Project risk management:
                        why not favour schedule based assessment?

                                What is Scheduled FMEA?
    •   Originally introduced by Renault under the French name of AMDEC Planning (Bensoussan,
        early 90s), its purpose is to gather technical and non technical project team members around
        the same decision model. Time to market was already very critical in the automotive industry.
        If it is important to your project as well (penalties, missed sales, etc.) think of it!
    •   It considers that a schedule is a system1 made of tasks and dependencies. As such it must be
        reliable (e.g. close to existing benchmarked experience) and maintainable (e.g. resilience to
        re-baselining) in all the three dimensions:
               o Inherent or embedded: is the element ‘self supporting’?
               o Logistic: is the way the element has been designed/defined based on real experience
                   and objective enough to be considered as ‘safe’?
               o Propagation: in case of failure of the element, how far or quick other key points of the
                   schedule will be affected?
    •   It transfers the discipline of FME(C)A, a very popular technique in the car industry for
        addressing technical risks, to the body of knowledge of project management.

                   What are the benefits of Scheduled FMEA?

    •   Uses the clear structure of the project network to systematically identify risk
    •   Helps asking unpleasant questions up-front:
             o Politically correct task durations
             o Irrelevant decomposition of W/P into tasks or activities
             o Disagreement or ignorance of inputs-ouputs chains2
             o Skills of selected operators
    •   Promotes a more robust way to consolidate schedule impact of risks and opportunities
    •   Facilitates the involvement of all stakeholders as each participant thinks first of his part of the
        job, before questioning the quality or in-time delivery of inputs
    •   Assessment sessions can be arranged according to the usual clusters of the organisation:
        resource-based, time-frame based, expertise-based, etc.
    •   No duplication of effort with the project risk register
    •   An interesting preliminary step that speeds up Monte Carlo simulation


                                               Issues:

    •   Like FMEA, could be time consuming as it is based on a systematic questioning of tasks,
        links, competence of resources
    •   Avoid paralysis by analysis: rely on assessment of operations
    •   Do not create unnecessary conflict with operations: the project schedule does not reinvent or
        describe everything they do!
    •   Many topics are generic to the usual architecture of projects in your organisation. Replace
        thorough analysis by a sanity check wherever possible!
    •   Once the discipline is understood, it is easily supported by spreadsheets…and still robust


                                    How to implement it:
    •   Contributors individually think about their portion of the project work (in between major
        milestones they are responsible for)

1
  2 basic characteristics: the whole is more than the sum of its parts; an assembly of elements with a
purpose
2
  Remember RACI or LCR matrix that deal with this topic as well


© Marc Desrumaux www.d-rix.fr                                                                5 mars 2010
•   With reference to the coding system of tasks and dependencies, they use a FMEA-like
        register to record uncertainties
    •   The project risk management plan defines the weighting system to use for reliability and
        maintainability on one hand3, for inherent, logistic and propagation on the other hand
    •   Each dimension is rated by the contributor on a 1 to 4 scale. Numbers are then multiplied or
        added and a path or milestone rating can be computed.
    •   You can easily compare the rating of important elements with the float at design
        protective/preventive actions




                                    Reliability                                                 Maintainability
                     Inherent          Logistic         Propagation           Inherent              Logistic          Propagation
                  Is content        Any functional      Validation of       Are tasks            Extra resources     Effectiveness of
                  known or          analysis report     inputs?             modular or           available?          fall back
                  understood?       to qualify                              tailored?                                solutions
Tasks                               requirement?
                  Are all           What about          RAM and             Is content           Work                Flexibility of QCT
                  necessary         work loads?         competencies        negotiated?          authorisation       objectives?
                  tasks for W/P                         of                  Agreed?              System
                  included?                             stakeholders?
                  Are task          Availability of     Process to                                                   Can content be
                  owners            resources?          detect/                                                      re-negotiated?
                  capable?                              anticipate
                                                        changes?
                  Did we do it      Candidness of       Is early start of   flexibility level    Triggering          Re-baselining
                  that way          information?        tasks possible?     of content           counter actions     procedures
                  before?                                                                        to warnings
Dependencies      buffer or         Process flows       Early warnings?     schedule             Variance            Buffer
                  padding           known/ mature?      Dash boards?        elasticity           analysis            consumption?
                  included?                                                                      procedures
                  Contracts         Communication       Contingency         Fall back            Exception           Flexibility of
                  inputs-outputs,   channels:           reserves            positions            (crisis)            partnerships
                  incl’d?           effective, clear?                                            procedures
                                                        Work around or                                               Reserve & buffer
                                                        contingency                                                  Management
                                                        plans?




3
  For example reliability factor is 2 ; maintainability is 1 ; inherent 3, logistic 2, propagation 1. It would
mean that the project team favours more a robust schedule than a flexible one and that reference to
past experience is more important than resilience to failure of an element. Assume a given task gets
the respective scores of TRI=2; TRL=4; TRP=1; TMI=4; TML=1:TMP=2.The overall rating of the task will be
(2x3 + 4x2+ 1x1)x2 + (4x3 + 1x2 + 2x1)x1= 46. Rating of paths incorporate rating of dependencies.


© Marc Desrumaux www.d-rix.fr                                                                                      5 mars 2010
© Marc Desrumaux www.d-rix.fr   5 mars 2010

Más contenido relacionado

La actualidad más candente

Quantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationQuantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationKarl Davey
 
Lengyel.david
Lengyel.davidLengyel.david
Lengyel.davidNASAPMC
 
Dan galorath
Dan galorathDan galorath
Dan galorathNASAPMC
 
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...QAI
 
Doug brown
Doug brownDoug brown
Doug brownNASAPMC
 
Jim.free
Jim.freeJim.free
Jim.freeNASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeffNASAPMC
 
IT GOVERNANCE CONSULTING
IT GOVERNANCE CONSULTINGIT GOVERNANCE CONSULTING
IT GOVERNANCE CONSULTINGArul Nambi
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Return on Investment for a Design for Reliability Program
Return on Investment for a Design for Reliability ProgramReturn on Investment for a Design for Reliability Program
Return on Investment for a Design for Reliability ProgramAccendo Reliability
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandraNASAPMC
 
Nichols.hornback.moses
Nichols.hornback.mosesNichols.hornback.moses
Nichols.hornback.mosesNASAPMC
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliottNASAPMC
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions SA
 
Homayoon.dezfuli
Homayoon.dezfuliHomayoon.dezfuli
Homayoon.dezfuliNASAPMC
 
gtnews TMS Buyers Guide
gtnews TMS Buyers Guidegtnews TMS Buyers Guide
gtnews TMS Buyers Guidebenpoolewriter
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions SA
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donnaNASAPMC
 
A Brief Introduction to the SCRUM Agile Methodology
A Brief Introduction to the SCRUM Agile MethodologyA Brief Introduction to the SCRUM Agile Methodology
A Brief Introduction to the SCRUM Agile MethodologyTaha Kass-Hout, MD, MS
 

La actualidad más candente (20)

Quantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalationQuantitative Risk Analysis - Preventing Project cost escalation
Quantitative Risk Analysis - Preventing Project cost escalation
 
Lengyel.david
Lengyel.davidLengyel.david
Lengyel.david
 
Dan galorath
Dan galorathDan galorath
Dan galorath
 
Symons
SymonsSymons
Symons
 
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
CMMI High Maturity Best Practices HMBP 2010: Deploying High Maturity Practice...
 
Doug brown
Doug brownDoug brown
Doug brown
 
Jim.free
Jim.freeJim.free
Jim.free
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
IT GOVERNANCE CONSULTING
IT GOVERNANCE CONSULTINGIT GOVERNANCE CONSULTING
IT GOVERNANCE CONSULTING
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Return on Investment for a Design for Reliability Program
Return on Investment for a Design for Reliability ProgramReturn on Investment for a Design for Reliability Program
Return on Investment for a Design for Reliability Program
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Nichols.hornback.moses
Nichols.hornback.mosesNichols.hornback.moses
Nichols.hornback.moses
 
Harvey elliott
Harvey elliottHarvey elliott
Harvey elliott
 
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
Macrosolutions Consulting Service: Applying Quantitative Methods and Risks Si...
 
Homayoon.dezfuli
Homayoon.dezfuliHomayoon.dezfuli
Homayoon.dezfuli
 
gtnews TMS Buyers Guide
gtnews TMS Buyers Guidegtnews TMS Buyers Guide
gtnews TMS Buyers Guide
 
Macrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management ProcessesMacrosolutions Consulting Service: Structuring the Risks Management Processes
Macrosolutions Consulting Service: Structuring the Risks Management Processes
 
Rhodes.donna
Rhodes.donnaRhodes.donna
Rhodes.donna
 
A Brief Introduction to the SCRUM Agile Methodology
A Brief Introduction to the SCRUM Agile MethodologyA Brief Introduction to the SCRUM Agile Methodology
A Brief Introduction to the SCRUM Agile Methodology
 

Destacado

Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...
Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...
Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...gpartha85
 
Divorzio 12 maggio alessandra moretti
Divorzio 12 maggio alessandra morettiDivorzio 12 maggio alessandra moretti
Divorzio 12 maggio alessandra morettiRita Ghedini
 
Level of prevention
Level of preventionLevel of prevention
Level of preventionsangita8
 
Preventive health care for women ppt
Preventive health care for women pptPreventive health care for women ppt
Preventive health care for women ppttaichung
 
Prevention ppt
Prevention pptPrevention ppt
Prevention pptSandhya M
 
From Problems to Preventive Care
From Problems to Preventive CareFrom Problems to Preventive Care
From Problems to Preventive Carefaultyadult7689
 

Destacado (10)

Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...
Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...
Predicting Trends in Preventive Care Service Utilization Impacting Cardiovasc...
 
Divorzio 12 maggio alessandra moretti
Divorzio 12 maggio alessandra morettiDivorzio 12 maggio alessandra moretti
Divorzio 12 maggio alessandra moretti
 
Preventive Knee Care Tips
Preventive Knee Care Tips Preventive Knee Care Tips
Preventive Knee Care Tips
 
Preventive Care
Preventive CarePreventive Care
Preventive Care
 
Preventive Care
Preventive CarePreventive Care
Preventive Care
 
Health prevention model
Health prevention modelHealth prevention model
Health prevention model
 
Level of prevention
Level of preventionLevel of prevention
Level of prevention
 
Preventive health care for women ppt
Preventive health care for women pptPreventive health care for women ppt
Preventive health care for women ppt
 
Prevention ppt
Prevention pptPrevention ppt
Prevention ppt
 
From Problems to Preventive Care
From Problems to Preventive CareFrom Problems to Preventive Care
From Problems to Preventive Care
 

Similar a Ft Amdec Planning

Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectZulkefle Idris
 
Agile Intro for FCL
Agile Intro for FCLAgile Intro for FCL
Agile Intro for FCLjabizz
 
You don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmYou don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmGlen Alleman
 
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfPrimavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfInSync2011
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel daveNASAPMC
 
Project management
Project managementProject management
Project managementSameer Kumar
 
Agile Project Management
Agile Project Management Agile Project Management
Agile Project Management Dharma Kshetri
 
Disciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionDisciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionIBM Rational software
 
Successfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned ValueSuccessfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned ValueGlen Alleman
 
An Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssayAn Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssaySharon Roberts
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wmsSubhan Novianda
 
Fear and Loathing in Agility: Long Live the Accounting Department
Fear and Loathing in Agility: Long Live the Accounting DepartmentFear and Loathing in Agility: Long Live the Accounting Department
Fear and Loathing in Agility: Long Live the Accounting DepartmentAccenture | SolutionsIQ
 
Agile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsAgile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsGlen Alleman
 
Agile - Agile Software Project Management Methodologies
Agile - Agile Software Project Management MethodologiesAgile - Agile Software Project Management Methodologies
Agile - Agile Software Project Management MethodologiesRam Srivastava
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooDavid Harmer
 

Similar a Ft Amdec Planning (20)

Dec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex ProjectDec 2012 Evening Talk - Managing Complex Project
Dec 2012 Evening Talk - Managing Complex Project
 
Agile Intro for FCL
Agile Intro for FCLAgile Intro for FCL
Agile Intro for FCL
 
You don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pmYou don’t need agile to avoid the seven deadly sins of pm
You don’t need agile to avoid the seven deadly sins of pm
 
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdfPrimavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
Primavera _ Mike Sicilia _ Orace Primavera vision and road ahead.pdf
 
Biju 2008 Pmi Whitepaper
Biju 2008 Pmi WhitepaperBiju 2008 Pmi Whitepaper
Biju 2008 Pmi Whitepaper
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
Project management
Project managementProject management
Project management
 
Agile Project Management
Agile Project Management Agile Project Management
Agile Project Management
 
Ohsms geotech risk_acg_fillseminar_june2013_alexatkins
Ohsms geotech risk_acg_fillseminar_june2013_alexatkinsOhsms geotech risk_acg_fillseminar_june2013_alexatkins
Ohsms geotech risk_acg_fillseminar_june2013_alexatkins
 
Disciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An IntroductionDisciplined Agile Delivery: An Introduction
Disciplined Agile Delivery: An Introduction
 
MCP1
MCP1MCP1
MCP1
 
Successfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned ValueSuccessfully Integrating Agile and Earned Value
Successfully Integrating Agile and Earned Value
 
Jharna Software
Jharna SoftwareJharna Software
Jharna Software
 
Erp
ErpErp
Erp
 
An Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming EssayAn Inside Look At Extreme Programming Essay
An Inside Look At Extreme Programming Essay
 
How to choose and implement wms
How to choose and implement wmsHow to choose and implement wms
How to choose and implement wms
 
Fear and Loathing in Agility: Long Live the Accounting Department
Fear and Loathing in Agility: Long Live the Accounting DepartmentFear and Loathing in Agility: Long Live the Accounting Department
Fear and Loathing in Agility: Long Live the Accounting Department
 
Agile Project Management Methods of IT Projects
Agile Project Management Methods of IT ProjectsAgile Project Management Methods of IT Projects
Agile Project Management Methods of IT Projects
 
Agile - Agile Software Project Management Methodologies
Agile - Agile Software Project Management MethodologiesAgile - Agile Software Project Management Methodologies
Agile - Agile Software Project Management Methodologies
 
Agile projects are for delivering packaged software too
Agile projects are for delivering packaged software tooAgile projects are for delivering packaged software too
Agile projects are for delivering packaged software too
 

Último

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...lizamodels9
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Último (20)

Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Ft Amdec Planning

  • 1. Project risk management: why not favour schedule based assessment? What is Scheduled FMEA? • Originally introduced by Renault under the French name of AMDEC Planning (Bensoussan, early 90s), its purpose is to gather technical and non technical project team members around the same decision model. Time to market was already very critical in the automotive industry. If it is important to your project as well (penalties, missed sales, etc.) think of it! • It considers that a schedule is a system1 made of tasks and dependencies. As such it must be reliable (e.g. close to existing benchmarked experience) and maintainable (e.g. resilience to re-baselining) in all the three dimensions: o Inherent or embedded: is the element ‘self supporting’? o Logistic: is the way the element has been designed/defined based on real experience and objective enough to be considered as ‘safe’? o Propagation: in case of failure of the element, how far or quick other key points of the schedule will be affected? • It transfers the discipline of FME(C)A, a very popular technique in the car industry for addressing technical risks, to the body of knowledge of project management. What are the benefits of Scheduled FMEA? • Uses the clear structure of the project network to systematically identify risk • Helps asking unpleasant questions up-front: o Politically correct task durations o Irrelevant decomposition of W/P into tasks or activities o Disagreement or ignorance of inputs-ouputs chains2 o Skills of selected operators • Promotes a more robust way to consolidate schedule impact of risks and opportunities • Facilitates the involvement of all stakeholders as each participant thinks first of his part of the job, before questioning the quality or in-time delivery of inputs • Assessment sessions can be arranged according to the usual clusters of the organisation: resource-based, time-frame based, expertise-based, etc. • No duplication of effort with the project risk register • An interesting preliminary step that speeds up Monte Carlo simulation Issues: • Like FMEA, could be time consuming as it is based on a systematic questioning of tasks, links, competence of resources • Avoid paralysis by analysis: rely on assessment of operations • Do not create unnecessary conflict with operations: the project schedule does not reinvent or describe everything they do! • Many topics are generic to the usual architecture of projects in your organisation. Replace thorough analysis by a sanity check wherever possible! • Once the discipline is understood, it is easily supported by spreadsheets…and still robust How to implement it: • Contributors individually think about their portion of the project work (in between major milestones they are responsible for) 1 2 basic characteristics: the whole is more than the sum of its parts; an assembly of elements with a purpose 2 Remember RACI or LCR matrix that deal with this topic as well © Marc Desrumaux www.d-rix.fr 5 mars 2010
  • 2. With reference to the coding system of tasks and dependencies, they use a FMEA-like register to record uncertainties • The project risk management plan defines the weighting system to use for reliability and maintainability on one hand3, for inherent, logistic and propagation on the other hand • Each dimension is rated by the contributor on a 1 to 4 scale. Numbers are then multiplied or added and a path or milestone rating can be computed. • You can easily compare the rating of important elements with the float at design protective/preventive actions Reliability Maintainability Inherent Logistic Propagation Inherent Logistic Propagation Is content Any functional Validation of Are tasks Extra resources Effectiveness of known or analysis report inputs? modular or available? fall back understood? to qualify tailored? solutions Tasks requirement? Are all What about RAM and Is content Work Flexibility of QCT necessary work loads? competencies negotiated? authorisation objectives? tasks for W/P of Agreed? System included? stakeholders? Are task Availability of Process to Can content be owners resources? detect/ re-negotiated? capable? anticipate changes? Did we do it Candidness of Is early start of flexibility level Triggering Re-baselining that way information? tasks possible? of content counter actions procedures before? to warnings Dependencies buffer or Process flows Early warnings? schedule Variance Buffer padding known/ mature? Dash boards? elasticity analysis consumption? included? procedures Contracts Communication Contingency Fall back Exception Flexibility of inputs-outputs, channels: reserves positions (crisis) partnerships incl’d? effective, clear? procedures Work around or Reserve & buffer contingency Management plans? 3 For example reliability factor is 2 ; maintainability is 1 ; inherent 3, logistic 2, propagation 1. It would mean that the project team favours more a robust schedule than a flexible one and that reference to past experience is more important than resilience to failure of an element. Assume a given task gets the respective scores of TRI=2; TRL=4; TRP=1; TMI=4; TML=1:TMP=2.The overall rating of the task will be (2x3 + 4x2+ 1x1)x2 + (4x3 + 1x2 + 2x1)x1= 46. Rating of paths incorporate rating of dependencies. © Marc Desrumaux www.d-rix.fr 5 mars 2010
  • 3. © Marc Desrumaux www.d-rix.fr 5 mars 2010