SlideShare una empresa de Scribd logo
1 de 26
REC Presentation




                           Leaders in Energy & Environmental Commodities




Sustainability. Value. Delivered.         www.general-carbon.com           1
GC Advisors
• Leading player in energy & environmental commodities




• Advisory services for power market participants
• Developing renewable energy certificates, energy efficiency certificates &
  carbon offsets
• Driving sustainable development projects
• Operating across India, South East Asia and Africa

Sustainability. Value. Delivered.   www.general-carbon.com                     2
Energy
• Power sourcing/sales
        – Short, Medium & Long term contracts
        – Power Exchange based advisory services
• Regulatory and strategic support to provide
  a single-window approach
• Energy strategy
        – Assessing renewable purchase obligation and
          cost effective sourcing plan
        – Energy consumption and developing
          management plan

Sustainability. Value. Delivered.   www.general-carbon.com   3
Environmental commodities
• Carbon offsets
        – 100 million CERs & 20 million VERs
        – Carbon offset projects across - India, Indonesia, Thailand, Sri Lanka, Nigeria,
          Ethiopia & Kenya
        – Fixed, floating, spot & exotic structures including upfront payment
        – Equity, Debt and mezzanine financing based on carbon credits
• Renewable Energy Certificates (RECs)
        – 350 MW of REC projects across India
        – Develop RECs through advisory and turnkey projects
• Energy efficiency certificates (EsCerts)
        – Engaging large clients to prepare for PAT
        – Integrate PAT and REC obligations to develop holistic compliance toolkit



Sustainability. Value. Delivered.      www.general-carbon.com                               4
Our knowledge base
• Wind energy portfolio of > 1300 MW
        – Projects across TN, Karnataka, AP, Maharashtra,
          Gujarat and Rajasthan
• Natural gas portfolio of > 1000 MW
• Hydro portfolio of > 600 MW
• Biomass portfolio of > 300 MW
• Supercritical based portfolio of > 4000 MWs

Sustainability. Value. Delivered.   www.general-carbon.com   5
What is RPO                                                     The Electricity Act, 2003
•     The Electricity Act & National Action
      Plan on Climate Change (NAPCC) provide
      roadmap for increasing renewable
      energy in total generation
•     Renewable Purchase Obligation (RPO) is
      obligation mandated by SERC for
      promotion of renewable energy
      generation
                                                           National Action Plan on
•     RPO is the minimum percentage of                    Climate Change (NAPCC) –
      renewable energy share in the area of a                     June 2008
        –    Distribution licensee
        –    Open Access Consumer
        –    Captive consumer
                                                                2010     2015     2020



Sustainability. Value. Delivered.      www.general-carbon.com                               6
Status of notification by States
State                               RPO %        Notification                     Pref. Tariff   APPC
                                    (FY 12-13)                                    (Wind)

Maharashtra                         8.00         Final                            3.38 -5.07     2.57*
Madhya Pradesh                      4.00         Final                            4.35           2.47*
Tamil Nadu                          9.00*        Gazetted                         3.51           2.54
Rajasthan                           7.10         Amendment to gazette awaited     5.18- 5.44     2.75*
Haryana                             2.00         Final                            4.08           2.77


Gujarat                             7.00         Gazetted except OA and CPP       4.23           2.64
Chhattisgarh                        5.75*        Gazetted                         ~3.13          2.11- 4.66
Karnataka                           7.0-10.0*    Final                            3.70           2.60


Andhra Pradesh                      5.00         Final                            4.70           2.00*
Orissa                              5.50         Gazetted                         5.31

        Sustainability. Value. Delivered.                www.general-carbon.com                          7
Renewable Energy Certificates (REC)
• REC is a tradable certificate of proof that one MWh of
  electricity has been injected (or deemed to be injected) to
  grid by an RE generator.


• REC types & Price band:

REC                                 Up to April 2012               April 2012 - April 2017
Non Solar                                Rs 1,500 - 3,900               Rs 1,500 - 3,300
Solar                                   Rs 12,000 – 17,000              Rs 9,300 – 13,400




Sustainability. Value. Delivered.         www.general-carbon.com                             8
MNRE APPROVED SOURCES
• WIND
• BIOMASS
• SMALL HYDRO
• SOLAR
• BAGASSED BASED CO-GENERATION
• MSW PROJECT
• BIOGAS BASED PROJECT
• BLACK LIQOUR


Sustainability. Value. Delivered.   www.general-carbon.com   9
Who is eligible to participate in REC?




Sustainability. Value. Delivered.   www.general-carbon.com   10
Other eligibility terms
• Preferential tariff PPA
        – Not eligible for 3 years if they cancel PPA
                 • Eligible if DISCOM cancels PPA or after expiry of PPA
• Captive consumption
        – Eligible if no promotional benefit
                 • Concessional wheeling/transmission charges
                 • Banking facility
                 • Electricity duty waiver
        – Not eligible for 3 years even if generator foregoes benefits
        – Eligible if concessions are withdrawn by SERC

Sustainability. Value. Delivered.       www.general-carbon.com             11
Other eligibility terms
• GBI and Accelerated depreciation benefits are
  not considered concessional
• Not available for off grid projects
• Auxiliary consumption not eligible




Sustainability. Value. Delivered.   www.general-carbon.com   12
Status of REC Regulation
• Arunachal Pradesh, Sikkim, West Bengal are
  yet to designate state agency and draw up
  REC regulation
• Delhi is yet to finalize the REC regulation
  (Draft exists)
• Nagaland is yet to designate state agency
  (Regulation finalized)
Sustainability. Value. Delivered.   www.general-carbon.com   13
Accreditation Process
1.       Web based Application + Submission of information in physical form with the
         State Agency (SA) along with processing fee and accreditation charges
2.       SA will undertake preliminary scrutiny of the application within 5 days of receipt
3.       SA will intimate in writing if further information is needed
4.       SA will evaluate the application based on 8 criteria
5.       If Application fulfills the evaluation criteria, SA shall grant 'Certificate for
         Accreditation‘. Else rejection is intimated.
6.       State Agency will also intimate regarding the accreditation of particular RE
         generation project to:
        – Central Agency (NLDC)
        – Host SLDC
        – Local DisCom




Sustainability. Value. Delivered.       www.general-carbon.com                            14
Accreditation - Documentation & Evaluation
The application for accreditation shall                   The 8 criteria of evaluation in accreditation
contain
                                                          1.      Undertaking of 'Availability of Land' in possession for
1.     Owners details,                                            setting up generating station
2.     Operator details (in case the owner and            2.      Power Evacuation Arrangement permission letter from
       operator are different legal entities),                    the host State Transmission Utility or the concerned
3.     Generating Station details,                                Distribution Licensee, as the case may be
4.     Connectivity details with concerned licensee       3.      Confirmation of Metering Arrangement and Metering
       (STU/DISCOM),                                              Location
5.     Metering details,                                  4.      Date of Commissioning of RE project for existing
6.     Statutory Clearance details,                               eligible RE Project or Proposed Date of Commissioning
7.     Undertaking of not having entered into PPA on              for new RE for accreditation
       preferential tariff for the capacity for which     5.      Undertaking regarding Off-take/Power Purchase
       participation in REC scheme is sought as per               Agreement
       the CERC REC Regulations and                       6.      Proposed Model and Make for critical equipment (say,
8.     Any other relevant information as per the format           WTG, STG, PV Module) for the RE Project. Confirmation
       of application                                             of compliance of critical equipment with relevant
                                                                  applicable IEC or CEA Standards
                                                          7.      Undertaking for compliance with the usage of fossil
                                                                  fuel criteria as specified by MNRE
                                                          8.      Details of application processing fees/accreditation
                                                                  charges



Sustainability. Value. Delivered.              www.general-carbon.com                                                  15
Registration Process
1.       Web based Application + Submission of information in physical form with the
         Central Agency (NLDC) along with processing fee and registration charges
2.       NLDC will undertake preliminary scrutiny of the Application within 5 days of
         receipt
3.       NLDC will intimate in writing if further information is needed
4.       NLDC will evaluate the application based on 4 criteria
5.       If Application fulfills the evaluation criteria, CA shall grant 'Certificate for
         Registration‘. Else rejection is intimated.
6.       NLDC will also intimate regarding the registration of particular RE generation
         project to:
        – Host State Agency
        – Host SLDC
        – Power Exchanges




Sustainability. Value. Delivered.       www.general-carbon.com                              16
Registration - Documentation & Evaluation
The application for accreditation shall               The 4 criteria of evaluation in accreditation
contain

1.     Owner details                                  1.      A Valid Certification of Accreditation by State
2.     RE Generating Station details                          Agency
3.     Certificate of accreditation by the State
                                                      2.      Date of Commissioning or Proposed date of
       Agency
4.     Generating facility commissioning schedule             Commissioning or Commissioning Schedule for
5.     Any other relevant information as per the              new projects.
       enclosed format                                3.      Undertaking that it has not entered into any
                                                              Power Purchase Agreement at preferential
                                                              tariff as may be determined by the Appropriate
                                                              Commission
                                                      4.      Details of payment of registration fees/charges




Sustainability. Value. Delivered.          www.general-carbon.com                                               17
Issuance Process
1.       Obtain Certification of Energy from SLDC on monthly basis
2.       Application for issuance is possible on a fortnightly basis but within 3 months from the date of injection
3.       Web based Application + Submission information in physical form with Central Agency (NLDC) along
         with Issuance fee
         The application shall include: (i) Energy Injection Report - certified by the SLDC (ii) Registration
         Certificate
4.       NLDC will undertake preliminary scrutiny of the Application within 2 days of receipt
5.       NLDC will intimate in writing if further information is needed
6.       NLDC will evaluate the application based on 4 criteria
        – Verification of the time period for which the NLDC may have already issued RECs
        – Verification of RECs claimed from the duly certified Energy Injection Reports by the SLDC
        – Details of fee & charges made for issuance of certificates.
        – Confirmation of Compliance Auditor report, if any.
7.       If Application fulfills the evaluation criteria, CA shall issue ‘Renewable Energy Certificates ‘. Else rejection
         is intimated.
8.       NLDC will also intimate regarding the Issuance of particular RE generation project to:
        – Host State Agency


Sustainability. Value. Delivered.                 www.general-carbon.com                                               18
Redemption (Trading) Process
1.       REC has a 365 days expiry period from the date of issuance within which it shall be traded
2.       Registered RE Generator to have membership on the designated Power Exchange, else they
         should sell their RECs through a Trader Member (Eg. GC Advisors)
3.       Trading of RECs to take place on last Wednesday of every month.
4.       During the time the bidding window opens place offer for dealing of RECs within the specified
         price band.
5.       Buyers shall place their bids through the trading platform of the respective Power Exchange
6.       On closure of the trading window, the Power Exchange shall send the maximum bid volumes for
         each of the eligible entity, which has placed offers on that Power Exchange, to the Central Agency
         for verification of the quantity of valid RECs
7.       NLDC shall check the maximum bid volume against the quantity of valid RECs & confirm the
         availability of the valid RECs
8.       The Power Exchange shall work out the Market Clearing Price and the Market Clearing Volume &
         send the final cleared trades to NLDC
9.       RECs will be extinguished in the records of NLDC in the 'First-in-First-out' order




Sustainability. Value. Delivered.            www.general-carbon.com                                      19
REC Process - Timeline
       State Agency

                                        • RE Generator applies to the State agency for
                                          accreditation upto 6 month before Commissioning
                        Accreditation   • Process time: ~ 6 weeks




                                                                                                Power Exchange
                                        • Accredited project is applied for registration with
                                          NLDC
                        Registration    • Process time: ~ 3 weeks


                                        • May apply fortnightly basis; within 3 months of
                                          injection to grid
       NLDC




                          Issuance      • Process time: ~ 3 weeks



                                        • Last Wednesday of every month between 1300 –
                                          1500 hrs
                        Redemption




Sustainability. Value. Delivered.                    www.general-carbon.com                                      20
Process Costs
                        Cost Head                      Payable to        Cost Quantity (INR)
Application processing fees                          State Agency                           5,000
One‐time Accreditation Charge                        State Agency                          30,000
Annual Charge                                      State Agency                            10,000
Accreditation Expenses                             State Agency                            45,000
Application processing fees                    Central Agency (NLDC)                        1,000
One Time Registration Charges                  Central Agency (NLDC)                        5,000
Annual Charges                                 Central Agency (NLDC)                         1,000
Registration Expenses                          Central Agency (NLDC)                         7,000
Issuance fee                                   Central Agency (NLDC)                Rs. 10 per REC
Admission Fee                                     Power Exchange       Depends on Power Exchange
Interest Free Security Deposit                    Power Exchange       Depends on Power Exchange
Processing Fee                                    Power Exchange       Depends on Power Exchange
Annual Subscription Fees                          Power Exchange       Depends on Power Exchange
Annual Client Subscription Fee (each client)       Power Exchange      Depends on Power Exchange
Transaction Fees (Rs/REC)                          Power Exchange      Depends on Power Exchange

 Sustainability. Value. Delivered.        www.general-carbon.com                               21
REC and CDM
• REC and CDM can coexist
• Additionality based on APPC + Floor price of REC
        – In most cases APPC + REC is lower than cost of power
          (2.37 + 1.5 = 3.87)
        – CDM projects registered with captive costs of greater
          than 4.86
        – Hence, additionality is possible
• REC makes up for the difference between APPC
  and preferential tariff
Sustainability. Value. Delivered.   www.general-carbon.com        22
Demand for RECs
• More than just DISCOMs
        – Already procuring under preferential PPAs
        – Impact on their bottom line
• Open access consumers
        – Inter-state plus intra-state is a small segment
• Captive consumers
        – Large market made up of industrial users (cement,
          steel, chemical etc.) having thermal capacity
        – Will focus on RE development, RE PPAs or REC
Sustainability. Value. Delivered.   www.general-carbon.com    23
Key challenges: Still to be answered
• Grid connectivity & Reporting - Establishing metering
  communication with SLDC (no. of meters, joint/online
  reading, etc.)
• Captive –
        – Bagasse – Electricity duty exemption
        – Wind - Electricity duty exemption & promotional banking facility
        – RPO accounting - Will captive users be able to account for their RE
          power in their consumption if they have availed any benefit
          (duty/banking)
• Enforcement of RPO obligations
        – Are Obligated Entities willing to buy


Sustainability. Value. Delivered.   www.general-carbon.com                      24
Contact us
     To learn more about RECs –
     Process, eligibility, documentation, pricing, trading, etc. please feel free to
     contact us:-
       Mumbai – Mr. Rameez Shaikh                        Chennai – Ms. Priya Ranganayaki
       General Carbon Advisory Services Pvt. Ltd.        General Carbon Advisory Services Pvt. Ltd.
       5th floor, Great Social Building                  2/36, 1st floor, Venkat Iyer Road,
       60, Sir Pherozeshah Mehta Road, Fort              Near Royapuram Bridge,
       Mumbai 400001                                     Chennai 600001

       Phone: +91 22 2266 3201/3301                      Phone: +91 44 42167331
       Mobile: +91 9920033866                            Mobile: +91 9962526876
       Email: rameez.shaikh@general-carbon.com           Email: priya.v@general-carbon.com




Sustainability. Value. Delivered.          www.general-carbon.com                                     25
REC Presentation




                           Leaders in Energy & Environmental Commodities




Sustainability. Value. Delivered.         www.general-carbon.com           26

Más contenido relacionado

La actualidad más candente

Feeder Separation Project
Feeder Separation ProjectFeeder Separation Project
Feeder Separation ProjectIPPAI
 
A Guide To Decs
A Guide To DecsA Guide To Decs
A Guide To Decscrenergy
 
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...Bhalindra Bath - projects & M&A law
 
Apresentação call tiete 4 q11_final
Apresentação call tiete 4 q11_finalApresentação call tiete 4 q11_final
Apresentação call tiete 4 q11_finalAES Tietê
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Harish Sharma
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call PresentationAES Tietê
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015Headway Solar
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGRAVI PAL SINGH
 
Transmission Policies in Texas
Transmission Policies in TexasTransmission Policies in Texas
Transmission Policies in Texasaectnet
 
Epc Guide For Landlords
Epc Guide For LandlordsEpc Guide For Landlords
Epc Guide For Landlordscrenergy
 
50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dprExergy
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010Ngy Ea
 
Market And Regulatory Incentives For Cost Efficient Integration Of Dg
Market And Regulatory Incentives For Cost Efficient Integration Of DgMarket And Regulatory Incentives For Cost Efficient Integration Of Dg
Market And Regulatory Incentives For Cost Efficient Integration Of Dgdavidtrebolle
 

La actualidad más candente (19)

Feeder Separation Project
Feeder Separation ProjectFeeder Separation Project
Feeder Separation Project
 
A Guide To Decs
A Guide To DecsA Guide To Decs
A Guide To Decs
 
Fuel cell13agm
Fuel cell13agmFuel cell13agm
Fuel cell13agm
 
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
DECC decision on ROCs CfDs Grace Periods Grandfathering of ROCs and degressio...
 
Apresentação call tiete 4 q11_final
Apresentação call tiete 4 q11_finalApresentação call tiete 4 q11_final
Apresentação call tiete 4 q11_final
 
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
Rfp for tariff based competitive bidding for upto 170 mw solar power plant by...
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
09/08/2008 - 2Q08 Earnings Call Presentation
09/08/2008  	-   	2Q08 Earnings Call Presentation09/08/2008  	-   	2Q08 Earnings Call Presentation
09/08/2008 - 2Q08 Earnings Call Presentation
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmers
 
RERC Net metering Regulations 2015
RERC Net metering Regulations 2015RERC Net metering Regulations 2015
RERC Net metering Regulations 2015
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
Transmission Policies in Texas
Transmission Policies in TexasTransmission Policies in Texas
Transmission Policies in Texas
 
Epc Guide For Landlords
Epc Guide For LandlordsEpc Guide For Landlords
Epc Guide For Landlords
 
50 MW solar-thermal-dpr
50 MW solar-thermal-dpr50 MW solar-thermal-dpr
50 MW solar-thermal-dpr
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
Market And Regulatory Incentives For Cost Efficient Integration Of Dg
Market And Regulatory Incentives For Cost Efficient Integration Of DgMarket And Regulatory Incentives For Cost Efficient Integration Of Dg
Market And Regulatory Incentives For Cost Efficient Integration Of Dg
 
The ecowas small scale hydro power program
The ecowas small scale hydro power programThe ecowas small scale hydro power program
The ecowas small scale hydro power program
 

Destacado

REC Webinar - Engineering Modules for Financial Return
REC Webinar - Engineering Modules for Financial ReturnREC Webinar - Engineering Modules for Financial Return
REC Webinar - Engineering Modules for Financial ReturnWeb2Present
 
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Uday Mishra
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy CertificateJaspal Bhatia
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaBhargav Parmar
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?madhavanvee
 
Pert chart execution for REC
Pert chart execution for RECPert chart execution for REC
Pert chart execution for RECDeeSolar
 
Tuan mohd azuan bin tuan yusoff a139932-labtask2
Tuan mohd azuan bin tuan yusoff a139932-labtask2Tuan mohd azuan bin tuan yusoff a139932-labtask2
Tuan mohd azuan bin tuan yusoff a139932-labtask2tuan_azuan
 
Slideshare Language courses SME in Dutch
Slideshare Language courses SME in DutchSlideshare Language courses SME in Dutch
Slideshare Language courses SME in DutchElaN Languages
 
Strategy used to master english russia context
Strategy used to master english russia contextStrategy used to master english russia context
Strategy used to master english russia contextNurosielawati Mazlan
 
Slideshare Language courses in Dutch
Slideshare Language courses in DutchSlideshare Language courses in Dutch
Slideshare Language courses in DutchElaN Languages
 
Slideshare R&D in Dutch
Slideshare R&D in DutchSlideshare R&D in Dutch
Slideshare R&D in DutchElaN Languages
 
чернівці бібліотека і громадські організації
чернівці   бібліотека і громадські організаціїчернівці   бібліотека і громадські організації
чернівці бібліотека і громадські організаціїOlena Bashun
 
Slideshare MyElaN in Dutch
Slideshare MyElaN in DutchSlideshare MyElaN in Dutch
Slideshare MyElaN in DutchElaN Languages
 
Slideshare Language courses Sole trader in Dutch
Slideshare Language courses Sole trader in DutchSlideshare Language courses Sole trader in Dutch
Slideshare Language courses Sole trader in DutchElaN Languages
 
CDR of Lanco infratech
CDR of Lanco infratechCDR of Lanco infratech
CDR of Lanco infratechAman Sindhwani
 

Destacado (20)

REC Webinar - Engineering Modules for Financial Return
REC Webinar - Engineering Modules for Financial ReturnREC Webinar - Engineering Modules for Financial Return
REC Webinar - Engineering Modules for Financial Return
 
REC status
REC statusREC status
REC status
 
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
 
Renewable Energy Certificate
Renewable Energy CertificateRenewable Energy Certificate
Renewable Energy Certificate
 
Solar power projects under rec mechanism in india
Solar power projects under rec mechanism in indiaSolar power projects under rec mechanism in india
Solar power projects under rec mechanism in india
 
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
Will Renewable Energy Certificates(RECs) drive the growth of Solar in India?
 
Pert chart execution for REC
Pert chart execution for RECPert chart execution for REC
Pert chart execution for REC
 
UPCL - saga of distruction
UPCL -    saga of distruction UPCL -    saga of distruction
UPCL - saga of distruction
 
Efficiency and turnaround management
Efficiency and turnaround managementEfficiency and turnaround management
Efficiency and turnaround management
 
Lanco
LancoLanco
Lanco
 
Tuan mohd azuan bin tuan yusoff a139932-labtask2
Tuan mohd azuan bin tuan yusoff a139932-labtask2Tuan mohd azuan bin tuan yusoff a139932-labtask2
Tuan mohd azuan bin tuan yusoff a139932-labtask2
 
Slideshare Language courses SME in Dutch
Slideshare Language courses SME in DutchSlideshare Language courses SME in Dutch
Slideshare Language courses SME in Dutch
 
Final PPP
Final PPPFinal PPP
Final PPP
 
Strategy used to master english russia context
Strategy used to master english russia contextStrategy used to master english russia context
Strategy used to master english russia context
 
Slideshare Language courses in Dutch
Slideshare Language courses in DutchSlideshare Language courses in Dutch
Slideshare Language courses in Dutch
 
Slideshare R&D in Dutch
Slideshare R&D in DutchSlideshare R&D in Dutch
Slideshare R&D in Dutch
 
чернівці бібліотека і громадські організації
чернівці   бібліотека і громадські організаціїчернівці   бібліотека і громадські організації
чернівці бібліотека і громадські організації
 
Slideshare MyElaN in Dutch
Slideshare MyElaN in DutchSlideshare MyElaN in Dutch
Slideshare MyElaN in Dutch
 
Slideshare Language courses Sole trader in Dutch
Slideshare Language courses Sole trader in DutchSlideshare Language courses Sole trader in Dutch
Slideshare Language courses Sole trader in Dutch
 
CDR of Lanco infratech
CDR of Lanco infratechCDR of Lanco infratech
CDR of Lanco infratech
 

Similar a GC Advisors - REC Offering

GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPOGCAdvisors
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaY P Chawla
 
Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Greenfirstgreen
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismSpark Network
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesSaurabh Mehta
 
Ewura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayEwura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayandrewmnzava
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
 
RECs – a market ready for take off
RECs – a market ready for take offRECs – a market ready for take off
RECs – a market ready for take offpManifold
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOECD Environment
 
Issue in Renewable Energy
Issue in Renewable EnergyIssue in Renewable Energy
Issue in Renewable EnergyIPPAI
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Sarod Paichayonrittha
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly TechnologyProbodh Mallick
 
Clean Energy Certification
Clean Energy CertificationClean Energy Certification
Clean Energy CertificationVskills
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 

Similar a GC Advisors - REC Offering (20)

GC Advisors - RPO
GC Advisors - RPOGC Advisors - RPO
GC Advisors - RPO
 
REC status
REC statusREC status
REC status
 
CCSE Conference Plenary Presentation
CCSE Conference Plenary PresentationCCSE Conference Plenary Presentation
CCSE Conference Plenary Presentation
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP Chawla
 
Rajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist GreenRajasthan Solar Policy Frist Green
Rajasthan Solar Policy Frist Green
 
Introduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) MechanismIntroduction to the Renewable Energy Certificate (REC) Mechanism
Introduction to the Renewable Energy Certificate (REC) Mechanism
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
RENEWABLE POLICY
RENEWABLE POLICYRENEWABLE POLICY
RENEWABLE POLICY
 
Renewable Energy - Recent Initiatives
Renewable Energy - Recent InitiativesRenewable Energy - Recent Initiatives
Renewable Energy - Recent Initiatives
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Ewura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayEwura presentation at the Renewable energy day
Ewura presentation at the Renewable energy day
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptx
 
RECs – a market ready for take off
RECs – a market ready for take offRECs – a market ready for take off
RECs – a market ready for take off
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
Issue in Renewable Energy
Issue in Renewable EnergyIssue in Renewable Energy
Issue in Renewable Energy
 
Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012Feed in tariff malaysia brochure 2012
Feed in tariff malaysia brochure 2012
 
Environment Friendly Technology
Environment Friendly TechnologyEnvironment Friendly Technology
Environment Friendly Technology
 
Clean Energy Certification
Clean Energy CertificationClean Energy Certification
Clean Energy Certification
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 

GC Advisors - REC Offering

  • 1. REC Presentation Leaders in Energy & Environmental Commodities Sustainability. Value. Delivered. www.general-carbon.com 1
  • 2. GC Advisors • Leading player in energy & environmental commodities • Advisory services for power market participants • Developing renewable energy certificates, energy efficiency certificates & carbon offsets • Driving sustainable development projects • Operating across India, South East Asia and Africa Sustainability. Value. Delivered. www.general-carbon.com 2
  • 3. Energy • Power sourcing/sales – Short, Medium & Long term contracts – Power Exchange based advisory services • Regulatory and strategic support to provide a single-window approach • Energy strategy – Assessing renewable purchase obligation and cost effective sourcing plan – Energy consumption and developing management plan Sustainability. Value. Delivered. www.general-carbon.com 3
  • 4. Environmental commodities • Carbon offsets – 100 million CERs & 20 million VERs – Carbon offset projects across - India, Indonesia, Thailand, Sri Lanka, Nigeria, Ethiopia & Kenya – Fixed, floating, spot & exotic structures including upfront payment – Equity, Debt and mezzanine financing based on carbon credits • Renewable Energy Certificates (RECs) – 350 MW of REC projects across India – Develop RECs through advisory and turnkey projects • Energy efficiency certificates (EsCerts) – Engaging large clients to prepare for PAT – Integrate PAT and REC obligations to develop holistic compliance toolkit Sustainability. Value. Delivered. www.general-carbon.com 4
  • 5. Our knowledge base • Wind energy portfolio of > 1300 MW – Projects across TN, Karnataka, AP, Maharashtra, Gujarat and Rajasthan • Natural gas portfolio of > 1000 MW • Hydro portfolio of > 600 MW • Biomass portfolio of > 300 MW • Supercritical based portfolio of > 4000 MWs Sustainability. Value. Delivered. www.general-carbon.com 5
  • 6. What is RPO The Electricity Act, 2003 • The Electricity Act & National Action Plan on Climate Change (NAPCC) provide roadmap for increasing renewable energy in total generation • Renewable Purchase Obligation (RPO) is obligation mandated by SERC for promotion of renewable energy generation National Action Plan on • RPO is the minimum percentage of Climate Change (NAPCC) – renewable energy share in the area of a June 2008 – Distribution licensee – Open Access Consumer – Captive consumer 2010 2015 2020 Sustainability. Value. Delivered. www.general-carbon.com 6
  • 7. Status of notification by States State RPO % Notification Pref. Tariff APPC (FY 12-13) (Wind) Maharashtra 8.00 Final 3.38 -5.07 2.57* Madhya Pradesh 4.00 Final 4.35 2.47* Tamil Nadu 9.00* Gazetted 3.51 2.54 Rajasthan 7.10 Amendment to gazette awaited 5.18- 5.44 2.75* Haryana 2.00 Final 4.08 2.77 Gujarat 7.00 Gazetted except OA and CPP 4.23 2.64 Chhattisgarh 5.75* Gazetted ~3.13 2.11- 4.66 Karnataka 7.0-10.0* Final 3.70 2.60 Andhra Pradesh 5.00 Final 4.70 2.00* Orissa 5.50 Gazetted 5.31 Sustainability. Value. Delivered. www.general-carbon.com 7
  • 8. Renewable Energy Certificates (REC) • REC is a tradable certificate of proof that one MWh of electricity has been injected (or deemed to be injected) to grid by an RE generator. • REC types & Price band: REC Up to April 2012 April 2012 - April 2017 Non Solar Rs 1,500 - 3,900 Rs 1,500 - 3,300 Solar Rs 12,000 – 17,000 Rs 9,300 – 13,400 Sustainability. Value. Delivered. www.general-carbon.com 8
  • 9. MNRE APPROVED SOURCES • WIND • BIOMASS • SMALL HYDRO • SOLAR • BAGASSED BASED CO-GENERATION • MSW PROJECT • BIOGAS BASED PROJECT • BLACK LIQOUR Sustainability. Value. Delivered. www.general-carbon.com 9
  • 10. Who is eligible to participate in REC? Sustainability. Value. Delivered. www.general-carbon.com 10
  • 11. Other eligibility terms • Preferential tariff PPA – Not eligible for 3 years if they cancel PPA • Eligible if DISCOM cancels PPA or after expiry of PPA • Captive consumption – Eligible if no promotional benefit • Concessional wheeling/transmission charges • Banking facility • Electricity duty waiver – Not eligible for 3 years even if generator foregoes benefits – Eligible if concessions are withdrawn by SERC Sustainability. Value. Delivered. www.general-carbon.com 11
  • 12. Other eligibility terms • GBI and Accelerated depreciation benefits are not considered concessional • Not available for off grid projects • Auxiliary consumption not eligible Sustainability. Value. Delivered. www.general-carbon.com 12
  • 13. Status of REC Regulation • Arunachal Pradesh, Sikkim, West Bengal are yet to designate state agency and draw up REC regulation • Delhi is yet to finalize the REC regulation (Draft exists) • Nagaland is yet to designate state agency (Regulation finalized) Sustainability. Value. Delivered. www.general-carbon.com 13
  • 14. Accreditation Process 1. Web based Application + Submission of information in physical form with the State Agency (SA) along with processing fee and accreditation charges 2. SA will undertake preliminary scrutiny of the application within 5 days of receipt 3. SA will intimate in writing if further information is needed 4. SA will evaluate the application based on 8 criteria 5. If Application fulfills the evaluation criteria, SA shall grant 'Certificate for Accreditation‘. Else rejection is intimated. 6. State Agency will also intimate regarding the accreditation of particular RE generation project to: – Central Agency (NLDC) – Host SLDC – Local DisCom Sustainability. Value. Delivered. www.general-carbon.com 14
  • 15. Accreditation - Documentation & Evaluation The application for accreditation shall The 8 criteria of evaluation in accreditation contain 1. Undertaking of 'Availability of Land' in possession for 1. Owners details, setting up generating station 2. Operator details (in case the owner and 2. Power Evacuation Arrangement permission letter from operator are different legal entities), the host State Transmission Utility or the concerned 3. Generating Station details, Distribution Licensee, as the case may be 4. Connectivity details with concerned licensee 3. Confirmation of Metering Arrangement and Metering (STU/DISCOM), Location 5. Metering details, 4. Date of Commissioning of RE project for existing 6. Statutory Clearance details, eligible RE Project or Proposed Date of Commissioning 7. Undertaking of not having entered into PPA on for new RE for accreditation preferential tariff for the capacity for which 5. Undertaking regarding Off-take/Power Purchase participation in REC scheme is sought as per Agreement the CERC REC Regulations and 6. Proposed Model and Make for critical equipment (say, 8. Any other relevant information as per the format WTG, STG, PV Module) for the RE Project. Confirmation of application of compliance of critical equipment with relevant applicable IEC or CEA Standards 7. Undertaking for compliance with the usage of fossil fuel criteria as specified by MNRE 8. Details of application processing fees/accreditation charges Sustainability. Value. Delivered. www.general-carbon.com 15
  • 16. Registration Process 1. Web based Application + Submission of information in physical form with the Central Agency (NLDC) along with processing fee and registration charges 2. NLDC will undertake preliminary scrutiny of the Application within 5 days of receipt 3. NLDC will intimate in writing if further information is needed 4. NLDC will evaluate the application based on 4 criteria 5. If Application fulfills the evaluation criteria, CA shall grant 'Certificate for Registration‘. Else rejection is intimated. 6. NLDC will also intimate regarding the registration of particular RE generation project to: – Host State Agency – Host SLDC – Power Exchanges Sustainability. Value. Delivered. www.general-carbon.com 16
  • 17. Registration - Documentation & Evaluation The application for accreditation shall The 4 criteria of evaluation in accreditation contain 1. Owner details 1. A Valid Certification of Accreditation by State 2. RE Generating Station details Agency 3. Certificate of accreditation by the State 2. Date of Commissioning or Proposed date of Agency 4. Generating facility commissioning schedule Commissioning or Commissioning Schedule for 5. Any other relevant information as per the new projects. enclosed format 3. Undertaking that it has not entered into any Power Purchase Agreement at preferential tariff as may be determined by the Appropriate Commission 4. Details of payment of registration fees/charges Sustainability. Value. Delivered. www.general-carbon.com 17
  • 18. Issuance Process 1. Obtain Certification of Energy from SLDC on monthly basis 2. Application for issuance is possible on a fortnightly basis but within 3 months from the date of injection 3. Web based Application + Submission information in physical form with Central Agency (NLDC) along with Issuance fee The application shall include: (i) Energy Injection Report - certified by the SLDC (ii) Registration Certificate 4. NLDC will undertake preliminary scrutiny of the Application within 2 days of receipt 5. NLDC will intimate in writing if further information is needed 6. NLDC will evaluate the application based on 4 criteria – Verification of the time period for which the NLDC may have already issued RECs – Verification of RECs claimed from the duly certified Energy Injection Reports by the SLDC – Details of fee & charges made for issuance of certificates. – Confirmation of Compliance Auditor report, if any. 7. If Application fulfills the evaluation criteria, CA shall issue ‘Renewable Energy Certificates ‘. Else rejection is intimated. 8. NLDC will also intimate regarding the Issuance of particular RE generation project to: – Host State Agency Sustainability. Value. Delivered. www.general-carbon.com 18
  • 19. Redemption (Trading) Process 1. REC has a 365 days expiry period from the date of issuance within which it shall be traded 2. Registered RE Generator to have membership on the designated Power Exchange, else they should sell their RECs through a Trader Member (Eg. GC Advisors) 3. Trading of RECs to take place on last Wednesday of every month. 4. During the time the bidding window opens place offer for dealing of RECs within the specified price band. 5. Buyers shall place their bids through the trading platform of the respective Power Exchange 6. On closure of the trading window, the Power Exchange shall send the maximum bid volumes for each of the eligible entity, which has placed offers on that Power Exchange, to the Central Agency for verification of the quantity of valid RECs 7. NLDC shall check the maximum bid volume against the quantity of valid RECs & confirm the availability of the valid RECs 8. The Power Exchange shall work out the Market Clearing Price and the Market Clearing Volume & send the final cleared trades to NLDC 9. RECs will be extinguished in the records of NLDC in the 'First-in-First-out' order Sustainability. Value. Delivered. www.general-carbon.com 19
  • 20. REC Process - Timeline State Agency • RE Generator applies to the State agency for accreditation upto 6 month before Commissioning Accreditation • Process time: ~ 6 weeks Power Exchange • Accredited project is applied for registration with NLDC Registration • Process time: ~ 3 weeks • May apply fortnightly basis; within 3 months of injection to grid NLDC Issuance • Process time: ~ 3 weeks • Last Wednesday of every month between 1300 – 1500 hrs Redemption Sustainability. Value. Delivered. www.general-carbon.com 20
  • 21. Process Costs Cost Head Payable to Cost Quantity (INR) Application processing fees State Agency 5,000 One‐time Accreditation Charge State Agency 30,000 Annual Charge State Agency 10,000 Accreditation Expenses State Agency 45,000 Application processing fees Central Agency (NLDC) 1,000 One Time Registration Charges Central Agency (NLDC) 5,000 Annual Charges Central Agency (NLDC) 1,000 Registration Expenses Central Agency (NLDC) 7,000 Issuance fee Central Agency (NLDC) Rs. 10 per REC Admission Fee Power Exchange Depends on Power Exchange Interest Free Security Deposit Power Exchange Depends on Power Exchange Processing Fee Power Exchange Depends on Power Exchange Annual Subscription Fees Power Exchange Depends on Power Exchange Annual Client Subscription Fee (each client) Power Exchange Depends on Power Exchange Transaction Fees (Rs/REC) Power Exchange Depends on Power Exchange Sustainability. Value. Delivered. www.general-carbon.com 21
  • 22. REC and CDM • REC and CDM can coexist • Additionality based on APPC + Floor price of REC – In most cases APPC + REC is lower than cost of power (2.37 + 1.5 = 3.87) – CDM projects registered with captive costs of greater than 4.86 – Hence, additionality is possible • REC makes up for the difference between APPC and preferential tariff Sustainability. Value. Delivered. www.general-carbon.com 22
  • 23. Demand for RECs • More than just DISCOMs – Already procuring under preferential PPAs – Impact on their bottom line • Open access consumers – Inter-state plus intra-state is a small segment • Captive consumers – Large market made up of industrial users (cement, steel, chemical etc.) having thermal capacity – Will focus on RE development, RE PPAs or REC Sustainability. Value. Delivered. www.general-carbon.com 23
  • 24. Key challenges: Still to be answered • Grid connectivity & Reporting - Establishing metering communication with SLDC (no. of meters, joint/online reading, etc.) • Captive – – Bagasse – Electricity duty exemption – Wind - Electricity duty exemption & promotional banking facility – RPO accounting - Will captive users be able to account for their RE power in their consumption if they have availed any benefit (duty/banking) • Enforcement of RPO obligations – Are Obligated Entities willing to buy Sustainability. Value. Delivered. www.general-carbon.com 24
  • 25. Contact us To learn more about RECs – Process, eligibility, documentation, pricing, trading, etc. please feel free to contact us:- Mumbai – Mr. Rameez Shaikh Chennai – Ms. Priya Ranganayaki General Carbon Advisory Services Pvt. Ltd. General Carbon Advisory Services Pvt. Ltd. 5th floor, Great Social Building 2/36, 1st floor, Venkat Iyer Road, 60, Sir Pherozeshah Mehta Road, Fort Near Royapuram Bridge, Mumbai 400001 Chennai 600001 Phone: +91 22 2266 3201/3301 Phone: +91 44 42167331 Mobile: +91 9920033866 Mobile: +91 9962526876 Email: rameez.shaikh@general-carbon.com Email: priya.v@general-carbon.com Sustainability. Value. Delivered. www.general-carbon.com 25
  • 26. REC Presentation Leaders in Energy & Environmental Commodities Sustainability. Value. Delivered. www.general-carbon.com 26

Notas del editor

  1. June 2011
  2. June 2011