The NPOESS Integrated Program Office and its principal contractors -- Raytheon and Northrop-Grumman -- are prepraring for the launch of the NPP risk-reduction mission in 2006. This presentation will review program status, and how HDF will be used to deliver NPOESS products at the domestic weather centrals and worldwide field terminals.
16. UNDER REVIEW
NPOESS Preparatory Project (NPP)
Level 1 Joint Master Schedule
(Reflects proposed Satellite integration plan)
Status as of 6/30/04
2000
2001
2002
2003
2004
2005
2006
Calendar Year Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
CRITICAL MILESTONES
MSRR ATMS
FIA
EMD MPDR
PDR
VIIRS Instrument (IPO)
CrIS Instrument (IPO)
Awd
MRR 10/06
CDR
Del.
CDR
EDU2
Sys DDR
EDU
CrIS FU1
Del. PSR
PDR
Awd
Detailed Design
Implementation
ATP
CDR
OMPS Instrument (IPO)
ATMS PFM
3/05
PSR
OMPS
PFM
7/05
PSR
Bus/IRR
PER
EDU
Test
Complete
Awd
Awd
Study 1
SDR
CDR
RFO Awd
Study 2 Study 2
PDR
10/05
EDU PER
CDR
ATMS Instrument (NASA)
S/C Development (NASA)
VIIRS FU1
11/05
PSR
EDU
VIIRS
S/SSR
ATP
NLS
PSRR10/06
ICD
LV LRD
Ready
Awd
SFR
IDR
INTERFACE DATA PROCESSING SEGMENT (IPO)
SRR
SFR
IDR
EMD
EMD
COMMAND, CONTROL & COMM SEGMENT (IPO)
RFP PDR
SCIENCE DATA SEGMENT (NASA)
CDA
B1.2
B1.3
B1.1
B1.2
CDA
RFP PDR EMD
Awd
MISSION SYSTEM INTEGRATION (NASA)
3/06
Ground
Ready B1.4
Ops
3/06
B1.1
SRR
Rel.
Rel.
Rel.
Rel.
1.0
2.0/2.1
3.0
Rel.
4.0
NCT1
EtE
Complete
5/05
NCT2
LEGEND:
Baseline Approval Signatures:
IPO NPP Project Manager________Original Signed by ___ 12/12/03
Peter A. Wilczynski
Date
IPO System Program Director____ Original Signed by ____12/12/03
John D. Cunningham
Date
B1.3
Ops
SRR
0.0
ARCHIVE & DISTRIBUTION SEGMENT (NESDIS)
Ground
Ready
B1.4
Awd
EMD
Launch
ORR
2/05
S/C
LAUNCH SUPPORT SEGMENT (NASA)
SRR
Launch
ORR
NRA
Awd
SPACE SEGMENT
MOR
FIA
MCR
MCDR
NASA NPP Project Manager_________ Original Signed by ____ 12/12/03
James G. Watzin
Date
NASA EOS Program Manager _______ Original Signed by ____ 12/16/03
George W. Morrow
Date
NCT3
NCT4
ORT
Controlled
Milestone
Critical Path
Baseline date
(if slipped)
Revised from