SlideShare una empresa de Scribd logo
1 de 60
Layout Strategy
Objectives of the Layout Strategy ,[object Object],[object Object],[object Object],[object Object],[object Object]
What is Facility Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Strategic Importance of Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Requirements of a Good Layout ,[object Object],[object Object],[object Object],[object Object],[object Object]
Constraints on Layout Objectives ,[object Object],[object Object],[object Object],[object Object]
Six Layout Strategies ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Six Layout Strategies - continued ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Fixed-Position Layout ,[object Object],[object Object],[object Object],[object Object],[object Object]
Factors Complicating a Fixed Position Layout ,[object Object],[object Object],[object Object]
Process-Oriented Layout ,[object Object],[object Object],[object Object],[object Object]
Emergency Room Layout Surgery Radiology E.R. beds Pharmacy Billing/exit E.R.Triage room E.R. Admissions Patient B - erratic pacemaker Patient A - broken leg Hallway
Steps in Developing a  Process-Oriented Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Cost of Process-Oriented Layout
Interdepartmental Flow of Parts 1 2 3 4 5 6 1 2 3 4 5 6 50 100 0 0 20 30 50 10 0 20 0 100 50 0 0
Number of Weekly Loads 100 50 30 10 20 50 20 100 50 1 2 3 4 5 6
Possible Layout 1 Assembly Department (1) Painting Department (2) Machine Shop Department (3) Receiving Department (4) Shipping Department (5) Testing Department (6) Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 60’ 40’
Number of Weekly Loads 100 50 30 10 20 50 20 100 50 1 2 3 4 5 6
Possible Layout 2 Painting Department (2) Assembly Department (1) Machine Shop Department (3) Receiving Department (4) Shipping Department (5) Testing Department (6) Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 60’ 40’
Computer Programs for Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Out-Patient Hospital Example CRAFT 1  2  3  4  5  6 1  2  3  4  5  6 1 2 3 4 5 6 1 2 3 4 5 6 Total cost:  20,100 Est. Cost Reduction  .00 Iteration  0 Total cost:  14,390 Est. Cost Reduction  70. Iteration  3 Legend: A = xray/MRI rooms B = laboratories C = admissions D = exam rooms E = operating rooms F = recovery rooms D E E E E E D D D B B B A A A A F F F F F D D D C C D D D D D B A A A A F F F A A A F F E B B B D D D D A A A A A E E D C C E E D D D B D D D D
Cellular Layout - Work Cells ,[object Object],[object Object],[object Object],[object Object]
Improving Layouts by Moving to the Work Cell Concept
Work Cells - Some Advantages ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Work Cell Advantages Inventory Floor space Direct labor costs Equipment utilization Employee participation Quality
Work Cell Floor Plan Office Tool Room Work Cell Saws Drills
Requirements for Cellular Production ,[object Object],[object Object],[object Object],[object Object]
Work Cells, etc. Work Cell A temporary assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility Example:  job shop with rearranged machinery and personnel to produce 30 unique control panels Focused Work Center A permanent assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility Example:  manufacturing of pipe brackets at a shipyard Focused Factory A permanent facility to produce a product or component in a product-oriented facility Example:  a plant to produce window mechanisms for automobiles
Number of Product Lines and Operating Performance -5 0 5 10 15 Sales ($M) 100 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],More focused plants ,[object Object],[object Object],[object Object],[object Object],[object Object],Less focused plants
Office Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Office Layout Floor Plan Accounting Manager Brand X Finance Fin. Acct.
Retail/Service Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Retail Layouts - Rules of Thumb ,[object Object],[object Object],[object Object],[object Object],[object Object]
Retail/Service Layout –   Grid Design Office Carts Check- out Grocery Store Meat Bread Milk Produce Frozen Foods
Retail/Service Layout -  Free-Flow Design Feature Display Table Trans. Counter Apparel Store
Retail Store Shelf Space Planogram ,[object Object],[object Object],[object Object],[object Object],2 ft . 5   facings VO-5 VO-5 VO-5 SUAVE SUAVE VO-5 PERT PERT PERT PERT PERT VO-5
A Good Service Layout (Servicescape) Considers ,[object Object],[object Object],[object Object]
Warehouse Layout ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Warehouse Layout Floor Plan Zones Conveyor Truck Order Picker
Cross Docking ,[object Object],[object Object],[object Object],[object Object],[object Object],In-coming Outgoing © 1984-1994 T/Maker Co. © 1995 Corel Corp.
Random Stocking Systems Often: ,[object Object],[object Object],[object Object],[object Object],[object Object]
Product-Oriented Layout ,[object Object],[object Object],[object Object],[object Object]
Product-Oriented Requirements ,[object Object],[object Object],[object Object],[object Object]
Product-Oriented Layout - Assumptions ,[object Object],[object Object],[object Object],[object Object]
Product-Oriented Layout Types ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fabrication Line Assembly Line
Product Layout Advantages ,[object Object],[object Object],[object Object],[object Object],[object Object]
Product Layout Disadvantages ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
An Assembly Line Layout
Assembly Line Types
Repetitive Layout 1 3 2 4 5 Work Office Belt Conveyor Work Station Note: 5 tasks or operations; 3 work stations Work Station Station
Assembly Line Balancing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Assembly Line Balancing The General Procedure ,[object Object],[object Object],[object Object]
Assembly Line Balancing Steps ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Assembly Line Balancing Jargon ,[object Object],[object Object],[object Object],[object Object]
Assembly Line Balancing Equations Cycle time  =  Production time available Demand per day Minimum number of work stations     Task times Cycle time Efficiency  = =    Task times * (Cycle time) (Actual number of work stations)
Heuristics for Assigning Tasks in Assembly Line Balancing ,[object Object],[object Object],[object Object],[object Object],[object Object]
Line Balancing Example #1 30 E, H I 70 D, G H 100 F G 50 - F 30 B, D E 40 C D 30 - C 80 A B 60 - A Seconds Predecessor Task
Line Balancing Example #1 (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Line Balancing Example #2 30 E, H I 70 D, G H 100 F G 50 - F 30 B, D E 40 C D 30 - C 80 A B 60 - A Seconds Predecessor Task
Line Balancing Example #2 (cont.) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)FNian
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysisvideoaakash15
 
Line balancing
Line balancingLine balancing
Line balancinggeetha_64
 
History of Toyota Production System (TPS)
History of Toyota Production System (TPS)History of Toyota Production System (TPS)
History of Toyota Production System (TPS)W3 Group Canada Inc.
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layoutsAjith Antony
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Er. Bade Bhausaheb
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)nestor martinez
 
Facility Capacity & Layout Planning
Facility Capacity & Layout PlanningFacility Capacity & Layout Planning
Facility Capacity & Layout PlanningNishant Agrawal
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout StrategiesJoanmaines
 

La actualidad más candente (20)

Plant Layout Algorithm
Plant Layout AlgorithmPlant Layout Algorithm
Plant Layout Algorithm
 
Ch09(2)
Ch09(2)Ch09(2)
Ch09(2)
 
Layout Strategy
Layout StrategyLayout Strategy
Layout Strategy
 
Location theories
Location theoriesLocation theories
Location theories
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Line balancing
Line balancingLine balancing
Line balancing
 
Ch5 process analysis
Ch5 process analysisCh5 process analysis
Ch5 process analysis
 
Production planning hierarchy
Production planning hierarchyProduction planning hierarchy
Production planning hierarchy
 
Line balancing
Line balancingLine balancing
Line balancing
 
Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
History of Toyota Production System (TPS)
History of Toyota Production System (TPS)History of Toyota Production System (TPS)
History of Toyota Production System (TPS)
 
Operation Process
Operation ProcessOperation Process
Operation Process
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Product, process, fixed and group layouts
Product, process, fixed and group layoutsProduct, process, fixed and group layouts
Product, process, fixed and group layouts
 
Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.Industrial Engineering unit 5. Facility Design Notes by badebhau.
Industrial Engineering unit 5. Facility Design Notes by badebhau.
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)
 
Facility Capacity & Layout Planning
Facility Capacity & Layout PlanningFacility Capacity & Layout Planning
Facility Capacity & Layout Planning
 
Manufacturing cells
Manufacturing cellsManufacturing cells
Manufacturing cells
 
Process And Layout Strategies
Process And Layout StrategiesProcess And Layout Strategies
Process And Layout Strategies
 

Similar a Layout (20)

Layout
LayoutLayout
Layout
 
Ch09
Ch09Ch09
Ch09
 
Product service -profiling
Product service -profilingProduct service -profiling
Product service -profiling
 
Process design layout ppt bec doms
Process design layout ppt bec domsProcess design layout ppt bec doms
Process design layout ppt bec doms
 
4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt4 Chapter 6 Facility layout.ppt
4 Chapter 6 Facility layout.ppt
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Facility layout-material-handling
Facility layout-material-handlingFacility layout-material-handling
Facility layout-material-handling
 
chapter 6.ppt
chapter 6.pptchapter 6.ppt
chapter 6.ppt
 
IPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptxIPE 493_T6_Facility Layout.pptx
IPE 493_T6_Facility Layout.pptx
 
Production facilities
Production facilitiesProduction facilities
Production facilities
 
Plant layout
Plant layout Plant layout
Plant layout
 
Project On Facility Layout
Project On Facility LayoutProject On Facility Layout
Project On Facility Layout
 
layout-strategy. Credits to the owner pl
layout-strategy. Credits to the owner  pllayout-strategy. Credits to the owner  pl
layout-strategy. Credits to the owner pl
 
GEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUTGEOMETRIC MODELING FOR PLANT LAYOUT
GEOMETRIC MODELING FOR PLANT LAYOUT
 
LESSON-3.doc
LESSON-3.docLESSON-3.doc
LESSON-3.doc
 
Chap006 120827102017-phpapp02
Chap006 120827102017-phpapp02Chap006 120827102017-phpapp02
Chap006 120827102017-phpapp02
 
Process & Capacity 2
Process & Capacity 2Process & Capacity 2
Process & Capacity 2
 
Process design layout
Process design layoutProcess design layout
Process design layout
 
Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing Product Design & Process Selection-Manufacturing
Product Design & Process Selection-Manufacturing
 
Production managment
Production managmentProduction managment
Production managment
 

Más de FNian

Wipro Media Q1 0809
Wipro Media Q1 0809Wipro Media Q1 0809
Wipro Media Q1 0809FNian
 
Watts Brief
Watts BriefWatts Brief
Watts BriefFNian
 
The Role Of Business In Society Presentation At
The Role Of Business In Society   Presentation AtThe Role Of Business In Society   Presentation At
The Role Of Business In Society Presentation AtFNian
 
Unit C Eco Toolbox
Unit C Eco ToolboxUnit C Eco Toolbox
Unit C Eco ToolboxFNian
 
Singapore Jakarta Conf
Singapore Jakarta ConfSingapore Jakarta Conf
Singapore Jakarta ConfFNian
 
Syndication Pp
Syndication PpSyndication Pp
Syndication PpFNian
 
Integration of internal database system
Integration of internal database systemIntegration of internal database system
Integration of internal database systemFNian
 
Analyse sourcing and manufacturing strategies
Analyse sourcing and manufacturing strategiesAnalyse sourcing and manufacturing strategies
Analyse sourcing and manufacturing strategiesFNian
 
Scitc 2006 India 2005 And Future
Scitc 2006 India 2005 And FutureScitc 2006 India 2005 And Future
Scitc 2006 India 2005 And FutureFNian
 
Miller China Trade
Miller China TradeMiller China Trade
Miller China TradeFNian
 
Developing a market plan
Developing a market planDeveloping a market plan
Developing a market planFNian
 
Gianelle Tattara
Gianelle TattaraGianelle Tattara
Gianelle TattaraFNian
 
Gp Industry
Gp IndustryGp Industry
Gp IndustryFNian
 
House
HouseHouse
HouseFNian
 
How To Biuld Internal Rating System For Basel Ii
How To Biuld Internal Rating System For Basel IiHow To Biuld Internal Rating System For Basel Ii
How To Biuld Internal Rating System For Basel IiFNian
 
Gujarat
GujaratGujarat
GujaratFNian
 
Ietp Session 2 June 28
Ietp Session   2 June 28Ietp Session   2 June 28
Ietp Session 2 June 28FNian
 
India An Overview
India An OverviewIndia An Overview
India An OverviewFNian
 
Intra Industry
Intra IndustryIntra Industry
Intra IndustryFNian
 
Innovation Class 6
Innovation Class 6Innovation Class 6
Innovation Class 6FNian
 

Más de FNian (20)

Wipro Media Q1 0809
Wipro Media Q1 0809Wipro Media Q1 0809
Wipro Media Q1 0809
 
Watts Brief
Watts BriefWatts Brief
Watts Brief
 
The Role Of Business In Society Presentation At
The Role Of Business In Society   Presentation AtThe Role Of Business In Society   Presentation At
The Role Of Business In Society Presentation At
 
Unit C Eco Toolbox
Unit C Eco ToolboxUnit C Eco Toolbox
Unit C Eco Toolbox
 
Singapore Jakarta Conf
Singapore Jakarta ConfSingapore Jakarta Conf
Singapore Jakarta Conf
 
Syndication Pp
Syndication PpSyndication Pp
Syndication Pp
 
Integration of internal database system
Integration of internal database systemIntegration of internal database system
Integration of internal database system
 
Analyse sourcing and manufacturing strategies
Analyse sourcing and manufacturing strategiesAnalyse sourcing and manufacturing strategies
Analyse sourcing and manufacturing strategies
 
Scitc 2006 India 2005 And Future
Scitc 2006 India 2005 And FutureScitc 2006 India 2005 And Future
Scitc 2006 India 2005 And Future
 
Miller China Trade
Miller China TradeMiller China Trade
Miller China Trade
 
Developing a market plan
Developing a market planDeveloping a market plan
Developing a market plan
 
Gianelle Tattara
Gianelle TattaraGianelle Tattara
Gianelle Tattara
 
Gp Industry
Gp IndustryGp Industry
Gp Industry
 
House
HouseHouse
House
 
How To Biuld Internal Rating System For Basel Ii
How To Biuld Internal Rating System For Basel IiHow To Biuld Internal Rating System For Basel Ii
How To Biuld Internal Rating System For Basel Ii
 
Gujarat
GujaratGujarat
Gujarat
 
Ietp Session 2 June 28
Ietp Session   2 June 28Ietp Session   2 June 28
Ietp Session 2 June 28
 
India An Overview
India An OverviewIndia An Overview
India An Overview
 
Intra Industry
Intra IndustryIntra Industry
Intra Industry
 
Innovation Class 6
Innovation Class 6Innovation Class 6
Innovation Class 6
 

Último

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEarley Information Science
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 

Último (20)

Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 

Layout

  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Emergency Room Layout Surgery Radiology E.R. beds Pharmacy Billing/exit E.R.Triage room E.R. Admissions Patient B - erratic pacemaker Patient A - broken leg Hallway
  • 13.
  • 15. Interdepartmental Flow of Parts 1 2 3 4 5 6 1 2 3 4 5 6 50 100 0 0 20 30 50 10 0 20 0 100 50 0 0
  • 16. Number of Weekly Loads 100 50 30 10 20 50 20 100 50 1 2 3 4 5 6
  • 17. Possible Layout 1 Assembly Department (1) Painting Department (2) Machine Shop Department (3) Receiving Department (4) Shipping Department (5) Testing Department (6) Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 60’ 40’
  • 18. Number of Weekly Loads 100 50 30 10 20 50 20 100 50 1 2 3 4 5 6
  • 19. Possible Layout 2 Painting Department (2) Assembly Department (1) Machine Shop Department (3) Receiving Department (4) Shipping Department (5) Testing Department (6) Room 1 Room 2 Room 3 Room 4 Room 5 Room 6 60’ 40’
  • 20.
  • 21. Out-Patient Hospital Example CRAFT 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 Total cost: 20,100 Est. Cost Reduction .00 Iteration 0 Total cost: 14,390 Est. Cost Reduction 70. Iteration 3 Legend: A = xray/MRI rooms B = laboratories C = admissions D = exam rooms E = operating rooms F = recovery rooms D E E E E E D D D B B B A A A A F F F F F D D D C C D D D D D B A A A A F F F A A A F F E B B B D D D D A A A A A E E D C C E E D D D B D D D D
  • 22.
  • 23. Improving Layouts by Moving to the Work Cell Concept
  • 24.
  • 25. Work Cell Advantages Inventory Floor space Direct labor costs Equipment utilization Employee participation Quality
  • 26. Work Cell Floor Plan Office Tool Room Work Cell Saws Drills
  • 27.
  • 28. Work Cells, etc. Work Cell A temporary assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility Example: job shop with rearranged machinery and personnel to produce 30 unique control panels Focused Work Center A permanent assembly-line-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility Example: manufacturing of pipe brackets at a shipyard Focused Factory A permanent facility to produce a product or component in a product-oriented facility Example: a plant to produce window mechanisms for automobiles
  • 29.
  • 30.
  • 31. Office Layout Floor Plan Accounting Manager Brand X Finance Fin. Acct.
  • 32.
  • 33.
  • 34. Retail/Service Layout – Grid Design Office Carts Check- out Grocery Store Meat Bread Milk Produce Frozen Foods
  • 35. Retail/Service Layout - Free-Flow Design Feature Display Table Trans. Counter Apparel Store
  • 36.
  • 37.
  • 38.
  • 39. Warehouse Layout Floor Plan Zones Conveyor Truck Order Picker
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 50. Repetitive Layout 1 3 2 4 5 Work Office Belt Conveyor Work Station Note: 5 tasks or operations; 3 work stations Work Station Station
  • 51.
  • 52.
  • 53.
  • 54.
  • 55. Assembly Line Balancing Equations Cycle time = Production time available Demand per day Minimum number of work stations  Task times Cycle time Efficiency = =  Task times * (Cycle time) (Actual number of work stations)
  • 56.
  • 57. Line Balancing Example #1 30 E, H I 70 D, G H 100 F G 50 - F 30 B, D E 40 C D 30 - C 80 A B 60 - A Seconds Predecessor Task
  • 58.
  • 59. Line Balancing Example #2 30 E, H I 70 D, G H 100 F G 50 - F 30 B, D E 40 C D 30 - C 80 A B 60 - A Seconds Predecessor Task
  • 60.