The DAY Copper Gold Porphyry Project's value proposition to the investment community is simple to communicate, and easy to understand. The Day property is in the right location and has an excellent starting point with historical grades that are ~3 times that of Kemess South Mine (5th largest mine in BC), and ~3 times that of the Mt. Milligan project (currently being .
1. QUICK MARKET FACTS (as of Oct 20, 2010)
Current Price: $0.13
52 Week Range: $0.03 - $0.135
Shares Issued / Out: 30,059,822
Fully Diluted: 42,822,322
Market Capitalization: ~ $3,000,000
Insider Holdings: ~ 35%
TRADING SYMBOLS
TSX Venture Exchange: EQT
Frankfurt Exchange: T6U1
BOARD OF DIRECTORS
Jay Roberge Jody Dahrouge, B.Sc, P.Geo
Chris Grove Steve Williams, BASc, MBA
Steven Khan, B.Sc, MBA, CFA
STRATEGIC PARTNERS
Zimtu Capital Corp. Dahrouge Geological
Vancouver, BC Edmonton, AB
www.zimtu.com www.dahrouge.com
TRANSFER AGENT
Computor Share, Vancouver, BC
AUDITORS
Morgan & Company, Vancouver, BC
LAW FIRM
Clark Wilson LLP, Vancouver, BC
CONTACT
Equitas Resources Corp.
Suite 1450 – 789 West Pender
Vancouver, BC, V6C 1H2
t. 1 604 687-3113
f. 1 604 681-8240
Email: info@equitasresources.com
This core asset will be the Company’s flagship project, and consists of
~7,100 hectares located to the northwest of Prince George, BC and 50 kms
directly south of Northgate Minerals’ Kemess South Mine in the prolific
“Toodoggone Region” of BC.
The occurrence was discovered and previously drilled by Falconbridge Ltd
(now Xtrata Plc.). Drilling in the early 1970s produced several significant
intersections including 0.67% Copper and 0.84 g/t gold across 58.83 metres,
and Hole 74-4 with 14.94 m of 0.61% copper and 1.92 g/t gold.
Notable porphyry projects in the region include: Northgate Minerals Corp’s.
(TSX:NGX) Kemess South and North Projects, Terrane Metals Corp’s
(TSXv:TRX) Mount Milligan Project, and Serengeti Resources Inc’s (TSXv:SIR)
Kwanika Project.
The historical gold and copper grades that were encountered by Falconbridge
are up to three times as high as the grades that are mined nearby and serve
as an excellent starting point for further exploration.
The Company will initiate a winter work program which will include geo-
physics (may include Induced Polarization and or Aero-Magnetics) as well as
additional detailed sampling, mapping and further historical data compilation.
PROPERTY TONNES CU (%) AU (G/T) CATEGORY
Kemess South 22.7 0.14 0.28 Proven Reserves
Kemess North 719.2 0.15 0.30 Measured & indicated
Mt. Milligan 482.4 0.20 0.39 Proven & probable
Kwanika 182.6 0.29 0.28 Indicated
DAY PROPERTY INTERVAL CU (%) AU (G/T) CATEGORY
58.83 m 0.67 0.84 Historical Drilling
14.94 m 0.61 1.92 Historical Drilling
KEY INVESTMENT HIGHLIGHTS
• Early stage of value creation through exploration, and development
• Favorable location in close proximity to other major discoveries
• Historical drill results indicating ~3X the grade of major projects in the area
• Successful team for exploration, development, and discovery
• Strong strategic partners and market support
Certain exploration results referred to
herein are historical in nature and were
compiled before NI 43-101. Equitas has
not independently analyzed the results
of the previous exploration therefore
the historical results should not be
relied upon. Equitas believes these
historical results provide an indication
of the potential of the properties and
are relevant to ongoing exploration.
TSXV:EQT
FSE:T6U1
equitas is in the early stages of the value
creation process with the recent acquisition of
the Day Copper-Gold Porphyry Project.
2. Prince
George
BRITISH COLUMBIA
POWER LINE
RAIL LINE
ROAD
U S A
VICTORIA
KELOWNA
KAM
LO
OPS
Y U K O N
T E R R I T O R Y N . W . T .
EDMONTON
CALGARY
PRINCE
GEORGE
A L B E R T A
VERNON
VANCOUVER
NANAIMO
BELLINGHAM
REVELSTOKE
0
0 50 mi 100 mi
100 km 200 km
SCALE
DAY COPPER-GOLD
PORPHYRY PROJECT
TOODOGGONE, NORTH-CENTRAL
BRITISH COLUMBIA
KEMESS SOUTH
(In Production)
Proven Reserves 22.7 mt
0.14% Cu
0.28 g/t Au
KWANIKA
Indicated 182.6 mt
0.29% Cu
0.28 g/t Au
MT. MILLIGAN
(Mine Under Construction)
Proven & Probable Reserves
482.4 mt
0.20% Cu
0.39 g/t Au
DAY COPPER-GOLD
PORPHYRY PROJECT
DRILLING INTERSECTIONS
DDH 92-1: 0.54% Cu, 0.704 gpt Au over 56.99m
DDH 74-4: 0.61% Cu, 1.920 gpt Au over 14.94m
DDH 74-1: 0.67% Cu, 0.864 gpt Au over 60m