Capital Needs Assessment

Project: Apartment Name                                                                                             Date: 5/??/11

CAPITAL NEEDS SUMMARY

This assessment was conducted by individuals trained and experienced in building construction. The report that follows is based on that
investigation and was prepared as provided by USDA Rural Development PNA Guidelines found in Attachment B and Attachment C to the
contract. The report needs to be read in its entirety to understand fully all of the information that we have obtained.

The inspection was performed for the Capital Needs Assessment (CNA) of Apartment Name, ADDRESS, on Month XX, 2011 on behalf of
CORPORATION THAT OWNS APT COMPLEX, Inc. by INSPECTOR. The report was prepared by Crandall Engineering. All pictures and
references are based on the Month XX, 2011 site inspection. Weather conditions on the day of the investigation were cold with partly cloudy
skies.

Apartment Name is a senior housing project. Phase I (# units) was originally constructed circa 1900, and Phase II (# units) was constructed 1900.
Neighboring properties are comprised primarily of residential multi-family properties and some commercial. The property, with # units housed in
# separate one-story buildings, includes all 1-bedroom, 1-bathroom units. In a separate one story building is a community center, laundry,
maintenance, community kitchen and a male and Female ADA bathroom. There are currently no fully UFAS compliant accessible apartments.
All units have a single exterior door per unit that leads directly to the common parking lot. We recommend s number (#) one-bedroom apartments
be upgraded to UFAS standards to meet the 5% capacity requirement for ADA accessibility. All buildings have an exterior access.

The purpose of this Capital Needs Assessment (CNA) is to determine the current condition of the building envelope, systems, paved areas, utilities,
and site improvements, and to establish a preliminary capital reserve for the future. It is intended to be used in support of real estate transactions
where the client is either acquiring the building or wishes to know the current condition and future capital requirements for purposes of
rehabilitation and reserve requirements.

We performed the CNA according to the scope as generally defined by USDA Rural Development. The survey is based on interviews with local
management, a review of available documents, and an examination of the buildings and site, in particular, the foundation and/or slab-on-grade, the
roof, the exterior walls, the steel and wood framing, mechanical systems, exterior doors and windows, paved areas, and utilities. During our
investigation we inspected (??) apartment units, all common areas and all the building exteriors and grounds at Apartment Name.

The report contains the following:

        A description of the overall condition of buildings’ components and systems and conditions that may limit the expected useful life of the
        buildings and their components.



Narrative                                                  Page #1 of 10                                    CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                           Date: 5/??/11

        Information about significant deficiencies, deferred maintenance items, and material code violations based on a visual survey of the
        buildings and grounds, research of documents, and conversations with people who have knowledge about the facility.


LIMITATIONS

The statements in the report are opinions about the present condition of the subject property. They are based on visual evidence available during a
diligent investigation of all reasonably accessible areas. We did not remove any surface materials, perform any destructive testing, or move any
furnishings. The study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort.

The information, observations, and conclusions described in this report are valid on the date of the investigation and have been made under the
terms, conditions, limitations, and constraints noted in the report. We prepared the report for the exclusive use of CORPORATION THAT OWNS
APT COMPLEX. No other individual or party shall be entitled to reply upon the report without our express written consent. If another individual
or party relies on the report, such individual or party shall indemnify and hold Crandall Engineering harmless for any damages, losses, or expenses
incurred as a result of such use. Any use or reliance of the report by an individual or party other than CORPORATION THAT OWNS APT
COMPLEX shall constitute acceptance of these terms and conditions. Any electronic copies of this report that are provided to CORPORATION
THAT OWNS APT COMPLEX are for the convenience of CORPORATION THAT OWNS APT COMPLEX are not to be construed as the
original or final report.

The report is limited to the visual observations made during our investigation. We did not remove surface materials, conduct any destructive or
invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of
systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not
within the scope of our services at the time of investigation. We did not undertake to completely assess the stability of the buildings or the
underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment.

We did not investigate the following areas:
               All unit interiors

We do not render an opinion on uninvestigated portions of the facility.




Narrative                                                 Page #2 of 10                                   CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                            Date: 5/??/11

We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code
compliance investigation. The report is not to be considered a warranty of condition, and no warranty is implied. The photographs are an integral
part of this report and must be included in any review.

If opinions of probable costs are presented, they are preliminary only. Opinions are based on our general knowledge of building systems and the
contracting/construction industry. When appropriate, we have relied on standard sources, such as Means Building Construction Cost Data, to
develop opinions of probable costs. However, for some items for which we have developed opinions of probable cost (e.g., structural repairs), no
standard guide for developing such costs exists.

We have performed no design work as part of the study, nor have we obtained competitive quotations or estimates from contractors as this also is
beyond the scope of the project. The actual cost to remedy deficiencies and deferred maintenance items that we have identified may vary
significantly from estimates and competitive quotations from contractors.


EXISTING BUILDING SYSTEMS AND CONDITIONS SUMMARY

HEALTH AND SAFETY
In this section of the report, we are concerned with those deficiencies that will require immediate repair or replacement. Any existing health and
safety issues will be addressed by the Owner. Information on any existing health and safety issues are on the repair list provided by the Owner.
There are no health and safety issues requiring immediate attention at this site.


DEVELOPMENT/PROJECT DESIGN CHARATERISTICS

        Rehabilitation shall provide:
           o Provide an equipped computer center and internet access in the community center
           o Construct a playground on site (shuffleboard)
           o Individual porch/patio for each unit
           o Exercise room with exercise equipment (open to all residents)




Narrative                                                 Page #3 of 10                                    CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                              Date: 5/??/11

GREEN DEVELOPMENT/REHABILITATION INITITIVE

        Water Conservation
          o Replace all fixtures with those meeting the EPA WaterSense specification

        Efficient Energy Use
            o Install daylight sensors (photocells) or timers on all Energy Star rated lighting
            o Install Energy Star labeled lighting fixtures in all interior units

        Additional Green Points
           o Use of at least one construction material made from 50% or greater recycled content; flooring materials and/ or attic insulation will
               be used.
           o Project is within ½ mile of amenities relevant to housing projects
           o 100% brick exterior and replace siding with cement board.


SITE

Site Lighting
Exterior pole mounted lights provide light for site and parking. These also provide ground lighting, light fixtures are also located at each apartment
entrance. It is not known if lighting is adequate as the survey was performed during daytime hours; based on the number of lighting fixtures and
tenant interviews, the lighting appears to be adequate at the subject property. Building-mounted exterior lighting and the 48 pole lights are original.
We recommend replacement with Energy Star lighting fixtures and replace the 48 pole lights with 12 new pole lights.



Driveways, Parking Lots and Sidewalks
A single asphalt parking area is located at the front of the property, with head-in parking spaces with an entrance on the east side of the property
onto Main Street. A second parking area is located on the north west corner of the property, with head-in parking spaces with an entrance on the
north east side of the property onto Main Street. There is no ADA parking, signage, curbs, or ramps by the office or apartment buildings. The
sidewalks are in fair condition with some needing replaced/repairs. However, new walks and ramps should be installed to provide accessibility
throughout the site.



Narrative                                                  Page #4 of 10                                     CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                             Date: 5/??/11


Site Drainage
Site drainage for storm runoff is adequate in most areas. Some areas have been reported to have inadequate drainage causing large amounts of
standing water. All inlets to the city’s storm system are adequate.

Landscaping
Landscaping consists of trees, shrubs, and lawns surrounding the buildings. The quality and health of the vegetation and landscaping at all
locations is in fair condition. We recommend select landscaping improvements to improve the appearance and marketability of the apartments.

Signage
The site features one property identification sign posted near the property entry. The sign identifies the property by name.

Dumpster Enclosures
There are two dumpster areas to deposit trash on the site. New enclosures are recommended to improve the appearance, marketability, and sanitary
of the apartments.

ARCHITECTURAL

Structural Elements
The property, with 48 units housed in (12) separate one-story buildings, includes all 1-bedroom, 1-bathroom units. A separate building houses a
community center, laundry room, maintenance work/storage area, a male and female bathroom, and community kitchen. There are currently no
UFAS compliant accessible units. We recommend three (3) units be upgraded to UFAS standards to meet the 5% capacity recommendation for
ADA accessibility. The buildings exteriors are covered in with a brick veneer. Roofs are moderately sloped with asphalt/fiberglass composite
shingle surfacing. All roofs on all buildings were replaced n 2009. The substructure system is a poured concrete slab. Wood stud perimeter
bearing walls are used at the exterior to carry the pre-manufactured roof trusses and other roofing components. The buildings and grounds are in
fair to good condition.

Walls, Windows and Doors
Walls should be patched and painted as part of regular maintenance between tenants. We recommend that all interior doors should be replaced.
Sixteen (16) units of phase I and II exterior windows are original wood windows with aluminum storm windows and exterior unit doors are
original we recommend replacement with Energy Star windows and doors. Sixteen (16) units of phase I and II exterior windows are original wood




Narrative                                                  Page #5 of 10                                   CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                               Date: 5/??/11

windows with aluminum storm windows, all other windows are four (4) years old. The original windows are in poor condition. Exterior doors are
original hollow steel at the resident entries.

Common Areas
There is a separate building with a community center, kitchen, laundry room, male and female bathroom and maintenance area, we recommend
replacing appliances with Energy Star rated products and all fixtures with EPA specific fixtures. The existing office, is located in unit D109, using
the bedroom for maintenance storage. We recommend the addition of a maintenance work shed and remodeling the community center to
incorporate the office.

Fire Suppression and Life Safety
The buildings have smoke detectors in all units. We recommend that all smoke detectors be hard wired. There is also an emergency pull cord
system located in all units. Doors from the interior of the apartments lead directly to the exterior. Stove top fire stops in range hoods are also
recommended to be installed.


MECHANICAL AND ELECTRIC

HVAC Systems
The (32) Phase I units have electric base board heat and window mount A/C in the living room. The sixteen (16) Phase II units have gas furnaces
and exterior central A/C units. We recommend replacing all units with Energy Star heat pumps and air handling units with electric assisted heat.
This would reduce the energy cost to the tenant and improve the comfort.

Plumbing Systems
The local utility company provides water and sewer services. Copper piping is used to distribute interior domestic water, while plastic piping is
used for the wastewater collection. Bath fixtures are original and we recommend replacement. EPA WaterSense lavatories, water closets, and
showerheads should be installed when replaced. Many water heaters are past their EUL. We recommend replacement of all water heaters.

Electrical Systems
Electrical services come to each building, standard house voltage service at each apartment with a distribution panel serving an individual, panel at
each apartment. Each apartment has its own breaker panel. The electrical service to each dwelling unit consists of 120/240V ac 3-wire single-
phase with breaker panels rated for 125 amps. The apartments are on individual electric meters. There are no reported problems associated with
the wiring at this property.



Narrative                                                   Page #6 of 10                                     CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                              Date: 5/??/11


Lighting Systems
Interior light fixtures and bath exhaust fans are original. We recommend new Energy Star lighting fixtures and exhaust fans be installed. We
recommend installation of ceiling fans and light fixture combos be installed in all living rooms.


DWELLINGS

Interior Elements
The apartment interiors consist of one bedroom, a kitchen, a living area, a utility closet, room closet and coat closet. In the kitchen, there are wood
cabinets with laminate countertops, an electric range with a range hood, refrigerator, and sink with a standard single lever. We recommend
beginning replacement of the carpet and resilient flooring. Carpet should be replaced on a 10-year cycle. Resilient flooring should be replaced on
a 20-year cycle. This includes replacing the carpeting with resilient flooring in the office area and community area. Kitchen cabinets and
countertops/sinks are original and we recommend their replacement. Many of the cabinets have warped and expanded due to water intrusion at
kitchen sinks. EPA WaterSense faucets should be installed. Most ranges and range hoods are original we recommend their replacement. Few
refrigerators have been replaced and we recommend replacing them with Energy Star units. Vanities and bathroom fixtures are mostly original
and should be replaced. Many vanities have experienced the same problem with water damage at the bath sink.


ACCESSIBILITY

During the CNA inspection, the site and all public areas were screened for compliance with the Architectural Barriers Act, Section 504 of the
Rehabilitation Act of 1973, and the Americans with Disabilities Act. The Fair Housing Amendments Act effective date is 3/13/1991, and this
property pre-dates FHA accessibility requirements.
Multifamily housing dwelling units and common areas such as vehicle parking lots, mailboxes, trash dumpsters, and playgrounds are subject to
compliance with UFAS. Under UFAS, 5 percent of the total units, or one unit, whichever is greater must be fully accessible. The mix of
accessible units is to be comparable to the total mix of units at a specific property. The locations of accessible units are to be dispersed throughout
the project. ADA Guidelines require that at least one total but not less than one van-accessible parking space shall be made available for every
eight accessible spaces. Van accessible and handicap parking space signs are also required, with a sign post and aisle directly connected to the
accessible route.




Narrative                                                   Page #7 of 10                                    CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                          Date: 5/??/11

Accessible Units
Currently there are no fully UFAS compliant accessible apartments. There are 2, one-bedroom apartments which have been modified to meet
accessibility needs of tenants. We recommend three (3) units be upgraded to UFAS standards to meet the 5% capacity recommendation for ADA
accessibility. There are designated accessible parking spaces, however the pavement and signage do not meet the ADA specific requirements and
need to be modified and updated. Ramps are not provided up to every sidewalk, and modifications should be made to incorporate this. New walks
and ramps should be installed to provide accessibility throughout the site.

Accessible Parking
There are designated accessible parking spaces, however the pavement and signage do not meet the ADA specific requirements and need to be
modified and updated.

Public Restroom
The Community Center complete with a male and female ADA restrooms are not UFAS compliant. The office, unit D109, is not UFAS
assessable. We recommend upgrading all common areas to be fully UFAS compliant.


ENVIRONMENTAL

Lead Based Paint
Phase I buildings where constructed in 1976, Phase II buildings where constructed in 1984. The ban on lead paint occurred in 1978, after Phase I
and prior to Phase II. It is unknown if lead based paint was used. To the best of our knowledge no tests have been performed.

Asbestos Containing Material
Phase I buildings where constructed in 1976, Phase II buildings where constructed in 1984. The ban on asbestos containing construction materials
occurred in 1978, after Phase I and prior to Phase II. To the best of our knowledge no tests have been performed.

Mold and Mildew
The subject property was visually inspected for the presence of moisture intrusion and mold growth. There was not any evidence of moisture
intrusion or mold growth during our site visit.

Flood Zone
The subject property is located in an area that is mapped in published FIRM as zone “X”.



Narrative                                                Page #8 of 10                                   CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                          Date: 5/??/11


Transmission Lines
No electrical power transmission lines are located in the immediate vicinity of the subject property.

Pest Control
Pest infestations were not observed or reported during the inspection.

Other Environmental Concerns
No other environmental concerns were identified at the subject property.


HOW REPLACEMENT COSTS ARE DETERMINED
We developed a scope of work with the Owner. Our scope of work considered published cost data from reliable sources. When possible, we
utilized actual contractor pricing in the area in developing our cost estimates. We used the Fanny Mae Expected Useful Life Tables as a guide in
our replacement reserve analysis. These tables are provided by USDA in their January 07, 2011, Un-numbered Letter regarding Capital Needs
Assessments.


NEEDS FUNDED BY THIRD PARTY

This project is applying for third party funding for rehabilitation through the Federal Home Loan Bank of Indianapolis and the Affordable Housing
Program 2011 Implementation Plan and also the IHCDA for Strategic Investment Program. A copy of the Repair List used for this report is
available from the Owner.



ACKNOWLEDGEMENTS

The following people were interviewed during our survey:
        Mrs. No Namer (Site Manager)




Narrative                                                  Page #9 of 10                                 CNA Worksheet Version 1.5d
Capital Needs Assessment

Project: Apartment Name                                                                                           Date: 5/??/11

We reviewed the following documents:
       Apartment Name Construction Documents 19??

Maintenance Description

Maintenance is handled in-house or by contract teams as needed.

Observations & Comments

Maintenance practices for the subject appear to be adequate as in evidenced by the physical appearance of the property and its general condition.
Keep in mind that as properties age, their maintenance requirements will likely escalate.




Narrative                                                Page #10 of 10                                   CNA Worksheet Version 1.5d

Más contenido relacionado

Destacado

Destacado (6)

Technology Needs Assessment for Climate Change presentation Nairobi 20-22 sep...
Technology Needs Assessment for Climate Change presentation Nairobi 20-22 sep...Technology Needs Assessment for Climate Change presentation Nairobi 20-22 sep...
Technology Needs Assessment for Climate Change presentation Nairobi 20-22 sep...
 
Community Needs Assessment
Community Needs AssessmentCommunity Needs Assessment
Community Needs Assessment
 
Capital Needs Assessment Provider - Statement of Qualifications
Capital Needs Assessment Provider - Statement of QualificationsCapital Needs Assessment Provider - Statement of Qualifications
Capital Needs Assessment Provider - Statement of Qualifications
 
Psychological Assessment of Adults with Specific Performance Difficulties at ...
Psychological Assessment of Adults with Specific Performance Difficulties at ...Psychological Assessment of Adults with Specific Performance Difficulties at ...
Psychological Assessment of Adults with Specific Performance Difficulties at ...
 
Training Needs Assessment & Analysis
Training Needs Assessment & AnalysisTraining Needs Assessment & Analysis
Training Needs Assessment & Analysis
 
Build Features, Not Apps
Build Features, Not AppsBuild Features, Not Apps
Build Features, Not Apps
 

Similar a Capital Needs Assessment Example

ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability EngineerAngela Lopez
 
Department X (DEPARTMENT X)Quality Management (QM)Project .docx
Department X (DEPARTMENT X)Quality Management (QM)Project .docxDepartment X (DEPARTMENT X)Quality Management (QM)Project .docx
Department X (DEPARTMENT X)Quality Management (QM)Project .docxsalmonpybus
 
Esound Brochure
Esound BrochureEsound Brochure
Esound BrochureDevan2012
 
Esound Quick Brochure
Esound Quick BrochureEsound Quick Brochure
Esound Quick Brochurediegobelmonte
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochurekkdeacon
 
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET Journal
 
IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational BuildingIRJET Journal
 
Sample 2007 built_rural_area
Sample 2007 built_rural_areaSample 2007 built_rural_area
Sample 2007 built_rural_areaHomePro4214913
 
Tri-Tech Multi-Family lead paint testing-What to expect-FAQ
Tri-Tech Multi-Family lead paint testing-What to expect-FAQTri-Tech Multi-Family lead paint testing-What to expect-FAQ
Tri-Tech Multi-Family lead paint testing-What to expect-FAQDIYSampleTesting.com
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxmayas43
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxZiyad Zaidi
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val repIndependentgroup
 
Sample new construction-completed_over_a_year_earlier
Sample new construction-completed_over_a_year_earlierSample new construction-completed_over_a_year_earlier
Sample new construction-completed_over_a_year_earlierHomePro4214913
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIALNat Rice
 
PrePurchaseSampleReport
PrePurchaseSampleReportPrePurchaseSampleReport
PrePurchaseSampleReportMike Linklater
 

Similar a Capital Needs Assessment Example (20)

ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
Deterioration of Concrete
Deterioration of ConcreteDeterioration of Concrete
Deterioration of Concrete
 
Department X (DEPARTMENT X)Quality Management (QM)Project .docx
Department X (DEPARTMENT X)Quality Management (QM)Project .docxDepartment X (DEPARTMENT X)Quality Management (QM)Project .docx
Department X (DEPARTMENT X)Quality Management (QM)Project .docx
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochure
 
Esound Quick Brochure
Esound Quick BrochureEsound Quick Brochure
Esound Quick Brochure
 
Esound Brochure
Esound BrochureEsound Brochure
Esound Brochure
 
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building KalyanIRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
IRJET- Approximate Estimate and Planning of Old Tehsil Building Kalyan
 
Building Dilapidations International Sample Report with Gauge
Building Dilapidations International Sample Report with GaugeBuilding Dilapidations International Sample Report with Gauge
Building Dilapidations International Sample Report with Gauge
 
IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational Building
 
BS course bldg diagnostic
BS course bldg diagnosticBS course bldg diagnostic
BS course bldg diagnostic
 
Sample 2007 built_rural_area
Sample 2007 built_rural_areaSample 2007 built_rural_area
Sample 2007 built_rural_area
 
Tri-Tech Multi-Family lead paint testing-What to expect-FAQ
Tri-Tech Multi-Family lead paint testing-What to expect-FAQTri-Tech Multi-Family lead paint testing-What to expect-FAQ
Tri-Tech Multi-Family lead paint testing-What to expect-FAQ
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
 
Oberoi Hotel
Oberoi HotelOberoi Hotel
Oberoi Hotel
 
Creek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docxCreek Vista Marine FARAAZ KHAN WORK Report.docx
Creek Vista Marine FARAAZ KHAN WORK Report.docx
 
CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
Sample wind apartment ins val rep
Sample wind apartment ins val repSample wind apartment ins val rep
Sample wind apartment ins val rep
 
Sample new construction-completed_over_a_year_earlier
Sample new construction-completed_over_a_year_earlierSample new construction-completed_over_a_year_earlier
Sample new construction-completed_over_a_year_earlier
 
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
0111CE702-ESTIMATION AND QUANTITY SURVEYING VII SEMESTER E-LEARNING MATERIAL
 
PrePurchaseSampleReport
PrePurchaseSampleReportPrePurchaseSampleReport
PrePurchaseSampleReport
 

Más de Adam Hoeksema

Eac presentation final
Eac presentation finalEac presentation final
Eac presentation finalAdam Hoeksema
 
Executive Summary Example - Kajavic Industries
Executive Summary Example - Kajavic IndustriesExecutive Summary Example - Kajavic Industries
Executive Summary Example - Kajavic IndustriesAdam Hoeksema
 
How to Find Investors on LinkedIn
How to Find Investors on LinkedInHow to Find Investors on LinkedIn
How to Find Investors on LinkedInAdam Hoeksema
 
Positive Classroom Behavior
Positive Classroom BehaviorPositive Classroom Behavior
Positive Classroom BehaviorAdam Hoeksema
 
Investor pitch powerpoint example
Investor pitch powerpoint exampleInvestor pitch powerpoint example
Investor pitch powerpoint exampleAdam Hoeksema
 
Business Plan Outline Sample
Business Plan Outline SampleBusiness Plan Outline Sample
Business Plan Outline SampleAdam Hoeksema
 

Más de Adam Hoeksema (6)

Eac presentation final
Eac presentation finalEac presentation final
Eac presentation final
 
Executive Summary Example - Kajavic Industries
Executive Summary Example - Kajavic IndustriesExecutive Summary Example - Kajavic Industries
Executive Summary Example - Kajavic Industries
 
How to Find Investors on LinkedIn
How to Find Investors on LinkedInHow to Find Investors on LinkedIn
How to Find Investors on LinkedIn
 
Positive Classroom Behavior
Positive Classroom BehaviorPositive Classroom Behavior
Positive Classroom Behavior
 
Investor pitch powerpoint example
Investor pitch powerpoint exampleInvestor pitch powerpoint example
Investor pitch powerpoint example
 
Business Plan Outline Sample
Business Plan Outline SampleBusiness Plan Outline Sample
Business Plan Outline Sample
 

Último

9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDFMs Riya
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024VickyAulakh1
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...delhimodel235
 
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, NoidaM3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, Noidasarak0han45400
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...asmaqueen5
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️soniya singh
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdfManishSaxena95
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...asmaqueen5
 
Raquel Thompson: Combining Creativity with Practicality in Architecture
Raquel Thompson: Combining  Creativity with Practicality in ArchitectureRaquel Thompson: Combining  Creativity with Practicality in Architecture
Raquel Thompson: Combining Creativity with Practicality in ArchitectureRaquel Thompson Barbados
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...lizamodels9
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfBabyrudram
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhiasmaqueen5
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...Volition Properties
 
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Nehwal
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhidelhimodel235
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Venturessheltercareglobal
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTurbo Tenant
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaonsoniya singh
 

Último (20)

9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
9711199012 Call {Girls Delhi} Very Low rate Vaishali DownLoad PDF
 
Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024Greater Vancouver Realtors Statistics Package April 2024
Greater Vancouver Realtors Statistics Package April 2024
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
Call Girls in Noida Sector 11 Noida 💯Call Us 🔝 9582086666 🔝 South Delhi Escor...
 
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, NoidaM3M 129 E Brochure Noida Expressway, Sector 129, Noida
M3M 129 E Brochure Noida Expressway, Sector 129, Noida
 
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 57 Noida Escorts >༒8448380779 Escort Service
 
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...
Call Girls In Chand Nagar (Delhi)+918447779280 Welcome To Vip Women Seeking M...
 
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
call girls in ganesh nagar Delhi 8264348440 ✅ call girls ❤️
 
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Hinjewadi Phase 2 Pune E-Brochure.pdf
 
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
Call Girls In Laxmi Nagar Delhi +91-8447779280! !Best Woman Seeking Man Escor...
 
Raquel Thompson: Combining Creativity with Practicality in Architecture
Raquel Thompson: Combining  Creativity with Practicality in ArchitectureRaquel Thompson: Combining  Creativity with Practicality in Architecture
Raquel Thompson: Combining Creativity with Practicality in Architecture
 
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
:/Call Girls In Saidulajab Delhi ➥9990211544 High profile Riya Escorts In 24/...
 
Mahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdfMahindra Happinest Tathawade Pune Brochure.pdf
Mahindra Happinest Tathawade Pune Brochure.pdf
 
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In DelhiLow Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
Low Rate ↬Call Girls in Trilokpuri Delhi ↫8447779280}Escorts Service In Delhi
 
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...How to Build Multifamily and Laneway Suites  in Toronto!! (feat. Expert Archi...
How to Build Multifamily and Laneway Suites in Toronto!! (feat. Expert Archi...
 
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired FantasiesPooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
Pooja Mehta 9167673311 Get Warm Welcome By Andheri Escorts For Desired Fantasies
 
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
9990771857 Call Girls in Dwarka Sector 1 Delhi (Call Girls) Delhi
 
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial VenturesM3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
M3M The Line Brochure - Premium Investment Opportunity for Commercial Ventures
 
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports WorkTENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
TENANT SCREENING REPORT SERVICES​ How Tenant Screening Reports Work
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | GurgaonFULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
FULL ENJOY 🔝 8264348440 🔝 Call Girls in DLF phase 3 | Gurgaon
 

Capital Needs Assessment Example

  • 1. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 CAPITAL NEEDS SUMMARY This assessment was conducted by individuals trained and experienced in building construction. The report that follows is based on that investigation and was prepared as provided by USDA Rural Development PNA Guidelines found in Attachment B and Attachment C to the contract. The report needs to be read in its entirety to understand fully all of the information that we have obtained. The inspection was performed for the Capital Needs Assessment (CNA) of Apartment Name, ADDRESS, on Month XX, 2011 on behalf of CORPORATION THAT OWNS APT COMPLEX, Inc. by INSPECTOR. The report was prepared by Crandall Engineering. All pictures and references are based on the Month XX, 2011 site inspection. Weather conditions on the day of the investigation were cold with partly cloudy skies. Apartment Name is a senior housing project. Phase I (# units) was originally constructed circa 1900, and Phase II (# units) was constructed 1900. Neighboring properties are comprised primarily of residential multi-family properties and some commercial. The property, with # units housed in # separate one-story buildings, includes all 1-bedroom, 1-bathroom units. In a separate one story building is a community center, laundry, maintenance, community kitchen and a male and Female ADA bathroom. There are currently no fully UFAS compliant accessible apartments. All units have a single exterior door per unit that leads directly to the common parking lot. We recommend s number (#) one-bedroom apartments be upgraded to UFAS standards to meet the 5% capacity requirement for ADA accessibility. All buildings have an exterior access. The purpose of this Capital Needs Assessment (CNA) is to determine the current condition of the building envelope, systems, paved areas, utilities, and site improvements, and to establish a preliminary capital reserve for the future. It is intended to be used in support of real estate transactions where the client is either acquiring the building or wishes to know the current condition and future capital requirements for purposes of rehabilitation and reserve requirements. We performed the CNA according to the scope as generally defined by USDA Rural Development. The survey is based on interviews with local management, a review of available documents, and an examination of the buildings and site, in particular, the foundation and/or slab-on-grade, the roof, the exterior walls, the steel and wood framing, mechanical systems, exterior doors and windows, paved areas, and utilities. During our investigation we inspected (??) apartment units, all common areas and all the building exteriors and grounds at Apartment Name. The report contains the following: A description of the overall condition of buildings’ components and systems and conditions that may limit the expected useful life of the buildings and their components. Narrative Page #1 of 10 CNA Worksheet Version 1.5d
  • 2. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 Information about significant deficiencies, deferred maintenance items, and material code violations based on a visual survey of the buildings and grounds, research of documents, and conversations with people who have knowledge about the facility. LIMITATIONS The statements in the report are opinions about the present condition of the subject property. They are based on visual evidence available during a diligent investigation of all reasonably accessible areas. We did not remove any surface materials, perform any destructive testing, or move any furnishings. The study is not an exhaustive technical evaluation. Such an evaluation would entail a significantly larger scope than this effort. The information, observations, and conclusions described in this report are valid on the date of the investigation and have been made under the terms, conditions, limitations, and constraints noted in the report. We prepared the report for the exclusive use of CORPORATION THAT OWNS APT COMPLEX. No other individual or party shall be entitled to reply upon the report without our express written consent. If another individual or party relies on the report, such individual or party shall indemnify and hold Crandall Engineering harmless for any damages, losses, or expenses incurred as a result of such use. Any use or reliance of the report by an individual or party other than CORPORATION THAT OWNS APT COMPLEX shall constitute acceptance of these terms and conditions. Any electronic copies of this report that are provided to CORPORATION THAT OWNS APT COMPLEX are for the convenience of CORPORATION THAT OWNS APT COMPLEX are not to be construed as the original or final report. The report is limited to the visual observations made during our investigation. We did not remove surface materials, conduct any destructive or invasive testing, move furnishings or equipment, or undertake any digging or excavation. Accordingly, we cannot comment on the condition of systems that we could not see, such as buried structures and utilities, nor are we responsible for conditions that could not be seen or were not within the scope of our services at the time of investigation. We did not undertake to completely assess the stability of the buildings or the underlying foundation soil since this effort would require excavation and destructive testing. Likewise, this is not a seismic assessment. We did not investigate the following areas: All unit interiors We do not render an opinion on uninvestigated portions of the facility. Narrative Page #2 of 10 CNA Worksheet Version 1.5d
  • 3. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 We did not perform any computations or other engineering analysis as part of this evaluation, nor did we conduct a comprehensive code compliance investigation. The report is not to be considered a warranty of condition, and no warranty is implied. The photographs are an integral part of this report and must be included in any review. If opinions of probable costs are presented, they are preliminary only. Opinions are based on our general knowledge of building systems and the contracting/construction industry. When appropriate, we have relied on standard sources, such as Means Building Construction Cost Data, to develop opinions of probable costs. However, for some items for which we have developed opinions of probable cost (e.g., structural repairs), no standard guide for developing such costs exists. We have performed no design work as part of the study, nor have we obtained competitive quotations or estimates from contractors as this also is beyond the scope of the project. The actual cost to remedy deficiencies and deferred maintenance items that we have identified may vary significantly from estimates and competitive quotations from contractors. EXISTING BUILDING SYSTEMS AND CONDITIONS SUMMARY HEALTH AND SAFETY In this section of the report, we are concerned with those deficiencies that will require immediate repair or replacement. Any existing health and safety issues will be addressed by the Owner. Information on any existing health and safety issues are on the repair list provided by the Owner. There are no health and safety issues requiring immediate attention at this site. DEVELOPMENT/PROJECT DESIGN CHARATERISTICS Rehabilitation shall provide: o Provide an equipped computer center and internet access in the community center o Construct a playground on site (shuffleboard) o Individual porch/patio for each unit o Exercise room with exercise equipment (open to all residents) Narrative Page #3 of 10 CNA Worksheet Version 1.5d
  • 4. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 GREEN DEVELOPMENT/REHABILITATION INITITIVE Water Conservation o Replace all fixtures with those meeting the EPA WaterSense specification Efficient Energy Use o Install daylight sensors (photocells) or timers on all Energy Star rated lighting o Install Energy Star labeled lighting fixtures in all interior units Additional Green Points o Use of at least one construction material made from 50% or greater recycled content; flooring materials and/ or attic insulation will be used. o Project is within ½ mile of amenities relevant to housing projects o 100% brick exterior and replace siding with cement board. SITE Site Lighting Exterior pole mounted lights provide light for site and parking. These also provide ground lighting, light fixtures are also located at each apartment entrance. It is not known if lighting is adequate as the survey was performed during daytime hours; based on the number of lighting fixtures and tenant interviews, the lighting appears to be adequate at the subject property. Building-mounted exterior lighting and the 48 pole lights are original. We recommend replacement with Energy Star lighting fixtures and replace the 48 pole lights with 12 new pole lights. Driveways, Parking Lots and Sidewalks A single asphalt parking area is located at the front of the property, with head-in parking spaces with an entrance on the east side of the property onto Main Street. A second parking area is located on the north west corner of the property, with head-in parking spaces with an entrance on the north east side of the property onto Main Street. There is no ADA parking, signage, curbs, or ramps by the office or apartment buildings. The sidewalks are in fair condition with some needing replaced/repairs. However, new walks and ramps should be installed to provide accessibility throughout the site. Narrative Page #4 of 10 CNA Worksheet Version 1.5d
  • 5. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 Site Drainage Site drainage for storm runoff is adequate in most areas. Some areas have been reported to have inadequate drainage causing large amounts of standing water. All inlets to the city’s storm system are adequate. Landscaping Landscaping consists of trees, shrubs, and lawns surrounding the buildings. The quality and health of the vegetation and landscaping at all locations is in fair condition. We recommend select landscaping improvements to improve the appearance and marketability of the apartments. Signage The site features one property identification sign posted near the property entry. The sign identifies the property by name. Dumpster Enclosures There are two dumpster areas to deposit trash on the site. New enclosures are recommended to improve the appearance, marketability, and sanitary of the apartments. ARCHITECTURAL Structural Elements The property, with 48 units housed in (12) separate one-story buildings, includes all 1-bedroom, 1-bathroom units. A separate building houses a community center, laundry room, maintenance work/storage area, a male and female bathroom, and community kitchen. There are currently no UFAS compliant accessible units. We recommend three (3) units be upgraded to UFAS standards to meet the 5% capacity recommendation for ADA accessibility. The buildings exteriors are covered in with a brick veneer. Roofs are moderately sloped with asphalt/fiberglass composite shingle surfacing. All roofs on all buildings were replaced n 2009. The substructure system is a poured concrete slab. Wood stud perimeter bearing walls are used at the exterior to carry the pre-manufactured roof trusses and other roofing components. The buildings and grounds are in fair to good condition. Walls, Windows and Doors Walls should be patched and painted as part of regular maintenance between tenants. We recommend that all interior doors should be replaced. Sixteen (16) units of phase I and II exterior windows are original wood windows with aluminum storm windows and exterior unit doors are original we recommend replacement with Energy Star windows and doors. Sixteen (16) units of phase I and II exterior windows are original wood Narrative Page #5 of 10 CNA Worksheet Version 1.5d
  • 6. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 windows with aluminum storm windows, all other windows are four (4) years old. The original windows are in poor condition. Exterior doors are original hollow steel at the resident entries. Common Areas There is a separate building with a community center, kitchen, laundry room, male and female bathroom and maintenance area, we recommend replacing appliances with Energy Star rated products and all fixtures with EPA specific fixtures. The existing office, is located in unit D109, using the bedroom for maintenance storage. We recommend the addition of a maintenance work shed and remodeling the community center to incorporate the office. Fire Suppression and Life Safety The buildings have smoke detectors in all units. We recommend that all smoke detectors be hard wired. There is also an emergency pull cord system located in all units. Doors from the interior of the apartments lead directly to the exterior. Stove top fire stops in range hoods are also recommended to be installed. MECHANICAL AND ELECTRIC HVAC Systems The (32) Phase I units have electric base board heat and window mount A/C in the living room. The sixteen (16) Phase II units have gas furnaces and exterior central A/C units. We recommend replacing all units with Energy Star heat pumps and air handling units with electric assisted heat. This would reduce the energy cost to the tenant and improve the comfort. Plumbing Systems The local utility company provides water and sewer services. Copper piping is used to distribute interior domestic water, while plastic piping is used for the wastewater collection. Bath fixtures are original and we recommend replacement. EPA WaterSense lavatories, water closets, and showerheads should be installed when replaced. Many water heaters are past their EUL. We recommend replacement of all water heaters. Electrical Systems Electrical services come to each building, standard house voltage service at each apartment with a distribution panel serving an individual, panel at each apartment. Each apartment has its own breaker panel. The electrical service to each dwelling unit consists of 120/240V ac 3-wire single- phase with breaker panels rated for 125 amps. The apartments are on individual electric meters. There are no reported problems associated with the wiring at this property. Narrative Page #6 of 10 CNA Worksheet Version 1.5d
  • 7. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 Lighting Systems Interior light fixtures and bath exhaust fans are original. We recommend new Energy Star lighting fixtures and exhaust fans be installed. We recommend installation of ceiling fans and light fixture combos be installed in all living rooms. DWELLINGS Interior Elements The apartment interiors consist of one bedroom, a kitchen, a living area, a utility closet, room closet and coat closet. In the kitchen, there are wood cabinets with laminate countertops, an electric range with a range hood, refrigerator, and sink with a standard single lever. We recommend beginning replacement of the carpet and resilient flooring. Carpet should be replaced on a 10-year cycle. Resilient flooring should be replaced on a 20-year cycle. This includes replacing the carpeting with resilient flooring in the office area and community area. Kitchen cabinets and countertops/sinks are original and we recommend their replacement. Many of the cabinets have warped and expanded due to water intrusion at kitchen sinks. EPA WaterSense faucets should be installed. Most ranges and range hoods are original we recommend their replacement. Few refrigerators have been replaced and we recommend replacing them with Energy Star units. Vanities and bathroom fixtures are mostly original and should be replaced. Many vanities have experienced the same problem with water damage at the bath sink. ACCESSIBILITY During the CNA inspection, the site and all public areas were screened for compliance with the Architectural Barriers Act, Section 504 of the Rehabilitation Act of 1973, and the Americans with Disabilities Act. The Fair Housing Amendments Act effective date is 3/13/1991, and this property pre-dates FHA accessibility requirements. Multifamily housing dwelling units and common areas such as vehicle parking lots, mailboxes, trash dumpsters, and playgrounds are subject to compliance with UFAS. Under UFAS, 5 percent of the total units, or one unit, whichever is greater must be fully accessible. The mix of accessible units is to be comparable to the total mix of units at a specific property. The locations of accessible units are to be dispersed throughout the project. ADA Guidelines require that at least one total but not less than one van-accessible parking space shall be made available for every eight accessible spaces. Van accessible and handicap parking space signs are also required, with a sign post and aisle directly connected to the accessible route. Narrative Page #7 of 10 CNA Worksheet Version 1.5d
  • 8. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 Accessible Units Currently there are no fully UFAS compliant accessible apartments. There are 2, one-bedroom apartments which have been modified to meet accessibility needs of tenants. We recommend three (3) units be upgraded to UFAS standards to meet the 5% capacity recommendation for ADA accessibility. There are designated accessible parking spaces, however the pavement and signage do not meet the ADA specific requirements and need to be modified and updated. Ramps are not provided up to every sidewalk, and modifications should be made to incorporate this. New walks and ramps should be installed to provide accessibility throughout the site. Accessible Parking There are designated accessible parking spaces, however the pavement and signage do not meet the ADA specific requirements and need to be modified and updated. Public Restroom The Community Center complete with a male and female ADA restrooms are not UFAS compliant. The office, unit D109, is not UFAS assessable. We recommend upgrading all common areas to be fully UFAS compliant. ENVIRONMENTAL Lead Based Paint Phase I buildings where constructed in 1976, Phase II buildings where constructed in 1984. The ban on lead paint occurred in 1978, after Phase I and prior to Phase II. It is unknown if lead based paint was used. To the best of our knowledge no tests have been performed. Asbestos Containing Material Phase I buildings where constructed in 1976, Phase II buildings where constructed in 1984. The ban on asbestos containing construction materials occurred in 1978, after Phase I and prior to Phase II. To the best of our knowledge no tests have been performed. Mold and Mildew The subject property was visually inspected for the presence of moisture intrusion and mold growth. There was not any evidence of moisture intrusion or mold growth during our site visit. Flood Zone The subject property is located in an area that is mapped in published FIRM as zone “X”. Narrative Page #8 of 10 CNA Worksheet Version 1.5d
  • 9. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 Transmission Lines No electrical power transmission lines are located in the immediate vicinity of the subject property. Pest Control Pest infestations were not observed or reported during the inspection. Other Environmental Concerns No other environmental concerns were identified at the subject property. HOW REPLACEMENT COSTS ARE DETERMINED We developed a scope of work with the Owner. Our scope of work considered published cost data from reliable sources. When possible, we utilized actual contractor pricing in the area in developing our cost estimates. We used the Fanny Mae Expected Useful Life Tables as a guide in our replacement reserve analysis. These tables are provided by USDA in their January 07, 2011, Un-numbered Letter regarding Capital Needs Assessments. NEEDS FUNDED BY THIRD PARTY This project is applying for third party funding for rehabilitation through the Federal Home Loan Bank of Indianapolis and the Affordable Housing Program 2011 Implementation Plan and also the IHCDA for Strategic Investment Program. A copy of the Repair List used for this report is available from the Owner. ACKNOWLEDGEMENTS The following people were interviewed during our survey: Mrs. No Namer (Site Manager) Narrative Page #9 of 10 CNA Worksheet Version 1.5d
  • 10. Capital Needs Assessment Project: Apartment Name Date: 5/??/11 We reviewed the following documents: Apartment Name Construction Documents 19?? Maintenance Description Maintenance is handled in-house or by contract teams as needed. Observations & Comments Maintenance practices for the subject appear to be adequate as in evidenced by the physical appearance of the property and its general condition. Keep in mind that as properties age, their maintenance requirements will likely escalate. Narrative Page #10 of 10 CNA Worksheet Version 1.5d