Greystones Harbour and Marina presentation to Greystones Town Council    GREYSTONES HARBOUR: The next phase
The revised plans are very similar to the original. 

           •It retains the public and community facilities such as club houses and associated facilities, 
           •a site for a Coastguard building,
           •a boat maintenance yard,
           •public launching facilities,
           •a harbour,
           •public square,
           •public walking areas such as a Boardwalk and breakwaters,
           •The Marina,
           •new North beach,
           •a public park and children’s play area, 
           •access to the cliff walk to Bray,
           •public parking, 




Greystones Harbour and Marina presentation to Greystones Town Council 
The changes will bring some modifications to the detail of the public areas, mainly 
     to do with public car parking and associated landscaping. 

      This does not affect the quality of the public facilities, all of the key parts of the 
      public realm are there 
      They are shown in the revised overall plan.                                                   Clubs



                                                                   Breakwaters   Marina   Harbour




                                                     Boardwalk

                                                     North Beach

                                                                                                    Public 
                                                                                                    Square



                                           Public Park




Greystones Harbour and Marina presentation to Greystones Town Council 
The changes  to  the  Scheme  will  or  have  been  considered  as  a  series  of 
            Part 8 applications to Wicklow County Council

            1. Part 8 Approval granted for

                  The  inclusion  of  a  Primary  Care  Centre  within  Building  D  which  fronts  onto  the 
                  Harbourside Public Square and changes to the landscape design of the public open 
                  areas located at the Harbour,

            2. A subsequent Part 8 Application has been made

                 An  increase  in  the  number  of  residential  units  from  341  as  approved  by  the  An 
                 Bord Pleanala to 375, i.e. an increase of 34 units and an increase in the quantum 
                 of commercial space of 800sq m to 6425 sq m.

                 Changes to the landscape design of the public open areas located at the Harbour, 
                 between  the  apartment  blocks  and  at  the  Public  Park.  This  will  involve  the 
                 provision of additional parking at the Harbourside and extending Terrace 12 of the 
                 development area into the Southern edge of the Park




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                      2.                  1.

                                                1.




                                           Public Park


                                                                         Harbourside Space




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                        2.                                        1.
                      2.     Revised Housing layout to include detached and semi‐detached houses and apartment buildings




Greystones Harbour and Marina presentation to Greystones Town Council 
3.                                          2.                          1.
                        3.     Extended Terrace 12 to provide detached housing overlooking public park




Greystones Harbour and Marina presentation to Greystones Town Council 
End 2011

     •Harbour hoardings removed

     •Club building complete

     •Public Square works complete

     •Primary Care Center complete

     •Temporary Access road to serve
     Primary Care Centre and site traffic

     •Low level barrier separating existing
     North Beach Road and temporary access
     road

     •Access to North Beach at new shingle
     beach location

     •Access to Cliff Walk maintained at site
     perimeter




                                                                         Site Layout End 2011

Greystones Harbour and Marina presentation to Greystones Town Council 
The harbourside public space at end of 2011




Greystones Harbour and Marina presentation to Greystones Town Council 
DATES


           Part 8 Submissions & Approvals

           Primary Care Centre, Community Buildings & Public Spaces approved by Wicklow Co. Co.        September 2010

           A second Part 8 Application for the remaining changes has gone on display, going through 
           the consultantion and reporting process to have a decision from Wicklow Co. Council in      December 2010


           Building Works Timeframe

           New Harbour works                                                                           Completed late 2010
           Including  slipways

           Primary Care Centre , Community Clubs & Public Square                                       Commence early 2011 & 
                                                                                                       complete by end 2011

           Residential  & Commercial elements                                                          Subject to ongoing review 
                                                                                                       from early 2012 in relation to 
                                                                                                       market changes and demands




Greystones Harbour and Marina presentation to Greystones Town Council 
GREYSTONES HARBOUR: The next phase




Greystones Harbour and Marina presentation to Greystones Town Council 
Thank you.

More Related Content

What's hot

Cabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact SheetCabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact SheetOPM Saint Lucia
 
Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010reapoklahoma
 
Agenda 11.06.2012[1]
Agenda   11.06.2012[1]Agenda   11.06.2012[1]
Agenda 11.06.2012[1]clerkmoulton
 
Marina barrage
Marina barrageMarina barrage
Marina barragelohbingsen
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration ProjectFairfax County
 
Document Finished
Document FinishedDocument Finished
Document FinishedGregg Boyd
 
City Council February 21, 2012 Pool and River projects Update
City Council February 21, 2012 Pool and River projects UpdateCity Council February 21, 2012 Pool and River projects Update
City Council February 21, 2012 Pool and River projects UpdateCity of San Angelo Texas
 
BDZ GHD Structure Plan
BDZ GHD Structure PlanBDZ GHD Structure Plan
BDZ GHD Structure PlanSelf-Employed
 
Portfolio Booklet Compiled 72dpi 2011
Portfolio Booklet Compiled 72dpi 2011Portfolio Booklet Compiled 72dpi 2011
Portfolio Booklet Compiled 72dpi 2011lucywiggins
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectFairfax County
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershedkvon15
 
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Fairfax County
 
Marina barrage
Marina barrageMarina barrage
Marina barragelohbingsen
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Riddhi Dash
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairFairfax County
 
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-WinonaPost-Bulletin Co.
 

What's hot (20)

Cabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact SheetCabot Saint Lucia Fact Sheet
Cabot Saint Lucia Fact Sheet
 
Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010
 
Agenda 11.06.2012[1]
Agenda   11.06.2012[1]Agenda   11.06.2012[1]
Agenda 11.06.2012[1]
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
 
SJRA Highlands Division
SJRA Highlands DivisionSJRA Highlands Division
SJRA Highlands Division
 
9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project9499 Beach Mill Road Channel Restoration Project
9499 Beach Mill Road Channel Restoration Project
 
Document Finished
Document FinishedDocument Finished
Document Finished
 
City Council February 21, 2012 Pool and River projects Update
City Council February 21, 2012 Pool and River projects UpdateCity Council February 21, 2012 Pool and River projects Update
City Council February 21, 2012 Pool and River projects Update
 
Comprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual ReviewComprehensive Plan, UDO Annual Review
Comprehensive Plan, UDO Annual Review
 
BDZ GHD Structure Plan
BDZ GHD Structure PlanBDZ GHD Structure Plan
BDZ GHD Structure Plan
 
Portfolio Booklet Compiled 72dpi 2011
Portfolio Booklet Compiled 72dpi 2011Portfolio Booklet Compiled 72dpi 2011
Portfolio Booklet Compiled 72dpi 2011
 
Accotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration ProjectAccotink Creek at Wakefield Park Stream Restoration Project
Accotink Creek at Wakefield Park Stream Restoration Project
 
Pic 2 panels june 23 2015
Pic 2 panels june 23 2015Pic 2 panels june 23 2015
Pic 2 panels june 23 2015
 
Public Meeting #2 Information Materials
Public Meeting #2 Information MaterialsPublic Meeting #2 Information Materials
Public Meeting #2 Information Materials
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershed
 
Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)Leigh Meadow & Towlston Basin (0584DP/0103DP)
Leigh Meadow & Towlston Basin (0584DP/0103DP)
 
Marina barrage
Marina barrageMarina barrage
Marina barrage
 
Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1Paldiresidentialneighborhoodpart1
Paldiresidentialneighborhoodpart1
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
 

Viewers also liked

Linkedin Profile Creation & Improvement Presentation
Linkedin Profile Creation & Improvement PresentationLinkedin Profile Creation & Improvement Presentation
Linkedin Profile Creation & Improvement Presentationguest8bed4c
 
Edie wynne newsletter oct 2010
Edie wynne newsletter oct 2010Edie wynne newsletter oct 2010
Edie wynne newsletter oct 2010ExSite
 
Zonnepanelen
ZonnepanelenZonnepanelen
ZonnepanelenJanssensB
 
Draft anti social behaviour policy
Draft anti social behaviour policyDraft anti social behaviour policy
Draft anti social behaviour policyExSite
 
Linkedin profile creation & improvement presentation
Linkedin profile creation & improvement presentationLinkedin profile creation & improvement presentation
Linkedin profile creation & improvement presentationguest8bed4c
 
Videó KameráK TíPusai
Videó KameráK TíPusaiVideó KameráK TíPusai
Videó KameráK TíPusaiDurkó Zoli
 
Fast strategic plan 2010 2013
Fast strategic plan 2010 2013Fast strategic plan 2010 2013
Fast strategic plan 2010 2013ExSite
 
Guide to noise regulations
Guide to noise regulationsGuide to noise regulations
Guide to noise regulationsExSite
 
Addiction services northeast
Addiction services northeastAddiction services northeast
Addiction services northeastExSite
 
Dahlberg building managing strong hr pillars tallent acquisition-061612 (1)
Dahlberg building  managing strong hr pillars   tallent acquisition-061612 (1)Dahlberg building  managing strong hr pillars   tallent acquisition-061612 (1)
Dahlberg building managing strong hr pillars tallent acquisition-061612 (1)Sushama Naina
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis HarbourTristan Wiggill
 
Coastal defense structures
Coastal defense structuresCoastal defense structures
Coastal defense structuresAjit Kumar
 
Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujaratadhyaru19
 
Coastal structure
Coastal structureCoastal structure
Coastal structureWRE Forum
 
Growth and development
Growth and developmentGrowth and development
Growth and developmentAruna Ap
 

Viewers also liked (15)

Linkedin Profile Creation & Improvement Presentation
Linkedin Profile Creation & Improvement PresentationLinkedin Profile Creation & Improvement Presentation
Linkedin Profile Creation & Improvement Presentation
 
Edie wynne newsletter oct 2010
Edie wynne newsletter oct 2010Edie wynne newsletter oct 2010
Edie wynne newsletter oct 2010
 
Zonnepanelen
ZonnepanelenZonnepanelen
Zonnepanelen
 
Draft anti social behaviour policy
Draft anti social behaviour policyDraft anti social behaviour policy
Draft anti social behaviour policy
 
Linkedin profile creation & improvement presentation
Linkedin profile creation & improvement presentationLinkedin profile creation & improvement presentation
Linkedin profile creation & improvement presentation
 
Videó KameráK TíPusai
Videó KameráK TíPusaiVideó KameráK TíPusai
Videó KameráK TíPusai
 
Fast strategic plan 2010 2013
Fast strategic plan 2010 2013Fast strategic plan 2010 2013
Fast strategic plan 2010 2013
 
Guide to noise regulations
Guide to noise regulationsGuide to noise regulations
Guide to noise regulations
 
Addiction services northeast
Addiction services northeastAddiction services northeast
Addiction services northeast
 
Dahlberg building managing strong hr pillars tallent acquisition-061612 (1)
Dahlberg building  managing strong hr pillars   tallent acquisition-061612 (1)Dahlberg building  managing strong hr pillars   tallent acquisition-061612 (1)
Dahlberg building managing strong hr pillars tallent acquisition-061612 (1)
 
Development at Port Louis Harbour
Development at Port Louis HarbourDevelopment at Port Louis Harbour
Development at Port Louis Harbour
 
Coastal defense structures
Coastal defense structuresCoastal defense structures
Coastal defense structures
 
Marine civil engineering and Gujarat
Marine civil engineering and GujaratMarine civil engineering and Gujarat
Marine civil engineering and Gujarat
 
Coastal structure
Coastal structureCoastal structure
Coastal structure
 
Growth and development
Growth and developmentGrowth and development
Growth and development
 

Similar to Greystones presentation10 10

Greystones habour presentation 10 11
Greystones habour presentation 10 11Greystones habour presentation 10 11
Greystones habour presentation 10 11ExSite
 
Greystones Harbour Presentation 03 2010
Greystones Harbour Presentation 03 2010Greystones Harbour Presentation 03 2010
Greystones Harbour Presentation 03 2010ExSite
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018VictoriaColangelo
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012Erin Vieira
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Fairfax County
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Stephen Bolduc
 
2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San Diego2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San DiegoPort of San Diego
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - JupiterAPA Florida
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNew Jersey Future
 
Robert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec ConsultantsRobert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec ConsultantsMetropolitan Area Planning Council
 
Accommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsAccommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsEngineers Australia
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockHoboken Resistance
 
Harbour presentation 10 11
Harbour presentation 10 11Harbour presentation 10 11
Harbour presentation 10 11ExSite
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence ReportNaoise
 
Final seia report english opened for public comments new
Final seia  report english opened for public comments newFinal seia  report english opened for public comments new
Final seia report english opened for public comments newlbrlbo
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space PlanRob May
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardinerEast
 
Example model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEExample model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEMrs Coles
 

Similar to Greystones presentation10 10 (20)

Greystones habour presentation 10 11
Greystones habour presentation 10 11Greystones habour presentation 10 11
Greystones habour presentation 10 11
 
Northriverside Research web
Northriverside Research webNorthriverside Research web
Northriverside Research web
 
Greystones Harbour Presentation 03 2010
Greystones Harbour Presentation 03 2010Greystones Harbour Presentation 03 2010
Greystones Harbour Presentation 03 2010
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018
 
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
SLIPP All-Committee Meeting: Shoreline Update 12-April-2012
 
Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014Royal Lake Dredging and Restoration Project Update-June 2014
Royal Lake Dredging and Restoration Project Update-June 2014
 
Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010Bangor Waterfront Park Plans by Shadley 12-2010
Bangor Waterfront Park Plans by Shadley 12-2010
 
2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San Diego2009 Annual Report: Port of San Diego
2009 Annual Report: Port of San Diego
 
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
9/9 FRI 09:30 | Financing Public Waterfront Access - Jupiter
 
NJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 ForbesNJFuture Redevelopment Forum 2016 Forbes
NJFuture Redevelopment Forum 2016 Forbes
 
Robert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec ConsultantsRobert Roseen, Associate, Water Resources, Geosyntec Consultants
Robert Roseen, Associate, Water Resources, Geosyntec Consultants
 
Accommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle PortsAccommodating Trade Growth at Fremantle Ports
Accommodating Trade Growth at Fremantle Ports
 
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry DockJen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
Jen Giattino anfd Tiffanie Fisher letter to NJDEP re: Union Dry Dock
 
Harbour presentation 10 11
Harbour presentation 10 11Harbour presentation 10 11
Harbour presentation 10 11
 
Clontarf Flood Defence Report
Clontarf Flood Defence ReportClontarf Flood Defence Report
Clontarf Flood Defence Report
 
Final seia report english opened for public comments new
Final seia  report english opened for public comments newFinal seia  report english opened for public comments new
Final seia report english opened for public comments new
 
Union Square Open Space Plan
Union Square Open Space PlanUnion Square Open Space Plan
Union Square Open Space Plan
 
Gardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panelsGardiner East EA Public Forum 3 (Feb062014) - panels
Gardiner East EA Public Forum 3 (Feb062014) - panels
 
Example model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSEExample model answers for OCR B Geography GCSE
Example model answers for OCR B Geography GCSE
 
Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012Doug Thiessen Outlook 2012
Doug Thiessen Outlook 2012
 

More from ExSite

John O'Mahony - One Year in Government
John O'Mahony - One Year in GovernmentJohn O'Mahony - One Year in Government
John O'Mahony - One Year in GovernmentExSite
 
John O'Mahony know where you stand 2012
John O'Mahony know where you stand 2012John O'Mahony know where you stand 2012
John O'Mahony know where you stand 2012ExSite
 
John O'Mahony one year in govenment
John O'Mahony one year in govenmentJohn O'Mahony one year in govenment
John O'Mahony one year in govenmentExSite
 
Power point website
Power point websitePower point website
Power point websiteExSite
 
Cap post 2013.ppt
Cap post 2013.pptCap post 2013.ppt
Cap post 2013.pptExSite
 
Presentation to forum delegation to ed 19.10.2011
Presentation to forum delegation to ed   19.10.2011Presentation to forum delegation to ed   19.10.2011
Presentation to forum delegation to ed 19.10.2011ExSite
 
All weather sports area
All weather sports areaAll weather sports area
All weather sports areaExSite
 
All weather sports area
All weather sports areaAll weather sports area
All weather sports areaExSite
 
Dublin bus 2011
Dublin bus 2011Dublin bus 2011
Dublin bus 2011ExSite
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11ExSite
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11ExSite
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11ExSite
 
Whitehall Framework Plan
Whitehall Framework Plan  Whitehall Framework Plan
Whitehall Framework Plan ExSite
 
Whitehall Framework Plan
Whitehall Framework Plan  Whitehall Framework Plan
Whitehall Framework Plan ExSite
 
Governor honohan's address to the iiea restoring ireland's credit by reduci...
Governor honohan's address to the iiea   restoring ireland's credit by reduci...Governor honohan's address to the iiea   restoring ireland's credit by reduci...
Governor honohan's address to the iiea restoring ireland's credit by reduci...ExSite
 
Mairead McGuinness - Newsletter, Winter 2010
Mairead McGuinness - Newsletter, Winter 2010Mairead McGuinness - Newsletter, Winter 2010
Mairead McGuinness - Newsletter, Winter 2010ExSite
 
Faculty national clinical programme for pathology
Faculty  national clinical programme for pathologyFaculty  national clinical programme for pathology
Faculty national clinical programme for pathologyExSite
 
J O'Mahony Newsletter Oct 2010
J O'Mahony Newsletter Oct 2010J O'Mahony Newsletter Oct 2010
J O'Mahony Newsletter Oct 2010ExSite
 
Business Newsletter From John O'Mahony TD
Business Newsletter From John O'Mahony TDBusiness Newsletter From John O'Mahony TD
Business Newsletter From John O'Mahony TDExSite
 
Childhood abuse
Childhood abuseChildhood abuse
Childhood abuseExSite
 

More from ExSite (20)

John O'Mahony - One Year in Government
John O'Mahony - One Year in GovernmentJohn O'Mahony - One Year in Government
John O'Mahony - One Year in Government
 
John O'Mahony know where you stand 2012
John O'Mahony know where you stand 2012John O'Mahony know where you stand 2012
John O'Mahony know where you stand 2012
 
John O'Mahony one year in govenment
John O'Mahony one year in govenmentJohn O'Mahony one year in govenment
John O'Mahony one year in govenment
 
Power point website
Power point websitePower point website
Power point website
 
Cap post 2013.ppt
Cap post 2013.pptCap post 2013.ppt
Cap post 2013.ppt
 
Presentation to forum delegation to ed 19.10.2011
Presentation to forum delegation to ed   19.10.2011Presentation to forum delegation to ed   19.10.2011
Presentation to forum delegation to ed 19.10.2011
 
All weather sports area
All weather sports areaAll weather sports area
All weather sports area
 
All weather sports area
All weather sports areaAll weather sports area
All weather sports area
 
Dublin bus 2011
Dublin bus 2011Dublin bus 2011
Dublin bus 2011
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11
 
Leaflet8 11
Leaflet8 11Leaflet8 11
Leaflet8 11
 
Whitehall Framework Plan
Whitehall Framework Plan  Whitehall Framework Plan
Whitehall Framework Plan
 
Whitehall Framework Plan
Whitehall Framework Plan  Whitehall Framework Plan
Whitehall Framework Plan
 
Governor honohan's address to the iiea restoring ireland's credit by reduci...
Governor honohan's address to the iiea   restoring ireland's credit by reduci...Governor honohan's address to the iiea   restoring ireland's credit by reduci...
Governor honohan's address to the iiea restoring ireland's credit by reduci...
 
Mairead McGuinness - Newsletter, Winter 2010
Mairead McGuinness - Newsletter, Winter 2010Mairead McGuinness - Newsletter, Winter 2010
Mairead McGuinness - Newsletter, Winter 2010
 
Faculty national clinical programme for pathology
Faculty  national clinical programme for pathologyFaculty  national clinical programme for pathology
Faculty national clinical programme for pathology
 
J O'Mahony Newsletter Oct 2010
J O'Mahony Newsletter Oct 2010J O'Mahony Newsletter Oct 2010
J O'Mahony Newsletter Oct 2010
 
Business Newsletter From John O'Mahony TD
Business Newsletter From John O'Mahony TDBusiness Newsletter From John O'Mahony TD
Business Newsletter From John O'Mahony TD
 
Childhood abuse
Childhood abuseChildhood abuse
Childhood abuse
 

Greystones presentation10 10

  • 2. The revised plans are very similar to the original.  •It retains the public and community facilities such as club houses and associated facilities,  •a site for a Coastguard building, •a boat maintenance yard, •public launching facilities, •a harbour, •public square, •public walking areas such as a Boardwalk and breakwaters, •The Marina, •new North beach, •a public park and children’s play area,  •access to the cliff walk to Bray, •public parking,  Greystones Harbour and Marina presentation to Greystones Town Council 
  • 3. The changes will bring some modifications to the detail of the public areas, mainly  to do with public car parking and associated landscaping.  This does not affect the quality of the public facilities, all of the key parts of the  public realm are there  They are shown in the revised overall plan. Clubs Breakwaters Marina Harbour Boardwalk North Beach Public  Square Public Park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 4. The changes  to  the  Scheme  will  or  have  been  considered  as  a  series  of  Part 8 applications to Wicklow County Council 1. Part 8 Approval granted for The  inclusion  of  a  Primary  Care  Centre  within  Building  D  which  fronts  onto  the  Harbourside Public Square and changes to the landscape design of the public open  areas located at the Harbour, 2. A subsequent Part 8 Application has been made An  increase  in  the  number  of  residential  units  from  341  as  approved  by  the  An  Bord Pleanala to 375, i.e. an increase of 34 units and an increase in the quantum  of commercial space of 800sq m to 6425 sq m. Changes to the landscape design of the public open areas located at the Harbour,  between  the  apartment  blocks  and  at  the  Public  Park.  This  will  involve  the  provision of additional parking at the Harbourside and extending Terrace 12 of the  development area into the Southern edge of the Park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 5. 3. 2. 1. 1. Public Park Harbourside Space Greystones Harbour and Marina presentation to Greystones Town Council 
  • 6. 3. 2. 1. 2. Revised Housing layout to include detached and semi‐detached houses and apartment buildings Greystones Harbour and Marina presentation to Greystones Town Council 
  • 7. 3. 2. 1. 3. Extended Terrace 12 to provide detached housing overlooking public park Greystones Harbour and Marina presentation to Greystones Town Council 
  • 8. End 2011 •Harbour hoardings removed •Club building complete •Public Square works complete •Primary Care Center complete •Temporary Access road to serve Primary Care Centre and site traffic •Low level barrier separating existing North Beach Road and temporary access road •Access to North Beach at new shingle beach location •Access to Cliff Walk maintained at site perimeter Site Layout End 2011 Greystones Harbour and Marina presentation to Greystones Town Council 
  • 10. DATES Part 8 Submissions & Approvals Primary Care Centre, Community Buildings & Public Spaces approved by Wicklow Co. Co. September 2010 A second Part 8 Application for the remaining changes has gone on display, going through  the consultantion and reporting process to have a decision from Wicklow Co. Council in  December 2010 Building Works Timeframe New Harbour works Completed late 2010 Including  slipways Primary Care Centre , Community Clubs & Public Square  Commence early 2011 &  complete by end 2011 Residential  & Commercial elements Subject to ongoing review  from early 2012 in relation to  market changes and demands Greystones Harbour and Marina presentation to Greystones Town Council