SlideShare una empresa de Scribd logo
1 de 5
_____________________________________________________________________________
Gary Randolph Lutz 9388 Placid Way, Howell, MI 48843
grlutz72@att.net
810-632-5087 (H)
810-623-3273 (C)
_____________________________________________________________________________
The commitment:
To be active in given disciplines described herein; to operate within both conventional and non-
conventional automotive product development philosophy, with high inter-disciplinary
collaboration, providing technical contribution at all levels.
RECARO North America, Inc., Auburn Hills, MI
Program Manager - Tesla - Aug 2014 to Feb 2015
 Program Lead (contract consultant) for development and introduction of RECARO
Performance Seating to Tesla Model S – Development at Auburn Hills -> Production in
Fremont, CA
o Responsible for Program Management providing direction and leadership for
Front & Rear Seating System utilizing the JCI Plus Development Process securing
Tesla introduction timing and budget for Model S - Dual Motor P85D.
 Direct liaison management: Design, Prototype, and Test
 Indirect management: Finance, Purchasing, HR, IT, Industrial Engineering,
Quality, and Plant Operations
 Achievement of Timing/Budget/Quality Gates throughout
Development/Production Validation/Launch for all disciplines
o Responsible for providing direction and leadership for joint development with
Tesla Seat Engineering & Test, Advanced Styling Development, Purchasing, and
Material Planning Logistics teams throughout Development, Production
Validation and Launch Process
 Program Lead for synthesis of conceptual development strategies for production site
readiness in Fremont, CA., providing leadership and job focus, working closely with the
Launch Support Teamdispatched from Auburn Hills to Fremont, CA.
o Launch Support Teamwas tasked with:
 Facilities Management
 Development of Office Properties
 Construction & Maintenance Management
 IT Systems Management
 HR, EH&S Management
 Materials & Logistics Management
 Successfully launched RECARO Performance Seats for Tesla Model S – P85D (6) six
weeks ahead of Business Case SOP Timing per Tesla CEO and Chief Product Architect
request
Nissan Technical Center of North America; Farmington Hills, MI
Senior Manager – Resource Management & Engineering Strategic Planning – Apr 2009 to May
2011 (Retired)
 Vehicle Design & Development Resource Management subject matter expert for Nissan
Technical Center of North America, Nissan Mexico Research & Development and Brazil
Research & Development for Light Duty Truck, Heavy Duty Truck and Sport Utility
Vehicle, Sentra, Versa, Altima, Pathfinder, Maxima
 Developed annual Long Term Business Plans (10 year, 3 year, Annual Plan) for Global
Resource allocations based on Nissan’s Global Business Plan, and Global resource
utilization plan (Budget & Human Resources)
 Implemented Resource Management tool to measure and forecast design & test
workload requirements by vehicle component including engine/powertrain
 Utilized findings for maintaining successful capacity utilization for North America and
Global vehicle/powertrain design & development, fixed costs control; successfully
avoiding employee separation
 Rolled out shortened development process eliminating prototype builds by virtual
design called V3P process to maximize cost savings and development time from vehicle
concept to start of production
 Quarterly Global presentations in Japan regarding the state of full and profitable
utilization of resources based on latest vehicle & powertrain product plan.
Nissan Technical Center of North America; Farmington Hills, MI
Manager Finance – Development Cost, Resource Planning, Budget Planning & Control – Apr
1999 to March 2009
 Vehicle Design & Development Cost Planning & Resource Management for Nissan
Technical Center of North America, Nissan Mexico Research & Development, and
Europe Brussels Research & Development for Light Duty Truck, Heavy Duty Truck and
Sport Utility Vehicle, Sentra, Versa, Altima, Pathfinder, Maxima
 Responsibility expanded for entire Nissan North America Long Term Business Plans,
Annual Budget, Design & Development vehicle cost, Research & Test Division contracts
between Japan & Mexico
 Developed SAP Financial Reporting System with Deloitte & Touche (SAP) for all Financial
reporting to Nissan North America Headquarters Tennessee & Japan for Vehicle Design
& Development Cost and Resource Management. Developed the Electronic Time
Reporting System for all employees Direct Project Development and Indirect Support
Staff
 Coordinated and accomplished numerous Company Wide budget reduction plans based
on control of annual business plan in order to meet profitability objectives
 Finance representative for Cross Functional Team focusing on data gathering, problem
solving, and resolution presentation to Management Committee
Cross Functional Team Members
 Business Development Office
 Purchasing
 Manufacturing & Logistics
 Research & Development
 Marketing
 Finance
 G & A
 Finance representative for “Value Up” short term studies to resolve issues impinging
upon the success of attaining (1) Three Year Plan Objectives, (2) Sales Volumes, (3) 20%
Return of Investment for Vehicle Design & Development Cost
Nissan Technical Center of North America; Farmington Hills, MI
Senior Project Engineer - Vehicle Engineering Development - Nov 1988 to March 1999
 Vehicle Engineering Development responsibility for Design & Development Cost &
Resource Management for Styling, Prototype, Pre-Production, and Launch of Light Duty
Truck, Sentra, Altima, X-Terra, Pathfinder, Maxima
 Vehicle Engineering Development responsibility for Design & Development Cost &
Resource Management for Long Term Business Plan: 10 year, 5 year, 3 year, and Annual
Budget
 Vehicle Engineering Development liaison for Federal Motor Vehicle Safety Standards
and Environmental Protection Agency between Washington D.C.: NHTSA and EPA
 Policy & Procedure development for job sharing/job transfer between Nissan Technical
Center of North America and Nissan Motor Manufacturing USA for Light Duty Truck,
Sentra, Altima, X-Terra, Pathfinder, Maxima
Nissan Motor Manufacturing, USA; Smyrna, TN
Senior Project Engineer - Product Design - June 1982 to Nov 1988
 Successfully achieved 38% Local Content in order to launch 1983 Pick-Up Truck and
Sentra
 Policy and Procedure establishment for Design Release Systembetween US, Japan, and
Suppliers
 Regulatory liaison (Chairman Product Regulation Compliance Committee) between
Engineering and Manufacturing for Federal Motor Vehicle Safety Standards, and
Environmental Protection Agency. Responsible for practical application of new
legislation regarding Federal Motor Vehicle Safety & Environmental Protection Agency
regulations
 Coordination of production builds for Crash Vehicles to confirm vehicles meeting Design
& Manufacturing intent prior to vehicle release for sale to customers
 Engineering liaison with Nissan North America- Legal Office for completion of
Engineering Interrogatories involving vehicle recall notices
 System design for establishing ‘Plant -Wide’ safety assembly awareness through Vital
Process Control
Ford Motor Company, Body Engineering; Dearborn, MI
Project Program Analyst – Program Control - Dec 1977 to June 1982
 Vehicle Program Management for launch of 1979 Model Year Escort (Pinto replacement
vehicle)
 Advanced Body Engineering Project Program Analyst for forward model planning for
Design Cost & Weight Control
 Vehicle Program Management for launch of 1982 Model Year Lincoln Continental, Town
Car, Mark III
____________________________________________________
Education
ARIZONA STATE UNIVERSITY; Tempe, AZ – BS in Business Management
RECARO North America, Inc., Auburn Hills, MI
Program Manager - Tesla - Aug 2014 to Feb 2015
 Program Lead (contract consultant) for development and introduction of RECARO
Performance Seating to Tesla Model S – Development at Auburn Hills -> Production
Launch in Fremont, CA
o Responsible for Program Management providing direction and leadership for
Front & Rear Seating System utilizing the JCI Plus Development Process securing
Tesla introduction timing and budget for Model S - Dual Motor P85D.
 Direct liaison management: Design, Prototype, and Test
 Indirect management: Finance, Purchasing, HR, IT, Industrial Engineering,
Quality, and Plant Operations
 Achievement of Timing/Budget/Quality Gates throughout
Development/Production Validation/Launch for all disciplines
o Responsible for providing direction and leadership for joint development with
Tesla Seat Engineering & Test, Advanced Styling Development, Purchasing, and
Material Planning Logistics teams throughout Development, Production
Validation and Launch Process
 Program Lead for synthesis of conceptual development strategies for production site
readiness in Fremont, CA., providing leadership and job focus working closely with the
Launch Support Teamdispatched from Auburn Hills to Fremont, CA.
o Launch Support Teamwas tasked with:
 Facilities Management
 Development of Office Properties
 Construction & Maintenance Management
 IT Systems Management
 HR, EH&S Management
 Materials & Logistics Management
 Launched RECARO Performance Seats for Tesla Model S – P85D (6) six weeks ahead of
Business Case SOP Timing per Tesla CEO and Chief Product Architect request

Más contenido relacionado

Similar a Launching RECARO Seats for Tesla Model S

Similar a Launching RECARO Seats for Tesla Model S (20)

Resume md islam
Resume md islamResume md islam
Resume md islam
 
Resume md islam
Resume md islamResume md islam
Resume md islam
 
Hariharan 2016
Hariharan 2016Hariharan 2016
Hariharan 2016
 
Ken resume
Ken resumeKen resume
Ken resume
 
Nelson Resume(dec)
Nelson Resume(dec)Nelson Resume(dec)
Nelson Resume(dec)
 
Adams_curentR
Adams_curentRAdams_curentR
Adams_curentR
 
Resume Paul Ferrata 2018
Resume Paul Ferrata 2018Resume Paul Ferrata 2018
Resume Paul Ferrata 2018
 
Troy Presler Resume_Product Management
Troy Presler Resume_Product ManagementTroy Presler Resume_Product Management
Troy Presler Resume_Product Management
 
Steve Parlin 2017
Steve Parlin 2017Steve Parlin 2017
Steve Parlin 2017
 
Jay Resnick1 - Resume
Jay Resnick1 - ResumeJay Resnick1 - Resume
Jay Resnick1 - Resume
 
Robert Freeman Resume Aug15
Robert Freeman Resume Aug15Robert Freeman Resume Aug15
Robert Freeman Resume Aug15
 
JodyAllenChurch 4-21-15
JodyAllenChurch 4-21-15JodyAllenChurch 4-21-15
JodyAllenChurch 4-21-15
 
PatrickJacks_Resume2
PatrickJacks_Resume2PatrickJacks_Resume2
PatrickJacks_Resume2
 
Srinivas Resume 2016
Srinivas Resume 2016Srinivas Resume 2016
Srinivas Resume 2016
 
Cartwright Gary - Resume FINAL
Cartwright Gary - Resume FINALCartwright Gary - Resume FINAL
Cartwright Gary - Resume FINAL
 
Program Manager Resume 4
Program Manager Resume 4Program Manager Resume 4
Program Manager Resume 4
 
Kipp Bottorff Update 2016 v2
Kipp Bottorff Update 2016 v2Kipp Bottorff Update 2016 v2
Kipp Bottorff Update 2016 v2
 
resume tech support 031516
resume tech support 031516resume tech support 031516
resume tech support 031516
 
EdOBridgmanMBAPMP
EdOBridgmanMBAPMPEdOBridgmanMBAPMP
EdOBridgmanMBAPMP
 
EdOBridgmanMBAPMP
EdOBridgmanMBAPMPEdOBridgmanMBAPMP
EdOBridgmanMBAPMP
 

Launching RECARO Seats for Tesla Model S

  • 1. _____________________________________________________________________________ Gary Randolph Lutz 9388 Placid Way, Howell, MI 48843 grlutz72@att.net 810-632-5087 (H) 810-623-3273 (C) _____________________________________________________________________________ The commitment: To be active in given disciplines described herein; to operate within both conventional and non- conventional automotive product development philosophy, with high inter-disciplinary collaboration, providing technical contribution at all levels. RECARO North America, Inc., Auburn Hills, MI Program Manager - Tesla - Aug 2014 to Feb 2015  Program Lead (contract consultant) for development and introduction of RECARO Performance Seating to Tesla Model S – Development at Auburn Hills -> Production in Fremont, CA o Responsible for Program Management providing direction and leadership for Front & Rear Seating System utilizing the JCI Plus Development Process securing Tesla introduction timing and budget for Model S - Dual Motor P85D.  Direct liaison management: Design, Prototype, and Test  Indirect management: Finance, Purchasing, HR, IT, Industrial Engineering, Quality, and Plant Operations  Achievement of Timing/Budget/Quality Gates throughout Development/Production Validation/Launch for all disciplines o Responsible for providing direction and leadership for joint development with Tesla Seat Engineering & Test, Advanced Styling Development, Purchasing, and Material Planning Logistics teams throughout Development, Production Validation and Launch Process  Program Lead for synthesis of conceptual development strategies for production site readiness in Fremont, CA., providing leadership and job focus, working closely with the Launch Support Teamdispatched from Auburn Hills to Fremont, CA. o Launch Support Teamwas tasked with:  Facilities Management  Development of Office Properties  Construction & Maintenance Management  IT Systems Management  HR, EH&S Management  Materials & Logistics Management  Successfully launched RECARO Performance Seats for Tesla Model S – P85D (6) six weeks ahead of Business Case SOP Timing per Tesla CEO and Chief Product Architect request
  • 2. Nissan Technical Center of North America; Farmington Hills, MI Senior Manager – Resource Management & Engineering Strategic Planning – Apr 2009 to May 2011 (Retired)  Vehicle Design & Development Resource Management subject matter expert for Nissan Technical Center of North America, Nissan Mexico Research & Development and Brazil Research & Development for Light Duty Truck, Heavy Duty Truck and Sport Utility Vehicle, Sentra, Versa, Altima, Pathfinder, Maxima  Developed annual Long Term Business Plans (10 year, 3 year, Annual Plan) for Global Resource allocations based on Nissan’s Global Business Plan, and Global resource utilization plan (Budget & Human Resources)  Implemented Resource Management tool to measure and forecast design & test workload requirements by vehicle component including engine/powertrain  Utilized findings for maintaining successful capacity utilization for North America and Global vehicle/powertrain design & development, fixed costs control; successfully avoiding employee separation  Rolled out shortened development process eliminating prototype builds by virtual design called V3P process to maximize cost savings and development time from vehicle concept to start of production  Quarterly Global presentations in Japan regarding the state of full and profitable utilization of resources based on latest vehicle & powertrain product plan. Nissan Technical Center of North America; Farmington Hills, MI Manager Finance – Development Cost, Resource Planning, Budget Planning & Control – Apr 1999 to March 2009  Vehicle Design & Development Cost Planning & Resource Management for Nissan Technical Center of North America, Nissan Mexico Research & Development, and Europe Brussels Research & Development for Light Duty Truck, Heavy Duty Truck and Sport Utility Vehicle, Sentra, Versa, Altima, Pathfinder, Maxima  Responsibility expanded for entire Nissan North America Long Term Business Plans, Annual Budget, Design & Development vehicle cost, Research & Test Division contracts between Japan & Mexico  Developed SAP Financial Reporting System with Deloitte & Touche (SAP) for all Financial reporting to Nissan North America Headquarters Tennessee & Japan for Vehicle Design & Development Cost and Resource Management. Developed the Electronic Time Reporting System for all employees Direct Project Development and Indirect Support Staff  Coordinated and accomplished numerous Company Wide budget reduction plans based on control of annual business plan in order to meet profitability objectives  Finance representative for Cross Functional Team focusing on data gathering, problem solving, and resolution presentation to Management Committee
  • 3. Cross Functional Team Members  Business Development Office  Purchasing  Manufacturing & Logistics  Research & Development  Marketing  Finance  G & A  Finance representative for “Value Up” short term studies to resolve issues impinging upon the success of attaining (1) Three Year Plan Objectives, (2) Sales Volumes, (3) 20% Return of Investment for Vehicle Design & Development Cost Nissan Technical Center of North America; Farmington Hills, MI Senior Project Engineer - Vehicle Engineering Development - Nov 1988 to March 1999  Vehicle Engineering Development responsibility for Design & Development Cost & Resource Management for Styling, Prototype, Pre-Production, and Launch of Light Duty Truck, Sentra, Altima, X-Terra, Pathfinder, Maxima  Vehicle Engineering Development responsibility for Design & Development Cost & Resource Management for Long Term Business Plan: 10 year, 5 year, 3 year, and Annual Budget  Vehicle Engineering Development liaison for Federal Motor Vehicle Safety Standards and Environmental Protection Agency between Washington D.C.: NHTSA and EPA  Policy & Procedure development for job sharing/job transfer between Nissan Technical Center of North America and Nissan Motor Manufacturing USA for Light Duty Truck, Sentra, Altima, X-Terra, Pathfinder, Maxima Nissan Motor Manufacturing, USA; Smyrna, TN Senior Project Engineer - Product Design - June 1982 to Nov 1988  Successfully achieved 38% Local Content in order to launch 1983 Pick-Up Truck and Sentra  Policy and Procedure establishment for Design Release Systembetween US, Japan, and Suppliers  Regulatory liaison (Chairman Product Regulation Compliance Committee) between Engineering and Manufacturing for Federal Motor Vehicle Safety Standards, and Environmental Protection Agency. Responsible for practical application of new legislation regarding Federal Motor Vehicle Safety & Environmental Protection Agency regulations  Coordination of production builds for Crash Vehicles to confirm vehicles meeting Design & Manufacturing intent prior to vehicle release for sale to customers  Engineering liaison with Nissan North America- Legal Office for completion of Engineering Interrogatories involving vehicle recall notices
  • 4.  System design for establishing ‘Plant -Wide’ safety assembly awareness through Vital Process Control Ford Motor Company, Body Engineering; Dearborn, MI Project Program Analyst – Program Control - Dec 1977 to June 1982  Vehicle Program Management for launch of 1979 Model Year Escort (Pinto replacement vehicle)  Advanced Body Engineering Project Program Analyst for forward model planning for Design Cost & Weight Control  Vehicle Program Management for launch of 1982 Model Year Lincoln Continental, Town Car, Mark III ____________________________________________________ Education ARIZONA STATE UNIVERSITY; Tempe, AZ – BS in Business Management
  • 5. RECARO North America, Inc., Auburn Hills, MI Program Manager - Tesla - Aug 2014 to Feb 2015  Program Lead (contract consultant) for development and introduction of RECARO Performance Seating to Tesla Model S – Development at Auburn Hills -> Production Launch in Fremont, CA o Responsible for Program Management providing direction and leadership for Front & Rear Seating System utilizing the JCI Plus Development Process securing Tesla introduction timing and budget for Model S - Dual Motor P85D.  Direct liaison management: Design, Prototype, and Test  Indirect management: Finance, Purchasing, HR, IT, Industrial Engineering, Quality, and Plant Operations  Achievement of Timing/Budget/Quality Gates throughout Development/Production Validation/Launch for all disciplines o Responsible for providing direction and leadership for joint development with Tesla Seat Engineering & Test, Advanced Styling Development, Purchasing, and Material Planning Logistics teams throughout Development, Production Validation and Launch Process  Program Lead for synthesis of conceptual development strategies for production site readiness in Fremont, CA., providing leadership and job focus working closely with the Launch Support Teamdispatched from Auburn Hills to Fremont, CA. o Launch Support Teamwas tasked with:  Facilities Management  Development of Office Properties  Construction & Maintenance Management  IT Systems Management  HR, EH&S Management  Materials & Logistics Management  Launched RECARO Performance Seats for Tesla Model S – P85D (6) six weeks ahead of Business Case SOP Timing per Tesla CEO and Chief Product Architect request