CAPE TOWN, SOUTH AFRICA, 2-4 SEPTEMBER 2013
BACK ANALYSIS OF THE COLLAPSE
OF A METAL TRUSS STRUCTURE
Chiara Crosti, Franco Bontempi
““SapienzaSapienza”” University of RomeUniversity of Rome
School of Civil and Industrial EngineeringSchool of Civil and Industrial Engineering
chiara.crosti@uniroma1.itchiara.crosti@uniroma1.it –– franco.bontempi@uniroma1.itfranco.bontempi@uniroma1.it
Radiohead’s concert, 2012
Image taken from:
http://abcnews.go.com/Entertainment/stage-collapses-
radiohead-concert
killing/story?id=16587415#.UGrriE3A9_c
Country music concert, 2011
Image taken from:
http://www.billboard.com/news/
Big valley Jamboree, 2009
Image taken from:
http://www.cbc.ca/news/canada/edmonton/story/2012/01
/20/edmonton-charges-stayed-big-valley-jamboree.html
Jovanotti’s concert, 2011
Image taken from:
http://tg24.sky.it/tg24/cronaca/photogallery/201
1/12/12/crollo_palco_concerto_jovanotti_trieste
.html
FORENSIC ASPECTS
chiara.crosti@uniroma1.it
1/27
http://www.udine20.it/wp-content/uploads/2012/03/palco-laura-pausini.jpg
CASE STUDY:
AIM OF THIS WORK:
The aim of this work was not to define who made the mistake, but:
a.to investigate which kind of “error” could have compromised the safety of this
structure; and,
b.to evaluate the consequence of these “errors” in terms of global structural
response.
chiara.crosti@uniroma1.it
2/27 FORENSIC ASPECTS
A temporary structure can be defined as a structure that can be readily and completely
dismantled and removed from the site between periods of actual use.
They comprise 3 distinct elements:
1. The foundations – designed to both support the structure and hold it down (due to wind-
uplift, sliding or over-turning).
2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground,
e.g. people, equipment.
3. The stability system – bracing and other specialist members to resist horizontal loads, e.g.
due to crowd movement and wind loads.
TEMPORARY DEMOUNTABLE STRUCTURES (TDM)
FORENSIC ASPECTS
chiara.crosti@uniroma1.it
3/27
A temporary structure can be defined as a structure that can be readily and completely
dismantled and removed from the site between periods of actual use.
They comprise 3 distinct elements:
1. The foundations – designed to both support the structure and hold it down (due to wind-
uplift, sliding or over-turning).
2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground,
e.g. people, equipment.
3. The stability system – bracing and other specialist members to resist horizontal loads, e.g.
due to crowd movement and wind loads.
TEMPORARY DEMOUNTABLE STRUCTURES (TDM)
FORENSIC ASPECTS
chiara.crosti@uniroma1.it
4/27
TIMELINE
SWISS CHEESE MODEL (Reason, 1997)
FORENSIC ASPECTS
chiara.crosti@uniroma1.it
5/27
Management &
Administration
Inadequate site
investigation
Inappropriate
ground condition
Inadequate safety
plan
………..
Inadequate
structural design
Failure to adopt
Building Codes
Inadequate loads
estimation
……..
Improper construction
procedure
Improper working position
Breach of regulation or code of
practice
………..
SWISS CHEESE MODEL (Reason, 1997)
FORENSIC ASPECTS
Built-up Load-inDesign
chiara.crosti@uniroma1.it
6/27
Management &
Administration
Inadequate site
investigation
Inappropriate
ground condition
Inadequate safety
plan
………..
Inadequate
structural design
Failure to adopt
Building Codes
Inadequate loads
estimation
……..
Improper construction
procedure
Improper working position
Breach of regulation or code of
practice
………..
COLLAPSECOLLAPSE
SWISS CHEESE MODEL (Reason, 1997)
FORENSIC ASPECTS
Built-up Load-inDesign
chiara.crosti@uniroma1.it
7/27
BUILD-UP PHASE (CASE STUDY)
Positioning on the ground
of the load distribution
plates
Positioning of the bases of
the columns
Assembling on the floor
of the roof structure
called “Space Roof”
Assempled and anchored
secondary beams
Lifting the columns of
the roof structure and
anchoring the top of the
columns to the roof
Assembling of the hung
beams and other
components of the stage
(lighting, video, etc.)
Rigging phase Delivery of the structure
for its use
Technical-administrative
testing
COLLAPSE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
8/27
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
BUILD-UP PHASE (CASE STUDY)
chiara.crosti@uniroma1.it
9/27
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
BUILD-UP PHASE (CASE STUDY)
chiara.crosti@uniroma1.it
10/27
COLLAPSE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
BUILD-UP PHASE (CASE STUDY)
11/27
15/22
FINITE ELEMENT MODEL
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
ton
A
B
C
1 2
16m
21.8m
33 m
a
b
c de
f
g hi
l m
a (ton) 8.7
b (ton) 6.5
c (ton) 8.7
d (ton) 2.3
e (ton) 2.3
f (ton) 7.75
g (ton) 4.3
h (ton) 5.6
I (ton) 5.6
l (ton) 6.7
m (ton) 6.7
MATERIAL: ALUMINIUM
EN AW-6082 T6
chiara.crosti@uniroma1.it
12/27
EUROCODE
φ 0.005
kc 1.224745 > 1
nc 1
ks 1.224745 > 1
ns 1
φ0 0.005
N 2.25E+05 N
φN 1.13E+03 N
This structure is designed to be indoor; therefore the structural elements were
designed to carry vertical loads but may not have been designed for lateral loads. That
could be a fatal error in the design phase, in fact, following what prescribed in the
UNI ENV 1999-1-1:2007, in order to run global analyses, it is necessary to take
account of horizontal forces due to the imperfections of the elements composing the
structure.
FAILURE TO ADOPT STANDARD PROCEDURES
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
NO HORIZONTAL LOADS
NO BRACING MEMBERS
chiara.crosti@uniroma1.it
13/27
Top of the column
Bottom of the column
Rigid or Hinged
Rigid or Hinged
IMPROPER CONSTRUCTION PROCEDURE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
14/27
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
RIGID
HINGED
MODEL 5
Hinged
Rigid link
15/27
IMPROPER CONSTRUCTION PROCEDURE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
RIGID
HINGED
Hinged
Hinged
Beam Element
MODEL 4
16/27
IMPROPER CONSTRUCTION PROCEDURE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
Point contact element: used to model a gap between two surface,
stiffness is provided in compression but zero stiffness in tension
RIGID
UNILATERAL
1
2
3
4
5
6
7
8
Point contact
Element
L= 0.065 m
Beam Element
Hinged
Hinged
Hinged
Hinged
Hinged
Hinged
Hinged
Hinged
Translation
Stiffness
IMPROPER CONSTRUCTION PROCEDURE
17/27
MODEL 3
chiara.crosti@uniroma1.it
RIGID
RIGID
MODEL 0,1,2
Beam Element
Hinged Hinged
Hinged
Hinged
Hinged
Hinged
18/27 INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
IMPROPER CONSTRUCTION PROCEDURE
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
Model 1 Model 2
Model 0
GNL+ MNL+ Imperfection
GNL+ MNL
GNL
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
19/27
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
Model 1 Model 3Model 2
Model 0
GNL+ MNL+ Imperf.+ unilat.restr.
GNL+ MNL+ Imperfection
GNL+ MNL
GNL
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
19/27
Model 3
Load Factor = 0
Load Factor = 2
Load Factor = 3.5
Load Factor = 4.019
chiara.crosti@uniroma1.it
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE20/27
Dz = 11mm
Dz = 15mm
Load Factor = 4.019
MODEL 2
Dz = 7 mm
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
3/22
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
Model 1 Model 3Model 2
Model 0
Model 4
Model 5
GNL+ MNL+ Imperf.+ unilat.restr.
GNL+ MNL+ Imperfection
GNL+ MNL
GNL
GNL+ MNL+ Imperf.+ Hinges
GNL+ MNL+ Imperf.+ Hinges +
no outriggers
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
22/27
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
Model 1 Model 3Model 2
Model 0
Model 4
Model 5
GNL+ MNL+ Imperf.+ unilat.restr.
GNL+ MNL+ Imperfection
GNL+ MNL
GNL
GNL+ MNL+ Imperf.+ Hinges
GNL+ MNL+ Imperf.+ Hinges +
no outriggers
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
Load Factor
23% smaller
Initial
displacement
50% bigger
23/27
chiara.crosti@uniroma1.it
Model 3, ULF= 4.019 Model 4, ULF= 1.122 Model 5, ULF= 0.853Model 2, ULF= 3.946
24/27 INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
CONCLUSION
Inadequate site
investigation
SWISS CHEESE MODEL (Reason, 1997)
Management &
Administration
Design Built-up Load-in
COLLAPSECOLLAPSE
123
4
5
6
7
8
NO HORIZONTAL LOADS
NO BRACING MEMBERS
Failure to adopt
Building Codes
Improper construction
procedure
COLLAPSECOLLAPSE
chiara.crosti@uniroma1.it
25/27
Inadequate site
investigation
SWISS CHEESE MODEL (Reason, 1997)
Management &
Administration
Design Built-up Load-in
COLLAPSECOLLAPSE
NO HORIZONTAL LOADS
NO BRACING MEMBERS
Failure to adopt
Building Codes
Improper construction
procedure
COLLAPSECOLLAPSE
CONCLUSION
chiara.crosti@uniroma1.it
26/27
StroNGER S.r.l.
Research Spin-off for Structures of the Next Generation
Energy Harvesting and Resilience
Rome – Athens – Milan – Nice Cote Azur
Sede operativa: Via Giacomo Peroni 442-444, Tecnopolo Tiburtino,
00131 Roma (ITALY) – info@stronger2012.com
Str
o N
GER
www.stronger2012.com
Model 1, ULF= 4.00
Model 2. ULF= 3.97
Model 3, ULF= 4.16
chiara.crosti@uniroma1.it
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
1 kN
Rigid
Rigid
A
1 kN
Hinged
Rigid
B
1 kN
Rigid
Hinged
C
Columns going through the space roof Column not going through the space roof
1 kN
Rigid
Rigid
A
1 kN
Hinged
Rigid
B
1 kN
Rigid
Hinged
C
Node 42Node 42
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
A
B
C
chiara.crosti@uniroma1.it
3/22
RIGIDHINGEDRIGID
A
A
B
B
C
C
RIGID RIGID HINGED
RIGIDHINGEDRIGID
RIGID RIGID HINGED
16m14m
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
A
B
C
λBuckling= 13.57
λBuckling= 8.26
λBuckling= 2.61
λ: Linear Buckling Eigenvalue
chiara.crosti@uniroma1.it
3/22
Compression Tension
Maximum Compressive Strength = 2100 Kg
Mechanical properties for the “cut-off bar”
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
chiara.crosti@uniroma1.it
3/22
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
FINITE ELEMENT ANALYSIS RESULTS (Nonlinear)
Model 1 Model 3Model 2
GNL+ MNL+ Imperfection+ unilateral restraint
GNL+ MNL+ Imperfection
GNL+ MNL
GNL
Node where the Dx is measured
C2B2A2
chiara.crosti@uniroma1.it
3/22
Bending moment 1 trend of element 3001 (column C2)
chiara.crosti@uniroma1.it
3/22
Load Factor = 0
Load Factor = 2
Load Factor = 3.5
Load Factor = 4.019
chiara.crosti@uniroma1.it
INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE20/27

Más contenido relacionado

Similar a Back-analysis of the collapse of a metal truss structure

Structural Integrity Evaluation of Offshore Wind Turbines
Structural Integrity Evaluation of Offshore Wind TurbinesStructural Integrity Evaluation of Offshore Wind Turbines
Structural Integrity Evaluation of Offshore Wind Turbines
Franco Bontempi
 
Landing gear Failure analysis of an aircraft
Landing gear Failure analysis of an aircraftLanding gear Failure analysis of an aircraft
Landing gear Failure analysis of an aircraft
Rohit Katarya
 
Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel construction
Stefan Lammert
 
Iaetsd analytical study of general failure in
Iaetsd analytical study of general failure inIaetsd analytical study of general failure in
Iaetsd analytical study of general failure in
Iaetsd Iaetsd
 

Similar a Back-analysis of the collapse of a metal truss structure (20)

Sei2013 crosti
Sei2013 crostiSei2013 crosti
Sei2013 crosti
 
Back-analysis of the collapse of a metal truss structure
Back-analysis of the collapse of a metal truss structureBack-analysis of the collapse of a metal truss structure
Back-analysis of the collapse of a metal truss structure
 
3 - Structural Integrity Evaluation of Offshore Wind Turbines - Giuliani
3 - Structural Integrity Evaluation of Offshore Wind Turbines - Giuliani3 - Structural Integrity Evaluation of Offshore Wind Turbines - Giuliani
3 - Structural Integrity Evaluation of Offshore Wind Turbines - Giuliani
 
Structural Integrity Evaluation of Offshore Wind Turbines
Structural Integrity Evaluation of Offshore Wind TurbinesStructural Integrity Evaluation of Offshore Wind Turbines
Structural Integrity Evaluation of Offshore Wind Turbines
 
2018 A. R.A, GOMES - Observ method in urban tunnelling - Sydney 2018
2018 A. R.A, GOMES - Observ method in urban tunnelling - Sydney 20182018 A. R.A, GOMES - Observ method in urban tunnelling - Sydney 2018
2018 A. R.A, GOMES - Observ method in urban tunnelling - Sydney 2018
 
Strutture temporanee crosti ottobre 2014 sapienza
Strutture temporanee crosti ottobre 2014 sapienzaStrutture temporanee crosti ottobre 2014 sapienza
Strutture temporanee crosti ottobre 2014 sapienza
 
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMIFORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
FORENSIC ANALYSIS OF COLLAPSE OF SURFSIDE CONDMINIMUM, MIAMI
 
Robustezza Strutturale
Robustezza StrutturaleRobustezza Strutturale
Robustezza Strutturale
 
Bontempi AICC2005
Bontempi AICC2005Bontempi AICC2005
Bontempi AICC2005
 
SNAME Offshore Symposium - Morandi - Robustness
SNAME Offshore Symposium - Morandi - RobustnessSNAME Offshore Symposium - Morandi - Robustness
SNAME Offshore Symposium - Morandi - Robustness
 
Landing gear Failure analysis of an aircraft
Landing gear Failure analysis of an aircraftLanding gear Failure analysis of an aircraft
Landing gear Failure analysis of an aircraft
 
Modern fastening systems in tunnel construction
Modern fastening systems in tunnel constructionModern fastening systems in tunnel construction
Modern fastening systems in tunnel construction
 
IRJET- Effect of Core Wall on Torsional and Dynamic Behaviour of High –Rise F...
IRJET- Effect of Core Wall on Torsional and Dynamic Behaviour of High –Rise F...IRJET- Effect of Core Wall on Torsional and Dynamic Behaviour of High –Rise F...
IRJET- Effect of Core Wall on Torsional and Dynamic Behaviour of High –Rise F...
 
Progressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC StructuresProgressive Collapse Analysis of RC Structures
Progressive Collapse Analysis of RC Structures
 
Progressive Collapse Analysis of Steel Truss Foot Over Bridge
Progressive Collapse Analysis of Steel Truss Foot Over BridgeProgressive Collapse Analysis of Steel Truss Foot Over Bridge
Progressive Collapse Analysis of Steel Truss Foot Over Bridge
 
Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013
 
IRJET- Accomplishment Interpretation and Reformative Study for RCC Struct...
IRJET-  	  Accomplishment Interpretation and Reformative Study for RCC Struct...IRJET-  	  Accomplishment Interpretation and Reformative Study for RCC Struct...
IRJET- Accomplishment Interpretation and Reformative Study for RCC Struct...
 
Stability Analysis of Bridge Structures Using Modal Analysis
Stability Analysis of Bridge Structures Using Modal AnalysisStability Analysis of Bridge Structures Using Modal Analysis
Stability Analysis of Bridge Structures Using Modal Analysis
 
Iaetsd analytical study of general failure in
Iaetsd analytical study of general failure inIaetsd analytical study of general failure in
Iaetsd analytical study of general failure in
 
Design & Analysis of Spur Gears
Design & Analysis of Spur GearsDesign & Analysis of Spur Gears
Design & Analysis of Spur Gears
 

Más de Franco Bontempi

La realtà dei ponti e dei viadotti: controllo e manutenzione
La realtà dei ponti e dei viadotti: controllo e manutenzioneLa realtà dei ponti e dei viadotti: controllo e manutenzione
La realtà dei ponti e dei viadotti: controllo e manutenzione
Franco Bontempi
 

Más de Franco Bontempi (20)

84-91 UNI RM - Bontempi REV.pdf
84-91 UNI RM - Bontempi REV.pdf84-91 UNI RM - Bontempi REV.pdf
84-91 UNI RM - Bontempi REV.pdf
 
PGS - lezione 63 - robustness.pdf
PGS - lezione 63 - robustness.pdfPGS - lezione 63 - robustness.pdf
PGS - lezione 63 - robustness.pdf
 
PGS - lezione 60 - evidences of failures.pdf
PGS - lezione 60 - evidences of failures.pdfPGS - lezione 60 - evidences of failures.pdf
PGS - lezione 60 - evidences of failures.pdf
 
La realtà dei ponti e dei viadotti: controllo e manutenzione
La realtà dei ponti e dei viadotti: controllo e manutenzioneLa realtà dei ponti e dei viadotti: controllo e manutenzione
La realtà dei ponti e dei viadotti: controllo e manutenzione
 
ANALISI DEL RISCHIO PER LA SICUREZZA NELLE GALLERIE STRADALI.
ANALISI DEL RISCHIO PER LA SICUREZZA NELLE GALLERIE STRADALI.ANALISI DEL RISCHIO PER LA SICUREZZA NELLE GALLERIE STRADALI.
ANALISI DEL RISCHIO PER LA SICUREZZA NELLE GALLERIE STRADALI.
 
RISK ANALYSIS FOR SEVERE TRAFFIC ACCIDENTS IN ROAD TUNNELS
RISK ANALYSIS FOR SEVERE TRAFFIC ACCIDENTS IN ROAD TUNNELSRISK ANALYSIS FOR SEVERE TRAFFIC ACCIDENTS IN ROAD TUNNELS
RISK ANALYSIS FOR SEVERE TRAFFIC ACCIDENTS IN ROAD TUNNELS
 
Approccio sistemico al progetto dei grandi ponti
Approccio sistemico al progetto dei grandi pontiApproccio sistemico al progetto dei grandi ponti
Approccio sistemico al progetto dei grandi ponti
 
PGS - lezione D - grandi strutture.pdf
PGS - lezione D - grandi strutture.pdfPGS - lezione D - grandi strutture.pdf
PGS - lezione D - grandi strutture.pdf
 
PGS - lezione F - ingegneria forense.pdf
PGS - lezione F - ingegneria forense.pdfPGS - lezione F - ingegneria forense.pdf
PGS - lezione F - ingegneria forense.pdf
 
PGS - lezione C - controllo e manutenzione.pdf
PGS - lezione C - controllo e manutenzione.pdfPGS - lezione C - controllo e manutenzione.pdf
PGS - lezione C - controllo e manutenzione.pdf
 
PSA_MF_05_05_23.pdf
PSA_MF_05_05_23.pdfPSA_MF_05_05_23.pdf
PSA_MF_05_05_23.pdf
 
PSA_MF_04_05_23.pdf
PSA_MF_04_05_23.pdfPSA_MF_04_05_23.pdf
PSA_MF_04_05_23.pdf
 
Fenomeni di instabilita'
Fenomeni di instabilita'Fenomeni di instabilita'
Fenomeni di instabilita'
 
Introduzione al Calcolo Elasto – Plastico «a freddo» delle strutture in acciaio
Introduzione al Calcolo Elasto – Plastico «a freddo» delle strutture in acciaioIntroduzione al Calcolo Elasto – Plastico «a freddo» delle strutture in acciaio
Introduzione al Calcolo Elasto – Plastico «a freddo» delle strutture in acciaio
 
FB - PSA Esercitazione 1_12_18-II parte.pdf
FB - PSA Esercitazione 1_12_18-II parte.pdfFB - PSA Esercitazione 1_12_18-II parte.pdf
FB - PSA Esercitazione 1_12_18-II parte.pdf
 
Gestione di Ponti e Grandi Strutture: Spalle - Pile - Antenne
Gestione di Ponti e Grandi Strutture: Spalle - Pile - AntenneGestione di Ponti e Grandi Strutture: Spalle - Pile - Antenne
Gestione di Ponti e Grandi Strutture: Spalle - Pile - Antenne
 
Esplosioni.
Esplosioni.Esplosioni.
Esplosioni.
 
PGS - lezione 04 - MODELLAZIONI DISCRETE.pdf
PGS - lezione 04 - MODELLAZIONI DISCRETE.pdfPGS - lezione 04 - MODELLAZIONI DISCRETE.pdf
PGS - lezione 04 - MODELLAZIONI DISCRETE.pdf
 
PGS - lezione 03 - IMPALCATO DA PONTE E PIASTRE.pdf
PGS - lezione 03 - IMPALCATO DA PONTE E PIASTRE.pdfPGS - lezione 03 - IMPALCATO DA PONTE E PIASTRE.pdf
PGS - lezione 03 - IMPALCATO DA PONTE E PIASTRE.pdf
 
INCENDIO
INCENDIOINCENDIO
INCENDIO
 

Último

Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
nirzagarg
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
instagramfab782445
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
tbatkhuu1
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
amitlee9823
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
suhanimunjal27
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
nirzagarg
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
home
 

Último (20)

Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard  ...
Anamika Escorts Service Darbhanga ❣️ 7014168258 ❣️ High Cost Unlimited Hard ...
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
Abortion pill for sale in Muscat (+918761049707)) Get Cytotec Cash on deliver...
 
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️call girls in Dakshinpuri  (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
call girls in Dakshinpuri (DELHI) 🔝 >༒9953056974 🔝 genuine Escort Service 🔝✔️✔️
 
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
HiFi Call Girl Service Delhi Phone ☞ 9899900591 ☜ Escorts Service at along wi...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Th...
 
Case Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, PuneCase Study of Hotel Taj Vivanta, Pune
Case Study of Hotel Taj Vivanta, Pune
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Basapura ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 
infant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptxinfant assessment fdbbdbdddinal ppt.pptx
infant assessment fdbbdbdddinal ppt.pptx
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
call girls in Vasundhra (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
Sweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptxSweety Planet Packaging Design Process Book.pptx
Sweety Planet Packaging Design Process Book.pptx
 
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
Nisha Yadav Escorts Service Ernakulam ❣️ 7014168258 ❣️ High Cost Unlimited Ha...
 
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 104, Noida Call girls :8448380779 Model Escorts | 100% verified
 
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
Recommendable # 971589162217 # philippine Young Call Girls in Dubai By Marina...
 

Back-analysis of the collapse of a metal truss structure

  • 1. CAPE TOWN, SOUTH AFRICA, 2-4 SEPTEMBER 2013 BACK ANALYSIS OF THE COLLAPSE OF A METAL TRUSS STRUCTURE Chiara Crosti, Franco Bontempi ““SapienzaSapienza”” University of RomeUniversity of Rome School of Civil and Industrial EngineeringSchool of Civil and Industrial Engineering chiara.crosti@uniroma1.itchiara.crosti@uniroma1.it –– franco.bontempi@uniroma1.itfranco.bontempi@uniroma1.it
  • 2. Radiohead’s concert, 2012 Image taken from: http://abcnews.go.com/Entertainment/stage-collapses- radiohead-concert killing/story?id=16587415#.UGrriE3A9_c Country music concert, 2011 Image taken from: http://www.billboard.com/news/ Big valley Jamboree, 2009 Image taken from: http://www.cbc.ca/news/canada/edmonton/story/2012/01 /20/edmonton-charges-stayed-big-valley-jamboree.html Jovanotti’s concert, 2011 Image taken from: http://tg24.sky.it/tg24/cronaca/photogallery/201 1/12/12/crollo_palco_concerto_jovanotti_trieste .html FORENSIC ASPECTS chiara.crosti@uniroma1.it 1/27
  • 3. http://www.udine20.it/wp-content/uploads/2012/03/palco-laura-pausini.jpg CASE STUDY: AIM OF THIS WORK: The aim of this work was not to define who made the mistake, but: a.to investigate which kind of “error” could have compromised the safety of this structure; and, b.to evaluate the consequence of these “errors” in terms of global structural response. chiara.crosti@uniroma1.it 2/27 FORENSIC ASPECTS
  • 4. A temporary structure can be defined as a structure that can be readily and completely dismantled and removed from the site between periods of actual use. They comprise 3 distinct elements: 1. The foundations – designed to both support the structure and hold it down (due to wind- uplift, sliding or over-turning). 2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground, e.g. people, equipment. 3. The stability system – bracing and other specialist members to resist horizontal loads, e.g. due to crowd movement and wind loads. TEMPORARY DEMOUNTABLE STRUCTURES (TDM) FORENSIC ASPECTS chiara.crosti@uniroma1.it 3/27
  • 5. A temporary structure can be defined as a structure that can be readily and completely dismantled and removed from the site between periods of actual use. They comprise 3 distinct elements: 1. The foundations – designed to both support the structure and hold it down (due to wind- uplift, sliding or over-turning). 2. The superstructure – to carry all the imposed vertical (gravity) loads safely to the ground, e.g. people, equipment. 3. The stability system – bracing and other specialist members to resist horizontal loads, e.g. due to crowd movement and wind loads. TEMPORARY DEMOUNTABLE STRUCTURES (TDM) FORENSIC ASPECTS chiara.crosti@uniroma1.it 4/27 TIMELINE
  • 6. SWISS CHEESE MODEL (Reason, 1997) FORENSIC ASPECTS chiara.crosti@uniroma1.it 5/27
  • 7. Management & Administration Inadequate site investigation Inappropriate ground condition Inadequate safety plan ……….. Inadequate structural design Failure to adopt Building Codes Inadequate loads estimation …….. Improper construction procedure Improper working position Breach of regulation or code of practice ……….. SWISS CHEESE MODEL (Reason, 1997) FORENSIC ASPECTS Built-up Load-inDesign chiara.crosti@uniroma1.it 6/27
  • 8. Management & Administration Inadequate site investigation Inappropriate ground condition Inadequate safety plan ……….. Inadequate structural design Failure to adopt Building Codes Inadequate loads estimation …….. Improper construction procedure Improper working position Breach of regulation or code of practice ……….. COLLAPSECOLLAPSE SWISS CHEESE MODEL (Reason, 1997) FORENSIC ASPECTS Built-up Load-inDesign chiara.crosti@uniroma1.it 7/27
  • 9. BUILD-UP PHASE (CASE STUDY) Positioning on the ground of the load distribution plates Positioning of the bases of the columns Assembling on the floor of the roof structure called “Space Roof” Assempled and anchored secondary beams Lifting the columns of the roof structure and anchoring the top of the columns to the roof Assembling of the hung beams and other components of the stage (lighting, video, etc.) Rigging phase Delivery of the structure for its use Technical-administrative testing COLLAPSE INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it 8/27
  • 10. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE BUILD-UP PHASE (CASE STUDY) chiara.crosti@uniroma1.it 9/27
  • 11. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE BUILD-UP PHASE (CASE STUDY) chiara.crosti@uniroma1.it 10/27
  • 12. COLLAPSE INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it BUILD-UP PHASE (CASE STUDY) 11/27
  • 13. 15/22 FINITE ELEMENT MODEL INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE ton A B C 1 2 16m 21.8m 33 m a b c de f g hi l m a (ton) 8.7 b (ton) 6.5 c (ton) 8.7 d (ton) 2.3 e (ton) 2.3 f (ton) 7.75 g (ton) 4.3 h (ton) 5.6 I (ton) 5.6 l (ton) 6.7 m (ton) 6.7 MATERIAL: ALUMINIUM EN AW-6082 T6 chiara.crosti@uniroma1.it 12/27
  • 14. EUROCODE φ 0.005 kc 1.224745 > 1 nc 1 ks 1.224745 > 1 ns 1 φ0 0.005 N 2.25E+05 N φN 1.13E+03 N This structure is designed to be indoor; therefore the structural elements were designed to carry vertical loads but may not have been designed for lateral loads. That could be a fatal error in the design phase, in fact, following what prescribed in the UNI ENV 1999-1-1:2007, in order to run global analyses, it is necessary to take account of horizontal forces due to the imperfections of the elements composing the structure. FAILURE TO ADOPT STANDARD PROCEDURES INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE NO HORIZONTAL LOADS NO BRACING MEMBERS chiara.crosti@uniroma1.it 13/27
  • 15. Top of the column Bottom of the column Rigid or Hinged Rigid or Hinged IMPROPER CONSTRUCTION PROCEDURE INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it 14/27
  • 16. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it RIGID HINGED MODEL 5 Hinged Rigid link 15/27 IMPROPER CONSTRUCTION PROCEDURE
  • 17. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it RIGID HINGED Hinged Hinged Beam Element MODEL 4 16/27 IMPROPER CONSTRUCTION PROCEDURE
  • 18. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it Point contact element: used to model a gap between two surface, stiffness is provided in compression but zero stiffness in tension RIGID UNILATERAL 1 2 3 4 5 6 7 8 Point contact Element L= 0.065 m Beam Element Hinged Hinged Hinged Hinged Hinged Hinged Hinged Hinged Translation Stiffness IMPROPER CONSTRUCTION PROCEDURE 17/27 MODEL 3
  • 19. chiara.crosti@uniroma1.it RIGID RIGID MODEL 0,1,2 Beam Element Hinged Hinged Hinged Hinged Hinged Hinged 18/27 INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE IMPROPER CONSTRUCTION PROCEDURE
  • 20. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it Model 1 Model 2 Model 0 GNL+ MNL+ Imperfection GNL+ MNL GNL FINITE ELEMENT ANALYSIS RESULTS (Nonlinear) 19/27
  • 21. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it Model 1 Model 3Model 2 Model 0 GNL+ MNL+ Imperf.+ unilat.restr. GNL+ MNL+ Imperfection GNL+ MNL GNL FINITE ELEMENT ANALYSIS RESULTS (Nonlinear) 19/27 Model 3
  • 22. Load Factor = 0 Load Factor = 2 Load Factor = 3.5 Load Factor = 4.019 chiara.crosti@uniroma1.it INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE20/27 Dz = 11mm Dz = 15mm Load Factor = 4.019 MODEL 2 Dz = 7 mm
  • 23. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it 3/22
  • 24. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it Model 1 Model 3Model 2 Model 0 Model 4 Model 5 GNL+ MNL+ Imperf.+ unilat.restr. GNL+ MNL+ Imperfection GNL+ MNL GNL GNL+ MNL+ Imperf.+ Hinges GNL+ MNL+ Imperf.+ Hinges + no outriggers FINITE ELEMENT ANALYSIS RESULTS (Nonlinear) 22/27
  • 25. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it Model 1 Model 3Model 2 Model 0 Model 4 Model 5 GNL+ MNL+ Imperf.+ unilat.restr. GNL+ MNL+ Imperfection GNL+ MNL GNL GNL+ MNL+ Imperf.+ Hinges GNL+ MNL+ Imperf.+ Hinges + no outriggers FINITE ELEMENT ANALYSIS RESULTS (Nonlinear) Load Factor 23% smaller Initial displacement 50% bigger 23/27
  • 26. chiara.crosti@uniroma1.it Model 3, ULF= 4.019 Model 4, ULF= 1.122 Model 5, ULF= 0.853Model 2, ULF= 3.946 24/27 INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
  • 27. CONCLUSION Inadequate site investigation SWISS CHEESE MODEL (Reason, 1997) Management & Administration Design Built-up Load-in COLLAPSECOLLAPSE 123 4 5 6 7 8 NO HORIZONTAL LOADS NO BRACING MEMBERS Failure to adopt Building Codes Improper construction procedure COLLAPSECOLLAPSE chiara.crosti@uniroma1.it 25/27
  • 28. Inadequate site investigation SWISS CHEESE MODEL (Reason, 1997) Management & Administration Design Built-up Load-in COLLAPSECOLLAPSE NO HORIZONTAL LOADS NO BRACING MEMBERS Failure to adopt Building Codes Improper construction procedure COLLAPSECOLLAPSE CONCLUSION chiara.crosti@uniroma1.it 26/27
  • 29.
  • 30. StroNGER S.r.l. Research Spin-off for Structures of the Next Generation Energy Harvesting and Resilience Rome – Athens – Milan – Nice Cote Azur Sede operativa: Via Giacomo Peroni 442-444, Tecnopolo Tiburtino, 00131 Roma (ITALY) – info@stronger2012.com Str o N GER www.stronger2012.com
  • 31. Model 1, ULF= 4.00 Model 2. ULF= 3.97 Model 3, ULF= 4.16 chiara.crosti@uniroma1.it INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE
  • 32. 1 kN Rigid Rigid A 1 kN Hinged Rigid B 1 kN Rigid Hinged C Columns going through the space roof Column not going through the space roof 1 kN Rigid Rigid A 1 kN Hinged Rigid B 1 kN Rigid Hinged C Node 42Node 42 INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE A B C chiara.crosti@uniroma1.it 3/22
  • 33. RIGIDHINGEDRIGID A A B B C C RIGID RIGID HINGED RIGIDHINGEDRIGID RIGID RIGID HINGED 16m14m INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE A B C λBuckling= 13.57 λBuckling= 8.26 λBuckling= 2.61 λ: Linear Buckling Eigenvalue chiara.crosti@uniroma1.it 3/22
  • 34. Compression Tension Maximum Compressive Strength = 2100 Kg Mechanical properties for the “cut-off bar” INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE chiara.crosti@uniroma1.it 3/22
  • 35. INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE FINITE ELEMENT ANALYSIS RESULTS (Nonlinear) Model 1 Model 3Model 2 GNL+ MNL+ Imperfection+ unilateral restraint GNL+ MNL+ Imperfection GNL+ MNL GNL Node where the Dx is measured C2B2A2 chiara.crosti@uniroma1.it 3/22
  • 36. Bending moment 1 trend of element 3001 (column C2) chiara.crosti@uniroma1.it 3/22
  • 37. Load Factor = 0 Load Factor = 2 Load Factor = 3.5 Load Factor = 4.019 chiara.crosti@uniroma1.it INVESTIGATION ON TECHNICAL CAUSES OF THE COLLAPSE20/27