A scenario assessment model to assist the end-user in determining priorities for a series of agreed management prescriptions that can be enacted through controls on existing landuse
The Development of a Catchment Management Modelling System for the Googong Reservoir Catchment
1. The Development of a Catchment Management Modelling System for the Googong Reservoir Catchment Gavan Thomas, Ian Musto and Tony Sparks Ecowise Environmental Pty Ltd, Fyshwick, ACT Ph: 02 6270 7650
2.
3.
4.
5.
6.
7.
8.
9. ArcHydro Streams Drainage Areas Hydrography Channels Terrain Surfaces Rainfall Response Digital Orthophotos Basic idea: Transition from … Data Model Based on Inventory
10. … and … Data Model Based on Behaviour Follow a drop of water from where it falls on the land, to the stream, and all the way to the ocean.
11. … to Arc Hydro Data Model Integrate Data Inventory using a Behavioral Model Relationships between objects linked by tracing path of water movement