This document outlines a 7-step process for automating a network test lab using physical-layer switches. The steps include: 1) Assessing automation needs; 2) Deciding what to automate; 3) Choosing infrastructure like switches; 4) Choosing a lab management solution; 5) Planning the architecture; 6) Setting the administrative framework; and 7) Integrating with existing automation. The goal is to enable dynamic test beds, shorten test cycles, and improve testing through remote access and parallel tests. Physical-layer switches allow automated reconfiguration to quickly set up and run multiple tests.