5. What is “The Frog Room”? Previously a split level classroom/drama space? 11metres x 12 Metres(132m2) Only slightly bigger than an average classroom Now 1 large IT suite 80 machines = £32k Benching/Wiring/Furniture/Aircon = £23k Total cost = £55k
7. The Geeky Bit 2 x Dell Servers. Currently hosting 80 machines, but scalable up to 100-120 Thin Clients depending on client usage iGEL Thin Clients. Very low power devices. All programs are run on the servers, the Thin Client simply processes the Keyboard, Mouse and image updates.
8. Benefits of Thin Client Very low power consumption 80 Thin Client PCs (15 Watts) @ 10 per KW/hr. 7 Hours per day x 190 school days = £159.60 Server Power (2 x Servers @ 350 Watts x 24 Hours x 365 Days = £613.20 = . Total £772.80 80 Normal PCs (100 Watts) @ 10p per KWhr. 7 Hours per day x 190 school days = £1,064 Low heat output from machines. Even with 80 machines heat is comparable to a normal computer suite with 30 Computers. It’s cheap! Works out at about £400 per device and should last 5 years. With the necessary licensing the same servers can provide remote access during non-school times to students/staff, utilising the same hardware saving further costs. Low maintenance costs. No moving components reduce the chances of them breaking. Silent. Again no moving components means no noise.
9. How do we staff it? Cover Supervisors Senior Leadership Staff under allocation
10. Where does Frog fit in? All cover lesson work set on Frog Routine is very clear (Come in – Sit down – Log on – Log on – Check Assignments – Continue Learning) Wide variety of tasks assigned from whole lessons to “Quick assign” All planned absences are advised to set work on Frog Some unplanned absences can/do do this also
11. Benefits (Apart from the £60k) Less cover Easily meets “Rarely Cover” guidance Considerably more flexibility for the Cover Secretary Easier to “get students working” Maintains connection with learning Facilitates LOSC work setting Creates far less disruption than lessons with supply teachers Students prefer it Most staff prefer it.
12. Future Plans Even greater use of Frog to set more complex tasks Closer link to the PEP regarding work completed in a cover lesson The Frog Room Mk II?