ÿ‘’
ย 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
ย 

FPSO In Australia And New Zealand By Yoshihide Shimamura

  • 1. FPSO in Australia and New Zealand Status and Future Yoshihide Shimamura MODEC Offshore Production System 2009-11-9 WA Oil and Gas Facilities Group Meeting
  • 2. FPSO โ€“ Over View - Floating facility for Offshore Oil Field w/o Pipe Line - Fit for Marginal Field - Booming in West Africa, Brazil, S.E. Asia, incl. ANZ Why? - Low CAPEX - Early Development - Adaptable for Deep Water - Flexible for Field Characteristics 2
  • 3. GROWTH OF FLOATING PRODUCTION SYSTEMS Between 1999 and 2009 - Number of FPSO increased from 67 units to 165 units (+ 98 units, + 146%) - Number of TLP increased from 11 units to 22 units (+ 11 units, + 100%) FPSO TLP S par S em i 250 44 200 17 22 (Num ber of Ins talled Units ) 150 32 100 2 165 11 50 67 0 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 as of end y ear (2009 inc ludes units on order to be delivered during the y ear) Source: FLOATING PRODUCTION SYSTEMS assessment of the outlook for FPSOs, Semis, TLPs, Spars and FSOs โ€“ April 2009 (IMA) 3
  • 4. FLOATING PRODUCTION SYSTEMS IN OPERATION 22 Projects in Operation as of July 2009 151 12 7 2 SEM I T LP F PSO F SO 2 15 North Sea 40 SEM I T LP F PSO F SO Spar 7 Canada 4 1 1 15 15 88 SEM I F PSO T LP 7 F SO SEM I F PSO T LP F SO 17 3 China 1 Mediterranean 9 SEM I F PSO T LP F SO Spar 34 1 1 1 1 1 GOM 28 SEM I SEM I 43 T LP F PSO T LP F PSO F SO F SO Spar India SE A s ia 18 15 15 22 16 4 4 3 SEM I SEM I SEM I F PSO F PSO T LP T LP SEM I F SO F SO T LP F PSO F PSO T LP F SO F SO Spar W es t A f ric a Pac if ic W orld Total Braz il Source: FLOATING PRODUCTION SYSTEMS assessment of the outlook for FPSOs, Semis, TLPs, Spars and FSOs โ€“ July 2009 (IMA) *Not shown are 9 FPSOs and 3 production semis that are off-field and available for reuse. 4
  • 5. FPSO โ€“ In Australia/New Zealand -18 FPSO are operating or under construction -Lease (11) vs Operator Own (7) โ€“ average (54/46%) -Lease/Operation period <10 years -Disconnectable FPSO (13) -Water Depth โ€“ no deep water -Production rate - average 82,000BOPD/52mmscfd -Storage Capacity โ€“ average 860kBBL -Conversion case (13), new built case (5) -Less Operation crew (<30) 5
  • 6. FPSO in Australia/NZ FPSO Operation in Australia/New Zealand Laminaria Buffalo Elang/Kakatua Jabiru Challis Skua Griffin Cossack Puffin Darwin Vincent Montara Van Gogh Karratha Mutineer-Exeter Woolybutt Pyrenees Enfield Stybarrow Perth Maui-B Tui BMG Maari 6
  • 7. FPSO in Australia/NZ - Statistics Water Depth Production - Gas <100m 3 17% <50MMSCFD 7 100m - 300m 10 56% 50-100 5 >300m 5 28% >100MMSCFD 2 total 18 Max 115 Cossack Max Pyrenees 850m Min 2 Mutineer/Exeter Min Montara 79m Average 52 Production - Oil Storage <50KBOPD 5 <1Mil BBL 12 50-100 7 >1Mil BBL 6 >100KBOPD 6 Max 1.4Mil Laminaria Max 170KBOPD Laminaria Min 42 BMG Min 40KBOD Average 0.86Mil Average 82KBOPD 7
  • 9. Disconnectable FPSO โ€“ MV1 MODEC Venture 1 9
  • 10. FPSO ex Buffalo Venture 10
  • 11. Technical Challenges Last 10 years - Continuous Challenges to - More Deep - Bigger Capacity Coming 10 years - New phase of Challenge - More complex crude - More efficient - More eco-friendly 11
  • 12. Historical Change in Water Depth 1 ,6 0 0 1 ,4 0 0 1 ,2 0 0 1 ,0 0 0 W ate r De pth 800 600 400 200 0 1980 1985 1990 1995 2000 2005 2010 12
  • 13. Historical Change in Production Capacity 3 0 0 ,0 0 0 2 5 0 ,0 0 0 Production Rate (BOPD) 2 0 0 ,0 0 0 1 5 0 ,0 0 0 1 0 0 ,0 0 0 5 0 ,0 0 0 0 1970 1975 1980 1985 1990 1995 2000 2005 2010 13
  • 14. Expanding Topside Footprint 80,000BOPD/2007 25,000BOPD/1986 100,000BOPD/2007 31,000BOPD/1996 14
  • 15. Technical Challenges - Gas Last 10 years - Continuous Challenges to - More Gas Handling - Efficient Use Coming 10 years - New phase of Challenge - More efficient - More eco-friendly - New technology โ€“ GTL/LNG 15
  • 16. Historical Change in Gas Handling Capacity 700.0 600.0 Gas Handling Capacity (mmscfd) 500.0 400.0 300.0 200.0 100.0 0.0 1970 1980 1990 2000 2010 16
  • 17. Disposition of Produced Gas Flare Boiler Turbine Fuel Gas Generator Elect Motor Compressor Gas Turbine Generator Gas Turbine Compressor Gas Lift Gas Injection Export Gas 17
  • 18. FLNG 18
  • 19. GTL Plant with Micro Channel Reactor Technology 19
  • 20. FPSO Contractor โ€“ Lease Operation Merit for Operator - Saving of CAPEX - Flexible charter period โ€“ minimize development risk - High Oil Price = Extent Lease Period - Reduce OPEX โ€“ salary of crew (time charter case) Merit for FPSO Contractor - Constant revenue for long period - Redeployment of facility - Pool of resource 20
  • 21. FPSO Lease Operation Contract Facility Owner O&M Bare Boat Charter FPSO Contractor Oil Company Time Charter Contract FPSO Contractor FPSO Provider Operation Contract Oil Company FPSO Contractor Multiple Fleet Pool of Human Resource Synergy Effect Training Utilize for Multiple Fields Mobilize to Multiple Facilities Facility Management System 21
  • 22. FPSO/FSO TIME CHARTER / O&M PERIOD Time Charter Contract O&M Contract Fixed period Option period Fixed period Option period 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 FPSO Cidade de A ngra dos Reis MV 22 ๏ผŠ 15y Tullow Jubilee FPSO ๏ผŠ 7y FPSO Cidade de Santos MV 20 ๏ผŠ 12y BHP Py renees FPSO ๏ผ 15y FPSO Cidade de Niteroi MV 18 ๏ผŠ 9y FSO Rang Dong MV 17 ๏ผŠ 9y FPSO Song Doc Pride MV 19 ๏ผŠ 5y FPSO Sty barrow V enture MV 16 ๏ผŠ 10y FSO Cidade de Mac ae MV 15 ๏ผŠ 20y FPSO Cidade do Rio de Janeiro MV 14 ๏ผŠ 8y FSO Rong Doi MV 12 ๏ผŠ 7y FPSO Baobab Iv oirien MV 10 ๏ผŠ 10y FPSO Jas mine V enture MV 7 ๏ผŠ 3y (FPSO Buf f alo V enture) 2.5y FPSO MODEC V enture 11 ๏ผŠ 5y FPSO Cuulong MV 9 ๏ผŠ 5y ๏ผˆ pu rc h ase d by th e c lie n t๏ผ‰ FPSO Fluminens e ๏ผ 13y FPSO MV 8 Langs a V enture ๏ผŠ 1y 2y FSO Ta'Kuntah ๏ผŠ 10y 5y FPSO MODEC V enture 1 ๏ผŠ 2y 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 Oct 2009 * Consolidated Subsidiary Time Charter: 11 FPSO/FSOs, O&M: 2 FPSO * Affiliates accounted for by the Equity Method 22
  • 23. Leased FPSO Production Rate Crude Price High Initial Period Option Period Charter Period 23
  • 24. FPSO - Lease Operation Before Financial Crisis โ€“ Win-Win - Financial Support from Investor - Raising Oil Price - Technical maturity โ€“ lower barrier for new comer - Speculation FPSO fleet After Financial Crisis - Conservative investor - Lower Oil Price - High Fuel Cost/High Wage 24
  • 25. FPSO Ordered and Crude Oil Price FPS O O rde re d / C ru de O il Pric e 20 FPS O O rde re d 140 18 120 16 C ru de O il Pric e 14 100 12 80 10 8 60 6 40 4 2 20 0 0 1997/9 1998/9 1999/9 2000/9 2001/9 2002/9 2003/9 2004/9 2005/9 2006/9 2007/9 2008/9 25
  • 26. Re-deployment Project Timing Compatibility of Facility Depreciation of CAPEX 26
  • 27. FPSO Operation Short Term Issues - Increased fuel cost - Higher wage Long Term Issues - Aging of operator - Lack of resources - Impact to quality of operation (HSE) - Industrial-wide recruit and training program 27
  • 28. Operation - Complement A n o a N atu n a K akap N atu n a N an H ai S h e n g L i C u u lo n g M V 9 R u by P rin c e ss V ie tso vpe tro 0 1 SE Asia R an D o n g M V 1 2 P ath u m abah a M V 8 L an gsa V e n tu re N an H ai S h e n g K ai F lu m in e n se B ao bab Ivo rie n M V 1 0 K o m e K ribi Ta'K u n tah Atlantic M adie la S tybarro w B u ffalo V e n tu re M o de c V e n tu re 1 1 M O D EC V e n tu re 1 Aus/NZ W h akaaro pai 0 10 20 30 40 50 60 70 80 90 100 110 28
  • 29. Demographics of Operating Crew 20-29 T o tal 30-39 40-49 T h ailan d 50-59 60+ Vie tn am In do n e sia Au stralia 100% 80% 60% 40% 20% 0% 29
  • 30. Thank You and Any Question? 30