9. GLM I
PRODUCTION PROCESS
GRUART LA MANCHA
STOCKING IN THE
YARD FOR A YEAR FIRST BOILING
TRIMMING AND
SELECTION OF CORK
SHEETS
STACKING IN THE
PORCH
SECOND
BOILING
SLICING AND
PERFORATINGT
DISCARD OF CORK
WITH REMAINS OF
WOOD
DIMENSIONAL
ADJUSTMENT
AND
OVALIZATION
TRANSPORT TO
GLM II
RECEIPT CORK
IN GLM I
21. GLM II
GRUART LA MANCHA
WASHING WITH
CLEAR WATER
WASHING WITH
PEROXIDE
ELECTRONIC
SELECTION
DENSIMETRIC
CONTROL
MANUAL
SELECTION
WAREHOUSE 3ANTI-CAPILLARITY
TREATMENT
BRANDINGDUSTING AND
SOFTENING
PACKAGING
WAREHOUSE 4 LABORATORY DISPATCH
36. SELECTION OF
WOODLANDS
CONTROL OF THE
EXTRACTION OF
CORK
LOADING AND
TRANSPORT TO
GLM I
RECEIPT IN GLM
I
STOCKING IN THE
YARD FOR A YEAR
FIRST BOILING
ANALYTICAL
TEST OF THE
CORK
MONTHLY ANALYTICAL TEST
OF 10 SAMPLES PER STACK
TRIMMING AND
SELECTION OF CORK
SHEETS
STACKING IN THE
PORCH
NEW ANALYTICAL TEST
SECOND
BOILING
SLICING AND
PERFORATING
DISCARD OF CORK
WITH REMAINS OF
WOOD
DIMENSIONAL
ADJUSTMENT AND
OVALIZATION
NEW ANALYTICAL TEST
TRANSPORT TO
GLM II
NEW ANALYTICAL TEST AND
PROBABLE QUALITY
WASHING WITH
CLEAR WATER
DECHLORINATED AND
SOFTENED
WASHING WITH
PEROXIDE
PEROXIDES CONTROL AND
COMPLETE ANALYTICAL TEST
ELECTRONIC
SELECTION
DENSIMETRIC
CONTROL
MANUAL
SELECTION
WAREHOUSE 3
COMPLETE ANALYTICAL TEST FOR
THE CERTIFICATION
ANTI-CAPILLARITY
TREATMENT
BRANDING
DUSTING AND
SOFTENING
PACKAGING
WAREHOUSE 4 LABORATORY
FINAL PRODUCT CONTROL
DISPATCH
PROCESO DE FABRICACIÓN
GRUART LA MANCHA