SUSTAINABILITY

Pedder and Scampton aim to design all their buildings to be as sustainable as possible both at
the design stage and for the life of the building. We try to take a holistic view of each project so
as to make sensible decisions that will have the maximum impact in each individual case. Thus
the key sustainable issues will vary from project to project dependent upon the site, location,
brief and budget. Issues such as the use of renewable energy, recycled materials, natural
insulation etc are considered for each project as a matter of course.

At the outset of each project we will review the opportunities and difficulties offered by a given
site and this review will include consideration of issues such as orientation, access and the
possibilities for the incorporation of renewable energy sources. Wherever possible we will do
this in conjunction with consultants who have specialist sustainability knowledge. The review
ensures that sustainable issues are considered at the outset and incorporated into the
preliminary sketch designs and not just bolted on. Once this review has been carried out we will
make proposals to the client as to possible sustainability measures that can be included in the
building. It is important that such elements are appropriate to the user group and can be easily
understood and operated – for example, blinds that need to be regularly raised and lowered are
not useful if there is no one available to understand the system and to do this at the appropriate
times.




New house, West Hampstead                         House extension, East Sheen

An example of this initial assessment process is the Training Centre for Thrive in Battersea Park
where we worked with Price and Myer’s Sustainability team. The site is dominated by a very
large plane tree and siting of the building had to be carefully considered in order not to damage
its roots. Price and Myers carried out solar studies for the whole site which concluded that it
would not be possible to generate any significant renewable energy on the site because of the
shading created by the tree. (The site was also not suitable for a wind turbine or a ground
source heat pump). Key sustainability issues for the project then became orienting the building
to maximise the use of natural daylight, achieve good natural ventilation and minimise heat loss
and heating bills.

Similarly, the building is sited in a park and we are investigating the possibilities of using a log
fired boiler which could use the timber produced by the park maintenance contractors. Issues to
be considered here include the long term viability of the park as a source of logs – these are
likely to acquire value in the future and may no longer be available to our client, the storage
requirements of large quantities of logs and the health and safety issues associated with loading
the boiler with logs on a daily basis.

A priority for Pedder and Scampton is to get fundamental issues right which do not add cost to
the building but which minimise carbon emissions, energy consumption, waste and the embodied
energy in the materials used. This involves careful consideration of siting and orientation of each
project as well as the specification of appropriate materials, insulation etc.

For all projects we aim to orient the building as far as possible to maximise the use of natural
daylight and benefit from solar gain where useful, and to provide shading or omit windows where
not. The quality of internal environments is very important to us and we aim to create designs
that avoid overheating and glare without the need for air conditioning.

Similarly, for all our projects we aim to design in a way that minimises waste and to avoid
replacing sound building fabric unless essential. For example, if substantial excavations are
required we would aim to try and reuse the spoil elsewhere on the site and in refurbishment work
we often upgrade and reuse elements such as existing windows and doors rather than replacing
these.

New materials are considered for their sustainability – we often specify timber and we consider
reclaimed materials as well as new. Materials are sourced locally where possible. We are
constantly reviewing the possibilities for efficient insulation – this is particularly critical for our
inner city work where sites are often very tight and construction thicknesses can act as a major
constraint on a project. However we have recently specified sheep’s wool insulation and have
looked into the possibilities of hemp and recycled newspaper etc.

We have not yet specified a grey water recycling system for a project – these do seem to provide
some difficulties in use and require commitment from the building users, but this is something
that we discuss with individual clients in the light of their particular needs. We do, however, aim
to collect rainwater for gardening use.

We also consider the use of green roofs wherever possible – issues to consider include location
and maintenance – and we have specified extensive green roofs on a number of occasions.

Our interests extend into the landscape around our buildings and we have designed the gardens
to several projects both domestic and community based. The designs have included features
such as wildlife friendly ponds and planting to provide a variety of habitats.

The Haringey recycling project provided a specific opportunity to research the availability and
performance of recycled materials – for example, the ground surfacing for these sites is a
distinctive resin bound finish made from blue recycled glass which has worn well in use, and
panels made from items such as recycled Wellington boots and mobile phones have proved very
popular with the users. We have specified reclaimed timber floors on a number of occasions and
specify soft lime mortars wherever possible so that bricks can be recycled wherever possible.




                                                     Panel made from recycled mobile phones
TESTIMONIALS

‘…your architects are amazing. I’ve seen hundreds of projects all over the country and believe
me, your lot are the best. No one has reflected the needs of the residents/members with such
latitude of thinking, depth of understanding and glorious attention to detail. The building
embodies empathy with those who will use it.’

ODPM – funders for Press House, Crisis and Parker House projects

‘…P&S are a totally professional firm…do not be put off by their small size…your client will get
the highest quality design…originating in the client’s needs and aspirations….They are sticklers
for quality and design integrity….’

Project Manager, Stadium Housing Association

‘The public has given the thumbs-up to the top-notch sites in Seven Sisters as usage has
increased dramatically. The amount of recylables collected has risen by more than 20%’

LB Haringey Press Release about recycling sites

‘the touchdowns are excellent…we continually get excellent comments and feedback from
visitors to the building on their design and functionality’

Powergen Facilities Management Team

‘It’s looking fabulous! I took a little girl into the crèche earlier this week and she dashed straight
for the play cupboards and didn’t want to come out. Everyone who comes to visit is so
impressed….’

Manager, New Beginnings Day Centre




                                    Child’s eye view from inside playspace cupboards, Day Centre
PROFESSIONAL QUALIFICATIONS & PRACTICE RESOURCES

We are a small Architectural practice with 2 Directors who each run projects, one senior architect
and one recently qualified architect. Our workload is very varied and we often work with part time
staff who have the appropriate qualifications for the current projects in the office. We have a good
network of contacts with different skills and because many work for us part time they bring a
range of other expertise into the office. To date these skills include teaching (university level
architecture), family, post graduate specialist studies, architectural publishing……

We have carried out projects with construction budgets of around £1 million with the team above
and would take on additional staff should the need arise to keep a project adequately resourced.

Pedder and Scampton also have an established network of specialist Consultants who provide
support and specialist services in the following areas: graphics (production of promotional
material), computer visualization (3D photomontages etc.), perspective artist and modelmakers.
These are employed on a ‘project by project’ basis by Pedder and Scampton, with a body of
knowledge and standard systems that is carried through from one project to the next.

Pedder & Scampton Architects Ltd is a RIBA registered practice.




Helen Pedder & Gillian Scampton with the clients, user group and funding
representative at the opening of the Press House scheme


Member of ARB/RIBA joint validation panel for Schools of Architecture
Member of RIBA validation committee 2003 to date.
Design tutor, Cambridge University department of Architecture and History of Art 1987/1989 The
educational and professional qualifications of the two partners are:

Helen Pedder
Bachelor of Arts, Manchester University 1981, Bachelor of Architecture, Manchester University
1984, RIBA Part 3 & ARCUK Registration 1986, RIBA Membership 1986 to date
External Examiner for Bartlett School of Architecture Professional Practice Examinations 2005 to
date.

Gillian Scampton
MA Architecture, Cambridge University 1981, Diploma in Architecture, Cambridge University
1984, RIBA Part 3 exemption & ARCUK Registration 1986, RIBA Membership 1985 to date

External Examiner for Bartlett School of Architecture Professional Practice Examinations 1999 to
date.
External Examiner for University of Cambridge School of Architecture Professional Practice
Examinations 2003
External Examiner for Part 1 at Manchester School of Architecture, 2004-2006

Pedder & Scampton prefer to provide Architectural services right through from inception to
completion of the building as this enables us to work closely with the clients and construction
team to ensure the key ideas in the design are retained and realised. It has also in the past meant
that we can be involved closely with the very start and the very end of a project. For instance we
regularly take part in consultations that inform the design and detail design process in the early
stages. Similarly ‘completion projects’ where for example an artist comes in to work with part of
the user group on specific elements that finish the building off can be planned in from the start as
part of the whole building design and procurement.



PROFESSIONAL INDEMNITY INSURANCE

Pedder & Scampton currently hold Professional Indemnity Insurance up to £500,000.00 (copy of
verification document can be supplied if required).

Pedder & Scampton also hold Public & Employer’s Liability Insurance. Copies available if
required.




CONTACT DETAILS


Helen Pedder or Gillian Scampton
Pedder & Scampton Architects
United House
North Road
London N7 9DP

T: 020 7607 4156
F: 020 7607 4165
email@pedderscampton.com
www@pedderscampton.com

Más contenido relacionado

Último

The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningLars Bell
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 

Último (20)

The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
DSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine TuningDSPy a system for AI to Write Prompts and Do Fine Tuning
DSPy a system for AI to Write Prompts and Do Fine Tuning
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 

Destacado

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 

Destacado (20)

Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 

Architectural Brochure - community projects part 3

  • 1. SUSTAINABILITY Pedder and Scampton aim to design all their buildings to be as sustainable as possible both at the design stage and for the life of the building. We try to take a holistic view of each project so as to make sensible decisions that will have the maximum impact in each individual case. Thus the key sustainable issues will vary from project to project dependent upon the site, location, brief and budget. Issues such as the use of renewable energy, recycled materials, natural insulation etc are considered for each project as a matter of course. At the outset of each project we will review the opportunities and difficulties offered by a given site and this review will include consideration of issues such as orientation, access and the possibilities for the incorporation of renewable energy sources. Wherever possible we will do this in conjunction with consultants who have specialist sustainability knowledge. The review ensures that sustainable issues are considered at the outset and incorporated into the preliminary sketch designs and not just bolted on. Once this review has been carried out we will make proposals to the client as to possible sustainability measures that can be included in the building. It is important that such elements are appropriate to the user group and can be easily understood and operated – for example, blinds that need to be regularly raised and lowered are not useful if there is no one available to understand the system and to do this at the appropriate times. New house, West Hampstead House extension, East Sheen An example of this initial assessment process is the Training Centre for Thrive in Battersea Park where we worked with Price and Myer’s Sustainability team. The site is dominated by a very large plane tree and siting of the building had to be carefully considered in order not to damage its roots. Price and Myers carried out solar studies for the whole site which concluded that it would not be possible to generate any significant renewable energy on the site because of the shading created by the tree. (The site was also not suitable for a wind turbine or a ground source heat pump). Key sustainability issues for the project then became orienting the building to maximise the use of natural daylight, achieve good natural ventilation and minimise heat loss and heating bills. Similarly, the building is sited in a park and we are investigating the possibilities of using a log fired boiler which could use the timber produced by the park maintenance contractors. Issues to be considered here include the long term viability of the park as a source of logs – these are likely to acquire value in the future and may no longer be available to our client, the storage requirements of large quantities of logs and the health and safety issues associated with loading the boiler with logs on a daily basis. A priority for Pedder and Scampton is to get fundamental issues right which do not add cost to the building but which minimise carbon emissions, energy consumption, waste and the embodied
  • 2. energy in the materials used. This involves careful consideration of siting and orientation of each project as well as the specification of appropriate materials, insulation etc. For all projects we aim to orient the building as far as possible to maximise the use of natural daylight and benefit from solar gain where useful, and to provide shading or omit windows where not. The quality of internal environments is very important to us and we aim to create designs that avoid overheating and glare without the need for air conditioning. Similarly, for all our projects we aim to design in a way that minimises waste and to avoid replacing sound building fabric unless essential. For example, if substantial excavations are required we would aim to try and reuse the spoil elsewhere on the site and in refurbishment work we often upgrade and reuse elements such as existing windows and doors rather than replacing these. New materials are considered for their sustainability – we often specify timber and we consider reclaimed materials as well as new. Materials are sourced locally where possible. We are constantly reviewing the possibilities for efficient insulation – this is particularly critical for our inner city work where sites are often very tight and construction thicknesses can act as a major constraint on a project. However we have recently specified sheep’s wool insulation and have looked into the possibilities of hemp and recycled newspaper etc. We have not yet specified a grey water recycling system for a project – these do seem to provide some difficulties in use and require commitment from the building users, but this is something that we discuss with individual clients in the light of their particular needs. We do, however, aim to collect rainwater for gardening use. We also consider the use of green roofs wherever possible – issues to consider include location and maintenance – and we have specified extensive green roofs on a number of occasions. Our interests extend into the landscape around our buildings and we have designed the gardens to several projects both domestic and community based. The designs have included features such as wildlife friendly ponds and planting to provide a variety of habitats. The Haringey recycling project provided a specific opportunity to research the availability and performance of recycled materials – for example, the ground surfacing for these sites is a distinctive resin bound finish made from blue recycled glass which has worn well in use, and panels made from items such as recycled Wellington boots and mobile phones have proved very popular with the users. We have specified reclaimed timber floors on a number of occasions and specify soft lime mortars wherever possible so that bricks can be recycled wherever possible. Panel made from recycled mobile phones
  • 3. TESTIMONIALS ‘…your architects are amazing. I’ve seen hundreds of projects all over the country and believe me, your lot are the best. No one has reflected the needs of the residents/members with such latitude of thinking, depth of understanding and glorious attention to detail. The building embodies empathy with those who will use it.’ ODPM – funders for Press House, Crisis and Parker House projects ‘…P&S are a totally professional firm…do not be put off by their small size…your client will get the highest quality design…originating in the client’s needs and aspirations….They are sticklers for quality and design integrity….’ Project Manager, Stadium Housing Association ‘The public has given the thumbs-up to the top-notch sites in Seven Sisters as usage has increased dramatically. The amount of recylables collected has risen by more than 20%’ LB Haringey Press Release about recycling sites ‘the touchdowns are excellent…we continually get excellent comments and feedback from visitors to the building on their design and functionality’ Powergen Facilities Management Team ‘It’s looking fabulous! I took a little girl into the crèche earlier this week and she dashed straight for the play cupboards and didn’t want to come out. Everyone who comes to visit is so impressed….’ Manager, New Beginnings Day Centre Child’s eye view from inside playspace cupboards, Day Centre
  • 4. PROFESSIONAL QUALIFICATIONS & PRACTICE RESOURCES We are a small Architectural practice with 2 Directors who each run projects, one senior architect and one recently qualified architect. Our workload is very varied and we often work with part time staff who have the appropriate qualifications for the current projects in the office. We have a good network of contacts with different skills and because many work for us part time they bring a range of other expertise into the office. To date these skills include teaching (university level architecture), family, post graduate specialist studies, architectural publishing…… We have carried out projects with construction budgets of around £1 million with the team above and would take on additional staff should the need arise to keep a project adequately resourced. Pedder and Scampton also have an established network of specialist Consultants who provide support and specialist services in the following areas: graphics (production of promotional material), computer visualization (3D photomontages etc.), perspective artist and modelmakers. These are employed on a ‘project by project’ basis by Pedder and Scampton, with a body of knowledge and standard systems that is carried through from one project to the next. Pedder & Scampton Architects Ltd is a RIBA registered practice. Helen Pedder & Gillian Scampton with the clients, user group and funding representative at the opening of the Press House scheme Member of ARB/RIBA joint validation panel for Schools of Architecture Member of RIBA validation committee 2003 to date. Design tutor, Cambridge University department of Architecture and History of Art 1987/1989 The educational and professional qualifications of the two partners are: Helen Pedder Bachelor of Arts, Manchester University 1981, Bachelor of Architecture, Manchester University 1984, RIBA Part 3 & ARCUK Registration 1986, RIBA Membership 1986 to date External Examiner for Bartlett School of Architecture Professional Practice Examinations 2005 to date. Gillian Scampton MA Architecture, Cambridge University 1981, Diploma in Architecture, Cambridge University 1984, RIBA Part 3 exemption & ARCUK Registration 1986, RIBA Membership 1985 to date External Examiner for Bartlett School of Architecture Professional Practice Examinations 1999 to date.
  • 5. External Examiner for University of Cambridge School of Architecture Professional Practice Examinations 2003 External Examiner for Part 1 at Manchester School of Architecture, 2004-2006 Pedder & Scampton prefer to provide Architectural services right through from inception to completion of the building as this enables us to work closely with the clients and construction team to ensure the key ideas in the design are retained and realised. It has also in the past meant that we can be involved closely with the very start and the very end of a project. For instance we regularly take part in consultations that inform the design and detail design process in the early stages. Similarly ‘completion projects’ where for example an artist comes in to work with part of the user group on specific elements that finish the building off can be planned in from the start as part of the whole building design and procurement. PROFESSIONAL INDEMNITY INSURANCE Pedder & Scampton currently hold Professional Indemnity Insurance up to £500,000.00 (copy of verification document can be supplied if required). Pedder & Scampton also hold Public & Employer’s Liability Insurance. Copies available if required. CONTACT DETAILS Helen Pedder or Gillian Scampton Pedder & Scampton Architects United House North Road London N7 9DP T: 020 7607 4156 F: 020 7607 4165 email@pedderscampton.com www@pedderscampton.com