Acknowledgements
First and foremost, I would like to Thank to my Professor of Project Management, Dr. Ali
Ahsan for the valuable guidance and advice. He inspired us greatly to work in this
project. His willingness to motivate us contributed tremendously to our project.
I wish to express my cordial gratitude to the all peoples who have played a crucial role in
the research for this project, without their active cooperation the preparation of this
project could not have been completed within the specified limit.
The next person I would like to acknowledge is my project guide Mr. Arif Mehmood who
supported me throughout this project with utmost cooperation and patience.
Finally, an honorable mention goes to my family and friends for their understandings and
supports on me in completing this project. Without helps of the particular that
mentioned above, I would face many difficulties while doing this project.
1
Executive Summary
This is a hypothetical project. The purpose of this project is to develop the project planning
and initiation phase to understand how a project is carrying on, completed and what is
required to complete it. The MTA Corporation (hypothetical company) is a company
which produces and installs solar street lights. MTA Corporation is currently doing a
project of installing solar street lights for the Government of Pakistan in the Capital city
Islamabad. The whole project is developing on hypothetical assumptions. The
sponsors’’ of this project are; Government of Pakistan, World Bank, UN and UNICEF.
Reasons for installing Solar Street Lights in Pakistan are; Pakistan is going through many
critical problems and one of them is energy problem, which is effecting the growth and
development of the economy. Pakistan has a lot of resources to produce electricity
from different alternatives plans. For that reason we done analysis of the market and
analyze that the people are anxious and willing to reduce the energy crisis from the
country as well as the Government of Pakistan is looking/ finding ways to resolve the
crisis by developing rental electric power grids program temporarily that is costly. As
in the market till now no one has proposed solar street lights project to the
Government of Pakistan which can help them to reduce the energy Problem.
Government of Pakistan accepted the project proposed by the MTA Corporation of
installing Solar Street lights in the Capital city Islamabad to cater the energy crisis.
Different plan are made to ensure that who, what, where, when, why and How will be
recognize and explained.
2
Table of Content
Table of Contents
Acknowledgments…………………………………………………………………………………………………………………………………..1
Executive Summary…………………………………………………………………………………………………………………………………2
Table of Content……………………………………………………………………………………………………………………………………..3
Project Charter ………………………………………………………………………………………………………………………..……..……5
Objectives
Deliverables/ Millstones’
Stakeholders’
Assumptions
Risks
Decision Making Process
Project Cost
Project Plan………………………………………………………………………………………………………………………….………………8
General Information
Project Information
Technology
Environmental and Social Impact
Benefits of Solar Street Lights
Milestones
Costing & Budgeting
Scope Statement……………………………………………………………………………………………………………………..…….…13
Stakeholders’ Register……………………………………………………………………………………………………………………..15
Human Resource Management Plan………………………………………………………………………………………………..16
Communication Management Plan……………………………………………………………………………………………….……21
3
Procurement Management Plan………………………………………………………………………………………………………..22
Quality Management Plan…………………………………………………………………………………………………………….…...26
Risk Management Plan………………………………………………………………………………………………………………….……28
Conclusion……………………………………………………………………………………………………………………………………..…..29
4
PROJECT CHARTER
Tagline: - You pay LESS MONEY for MORE LIGHT with Solar Street Lights.
Mission:-
MTA Corporation aim “Towards provide alternative solar energy solutions for domestic,
industrial and commercial establishments in order to mitigate the energy problems in
Pakistan”.
Objectives:-
Solar energy is a very useful renewable source of energy, which may be the answer to the
future for power, or energy needs, as global warming seems to pick up rapidly. So, we
can all contribute to the environment by using solar energy thus erasing or trimming
down various gas emissions, which can endanger earth, in turn, the millions of people
in it. By installing solar street lights in the Capital city of Pakistan, it will help to reduce
the energy crisis. The installation cost of Solar Street light is less than the Traditional
Street lights installing and maintenance cost. So, by installing Solar Street lights, it will
help to boost the economy of Pakistan.
Deliverables/ Milestones:-
Less Cost, No electric current is required, high quality solar street lights, easy to maintain,
Heavy Duty 1/8 Aluminum with welded seams and rubber mats, Heavy duty front door
with stainless steel hinges, gaskets and lockable, No sharp edges on enclosure door, 24
volt 10 amp controller, Field adjustable for on/off times, Settable for gel cell battery
charge curve to ensure performance and autonomy, Pulse Width Modulation charge
regulation, Factory mounted in battery box, Controller automatically adjusts for
seasonal light changes, Extends battery life, reduces deep discharge cycling and
enhances autonomy.
Stakeholders’:-
Stakeholders’ of the project are Ministry of Finance, World Bank, UNO, and UNICEF, Project
team of MTA Company, CDA, and Government of Pakistan.
5
Assumptions:-
Project will be a successful one, because each stakeholder (Govt. of Pakistan, UN, World
Bank) is united and putting their whole lot of efforts to make this project a successful
one. Economy will be improved; investors’ will invest and so forth.
Risks:-
Solar electricity and heat are not available at night and also may not be accessible in case of
bad weather conditions. So, a solar or complementary power station is required which
maybe a problem for many locations.
Solar panels require a large area for installation in order to achieve a good level of
efficiency. Besides the solar energy can also be influenced by the presence of water
vapor, pollution etc. in the air, which may cause complexities.
Considerable amount of energy is lost when DC (direct current) has to be converted to AC
(alternating current). The solar cells can only produce DC, thus the conversion by help
of Grid-Tie Inverters incurs a loss of about 4-12%.
Decision Making Process:-
Decision will be taken with the agreement of the stakeholders’ and will be approved by the
CEO of the company.
Project Cost:-
6
Cost of the project is determined through the documents construct in the project.
Activities:
Procurement of Required Material
Project Initiation
Define Scope
Project Schedule
Estimated Cost & Budgeting Plan
Document Project Support Plans
Project Quality
Project Human Resource Management
Develop Procurement Plans
Set Up Project Environment
Human Resource Management
Assembling of Solar lights
Installation of Solar Street Lights
Maintenance
Monitoring and Controlling
Estimated Total Cost= "Rs36, 041,827.15"
Project Plan
7
GENERAL INFORMATION
Project sponsors and partners are;
• Government of Pakistan
• World Bank
• UN
• UNICEF
• Suppliers’
PROJECT INFORMATION
This is a hypothetical project. The purpose of this project is to develop the project planning
and initiation phase to understand how a project is carrying on, completed and what is
required to complete it. The MTA Corporation (hypothetical company) is a company
which produces and installs solar street lights. MTA Corporation is currently doing a
project of installing solar street lights for the Government of Pakistan in the Capital city
Islamabad. The whole project is developing on hypothetical assumptions.
Pakistan is going through many critical problems and one of them is energy problem, which
is effecting the growth and development of the economy. Pakistan has a lot of
resources to produce electricity from different alternatives plans. For that reason we
done analysis of the market and analyze that the people are anxious and willing to
reduce the energy crisis from the country as well as the Government of Pakistan is
looking/ finding ways to resolve the crisis by developing rental electric power grids
program temporarily that is costly. As in the market till now no one has proposed solar
street lights project to the Government of Pakistan which can help them to reduce the
energy Problem. Government of Pakistan accepted the project proposed by the MTA
Corporation of installing Solar Street lights in the Capital city Islamabad to cater the
energy crisis. Project detail is given in the following Documents. The information about
the Solar Street Light is explained in detail in the following topic.
Technology: - (Solar Light)
The solar light is a complex but useful source of light. Solar light is consisting of following
component;
8
Photovoltaic
A stand alone so photovoltaic street lighting system comprises a compact fluorescent lamp,
lead acid battery, PV module(s) control electronics, inter-connecting wires / cables,
Module mounting hardware, Battery box, Operation, instruction and maintenance
manual.
Duty Cycle
The system should be designed to automatically switch ON at dusk. Operate throughout the
night and automatically switch OFF at the dawn.
Lamp
The lamp will be of compact fluorescent (CFL) type, either 4 - Pin or 2 Pin type, with a
rating of 11W. For the 4 - Pin type CFL. Adequate pre-heating circuit must be provided.
The light output from the lamp should be around 900 +5% lumens. The lamp should be
housed in a weather proof assembly suitable for outdoor use, with a reflector on its
back. While fixing the assembly, the lamp should be held in a base up configuration.
Battery
Electrolyte type positive tubular plate is required. Low maintenance leads acid battery. The
battery will have a minimum rating of 12V 75 Ah (at C/10) discharge rate. 75 % of the
rated capacity of the battery should be between fully charged & load cut off conditions.
Celectron
The inverter should be of quasi sine wave/sine wave type. With frequency in the range 20 -
35 KHz. Half-wave operation is not acceptable. The total electronic efficiency should be
at least 80 %. No blackening or reduction in the lumen output by more than 10%
should be observed after 1000 ON/OFF cycles (two minutes ON followed by four
minutes OFF is one cycle). The idle current consumption should not be more than 10
mA. Electronics should operate at 12 V and should have temperature compensation for
proper charging of the battery throughout the year. Necessary lengths of wires/cables
and fuses should be provided. The PV module will be used to sense the ambient light
level for switching ON and OFF the lamp.
PV Module (s)
9
The PV module(s) shall contain crystalline silicon solar cells. The power output of the
module(s) under STC should be a minimum of 74 W either two modules; of minimum
37 W output each or one module of 74 W output should be used. The operating voltage
corresponding to the power output mentioned above should be 16.4 V. The open circuit
voltage of the PV modules under STC should be at least 21.0 Volts. The terminal box on
the module should have a provision for opening for replacing the cable if required. A
strip containing the following details should be laminated inside the module so as to be
clearly visible from the front side. Electronic Protections and Adequate protection is to
be incorporated under no -load conditions e.g. when the lamp is removed and the
system is switched ON. The system should have protection against battery overcharge
and deep discharge conditions. Fuses should be provided to protect against short
circuit conditions. The pole should be made of mild steel pipe with a height of 4 meters
above the ground level, after grouting and final installation. The pole should have the
provision to hold the water proof lamp housing it should be painted with a corrosion
resistant paint. A vented, acid proof and corrosion resistant painted metallic box for
outdoor use should be provided for housing the battery.
Components and parts used in the solar street lighting systems should conform to the latest
BIS specifications, wherever such specifications are available and applicable.
Environment and social impact:-
Energy saving provide electric energy with solar energy photovoltaic conversion, which
would never be exhausted. No pollution, no noise, no radiation. Safety No such accident
as electric shock or fire at all. Convenience Simple installation, no need to erect wire or
excavate ground without consideration of power shut down or power restriction. Solar
Street Light has long life high technical content of the product, control system and
module being of famous world brand, intelligent design, and reliable quality. Solar
energy is a High quality Technical product, green energy, using units attaching
importance to technology, enhancing green image and level. Solar energy is a
Investment all at once, same price as AC power (sum of AC power investment from
substation, power feeding, control cabinet, cable and engineering), investment all at
once with long term usage. Wide application solar energy comes from nature. It can be
used so long there is sunshine, especially suitable for green land sight light equipage,
high grade housing and outdoor lighting, tour scenic spot and coast lighting and
decoration, industrial development area, factory and enterprise street lamp, outdoor
light of colleges.
Benefits and features of solar lights:-
10
• Immune to power outages
• Wandal resistant hardware
• No trenching, no wiring
• No maintenance
• Stand alone, not connected to grid
• Easy installation-quick connect plug
• Longer lifetime (50,000 hours)
Organization, management, and training:-
Well trained employees are in MTA Corporation with a lot of experience and outstanding
work. Trainings are an important part of the organization to keep employees up-to-
date with the latest technology. HR Manager is responsible for the hiring, training and
compensation of the employees.
Project implementation:-
Schedule for project implementation is given in detail in the MS Project file. Partners'
responsibilities in implementation are MTA Corporation, Suppliers i.e. (Shi fang
Company, Malik steel, A.A Company, Askari Cement, and Hino-Pak).
Shi Fang Company:-
Lamps, Batteries’, PV Module(s), controlling device
Mechanical equipment
Electronic accessories
Malik Steel:-
Stainless steel poles, water prove box
AA Company:-
Procure Bricks for installing the pole holder.
11
Askari Cement:-
Procure Cement to make holder of the street light pole.
Hino-Pak Company:-
Procure trucks to transport street lights to the designated places.
Milestones:-
Sr.No Task
1 Budget approval from the organization
2 Inspection Team Report/Survey Report
3 Purchase of Materials
4 Purchase of Vehicles
5 Installation of Solar Street Lights to the designated locations
6 Final Report
12
Costing & Budgeting:-
Budget =Rs. 50,000,000
Total Estimated Cost= "Rs36, 041,827.15"
Scope Statement
Project Justification:-
There is a lot of Shortage of electricity in Pakistan. Pakistan Government is looking forward
to produce energy from other available resources in Pakistan. Solar energy is one
important way to produce electricity other than traditional way of producing
electricity. It is a onetime cost project which benefits for future.
Project Product:-
Solar Street Lights is the Project Product.
Project Deliverables:-
Solar Street Lights
Project Objective:-
Solar energy is a very useful renewable source of energy, which may be the answer to the
future for power, or energy needs, as global warming seems to pick up rapidly. So, we
can all contribute to the environment by using solar energy thus erasing or trimming
down various gas emissions, which can endanger earth, in turn, the millions of people
in it. By installing solar street lights in the Capital city Islamabad of Pakistan, it will help
to reduce the energy problem in some way. The installation cost of Solar Street light is
less than the Traditional Street light. So, by installing Solar Street lights, it will
definitely play a pivotal role to stabilize the economy of Pakistan.
Assumptions/Limitations:-
13
One time cost but beneficial, less emission of energy that effect ozone layer or help to
reduce global warming, better working then the traditional or previous ones. Cost is
one factor, Accessibility, Literacy rate, technology, experts.
Overall Project Priority:-
High
Medium
Low
Comments: -
This project is going to help in the growth of Pakistan’s economy because right now
Pakistan is going through a lot of major issues and electricity is one of them, so by
planting solar street lights it will reduce the consumption of electricity on traditional
street lights and the supply of electricity will be more likely be equal to the demand of
the people.
14
15
16
17
Stakeholders’ Register
18
19
Sr.No Name of
Stake
holde
rs
Designation Department Role in
proje
ct
Type of
communicatio
n
Expectation Interest Power
1 M Tanveer
Ahme
d
Project Manager Overall To assure
all
the
activi
ties
are
being
done
as
sched
uled
Face to Face and
daily meetings
Successfully
installing
the solar
street
lights in
Islamaba
d
High High
2 Governme
nt of
Pakist
an
Financing body Nil To finance
the
proje
ct
Reports and
meetings on
monthly basis
Fully support
to make
project
successful
High High
3 World
Bank
Financing body Nil --as
above
--
--as above-- --as above-- High High
4 Labor Work Force Operations To
produ
ce
solar
street
lights
and
plant
in the
Islam
abad
Meetings and Face
to Face
Salary on time Low Low
5 Suppliers Nil Nil To provide
the
best
availa
ble
mater
ial to
build
the
solar
street
lights
Written and
meetings
Contracts High Low
Human Resource Management Plan
Roles and Responsibilities’:-
20
CEOCEO
FINANCE
MANAGER
FINANCE
MANAGER
HUMAN
RESOURCE
MANGER
HUMAN
RESOURCE
MANGER
MARKETING
MANAGER
MARKETING
MANAGER
PROCUREMENT
MANAGER
PROCUREMENT
MANAGER
QUALITY
MANAGER
QUALITY
MANAGER
PROJECT
MANAGER
PROJECT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
ASSISTANT
MANAGER
TEAMTEAM ASSISTANT
MANAGER
ASSISTANT
MANAGER
TEAMTEAM
TECHNICAL
EMPLOYEES
TECHNICAL
EMPLOYEES
MARTKETING
RESEARCHER
MARTKETING
RESEARCHER
TEAMTEAM
TECHNICAL
EMPLOYEES
TECHNICAL
EMPLOYEES
TRAINERSTRAINERS
TEAMTEAM
ACCOUNTANT
S
ACCOUNTANT
S
AUDITORSAUDITORS
TEAMTEAM
ANALYTICAL
SKILLED
EMPLYEES
ANALYTICAL
SKILLED
EMPLYEES
Designation Roles & Responsibilities’
CEO
Its role is more like a leader and visionary person. She/he advises the
Board and supports motivation of employees in organization
products/programs and operations. He ensures staff and Board
have sufficient and up-to-date information, looks to the future for
change opportunities and interfaces between Board and
employees, and organization and community.
Marketing
Manager
To develop, establish and maintain marketing strategies to meet
organizational objectives. She/he manages and coordinates all
marketing, advertising and promotional staff and activities.
Conduct market research to determine market requirements for
existing and future products. Analysis of customer research,
current market conditions and competitor information, develop
and implement marketing plans and projects for new and existing
products. Manage the productivity of the marketing plans and
projects. Monitor, review and report on all marketing activity and
results. Determine and manage the marketing budget. Develop
pricing strategy and liaison with media and advertising.
21
Human Resource
Manager
Maintaining and develop HR policies, ensuring compliance and to
contribute the development of corporate HR policies. She/ he
develop the HR team, to ensure the provision of a professional HR
service to the organization. Manage a team of staff. She/ he are
Responsible for mentoring, guiding and developing them as a
second line to the current position. To ensure timely recruitment
of required level / quality of Management staff, other business
lines staff, including non-billable staff with appropriate global
approvals, in order to meet business needs, focusing on Employee
Retention and key Employee Identification initiatives. Prepare
information and input for the salary budgets. Ensure compliance to
the approved salary budget; give focus on pay for performance and
salary benchmarks where available. Ensure adherence to
corporate guideline on salary adjustments and promotions.
Coordinate increments and promotions of all staff. HR manager
develop the HR business plan and ensure appropriate
communication at all staff levels.
Finance Manager She/he coordinates the approval and rejection of, lines of credit and
commercial, real estate, and personal loans. Develop and analyze
information to assess the current and future financial status of
firms. Establish procedures for custody and control of assets,
records, loan collateral, and securities, in order to ensure
safekeeping. Evaluate data pertaining to costs in order to plan
budgets. Evaluate financial reporting systems, accounting and
collection procedures, and investment activities, and make
recommendations for changes to procedures, operating systems,
budgets, and other financial control functions. Oversee the flow of
cash and financial instruments. Plan, direct, and coordinate risk
and insurance programs of establishments to control risks and
losses. Prepare financial and regulatory reports required by laws,
regulations, and boards of directors. Prepare operational and risk
reports for management analysis. Communicate with stockholders
and other investors to provide information, and to raise capital.
22
Procurement
Manager
Quality Manager
Implement procurement strategy and policies. Forecast procurement
needs. Create and implement KPI’s. Continually develop expertise
to support growth for new projects. Monitor macro trends in
supplier and contract base and implement plans to react. Build and
develop relationships with key suppliers and customers. Lead the
procurement group in all phases. Identify and develop training
opportunities. She/ he order materials and services as per
negotiated and appropriately approved. Review quotations.
Prepare purchase requisitions, approve and issues purchase
orders in accordance with company policy and negotiated terms
and conditions. Maintain procurement files. Track Purchasing
activity and measurements. Discuss defective or unacceptable new
goods or services with users, vendors and others to determine
cause of problem and take corrective and preventative action.
Ensure supplier compliance with site and company requirements
for safety. Manage vendor relationships and assist in building
effective partnerships.
Aims to ensure that the product or service an organization provides is
fit for purpose and meets both external and internal requirements,
including legal compliance and customer expectations. A quality
manager, sometimes called a quality assurance manager,
coordinates the activities required to meet quality standards.
She/he also monitors and advice on the performance of the quality
management system and produces data and report on
performance, measuring against set indicators. They liaise with
other managers and staff throughout the organization to ensure
that the QA system is functioning properly. Where appropriate, the
quality manager advises on changes and their implementation and
provides training, tools and techniques to enable others to achieve
quality.
23
24
25
26
27
28
29
Communication Management Plan
30
31
Message Owner Recipient Delivery
Vehicle
Notification
Mediu
m
Frequency
Cycle
Project Status Project Manager Project
Sponsor
and Key
Stakehol
ders
Project
Status
Report
Word
Docume
nt sent
via e-
mail
Monthly
Meeting
Discussion,
Decisions,
Action
Items
Meeting Facilitator Meeting
Participa
nts
Meeting
Notes
Word
Docume
nt sent
via e-
mail
As often as
meeting
s are
held
Informational
updates on
issues,
schedules,
task
assignmen
ts that
must be
communic
ated
before the
next status
meeting
Project Manager Project
Sponsor
and Key
Stakehol
ders as
needed
Message E-Mail with
attachme
nts as
needed
On an as
needed
basis
when
informa
tion
become
s
availabl
e
Status updates
on Tasks
All team members
Project
Manager
Task
Update
s
EPM Task
Reportin
g
When a team
member
has a
task due
during
the
current
week
Executive
Presentati
on
Project Manager with
Project Sponsor
Executive
Sponsor
and Key
Stakehol
ders
Slide
Present
ation or
Report
PowerPoint
or Word
documen
t
As often as
needed
for
Stakeho
lder
involve
ment
and
commit
ment
Project
Steering
Committee
Project Manager,
Project Sponsor
Project
Steering
Committ
Steering
Commit
tee
In person –
with
PowerPo
Every 3 – 4
weeks
per
Procurement Management Plan
Procurement Statement:-
MTA Corporation is producing a premium product so we require a premium supplier. So
MTA Corporation requires a high quality product from the suppliers for their
customers.
Estimated Cost:-
Total Estimated Cost = Rs.17, 680,260 +/- 20%
Procurement Definition:-
For making the premium product i.e. Solar Street Lights, MTA Corporation requires the
following parts according to their specifications;
• Procurement of Stainless Steel Poles
• Procurement of Material
• Bricks
• Cement
• Lamp
• Battery
• Controlling device
• Celectron
• PV Module(s)
• Electronic Protection Materials
• Mechanical Hardware
32
• Electronic Accessories
• Vehicles (Trucks)
Specifications:-
Highly efficient mono crystal or multi crystal silicon solar panels for power supply.
Working Voltage: 12 / 24V DC
Lighting Time: 8 to 12 hours per day depending on the season
Advanced charging, discharging and lighting control circuit with reliable Performance
High lighting efficiency, great brightness
Easy installation
Safe, reliable, energy saving, economical, environmental protection
Lamp specifications:-
Lamp technology: LVD (Induction light)
Power Rating: 40W
Life span: > 100,000 hours
Mean lumen: 6,800
Mean pupil lumen: 11,000
CRI > 80
Color temperature: 2700, 2500 or 4100K (based on client’s decision for type of color)
Lamp fixture specifications:-
Different lamp fixture designs can be proposed. The fixture must include the following
components:
- Reflector
33
- Closed housing
- Electronic Ballast
- Mounting brackets
Details of the proposed fixtures should be submitted with both clear designs, cut sheets and
photometric performances.
PV module spec:-
Type: Multi or Mono crystalline technology
Conversion Efficiency: > to 15%
Manufacturing tolerance on rated power: ≤ 3%
Module Voltage: 12V
Environment: See general description for environment requirements
Connector type: Multi Contact type possibility
Total weight: ≤ 20 KG
Cell protection: The cells should be protected by a tempered glace
Batteries spec:-
The following are the minimum requirements for the battery(s):
Maintenance free
Gel type batteries
No leakage
12V type Deep discharge capacity
Expected life span over 8 years in normal operating condition
Charger controller specification:-
34
The charger controller should be located close to the battery(s) and it should need
minimum maintenance. This unit can include the automatic dusk/down switch and the
dimmer/timer module. The controller should have the following protections:
Overcharging
Over discharging
Overload
Selection Process & Criteria:-
RFP will be floated then identify the suppliers, evaluating the suppliers, selection of
supplier, alternative supplier, review. The criteria will be the terms and conditions of
contract. According to the specifications and required quality of the products that are
to be procured.
Project Procurement Team:-
Sr.No Designation Procurement Role
1 Project Manager He/ She are Responsible for overall procurement activities.
2 Procurement
manager
Assist the procurement manager and make it sure that required
product is procured.
3 Procurement
manager’s team
Check and balance of all the activities of procurement. Ensure that
right product and required quantity of product is acquired
35
Vendor Management:-
Procurement manager and his team will manage the relationship with supplier and ensure
that they provide the right parts on the time as per requirement.
Quality Management Plan
Project Scope:-
MTA Corporation aim “Towards provide alternative solar energy solutions for domestic,
industrial and commercial establishments in order to mitigate the energy problems in
Pakistan”.
Deliverable Description:-
The main deliverable of project is Solar Street Light. The other somewhat related to
product deliverables are; Less Cost, No electric current is required, high quality solar
street lights, easy to maintain, Heavy Duty 1/8 Aluminum with welded seams and
rubber mats, Heavy duty front door with stainless steel hinges, gaskets and lockable,
No sharp edges on enclosure door, 24 volt 10 amp controller, Field adjustable for
on/off times, Settable for gel cell battery charge curve to ensure performance and
autonomy, Pulse Width Modulation charge regulation, Factory mounted in battery box,
Controller automatically adjusts for seasonal light changes, Extends battery life,
reduces deep discharge cycling and enhances autonomy.
Acceptance Criteria:-
The product will only be accepted if it completes all the activities as per requirement and
fulfills the required mentioned quality in the project plan by the customer and the MTA
Corporation then it will be accepted otherwise, Quality manager will manage the
problem and make the product up to the set standard.
Quality Assurance Activities:-
36
Quality manager will monitor the project and its activities throughout the entire project
and ensure the quality according to the requirement and schedule.
Project Monitoring and Control:-
Monitoring and controlling will be done throughout the entire project by the quality and
Monitoring & controlling department on daily routine.
Project Team Quality Responsibilities:-
Quality team will be responsible for the overall all products acceptance. Pre-test will be
done by the team, audit and see the quality time to time throughout the project and
checklist will be made by project manager according to which quality team will ensure
that all the requirements’ of the product meets. In short project team quality is
responsible for the end product.
Risk Management Plan
37
38
Statement of
Risk
Backup power
station is
required
which
may not
be
possible
for some
locations.
Solar energy is
influence
d by the
presence
of water
vapor,
pollution
etc. in the
air, which
may cause
complexit
ies
Considerable
amount of
energy is
lost when
DC has to
be
converted
to AC
Inflation
Stakeholder
Affected
Cost will be
higher
Project
Failure
Medium
affect
Cost will
increase,
High
Priority
Medium
High
Medium
Medium
Probability/
Likeliho
od
40%
50%
70%
30%
Certainty
Medium
High
High
High
Possible
Cause
s
Bad
Weath
er
Air
Polluti
on,
Water
vapors
Conversion
of DC
into AC
Increase of
Curren
cy,
Unstab
le
econo
my
Possible
Conseque
nces
Will stop solar
street light
to work
Will disturb the
working of
solar street
lights
Will affect the
effectivene
ss of solar
street light
Will affect the
costing and
budgeting
of the
project.
Mitigation Strategy
By increasing the
Battery duration
and backup
storage.
By placing in the dry
areas, or by
protecting shield.
Conversion period can
be reduced to
when it is needed.
By stopping the
unnecessary
conversion of DC
into AC.
Forecasting’s will be
made in and rates
are pre-
determined with
the supplier.
Conclusion:-
Energy can be produced by many sources but now a days the traditional way of producing
energy is becoming more and more costly as well as there is no reserves of water
through which energy can be generated, so by using the alternative and new
technology to generate electricity is through solar energy, which is costly but not more
than the traditional one and gives long-term benefits. Overall the project is going to be
complete in short time span with the best outcomes.
39

Más contenido relacionado

La actualidad más candente

SHS-Work-Immersion-Portfolio-Final.docx
SHS-Work-Immersion-Portfolio-Final.docxSHS-Work-Immersion-Portfolio-Final.docx
SHS-Work-Immersion-Portfolio-Final.docxEDWINSALANATIN1
 
Barangay Project Documentation
Barangay Project DocumentationBarangay Project Documentation
Barangay Project DocumentationErika-Marie Garcia
 
11 Developing ICT Project for Social Change
11 Developing ICT Project for Social Change11 Developing ICT Project for Social Change
11 Developing ICT Project for Social ChangeTeodoro Llanes II
 
Philippine architecture ( post war period )
Philippine architecture ( post war period )Philippine architecture ( post war period )
Philippine architecture ( post war period )pupoy
 
Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10Sally Yi
 
Creating a Vicinity Map With Google Maps
Creating a Vicinity Map With Google MapsCreating a Vicinity Map With Google Maps
Creating a Vicinity Map With Google MapsMichael Miles
 
Philippine Disaster Risk Reduction and Management RA 10121
Philippine Disaster Risk Reduction and Management RA 10121Philippine Disaster Risk Reduction and Management RA 10121
Philippine Disaster Risk Reduction and Management RA 10121Jo Balucanag - Bitonio
 
Empowerment Technologies - Module 1
Empowerment Technologies - Module 1Empowerment Technologies - Module 1
Empowerment Technologies - Module 1Jesus Rances
 
Online Platforms for ICT Content Development - Empowerment Technologies
Online Platforms for ICT Content Development - Empowerment TechnologiesOnline Platforms for ICT Content Development - Empowerment Technologies
Online Platforms for ICT Content Development - Empowerment TechnologiesMark Jhon Oxillo
 
Barangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay Hall
 
Chapter 2-Realated literature and Studies
Chapter 2-Realated literature and StudiesChapter 2-Realated literature and Studies
Chapter 2-Realated literature and StudiesMercy Daracan
 
Sacred Heart Savings Cooperative, Candon City, Region 1 Philippines
Sacred Heart Savings Cooperative, Candon City, Region 1 PhilippinesSacred Heart Savings Cooperative, Candon City, Region 1 Philippines
Sacred Heart Savings Cooperative, Candon City, Region 1 Philippinesjo bitonio
 
Empowerment technologies
Empowerment technologiesEmpowerment technologies
Empowerment technologiesRufa Laguit
 

La actualidad más candente (20)

Thesis
ThesisThesis
Thesis
 
SHS-Work-Immersion-Portfolio-Final.docx
SHS-Work-Immersion-Portfolio-Final.docxSHS-Work-Immersion-Portfolio-Final.docx
SHS-Work-Immersion-Portfolio-Final.docx
 
Barangay Project Documentation
Barangay Project DocumentationBarangay Project Documentation
Barangay Project Documentation
 
11 Developing ICT Project for Social Change
11 Developing ICT Project for Social Change11 Developing ICT Project for Social Change
11 Developing ICT Project for Social Change
 
Chapter 2
Chapter 2Chapter 2
Chapter 2
 
Philippine architecture ( post war period )
Philippine architecture ( post war period )Philippine architecture ( post war period )
Philippine architecture ( post war period )
 
Concept Paper Best Examples
Concept Paper Best ExamplesConcept Paper Best Examples
Concept Paper Best Examples
 
Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10Vertical solar street light data sheet(1) 202104-10
Vertical solar street light data sheet(1) 202104-10
 
Creating a Vicinity Map With Google Maps
Creating a Vicinity Map With Google MapsCreating a Vicinity Map With Google Maps
Creating a Vicinity Map With Google Maps
 
Philippine Disaster Risk Reduction and Management RA 10121
Philippine Disaster Risk Reduction and Management RA 10121Philippine Disaster Risk Reduction and Management RA 10121
Philippine Disaster Risk Reduction and Management RA 10121
 
Empowerment Technologies - Module 1
Empowerment Technologies - Module 1Empowerment Technologies - Module 1
Empowerment Technologies - Module 1
 
Online Platforms for ICT Content Development - Empowerment Technologies
Online Platforms for ICT Content Development - Empowerment TechnologiesOnline Platforms for ICT Content Development - Empowerment Technologies
Online Platforms for ICT Content Development - Empowerment Technologies
 
Barangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management PlanBarangay 465 Disaster Risk Reduction Management Plan
Barangay 465 Disaster Risk Reduction Management Plan
 
Module 4 EMPOWERMENT TECHNOLOGY
Module 4 EMPOWERMENT TECHNOLOGYModule 4 EMPOWERMENT TECHNOLOGY
Module 4 EMPOWERMENT TECHNOLOGY
 
Pre colonial-period
Pre colonial-periodPre colonial-period
Pre colonial-period
 
Chapter 2-Realated literature and Studies
Chapter 2-Realated literature and StudiesChapter 2-Realated literature and Studies
Chapter 2-Realated literature and Studies
 
Title Defense Presentation
Title Defense PresentationTitle Defense Presentation
Title Defense Presentation
 
Sacred Heart Savings Cooperative, Candon City, Region 1 Philippines
Sacred Heart Savings Cooperative, Candon City, Region 1 PhilippinesSacred Heart Savings Cooperative, Candon City, Region 1 Philippines
Sacred Heart Savings Cooperative, Candon City, Region 1 Philippines
 
Empowerment technologies
Empowerment technologiesEmpowerment technologies
Empowerment technologies
 
Halimbawa ng Panukalang Proyekto.pdf
Halimbawa ng Panukalang Proyekto.pdfHalimbawa ng Panukalang Proyekto.pdf
Halimbawa ng Panukalang Proyekto.pdf
 

Destacado

ForesightPower Solar Street Lighting
ForesightPower Solar Street LightingForesightPower Solar Street Lighting
ForesightPower Solar Street LightingMichael French
 
Solar powered led street light with intensity
Solar powered led street light with intensitySolar powered led street light with intensity
Solar powered led street light with intensityKunal Mahajan
 
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...lacclimatebusinessforum
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchEdgefxkits & Solutions
 
2017 listen catalogue of solar light
2017 listen catalogue of solar light2017 listen catalogue of solar light
2017 listen catalogue of solar lightLISTEN lighting Julie
 
Primer on Solar Electricity for India
Primer on Solar Electricity for IndiaPrimer on Solar Electricity for India
Primer on Solar Electricity for IndiaH Janardan Prabhu
 
Solar powered led street light with auto intensity control
Solar powered led street light with auto intensity controlSolar powered led street light with auto intensity control
Solar powered led street light with auto intensity controlkanhaiya lal
 
Solar Powered Led Street Light With Auto Intensity Control
Solar Powered Led Street Light With Auto Intensity ControlSolar Powered Led Street Light With Auto Intensity Control
Solar Powered Led Street Light With Auto Intensity ControlEdgefxkits & Solutions
 
Technical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lightsTechnical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lightsLightinus Inc
 
Grace Solar Corporate
Grace Solar CorporateGrace Solar Corporate
Grace Solar Corporategracesolarpk
 
Solar street lights using solar tracker and
Solar street lights using solar tracker and Solar street lights using solar tracker and
Solar street lights using solar tracker and GITESHRMHATRE
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light ControllerHimanshi_Sharma
 
Fence presentation
Fence  presentationFence  presentation
Fence presentationprknaidu
 
PPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEMPPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEMsubhankar Dash
 

Destacado (18)

ForesightPower Solar Street Lighting
ForesightPower Solar Street LightingForesightPower Solar Street Lighting
ForesightPower Solar Street Lighting
 
Solar powered led street light with intensity
Solar powered led street light with intensitySolar powered led street light with intensity
Solar powered led street light with intensity
 
Hybrid pamphlet
Hybrid pamphletHybrid pamphlet
Hybrid pamphlet
 
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
PPPs for Energy Efficient Street Lighting and PPPs for Rooftop Solar Power Ge...
 
Mains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switchMains operated under voltage over voltage trip switch
Mains operated under voltage over voltage trip switch
 
2017 listen catalogue of solar light
2017 listen catalogue of solar light2017 listen catalogue of solar light
2017 listen catalogue of solar light
 
Primer on Solar Electricity for India
Primer on Solar Electricity for IndiaPrimer on Solar Electricity for India
Primer on Solar Electricity for India
 
Solar powered led street light with auto intensity control
Solar powered led street light with auto intensity controlSolar powered led street light with auto intensity control
Solar powered led street light with auto intensity control
 
Solar street light
Solar  street  lightSolar  street  light
Solar street light
 
Solar Powered Led Street Light With Auto Intensity Control
Solar Powered Led Street Light With Auto Intensity ControlSolar Powered Led Street Light With Auto Intensity Control
Solar Powered Led Street Light With Auto Intensity Control
 
Technical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lightsTechnical guide-smart-technology-and-solar-street-lights
Technical guide-smart-technology-and-solar-street-lights
 
How to select solar street light
How to select solar street lightHow to select solar street light
How to select solar street light
 
Grace Solar Corporate
Grace Solar CorporateGrace Solar Corporate
Grace Solar Corporate
 
solar street light
solar street lightsolar street light
solar street light
 
Solar street lights using solar tracker and
Solar street lights using solar tracker and Solar street lights using solar tracker and
Solar street lights using solar tracker and
 
Smart Traffic Light Controller
Smart Traffic Light ControllerSmart Traffic Light Controller
Smart Traffic Light Controller
 
Fence presentation
Fence  presentationFence  presentation
Fence presentation
 
PPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEMPPT ON SOLAR STREET LIGHTING SYSTEM
PPT ON SOLAR STREET LIGHTING SYSTEM
 

Similar a solar street light project report.

RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...KSSEM
 
Solar System proposal
Solar System proposalSolar System proposal
Solar System proposalSohail Azeem
 
Solar Charge Controller
Solar Charge ControllerSolar Charge Controller
Solar Charge ControllerBharat Biyani
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plantRusiru Sanjaya
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) Arpit Kurel
 
Solar energy.pptx
Solar energy.pptxSolar energy.pptx
Solar energy.pptxAmalNath44
 
Energy Production For Finance (1)
Energy Production For Finance (1)Energy Production For Finance (1)
Energy Production For Finance (1)AHMAD MUJTABA MALIK
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuDato Mat Isa
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdfsanjay vashishtha
 
The national solar mission
The national solar missionThe national solar mission
The national solar missionTrishala Gautam
 
Peripheral interface controller-based maximum power point tracking algorithm ...
Peripheral interface controller-based maximum power point tracking algorithm ...Peripheral interface controller-based maximum power point tracking algorithm ...
Peripheral interface controller-based maximum power point tracking algorithm ...TELKOMNIKA JOURNAL
 
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...IJMER
 
Rewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRoneeSingh
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CityVignesh Sekar
 
final year embedded systems projects in chennai
final year embedded systems projects in chennaifinal year embedded systems projects in chennai
final year embedded systems projects in chennaiAshok Kumar.k
 

Similar a solar street light project report. (20)

Solar power
Solar powerSolar power
Solar power
 
Solar energy
Solar energySolar energy
Solar energy
 
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
RENEWABLE ENERGY SYSTEM LAB in partnership between KSSEM & GOSHAKTHI RENEWABL...
 
Solar System proposal
Solar System proposalSolar System proposal
Solar System proposal
 
Solar Charge Controller
Solar Charge ControllerSolar Charge Controller
Solar Charge Controller
 
GREEN POWER PROJECT
GREEN POWER PROJECTGREEN POWER PROJECT
GREEN POWER PROJECT
 
10 mw solar power plant
10 mw solar power plant10 mw solar power plant
10 mw solar power plant
 
Zorays Inc.
Zorays Inc.Zorays Inc.
Zorays Inc.
 
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT) ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
ONE SUN ONE WORLD ONE GRID (OSOWOG REPORT)
 
Solar energy.pptx
Solar energy.pptxSolar energy.pptx
Solar energy.pptx
 
Energy Production For Finance (1)
Energy Production For Finance (1)Energy Production For Finance (1)
Energy Production For Finance (1)
 
Integrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for TerengganuIntegrated wte gasification & solar power plant for Terengganu
Integrated wte gasification & solar power plant for Terengganu
 
solar consultants corporate credentials (1).pdf
solar consultants corporate credentials  (1).pdfsolar consultants corporate credentials  (1).pdf
solar consultants corporate credentials (1).pdf
 
Fespl presentation
Fespl presentationFespl presentation
Fespl presentation
 
The national solar mission
The national solar missionThe national solar mission
The national solar mission
 
Peripheral interface controller-based maximum power point tracking algorithm ...
Peripheral interface controller-based maximum power point tracking algorithm ...Peripheral interface controller-based maximum power point tracking algorithm ...
Peripheral interface controller-based maximum power point tracking algorithm ...
 
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...
Planning and Designing a Stand Alone Solar Power System for Multi-Building Or...
 
Rewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project PresentationRewa Ultra Mega Solar Project Presentation
Rewa Ultra Mega Solar Project Presentation
 
Systematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar CitySystematic Roadmap Approach on Solar City
Systematic Roadmap Approach on Solar City
 
final year embedded systems projects in chennai
final year embedded systems projects in chennaifinal year embedded systems projects in chennai
final year embedded systems projects in chennai
 

Más de Hagi Sahib

48 power rules book report
48 power rules book report48 power rules book report
48 power rules book reportHagi Sahib
 
Mp3 Player complete marketing plan
Mp3 Player complete marketing planMp3 Player complete marketing plan
Mp3 Player complete marketing planHagi Sahib
 
Tobacco market research paper Questionnaire
Tobacco market research paper Questionnaire Tobacco market research paper Questionnaire
Tobacco market research paper Questionnaire Hagi Sahib
 
Obstacles in way of development of Pakistan economy
Obstacles in way of development of Pakistan economy Obstacles in way of development of Pakistan economy
Obstacles in way of development of Pakistan economy Hagi Sahib
 
Trade secrets and conflicts of interest
Trade secrets and conflicts of interestTrade secrets and conflicts of interest
Trade secrets and conflicts of interestHagi Sahib
 
Planning tool for presentation
Planning tool for presentationPlanning tool for presentation
Planning tool for presentationHagi Sahib
 
Is google is taking over the world
Is google is taking over the worldIs google is taking over the world
Is google is taking over the worldHagi Sahib
 
Assignment on leadership qualities of zulfikar Ali bhutto
Assignment on leadership qualities of zulfikar Ali bhuttoAssignment on leadership qualities of zulfikar Ali bhutto
Assignment on leadership qualities of zulfikar Ali bhuttoHagi Sahib
 
Online shoe Business idea
Online shoe Business ideaOnline shoe Business idea
Online shoe Business ideaHagi Sahib
 
Online shoes business idea report docs
Online shoes business idea report docsOnline shoes business idea report docs
Online shoes business idea report docsHagi Sahib
 
Panteene pro v project plan
Panteene pro v project planPanteene pro v project plan
Panteene pro v project planHagi Sahib
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project reportHagi Sahib
 
Eco friendly electricity generating tiles project
Eco friendly electricity generating tiles projectEco friendly electricity generating tiles project
Eco friendly electricity generating tiles projectHagi Sahib
 
Construction & esstablishment of cattle farm project report.
Construction & esstablishment of cattle farm project report.Construction & esstablishment of cattle farm project report.
Construction & esstablishment of cattle farm project report.Hagi Sahib
 
toy manufacturers project report.
toy manufacturers project report.toy manufacturers project report.
toy manufacturers project report.Hagi Sahib
 
Barber shop tiny clippers for kids project.
Barber shop tiny clippers for kids project.Barber shop tiny clippers for kids project.
Barber shop tiny clippers for kids project.Hagi Sahib
 
CNG station construction project report.
CNG station construction project report.CNG station construction project report.
CNG station construction project report.Hagi Sahib
 
construction of Reservation software solution for Airline Companies project ...
construction of  Reservation software solution for Airline Companies project ...construction of  Reservation software solution for Airline Companies project ...
construction of Reservation software solution for Airline Companies project ...Hagi Sahib
 
Aid of Medicines project report.
Aid of Medicines project report.Aid of Medicines project report.
Aid of Medicines project report.Hagi Sahib
 

Más de Hagi Sahib (20)

48 power rules book report
48 power rules book report48 power rules book report
48 power rules book report
 
Mp3 Player complete marketing plan
Mp3 Player complete marketing planMp3 Player complete marketing plan
Mp3 Player complete marketing plan
 
Tobacco market research paper Questionnaire
Tobacco market research paper Questionnaire Tobacco market research paper Questionnaire
Tobacco market research paper Questionnaire
 
Obstacles in way of development of Pakistan economy
Obstacles in way of development of Pakistan economy Obstacles in way of development of Pakistan economy
Obstacles in way of development of Pakistan economy
 
PepsiCo
PepsiCoPepsiCo
PepsiCo
 
Trade secrets and conflicts of interest
Trade secrets and conflicts of interestTrade secrets and conflicts of interest
Trade secrets and conflicts of interest
 
Planning tool for presentation
Planning tool for presentationPlanning tool for presentation
Planning tool for presentation
 
Is google is taking over the world
Is google is taking over the worldIs google is taking over the world
Is google is taking over the world
 
Assignment on leadership qualities of zulfikar Ali bhutto
Assignment on leadership qualities of zulfikar Ali bhuttoAssignment on leadership qualities of zulfikar Ali bhutto
Assignment on leadership qualities of zulfikar Ali bhutto
 
Online shoe Business idea
Online shoe Business ideaOnline shoe Business idea
Online shoe Business idea
 
Online shoes business idea report docs
Online shoes business idea report docsOnline shoes business idea report docs
Online shoes business idea report docs
 
Panteene pro v project plan
Panteene pro v project planPanteene pro v project plan
Panteene pro v project plan
 
Cafe construction project report
Cafe construction project reportCafe construction project report
Cafe construction project report
 
Eco friendly electricity generating tiles project
Eco friendly electricity generating tiles projectEco friendly electricity generating tiles project
Eco friendly electricity generating tiles project
 
Construction & esstablishment of cattle farm project report.
Construction & esstablishment of cattle farm project report.Construction & esstablishment of cattle farm project report.
Construction & esstablishment of cattle farm project report.
 
toy manufacturers project report.
toy manufacturers project report.toy manufacturers project report.
toy manufacturers project report.
 
Barber shop tiny clippers for kids project.
Barber shop tiny clippers for kids project.Barber shop tiny clippers for kids project.
Barber shop tiny clippers for kids project.
 
CNG station construction project report.
CNG station construction project report.CNG station construction project report.
CNG station construction project report.
 
construction of Reservation software solution for Airline Companies project ...
construction of  Reservation software solution for Airline Companies project ...construction of  Reservation software solution for Airline Companies project ...
construction of Reservation software solution for Airline Companies project ...
 
Aid of Medicines project report.
Aid of Medicines project report.Aid of Medicines project report.
Aid of Medicines project report.
 

Último

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfEnterprise Knowledge
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 

Último (20)

🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdfThe Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
The Role of Taxonomy and Ontology in Semantic Layers - Heather Hedden.pdf
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 

solar street light project report.

  • 1. Acknowledgements First and foremost, I would like to Thank to my Professor of Project Management, Dr. Ali Ahsan for the valuable guidance and advice. He inspired us greatly to work in this project. His willingness to motivate us contributed tremendously to our project. I wish to express my cordial gratitude to the all peoples who have played a crucial role in the research for this project, without their active cooperation the preparation of this project could not have been completed within the specified limit. The next person I would like to acknowledge is my project guide Mr. Arif Mehmood who supported me throughout this project with utmost cooperation and patience. Finally, an honorable mention goes to my family and friends for their understandings and supports on me in completing this project. Without helps of the particular that mentioned above, I would face many difficulties while doing this project. 1
  • 2. Executive Summary This is a hypothetical project. The purpose of this project is to develop the project planning and initiation phase to understand how a project is carrying on, completed and what is required to complete it. The MTA Corporation (hypothetical company) is a company which produces and installs solar street lights. MTA Corporation is currently doing a project of installing solar street lights for the Government of Pakistan in the Capital city Islamabad. The whole project is developing on hypothetical assumptions. The sponsors’’ of this project are; Government of Pakistan, World Bank, UN and UNICEF. Reasons for installing Solar Street Lights in Pakistan are; Pakistan is going through many critical problems and one of them is energy problem, which is effecting the growth and development of the economy. Pakistan has a lot of resources to produce electricity from different alternatives plans. For that reason we done analysis of the market and analyze that the people are anxious and willing to reduce the energy crisis from the country as well as the Government of Pakistan is looking/ finding ways to resolve the crisis by developing rental electric power grids program temporarily that is costly. As in the market till now no one has proposed solar street lights project to the Government of Pakistan which can help them to reduce the energy Problem. Government of Pakistan accepted the project proposed by the MTA Corporation of installing Solar Street lights in the Capital city Islamabad to cater the energy crisis. Different plan are made to ensure that who, what, where, when, why and How will be recognize and explained. 2
  • 3. Table of Content Table of Contents Acknowledgments…………………………………………………………………………………………………………………………………..1 Executive Summary…………………………………………………………………………………………………………………………………2 Table of Content……………………………………………………………………………………………………………………………………..3 Project Charter ………………………………………………………………………………………………………………………..……..……5 Objectives Deliverables/ Millstones’ Stakeholders’ Assumptions Risks Decision Making Process Project Cost Project Plan………………………………………………………………………………………………………………………….………………8 General Information Project Information Technology Environmental and Social Impact Benefits of Solar Street Lights Milestones Costing & Budgeting Scope Statement……………………………………………………………………………………………………………………..…….…13 Stakeholders’ Register……………………………………………………………………………………………………………………..15 Human Resource Management Plan………………………………………………………………………………………………..16 Communication Management Plan……………………………………………………………………………………………….……21 3
  • 4. Procurement Management Plan………………………………………………………………………………………………………..22 Quality Management Plan…………………………………………………………………………………………………………….…...26 Risk Management Plan………………………………………………………………………………………………………………….……28 Conclusion……………………………………………………………………………………………………………………………………..…..29 4
  • 5. PROJECT CHARTER Tagline: - You pay LESS MONEY for MORE LIGHT with Solar Street Lights. Mission:- MTA Corporation aim “Towards provide alternative solar energy solutions for domestic, industrial and commercial establishments in order to mitigate the energy problems in Pakistan”. Objectives:- Solar energy is a very useful renewable source of energy, which may be the answer to the future for power, or energy needs, as global warming seems to pick up rapidly. So, we can all contribute to the environment by using solar energy thus erasing or trimming down various gas emissions, which can endanger earth, in turn, the millions of people in it. By installing solar street lights in the Capital city of Pakistan, it will help to reduce the energy crisis. The installation cost of Solar Street light is less than the Traditional Street lights installing and maintenance cost. So, by installing Solar Street lights, it will help to boost the economy of Pakistan. Deliverables/ Milestones:- Less Cost, No electric current is required, high quality solar street lights, easy to maintain, Heavy Duty 1/8 Aluminum with welded seams and rubber mats, Heavy duty front door with stainless steel hinges, gaskets and lockable, No sharp edges on enclosure door, 24 volt 10 amp controller, Field adjustable for on/off times, Settable for gel cell battery charge curve to ensure performance and autonomy, Pulse Width Modulation charge regulation, Factory mounted in battery box, Controller automatically adjusts for seasonal light changes, Extends battery life, reduces deep discharge cycling and enhances autonomy. Stakeholders’:- Stakeholders’ of the project are Ministry of Finance, World Bank, UNO, and UNICEF, Project team of MTA Company, CDA, and Government of Pakistan. 5
  • 6. Assumptions:- Project will be a successful one, because each stakeholder (Govt. of Pakistan, UN, World Bank) is united and putting their whole lot of efforts to make this project a successful one. Economy will be improved; investors’ will invest and so forth. Risks:- Solar electricity and heat are not available at night and also may not be accessible in case of bad weather conditions. So, a solar or complementary power station is required which maybe a problem for many locations. Solar panels require a large area for installation in order to achieve a good level of efficiency. Besides the solar energy can also be influenced by the presence of water vapor, pollution etc. in the air, which may cause complexities. Considerable amount of energy is lost when DC (direct current) has to be converted to AC (alternating current). The solar cells can only produce DC, thus the conversion by help of Grid-Tie Inverters incurs a loss of about 4-12%. Decision Making Process:- Decision will be taken with the agreement of the stakeholders’ and will be approved by the CEO of the company. Project Cost:- 6
  • 7. Cost of the project is determined through the documents construct in the project. Activities: Procurement of Required Material Project Initiation Define Scope Project Schedule Estimated Cost & Budgeting Plan Document Project Support Plans Project Quality Project Human Resource Management Develop Procurement Plans Set Up Project Environment Human Resource Management Assembling of Solar lights Installation of Solar Street Lights Maintenance Monitoring and Controlling Estimated Total Cost= "Rs36, 041,827.15" Project Plan 7
  • 8. GENERAL INFORMATION Project sponsors and partners are; • Government of Pakistan • World Bank • UN • UNICEF • Suppliers’ PROJECT INFORMATION This is a hypothetical project. The purpose of this project is to develop the project planning and initiation phase to understand how a project is carrying on, completed and what is required to complete it. The MTA Corporation (hypothetical company) is a company which produces and installs solar street lights. MTA Corporation is currently doing a project of installing solar street lights for the Government of Pakistan in the Capital city Islamabad. The whole project is developing on hypothetical assumptions. Pakistan is going through many critical problems and one of them is energy problem, which is effecting the growth and development of the economy. Pakistan has a lot of resources to produce electricity from different alternatives plans. For that reason we done analysis of the market and analyze that the people are anxious and willing to reduce the energy crisis from the country as well as the Government of Pakistan is looking/ finding ways to resolve the crisis by developing rental electric power grids program temporarily that is costly. As in the market till now no one has proposed solar street lights project to the Government of Pakistan which can help them to reduce the energy Problem. Government of Pakistan accepted the project proposed by the MTA Corporation of installing Solar Street lights in the Capital city Islamabad to cater the energy crisis. Project detail is given in the following Documents. The information about the Solar Street Light is explained in detail in the following topic. Technology: - (Solar Light) The solar light is a complex but useful source of light. Solar light is consisting of following component; 8
  • 9. Photovoltaic A stand alone so photovoltaic street lighting system comprises a compact fluorescent lamp, lead acid battery, PV module(s) control electronics, inter-connecting wires / cables, Module mounting hardware, Battery box, Operation, instruction and maintenance manual. Duty Cycle The system should be designed to automatically switch ON at dusk. Operate throughout the night and automatically switch OFF at the dawn. Lamp The lamp will be of compact fluorescent (CFL) type, either 4 - Pin or 2 Pin type, with a rating of 11W. For the 4 - Pin type CFL. Adequate pre-heating circuit must be provided. The light output from the lamp should be around 900 +5% lumens. The lamp should be housed in a weather proof assembly suitable for outdoor use, with a reflector on its back. While fixing the assembly, the lamp should be held in a base up configuration. Battery Electrolyte type positive tubular plate is required. Low maintenance leads acid battery. The battery will have a minimum rating of 12V 75 Ah (at C/10) discharge rate. 75 % of the rated capacity of the battery should be between fully charged & load cut off conditions. Celectron The inverter should be of quasi sine wave/sine wave type. With frequency in the range 20 - 35 KHz. Half-wave operation is not acceptable. The total electronic efficiency should be at least 80 %. No blackening or reduction in the lumen output by more than 10% should be observed after 1000 ON/OFF cycles (two minutes ON followed by four minutes OFF is one cycle). The idle current consumption should not be more than 10 mA. Electronics should operate at 12 V and should have temperature compensation for proper charging of the battery throughout the year. Necessary lengths of wires/cables and fuses should be provided. The PV module will be used to sense the ambient light level for switching ON and OFF the lamp. PV Module (s) 9
  • 10. The PV module(s) shall contain crystalline silicon solar cells. The power output of the module(s) under STC should be a minimum of 74 W either two modules; of minimum 37 W output each or one module of 74 W output should be used. The operating voltage corresponding to the power output mentioned above should be 16.4 V. The open circuit voltage of the PV modules under STC should be at least 21.0 Volts. The terminal box on the module should have a provision for opening for replacing the cable if required. A strip containing the following details should be laminated inside the module so as to be clearly visible from the front side. Electronic Protections and Adequate protection is to be incorporated under no -load conditions e.g. when the lamp is removed and the system is switched ON. The system should have protection against battery overcharge and deep discharge conditions. Fuses should be provided to protect against short circuit conditions. The pole should be made of mild steel pipe with a height of 4 meters above the ground level, after grouting and final installation. The pole should have the provision to hold the water proof lamp housing it should be painted with a corrosion resistant paint. A vented, acid proof and corrosion resistant painted metallic box for outdoor use should be provided for housing the battery. Components and parts used in the solar street lighting systems should conform to the latest BIS specifications, wherever such specifications are available and applicable. Environment and social impact:- Energy saving provide electric energy with solar energy photovoltaic conversion, which would never be exhausted. No pollution, no noise, no radiation. Safety No such accident as electric shock or fire at all. Convenience Simple installation, no need to erect wire or excavate ground without consideration of power shut down or power restriction. Solar Street Light has long life high technical content of the product, control system and module being of famous world brand, intelligent design, and reliable quality. Solar energy is a High quality Technical product, green energy, using units attaching importance to technology, enhancing green image and level. Solar energy is a Investment all at once, same price as AC power (sum of AC power investment from substation, power feeding, control cabinet, cable and engineering), investment all at once with long term usage. Wide application solar energy comes from nature. It can be used so long there is sunshine, especially suitable for green land sight light equipage, high grade housing and outdoor lighting, tour scenic spot and coast lighting and decoration, industrial development area, factory and enterprise street lamp, outdoor light of colleges. Benefits and features of solar lights:- 10
  • 11. • Immune to power outages • Wandal resistant hardware • No trenching, no wiring • No maintenance • Stand alone, not connected to grid • Easy installation-quick connect plug • Longer lifetime (50,000 hours) Organization, management, and training:- Well trained employees are in MTA Corporation with a lot of experience and outstanding work. Trainings are an important part of the organization to keep employees up-to- date with the latest technology. HR Manager is responsible for the hiring, training and compensation of the employees. Project implementation:- Schedule for project implementation is given in detail in the MS Project file. Partners' responsibilities in implementation are MTA Corporation, Suppliers i.e. (Shi fang Company, Malik steel, A.A Company, Askari Cement, and Hino-Pak). Shi Fang Company:- Lamps, Batteries’, PV Module(s), controlling device Mechanical equipment Electronic accessories Malik Steel:- Stainless steel poles, water prove box AA Company:- Procure Bricks for installing the pole holder. 11
  • 12. Askari Cement:- Procure Cement to make holder of the street light pole. Hino-Pak Company:- Procure trucks to transport street lights to the designated places. Milestones:- Sr.No Task 1 Budget approval from the organization 2 Inspection Team Report/Survey Report 3 Purchase of Materials 4 Purchase of Vehicles 5 Installation of Solar Street Lights to the designated locations 6 Final Report 12
  • 13. Costing & Budgeting:- Budget =Rs. 50,000,000 Total Estimated Cost= "Rs36, 041,827.15" Scope Statement Project Justification:- There is a lot of Shortage of electricity in Pakistan. Pakistan Government is looking forward to produce energy from other available resources in Pakistan. Solar energy is one important way to produce electricity other than traditional way of producing electricity. It is a onetime cost project which benefits for future. Project Product:- Solar Street Lights is the Project Product. Project Deliverables:- Solar Street Lights Project Objective:- Solar energy is a very useful renewable source of energy, which may be the answer to the future for power, or energy needs, as global warming seems to pick up rapidly. So, we can all contribute to the environment by using solar energy thus erasing or trimming down various gas emissions, which can endanger earth, in turn, the millions of people in it. By installing solar street lights in the Capital city Islamabad of Pakistan, it will help to reduce the energy problem in some way. The installation cost of Solar Street light is less than the Traditional Street light. So, by installing Solar Street lights, it will definitely play a pivotal role to stabilize the economy of Pakistan. Assumptions/Limitations:- 13
  • 14. One time cost but beneficial, less emission of energy that effect ozone layer or help to reduce global warming, better working then the traditional or previous ones. Cost is one factor, Accessibility, Literacy rate, technology, experts. Overall Project Priority:- High Medium Low Comments: - This project is going to help in the growth of Pakistan’s economy because right now Pakistan is going through a lot of major issues and electricity is one of them, so by planting solar street lights it will reduce the consumption of electricity on traditional street lights and the supply of electricity will be more likely be equal to the demand of the people. 14
  • 15. 15
  • 16. 16
  • 17. 17
  • 19. 19 Sr.No Name of Stake holde rs Designation Department Role in proje ct Type of communicatio n Expectation Interest Power 1 M Tanveer Ahme d Project Manager Overall To assure all the activi ties are being done as sched uled Face to Face and daily meetings Successfully installing the solar street lights in Islamaba d High High 2 Governme nt of Pakist an Financing body Nil To finance the proje ct Reports and meetings on monthly basis Fully support to make project successful High High 3 World Bank Financing body Nil --as above -- --as above-- --as above-- High High 4 Labor Work Force Operations To produ ce solar street lights and plant in the Islam abad Meetings and Face to Face Salary on time Low Low 5 Suppliers Nil Nil To provide the best availa ble mater ial to build the solar street lights Written and meetings Contracts High Low
  • 20. Human Resource Management Plan Roles and Responsibilities’:- 20 CEOCEO FINANCE MANAGER FINANCE MANAGER HUMAN RESOURCE MANGER HUMAN RESOURCE MANGER MARKETING MANAGER MARKETING MANAGER PROCUREMENT MANAGER PROCUREMENT MANAGER QUALITY MANAGER QUALITY MANAGER PROJECT MANAGER PROJECT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER ASSISTANT MANAGER TEAMTEAM ASSISTANT MANAGER ASSISTANT MANAGER TEAMTEAM TECHNICAL EMPLOYEES TECHNICAL EMPLOYEES MARTKETING RESEARCHER MARTKETING RESEARCHER TEAMTEAM TECHNICAL EMPLOYEES TECHNICAL EMPLOYEES TRAINERSTRAINERS TEAMTEAM ACCOUNTANT S ACCOUNTANT S AUDITORSAUDITORS TEAMTEAM ANALYTICAL SKILLED EMPLYEES ANALYTICAL SKILLED EMPLYEES
  • 21. Designation Roles & Responsibilities’ CEO Its role is more like a leader and visionary person. She/he advises the Board and supports motivation of employees in organization products/programs and operations. He ensures staff and Board have sufficient and up-to-date information, looks to the future for change opportunities and interfaces between Board and employees, and organization and community. Marketing Manager To develop, establish and maintain marketing strategies to meet organizational objectives. She/he manages and coordinates all marketing, advertising and promotional staff and activities. Conduct market research to determine market requirements for existing and future products. Analysis of customer research, current market conditions and competitor information, develop and implement marketing plans and projects for new and existing products. Manage the productivity of the marketing plans and projects. Monitor, review and report on all marketing activity and results. Determine and manage the marketing budget. Develop pricing strategy and liaison with media and advertising. 21
  • 22. Human Resource Manager Maintaining and develop HR policies, ensuring compliance and to contribute the development of corporate HR policies. She/ he develop the HR team, to ensure the provision of a professional HR service to the organization. Manage a team of staff. She/ he are Responsible for mentoring, guiding and developing them as a second line to the current position. To ensure timely recruitment of required level / quality of Management staff, other business lines staff, including non-billable staff with appropriate global approvals, in order to meet business needs, focusing on Employee Retention and key Employee Identification initiatives. Prepare information and input for the salary budgets. Ensure compliance to the approved salary budget; give focus on pay for performance and salary benchmarks where available. Ensure adherence to corporate guideline on salary adjustments and promotions. Coordinate increments and promotions of all staff. HR manager develop the HR business plan and ensure appropriate communication at all staff levels. Finance Manager She/he coordinates the approval and rejection of, lines of credit and commercial, real estate, and personal loans. Develop and analyze information to assess the current and future financial status of firms. Establish procedures for custody and control of assets, records, loan collateral, and securities, in order to ensure safekeeping. Evaluate data pertaining to costs in order to plan budgets. Evaluate financial reporting systems, accounting and collection procedures, and investment activities, and make recommendations for changes to procedures, operating systems, budgets, and other financial control functions. Oversee the flow of cash and financial instruments. Plan, direct, and coordinate risk and insurance programs of establishments to control risks and losses. Prepare financial and regulatory reports required by laws, regulations, and boards of directors. Prepare operational and risk reports for management analysis. Communicate with stockholders and other investors to provide information, and to raise capital. 22
  • 23. Procurement Manager Quality Manager Implement procurement strategy and policies. Forecast procurement needs. Create and implement KPI’s. Continually develop expertise to support growth for new projects. Monitor macro trends in supplier and contract base and implement plans to react. Build and develop relationships with key suppliers and customers. Lead the procurement group in all phases. Identify and develop training opportunities. She/ he order materials and services as per negotiated and appropriately approved. Review quotations. Prepare purchase requisitions, approve and issues purchase orders in accordance with company policy and negotiated terms and conditions. Maintain procurement files. Track Purchasing activity and measurements. Discuss defective or unacceptable new goods or services with users, vendors and others to determine cause of problem and take corrective and preventative action. Ensure supplier compliance with site and company requirements for safety. Manage vendor relationships and assist in building effective partnerships. Aims to ensure that the product or service an organization provides is fit for purpose and meets both external and internal requirements, including legal compliance and customer expectations. A quality manager, sometimes called a quality assurance manager, coordinates the activities required to meet quality standards. She/he also monitors and advice on the performance of the quality management system and produces data and report on performance, measuring against set indicators. They liaise with other managers and staff throughout the organization to ensure that the QA system is functioning properly. Where appropriate, the quality manager advises on changes and their implementation and provides training, tools and techniques to enable others to achieve quality. 23
  • 24. 24
  • 25. 25
  • 26. 26
  • 27. 27
  • 28. 28
  • 29. 29
  • 31. 31 Message Owner Recipient Delivery Vehicle Notification Mediu m Frequency Cycle Project Status Project Manager Project Sponsor and Key Stakehol ders Project Status Report Word Docume nt sent via e- mail Monthly Meeting Discussion, Decisions, Action Items Meeting Facilitator Meeting Participa nts Meeting Notes Word Docume nt sent via e- mail As often as meeting s are held Informational updates on issues, schedules, task assignmen ts that must be communic ated before the next status meeting Project Manager Project Sponsor and Key Stakehol ders as needed Message E-Mail with attachme nts as needed On an as needed basis when informa tion become s availabl e Status updates on Tasks All team members Project Manager Task Update s EPM Task Reportin g When a team member has a task due during the current week Executive Presentati on Project Manager with Project Sponsor Executive Sponsor and Key Stakehol ders Slide Present ation or Report PowerPoint or Word documen t As often as needed for Stakeho lder involve ment and commit ment Project Steering Committee Project Manager, Project Sponsor Project Steering Committ Steering Commit tee In person – with PowerPo Every 3 – 4 weeks per
  • 32. Procurement Management Plan Procurement Statement:- MTA Corporation is producing a premium product so we require a premium supplier. So MTA Corporation requires a high quality product from the suppliers for their customers. Estimated Cost:- Total Estimated Cost = Rs.17, 680,260 +/- 20% Procurement Definition:- For making the premium product i.e. Solar Street Lights, MTA Corporation requires the following parts according to their specifications; • Procurement of Stainless Steel Poles • Procurement of Material • Bricks • Cement • Lamp • Battery • Controlling device • Celectron • PV Module(s) • Electronic Protection Materials • Mechanical Hardware 32
  • 33. • Electronic Accessories • Vehicles (Trucks) Specifications:- Highly efficient mono crystal or multi crystal silicon solar panels for power supply. Working Voltage: 12 / 24V DC Lighting Time: 8 to 12 hours per day depending on the season Advanced charging, discharging and lighting control circuit with reliable Performance High lighting efficiency, great brightness Easy installation Safe, reliable, energy saving, economical, environmental protection Lamp specifications:- Lamp technology: LVD (Induction light) Power Rating: 40W Life span: > 100,000 hours Mean lumen: 6,800 Mean pupil lumen: 11,000 CRI > 80 Color temperature: 2700, 2500 or 4100K (based on client’s decision for type of color) Lamp fixture specifications:- Different lamp fixture designs can be proposed. The fixture must include the following components: - Reflector 33
  • 34. - Closed housing - Electronic Ballast - Mounting brackets Details of the proposed fixtures should be submitted with both clear designs, cut sheets and photometric performances. PV module spec:- Type: Multi or Mono crystalline technology Conversion Efficiency: > to 15% Manufacturing tolerance on rated power: ≤ 3% Module Voltage: 12V Environment: See general description for environment requirements Connector type: Multi Contact type possibility Total weight: ≤ 20 KG Cell protection: The cells should be protected by a tempered glace Batteries spec:- The following are the minimum requirements for the battery(s): Maintenance free Gel type batteries No leakage 12V type Deep discharge capacity Expected life span over 8 years in normal operating condition Charger controller specification:- 34
  • 35. The charger controller should be located close to the battery(s) and it should need minimum maintenance. This unit can include the automatic dusk/down switch and the dimmer/timer module. The controller should have the following protections: Overcharging Over discharging Overload Selection Process & Criteria:- RFP will be floated then identify the suppliers, evaluating the suppliers, selection of supplier, alternative supplier, review. The criteria will be the terms and conditions of contract. According to the specifications and required quality of the products that are to be procured. Project Procurement Team:- Sr.No Designation Procurement Role 1 Project Manager He/ She are Responsible for overall procurement activities. 2 Procurement manager Assist the procurement manager and make it sure that required product is procured. 3 Procurement manager’s team Check and balance of all the activities of procurement. Ensure that right product and required quantity of product is acquired 35
  • 36. Vendor Management:- Procurement manager and his team will manage the relationship with supplier and ensure that they provide the right parts on the time as per requirement. Quality Management Plan Project Scope:- MTA Corporation aim “Towards provide alternative solar energy solutions for domestic, industrial and commercial establishments in order to mitigate the energy problems in Pakistan”. Deliverable Description:- The main deliverable of project is Solar Street Light. The other somewhat related to product deliverables are; Less Cost, No electric current is required, high quality solar street lights, easy to maintain, Heavy Duty 1/8 Aluminum with welded seams and rubber mats, Heavy duty front door with stainless steel hinges, gaskets and lockable, No sharp edges on enclosure door, 24 volt 10 amp controller, Field adjustable for on/off times, Settable for gel cell battery charge curve to ensure performance and autonomy, Pulse Width Modulation charge regulation, Factory mounted in battery box, Controller automatically adjusts for seasonal light changes, Extends battery life, reduces deep discharge cycling and enhances autonomy. Acceptance Criteria:- The product will only be accepted if it completes all the activities as per requirement and fulfills the required mentioned quality in the project plan by the customer and the MTA Corporation then it will be accepted otherwise, Quality manager will manage the problem and make the product up to the set standard. Quality Assurance Activities:- 36
  • 37. Quality manager will monitor the project and its activities throughout the entire project and ensure the quality according to the requirement and schedule. Project Monitoring and Control:- Monitoring and controlling will be done throughout the entire project by the quality and Monitoring & controlling department on daily routine. Project Team Quality Responsibilities:- Quality team will be responsible for the overall all products acceptance. Pre-test will be done by the team, audit and see the quality time to time throughout the project and checklist will be made by project manager according to which quality team will ensure that all the requirements’ of the product meets. In short project team quality is responsible for the end product. Risk Management Plan 37
  • 38. 38 Statement of Risk Backup power station is required which may not be possible for some locations. Solar energy is influence d by the presence of water vapor, pollution etc. in the air, which may cause complexit ies Considerable amount of energy is lost when DC has to be converted to AC Inflation Stakeholder Affected Cost will be higher Project Failure Medium affect Cost will increase, High Priority Medium High Medium Medium Probability/ Likeliho od 40% 50% 70% 30% Certainty Medium High High High Possible Cause s Bad Weath er Air Polluti on, Water vapors Conversion of DC into AC Increase of Curren cy, Unstab le econo my Possible Conseque nces Will stop solar street light to work Will disturb the working of solar street lights Will affect the effectivene ss of solar street light Will affect the costing and budgeting of the project. Mitigation Strategy By increasing the Battery duration and backup storage. By placing in the dry areas, or by protecting shield. Conversion period can be reduced to when it is needed. By stopping the unnecessary conversion of DC into AC. Forecasting’s will be made in and rates are pre- determined with the supplier.
  • 39. Conclusion:- Energy can be produced by many sources but now a days the traditional way of producing energy is becoming more and more costly as well as there is no reserves of water through which energy can be generated, so by using the alternative and new technology to generate electricity is through solar energy, which is costly but not more than the traditional one and gives long-term benefits. Overall the project is going to be complete in short time span with the best outcomes. 39