Ancillary Services

Accounting & Settlement
     Mechanisms
                           H K Chawla
                          DGM, NRLDC

                                  1
Regulatory Provisions


• Maiden definition in Indian context in the CERC (Indian Electricity Grid Code),
  Regulations, 2010
  “Ancillary services in power system (or grid) operation means services necessary
  to support the power system (or grid) operation in maintaining power quality,
  reliability and security of the grid, e.g active power support for load following,
  reactive power support, black start etc”
  Clause 11(1) (b) of the amended CERC UI Regulations, 2009
   (Application of Fund Collected through UI)
  “Providing ancillary services including but not limited to ‘load generation
  balancing’ during low grid frequency as identified by the Regional Load
  Despatch Centre, in accordance with the procedure prepared by it, to ensure
  grid security and safety:”
• NLDC prepared the approach paper & submitted it to CERC
                                                                               2
Present Scenario
  • STOA Limitations
       Fragmented capacity
       Match Making

• Unscheduled Interchange (UI): Balancing Mechanism
  for inadvertent interchange
    Limits on UI Volume
      Price Uncertainty
      Frequent Start-Stop operation
• Impact
  - Frequent Unplanned Load shedding
  - Value of load lost.
• Need for
   – Flexibility and customization
   – Harnessing all available generation resources before load
     shedding
Power Supply Position (Feb’ 2013)
 Region       Energy      Deficit %        Peak         Deficit %
            Requirement                   Demand
               (MU)                        (MW)

Northern       19,967       -8.0            36,923         -9.3
Western        21,456       -1.9            37,343         -2.6
Southern       22,544       -16.5           35,901         -13.1
Eastern        8,133        -4.6            14,338         -5.3
 North
Eastern
                877         -6.7            1,934          -4.6
All India      72,977       -8.4           126,439         -7.9

                                    Source: CEA Monthly Report
FREQUENCY DURATION CURVE APR'12 TO JULY'12                           FREQUENCY DURATION CURVE APR'12 TO JULY'12



              For Dated 1-4-2012 to 31-7-2012



          50.7

          50.5
                                                                           Frequency Below 49.7 Hz for 39% of Time.
          50.3

          50.1
FREQ(In Hz)




          49.9

          49.7

          49.5

          49.3

          49.1

          48.9

          48.7
                 0       10          20         30   40      50       60          70            80             90               100
   Scroll
                                                          % of Time        Zoom
Why Ancillary Services for India ?

• Reliability , Security, stability and Power quality
• Restructured Power Systems
• Lack of adequate Primary, Secondary and Tertiary
  Response
  Lack of Adequate Reserves
• Loose Power Pools
• Absence of Tight Frequency Control



                                                        7
Primary, Secondary and Tertiary
           Responses
 Primary   Secondary   Tertiary
Targets
• Harness Fragmented Generation at Optimum Cost
• Availability of more peaking capacity
• Opportunity for Generators
   – Help the grid
   – Monetary Incentive
   – Mitigate load shedding
   – Value of Lost Load
• Relieve of congestion
   – (utilization of Kayamkulam despite congestion)
• Renewable Generation
   - Handling Variation thereby facilitating integration
  Confidence to Pumped storage plants
                                                           9
Kayamkulam
                              Flowgate Limiting   injection
                              SR Import
                                                  would relieve
                                                  congestion
                    Flowgate Limiting             towards SR
                    S1-S2 exchange
                                                  import




Kayamkulam
Generation
             NLDC                                             10
Classifications of Ancillary Services

•   Frequency Support Ancillary Services (FSAS)

•   Voltage Control Ancillary Service

•   Black Start Ancillary Service
Section 27 (2) of the Electricity Act 2003




“Provided further that no Regional Load
Despatch Centre shall engage in the
business of generation of electricity or
trading in electricity.”
Role
􀁻 Despatch Decision
􀁻 Involvement in trading in electricity is
avoided as Facilitation through power exchanges
Section 28 (3) of the Electricity Act 2003


 ‘The Regional Load Despatch Centre shall

 a)         be responsible for optimum scheduling
            and despatch of electricity within the
            region in accordance with the contracts
            entered into with the licensees or the
            generating companies operating in the
            region.

 b)         keep accounts of quantity of electricity
            transmitted through the regional grid.’
Section 32 (2) of the Electricity Act 2003

 ‘The State Load Despatch Centre shall

 a)         be responsible for optimum scheduling
            and despatch of electricity within a
            State in accordance with the contracts
            entered into with the licensees or the
            generating companies operating in that
            State.
 b)         ..

 c)         keep accounts of quantity of electricity
            transmitted through the State grid.’
Existing Mechanism for Energy Accounting


• Energy accounting on 15-minute time block basis.
• Three part tariff for both beneficiaries as well as generators
• Three parts are :
                        Generators              Beneficiary (State)

Capacity Charge         Declared Capacity       Capacity Share
Energy Charge           Scheduled Energy        Schedule Drawal
UI Charge               Difference between      Difference between
                        Scheduled energy and    Schedule drawal and
                        Actual Generation       actual drawal

                                                                      15
UI Mechanism

• For deviation from scheduled generation/ Drawal
• Monday to Sunday is the weekly accounting period
• Inputs – DC, Scheduled Injection/ Drawal, Bilateral/
  collective exchanges, Metered Energy, Frequency
• Issued Weekly by RPCs
• Physical account maintained by RLDCs
• Interest on late payment of UI charges
• Responsibility of the State/SLDC- Further
  apportioning/recovery of UI charges from the various
  Discoms and embedded customers in the State
                                                         16
Unscheduled Interchange Curve
  2000.00
                                                                                UI Rate VS Frequency (w.e.f 17.09.2012)
  1800.00      1800                                                                         (Payment Side)
               Paisa/KWH
  1600.00                                                                                                                                                            FREQ Normal Range(50.20 - 49.50 HZ)

  1400.00

  1200.00                               900                                                                                                  49.50

  1000.00

   800.00
                                                                                                                                                                             49.70 HZ
   600.00                                                   28.12                                                                                                                            49.80
   400.00

   200.00                                                                                                   28.50 Paisa/0.02                                                                                                 50.00 HZ
                                                                                                            HZ
     0.00
                                                                                                                                                                             16.50
                                                                                                                                                                             Paisa/0.02
                                                                                                                                                             49.72




                                                                                                                                                                                                                             50.04
            49.00
                    49.04
                            49.08
                                    49.12
                                            49.16
                                                    49.20
                                                            49.24
                                                                    49.28
                                                                            49.32
                                                                                    49.36
                                                                                            49.40
                                                                                                    49.44
                                                                                                            49.48
                                                                                                                     49.52
                                                                                                                             49.56
                                                                                                                                     49.60
                                                                                                                                             49.64
                                                                                                                                                     49.68


                                                                                                                                                                     49.76
                                                                                                                                                                             49.80
                                                                                                                                                                                     49.84
                                                                                                                                                                                             49.88
                                                                                                                                                                                                     49.92
                                                                                                                                                                                                             49.96
                                                                                                                                                                                                                     50.00


                                                                                                                                                                                                                                     50.08
                                                                                                                                                                                                                                             50.12
                                                                                                                                                                                                                                                     50.16
                                                                                                                                                                                                                                                             50.20
                                                                                                                                                                                                                                                                     50.24
                                                                                                                                                                                                                                                                             50.28
                                                                                                                                                                             HZ
                                                                                                                    Frequency (HZ)
4/15/2013                                                                                                                POSOCO                                                                                                                                               17
2000
                               UI Charges ( payment side)
                                                                                UI Rate VS Frequency (w.e.f 17.09.2012)
1800
          1800                                                                              (Payment Side)
          Paisa/KWH                                                                                             FREQ Normal Range(50.20 - 49.50 HZ)
                                                                                                                ADDL UI for OD (in the range < 49.70 HZ & < 49.50 HZ & < 49.20 HZ)
1600
                                                                                                                ADDL UI for APM (in the range < 49.70 HZ & < 49.50 HZ)
                   100 %                                       49.20                                            ADDL UI for UI (in the range < 49.70 HZ & < 49.50 HZ & < 49.20 HZ)
1400
               1260                                                                                       Addl UI for O/D
               Paisa/KWH                                                                                           49.50 HZ
1200
                                         1080.00
                                40 %
                                 Paisa/KWH 20 %
1000

                                                                                                                                20 %
800
             900                                                                                                                        10 %
                                                                                                                                                                         49.70 HZ
                                                                                                                                                                           590.63 Paisa/KWH
        590.10paise/kwh                                                                    28.12
600                                                                                                                                                                                       49.80

400                                                    505.80                                                  463.65                                                 28.50 Paisa/0.02
                                                                                                                                                                      HZ
200                                                                     49.50                                                                           421.50 paise/kwh
                                                                                                                                                                             50.00 HZ
                                                                                                                                                                               16.50
   0                                                                                                                                                                           Paisa/0.02 HZ
                                                                                                                49.52
       49.00
               49.04
                       49.08
                               49.12
                                       49.16
                                               49.20
                                                       49.24
                                                               49.28
                                                                       49.32
                                                                               49.36
                                                                                       49.40
                                                                                               49.44
                                                                                                       49.48


                                                                                                                        49.56
                                                                                                                                49.60
                                                                                                                                        49.64
                                                                                                                                                49.68
                                                                                                                                                         49.72
                                                                                                                                                                 49.76
                                                                                                                                                                         49.80
                                                                                                                                                                                 49.84
                                                                                                                                                                                         49.88
                                                                                                                                                                                                 49.92
                                                                                                                                                                                                         49.96
                                                                                                                                                                                                                 50.00
                                                                                                                                                                                                                         50.04
                                                                                                                                                                                                                                 50.08
                                                                                                                                                                                                                                         50.12
                                                                                                                                                                                                                                                 50.16
                                                                                                                                                                                                                                                         50.20
                                                                                                                                                                                                                                                                 50.24
                                                                                                                                                                                                                                                                         50.28
                                                                                                               Frequency (HZ)
4/15/2013                                                                                                               POSOCO                                                                                                                                    18
1200
                                                  UI Charge receipt side          UI Rate VS Frequency (w.e.f 17.09.2012)
 1100                                                                                                                                              FREQ Normal Range

 1000
                 900 Paisa/KWH (Infirm Liquid Fuel)                                                                                                Buyer/Bef UD>10 % of sch or 250 MW whichever is less &
                                                                                                                                                   Seller/Gen >20 % of sch subject to 105 % of inst Cap in a
  900                                                                                                                                              block or 101 % of Inst cap over a day
                                                                                                                                                   APM for OG > 105% DC in a block or 101 % over Avg DC
  800
                                                                                          49. 48 HZ
  700
                                                      28.12 Paisa/0.02
  600
                                                                                                                                                                                                      49.80 HZ
                                                                                                                                                                                                                                   28.50 Paisa/0.02
  500           450 Paisa/KWH                                                                                                                                                                                                      HZ

  400                                                                                                                                                                                                                                               16.50 Paisa/0.02
                421.50 Paisa/KWH                             330 Paisa/KWHn (Infirm Imported Coal/RLNG)
                                                                                                                                                                                                                                                    HZ
  300                            260 Paisa/KWH ( Infirm APM Gas as fuel)
                                                                                                                                             49.80 HZ                      49.82 HZ
  200           165 paisa/KWH (Infirm Coal /Lignite/hydro)                                                                                                                                                                           50.00 HZ


  100

    0
                                                                          49.32
                                                                                  49.36
        49.00
                 49.04
                         49.08
                                  49.12
                                          49.16
                                                  49.20
                                                          49.24
                                                                  49.28




                                                                                          49.40
                                                                                                  49.44
                                                                                                          49.48
                                                                                                                   49.52
                                                                                                                           49.56
                                                                                                                                   49.60
                                                                                                                                           49.64
                                                                                                                                                   49.68
                                                                                                                                                           49.72
                                                                                                                                                                   49.76
                                                                                                                                                                           49.80
                                                                                                                                                                                   49.84
                                                                                                                                                                                           49.88
                                                                                                                                                                                                   49.92
                                                                                                                                                                                                           49.96
                                                                                                                                                                                                                   50.00
                                                                                                                                                                                                                           50.04
                                                                                                                                                                                                                                    50.08
                                                                                                                                                                                                                                            50.12
                                                                                                                                                                                                                                                    50.16
                                                                                                                                                                                                                                                            50.20
                                                                                                                                                                                                                                                                    50.24
                                                                                                                                                                                                                                                                            50.28
                                                                                                                  Frequency (HZ)


4/15/2013                                                                                                                  POSOCO                                                                                                                                           19
Year-wise Status of UI Amount Billed
Existing Settlement System

RLDCs and SLDCs have a key role in the
metering and settlement system

     •    RLDCs at the regional level
     •    SLDCs at the State level


Objective of the settlement system is to determine

Who bills whom for how much quantum of power
and how much money?
10 MW                TRADER
                                              10 MW


       @ Rs. 2.00/ u              @ Rs. 2.20/ u
A                                                     B
                       AGREEMENTS




A                  ACTUAL FLOW                        B

    8 MW                                      12 MW


                         GRID
TRADER            Rs. 2.20/ u for
Rs. 2.00/ u for
                                        10 MW
10 MW



                     PAYMENTS
A                                                   B
          UI for 2                 UI for 2
          MW                       MW




                     UI POOL A/C
Interchange: Possible Combinations
Scheduled-Scheduled         Unscheduled-UnscheduledExisting

                SI                         UI       Possible
                                                    Combinations
   SI                          UI


           Scheduled-Unscheduled
                                                    Interchange
                                                    under FSAS


                               UI
           SI

                     NLDC                                      24
FSAS
• Focus
   – Stabilize the frequency by utilizing the left over fragmented
     generation capacity.
• Umbrella (un-despatched generation)
   – Liquid fuel based
   – Diesel based
   – Merchant/ IPPs/ CPPs
• Liquid fuel and diesel based capacity
   – The load serving utilities partially harnessing intra-state and
     inter-state sources.
   – Un-despatched capacity and need of load serving entities
     fragmented.
   – Such Generations commercially feasible, if UI rates are
     higher than their costs.                                      25
Framework of FSAS
• Facilitation of FSAS through Power Exchanges
• New product for introducing FSAS
• Separate category of user group
   – Seller registration for FSAS
• Users to be Part of the existing settlement
  mechanism including deviations
• Proper visibility with data, communication,
  telemetry
• Standing clearance from concerned SLDC/RLDC
                                                 26
Procedure
• Competitive Bidding Process
• Window to open after closure of Day Ahead Market
   – Sellers to bid in either of the exchanges
   – Declaration of supplier, bid area, quantum, duration, price

• Adherence to the ‘anonymity philosophy
• Sellers in DAM with un-cleared bids and other sellers
  with surplus/idle power can be the Prospective
  participants.

                                                               27
Possible Opportunity for FSAS Ancillary


                Lost Sell Volume (Sell Bid-Unconstrained MCV) (Apr-12 to Mar-13)
Volume in MWH
• Compilation and Stacking of bids
  – For every time block of the next day
  – Stacking based on bid price

• Overall optimization by stacking and despatch
 of bids on National basis
Despatch under FSAS
• Despatch in real time
   – System Conditions
   – Deficit anticipation by the system operator .
• Lower limit in the IEGC frequency band ie 49.70
  Hz as the threshold frequency.
• System operator will trigger FSAS below
  threshold frequency.
   – Merit Order of bids
• Despatch certainty of at least 12 time blocks (i.e 3
  hours) to prevent frequent start-stop operation.
                                                     30
• Backing down,subject to system conditions, during
  the said 12 time blocks, compensation to the extent
  of their fixed cost.
• Despatch in case of Congestion
   – Pan India merit order may be discounted
   – TTC/ATC across Inter & Intra Regional to be
     honoured
• Consent from seller to ascertain its readiness
   – Participants option to schedule in STOA continue.
Scheduling & Accounting for FSAS

• Scheduling to be routed through Power Exchanges
  similar to that of Day Ahead Market
• PXs to reveal the injection point/ identity of the
  identified bidders.
• Despatched bids: incorporated in schedule of Sellers
• Unmatched one to one schedule


                                                       32
• Despatched bid quantum attributed towards
  drawal of the POOL; a fictitious notional entity.
• Drawees/ users of despatched power quantum to
  pay back for the service in the form of UI charges


• Scheduling as per present practice on regional basis
   – By SLDCs for embedded players
Integration of Settlement Mechanism with UI
                      Mechanism
                            Seller 1 Buyer 1 Buyer 2
   Day ahead schedule (MW)    100      75       25
   Schedule under FSAS (MW)    15       0        0
   UI (MW)                      5      12        8
   Total (MW)                 120      87       33

           15 MW @                      12 MW @ UI rate
           FSAS clearing                                  Buyer 1
           rate
                            UI POOL
Seller 1                   (Regional)   8 MW @ UI rate
                                                          Buyer 2
            5 MW @
            UI rate                                            34
Settlement under FSAS
•   Settlement
    Uniform pricing
    – As paid to the costliest generator who was called in
      last for that respective time block
• Energy based settlement
• Upper limit of CERC UI vector : ceiling price




                                                         35
• Payment to sellers through power exchanges
   – Transfer of Funds from respective regional UI pool to
     exchanges next day .
   – Exchange to pay to the supplier of services same day
• Scheduling , Transmission charges(PoC) and losses as
  applicable for STOA transactions
Voltage Control Ancillary Service
• VCAS to support & maintain voltage within the permissible
  limit.
• Provision for Voltage control ancillary service
   embedded in IEGC.
• Priced for regional entities except generating stations for
  Reactive Energy Exchange when voltages beyond 103% or
  97%.
• Cost of supplying reactive power
    – The capital cost of the equipment .
•    Generators
    – Reluctant to operate synchronous condenser mode
      Friction and windage losses.
    – Sometimes reduction in real-power production capability.
• Participation in Voltage Control by Generators may be
  compensated through Ancillary Service.
Black Start Ancillary Service
• Black start
   – Process to recover or reenergize a system from total or partial
     failure
• Generating units with black start facility
   – Certain identified units
   – Required for black start of an electrical power system
   – Should be able to start without external support
• CEA (Technical Standards for Connectivity to the Grid)
  Regulations, 2007
   – Clause 6(4) (c)
     “Participate in contingency operation such as load shedding,
     increasing or reducing generation, islanding, black start,
     providing start up power and restoration as per the procedure
     decided by appropriate Load Despatch Centre;”.
• Mandatory service as of now
• Startup supply requirement
   – 0.5% for hydro stations
   – 2% of the installed capacity for gas turbines
• Expenditure associated with Black Start
  –   capital cost of the equipment used to start the unit
  –   cost of the operators
  –   routine maintenance and testing cost
  –   cost of fuel
• Equipment cost recovered as fixed charges in generation tariff.
• Units not reimbursed for the operating cost .
• Need for Black Start as an Ancillary Service for voluntarily
  procurement from generating units.
ALL INDIA WIND ENERGY
                                     GENERATION
         250


         225
                                                                2011-12: MAX-168 MU; MIN-7 MU; AVG-57 MU
         200                                                    2012-13: MAX-224 MU; MIN-9MU; AVG-81 MU

         175


         150
MU/DAY




         125


         100


         75


         50


         25


          0
          01-Apr   01-May   31-May   30-Jun   30-Jul   29-Aug    28-Sep   28-Oct   27-Nov   27-Dec   26-Jan   25-Feb   26-Mar
                                                                 MONTH
                                                                                                          2011-12      2012-13
Wind Generation in Rajasthan from April'12 to Jan'13
     1200

                                                                                                                                                 Apr-12

     1050
                                                                                                                                                 May-12
                                                                                       Jun'12

      900
                                                                                                                                                 Jun-12



      750                                                               Jul'12                                                                   Jul-12



                                                                                                                                  May'12         Aug-12
      600
MW




                                                                                                                                                 Sep-12
                                                                                                                                       Aug'12
      450
                  Apr'12
                                                                                                                                                 Oct-12

      300
                                                          Dec'12
                                                                                                                                                 Nov-12
                                                                                                     Sep'12

      150                                                                                                                                        Dec-12
                Jan'13
                                     Oct'12                                                                             Nov12
                                                                                                                                                 Jan-13
        0
            1     2      3   4   5     6      7   8   9     10     11   12       13   14   15   16     17     18   19   20   21   22   23   24

                                                                           TIME
Integration of Renewable Generation
• Renewables 26.36 GW installed capacity targeted for 45 GW by
  2015 (RPO target level of 10% Nationally).
• Challenges for grid operators
   – Reliability top priority
   – Variability and uncertainty in aggregate electric demand .
   – Unit Commitment
   – Integration of intermittency nature of Renewable Generation
   – Frequency Control
   – Reactive Power Management
   – Physical constraints (i.e., available transmission)
   – Institutional constraints ( market structure)
• FSAS to complement the diurnal changes in renewable
  generation.
• FSAS to facilitate renewable integration by reducing the impact of
  their variation.
Summary
• Ancillary services separate from basic system services as such
  to be remunerated appropriately
• Discovery of Information
   – Undespatched generation: Quantum & price
   – Spinning Reserves: quantum & price
• Home Grown Solution
• Competitive Bidding
• Cost to customers
   – Imbalance price based on the prevailing UI vector
• Merit Order Despatch
   – Overall Countrywide Optimization

                                                              45
• Operational Flexibility for drawees
• Generators
   -Respond to price signals
   -Incentive for response and helping the grid
• UI and Ancillary
  – Two of the four pillars of market, Should co-exist
• Reliance on FSAS as a routine practice to be avoided
• Frequency Curve will get further smoothen with the
  availability of FSAS
• Powerful signal for investment to Generators
Pillars of Market Design




Sally Hunt – ‘ Making Competition Work in Electricity’
                                                         47
Way Forward


•   Staff paper by CERC
•   National Diagolue
•   Capacity Building at SLDC
•   Procedure by Nodal Agency/NLDC
•   Implementation
•   Monitoring of actual delivery
•   Demand Response
•   NLDC/Nodal Agency indemnification.
Evolution of Power Market in India


                                                      Ancillary
                                                      Market


                                              Transmission
                                            Pricing (PoC)2011

                                                  PX
                                                  2008
                                        Open Access
                                           2004
                               ABT
                              2002-03
                    IEGC
                  Feb.’2000
A Typical Dispatch
        Surpluses/Deficits - Balance supply and demand


         36     Forecast                                Contingency Real-time

         34    Day Ahead,                                               UI
                   PX
         32    Buy                                      Buy
00 MW




         30    Sell                                     Sell

         28
         26
                                      ADVANCE SHORT TERM BILATERAL CONTRACTS
         24
         22
                                                  FIRM SHARES IN ISGS


              1 2     3   4   5   6   7   8   9    10 11 12 13 14 15 16 17 18 19 20 21 22 23 24


                                                     Hours
Pumped Storage Plants…….
           facilitation through FSAS
• Nearly Rs. 2/kWh differential in peak and off peak prices of
  power

• Increased standard of living……load curve with pronounced
  humps.

• Higher level of pithead based coal generation……..lower off
  peak prices

• Narrowing of frequency band would further increase the
  differential between peak and off peak prices in the market.

• Absorbing large quantities of intermittent generation…..a major
  challenge……….pumped storage a beautiful complement

Más contenido relacionado

La actualidad más candente

Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecastinglinsstalex
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)shyamies11
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integrationRCREEE
 
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Alok Ghildiyal
 
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)Rohit vijay
 
Transmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operationsTransmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operationsWriteKraft Dissertations
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal schedulingASHIRBAD BARIK
 
Modern power system planning new
Modern power system planning newModern power system planning new
Modern power system planning newBayu imadul Bilad
 
Congestion management
Congestion managementCongestion management
Congestion managementGAURAV KUMAR
 
Load characteristics and Economic Aspects
Load characteristics and Economic AspectsLoad characteristics and Economic Aspects
Load characteristics and Economic AspectsAbha Tripathi
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNINGNishaDangi99
 
Renewable energy integration and energy storage
Renewable energy integration and energy storage Renewable energy integration and energy storage
Renewable energy integration and energy storage Bushveld Energy
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationSushant Kumar Sinha
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generationAFAQAHMED JAMADAR
 

La actualidad más candente (20)

Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Load Forecasting
Load ForecastingLoad Forecasting
Load Forecasting
 
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Renewable energy grid integration
Renewable energy grid integrationRenewable energy grid integration
Renewable energy grid integration
 
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
 
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)
POWER QUALITY ISSUES (POWER SYSTEM AND POWER ELECTRONICS)
 
Transmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operationsTransmission congestion management in deregulated power system operations
Transmission congestion management in deregulated power system operations
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
Hydrothermal scheduling
Hydrothermal schedulingHydrothermal scheduling
Hydrothermal scheduling
 
Modern power system planning new
Modern power system planning newModern power system planning new
Modern power system planning new
 
UPQC ppt main
UPQC ppt mainUPQC ppt main
UPQC ppt main
 
Congestion management
Congestion managementCongestion management
Congestion management
 
Load characteristics and Economic Aspects
Load characteristics and Economic AspectsLoad characteristics and Economic Aspects
Load characteristics and Economic Aspects
 
POWER SYSTEM PLANNING
POWER SYSTEM PLANNINGPOWER SYSTEM PLANNING
POWER SYSTEM PLANNING
 
Renewable energy integration and energy storage
Renewable energy integration and energy storage Renewable energy integration and energy storage
Renewable energy integration and energy storage
 
Tariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulationTariff structure & Cerc tariff regulation
Tariff structure & Cerc tariff regulation
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Demand Side Management
Demand Side ManagementDemand Side Management
Demand Side Management
 
Economics of power generation
Economics of power generationEconomics of power generation
Economics of power generation
 

Destacado

Ancillary Packaging Materials_S.K.saravana
Ancillary Packaging Materials_S.K.saravanaAncillary Packaging Materials_S.K.saravana
Ancillary Packaging Materials_S.K.saravanasaravanask
 
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...Dr. Jagannath Boramani
 
Hospital pharmacy report intravenous admixtures
Hospital pharmacy report   intravenous admixturesHospital pharmacy report   intravenous admixtures
Hospital pharmacy report intravenous admixturesjeff_bd
 
Dispensing of controlled substances
Dispensing of controlled substancesDispensing of controlled substances
Dispensing of controlled substancesZulcaif Ahmad
 
Fluid and electrolyte balances and imbalances
Fluid and electrolyte balances and imbalancesFluid and electrolyte balances and imbalances
Fluid and electrolyte balances and imbalanceskatherina Rajan
 

Destacado (8)

Ancillary Packaging Materials_S.K.saravana
Ancillary Packaging Materials_S.K.saravanaAncillary Packaging Materials_S.K.saravana
Ancillary Packaging Materials_S.K.saravana
 
Piggybacking
PiggybackingPiggybacking
Piggybacking
 
Iv admixtures PPT
Iv admixtures PPTIv admixtures PPT
Iv admixtures PPT
 
Electrolytes
Electrolytes   Electrolytes
Electrolytes
 
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...
Secondary Piggyback Iol Implantation For Correction Of Residual Refractive Er...
 
Hospital pharmacy report intravenous admixtures
Hospital pharmacy report   intravenous admixturesHospital pharmacy report   intravenous admixtures
Hospital pharmacy report intravenous admixtures
 
Dispensing of controlled substances
Dispensing of controlled substancesDispensing of controlled substances
Dispensing of controlled substances
 
Fluid and electrolyte balances and imbalances
Fluid and electrolyte balances and imbalancesFluid and electrolyte balances and imbalances
Fluid and electrolyte balances and imbalances
 

Similar a Ancillary Services Accounting & Settlement Mechanisms

Indian power sector
Indian power sectorIndian power sector
Indian power sectorVivek Mohan
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor ImprovementIRJET Journal
 
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...IDES Editor
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)shyamies11
 
Project report soofi
Project report soofiProject report soofi
Project report soofialmsoofi
 
IRJET- Variable Frequency Drive Used in Treadmill
IRJET- Variable Frequency Drive Used in TreadmillIRJET- Variable Frequency Drive Used in Treadmill
IRJET- Variable Frequency Drive Used in TreadmillIRJET Journal
 
Power Factor.ppt
Power Factor.pptPower Factor.ppt
Power Factor.pptVidya Sagar
 
IRJET - Power Quality Improvement in Distribution Power System using STATCOM
IRJET - Power Quality Improvement in Distribution Power System using STATCOMIRJET - Power Quality Improvement in Distribution Power System using STATCOM
IRJET - Power Quality Improvement in Distribution Power System using STATCOMIRJET Journal
 
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...IRJET Journal
 
IRJET- Dynamic Wireless Electric Vehicle Charging System
IRJET-  	  Dynamic Wireless Electric Vehicle Charging SystemIRJET-  	  Dynamic Wireless Electric Vehicle Charging System
IRJET- Dynamic Wireless Electric Vehicle Charging SystemIRJET Journal
 
デザインキット・DCモータ制御回路の解説書
デザインキット・DCモータ制御回路の解説書デザインキット・DCモータ制御回路の解説書
デザインキット・DCモータ制御回路の解説書Tsuyoshi Horigome
 

Similar a Ancillary Services Accounting & Settlement Mechanisms (20)

Ca31511515
Ca31511515Ca31511515
Ca31511515
 
Indian power sector
Indian power sectorIndian power sector
Indian power sector
 
IRJET- Automated Energy Monitering System and Power Factor Improvement
IRJET-  	  Automated Energy Monitering System and Power Factor ImprovementIRJET-  	  Automated Energy Monitering System and Power Factor Improvement
IRJET- Automated Energy Monitering System and Power Factor Improvement
 
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...
Improved Indirect Rotor Flux Oriented Control of PWM inverter fed Induction M...
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 
Project report soofi
Project report soofiProject report soofi
Project report soofi
 
IRJET- Variable Frequency Drive Used in Treadmill
IRJET- Variable Frequency Drive Used in TreadmillIRJET- Variable Frequency Drive Used in Treadmill
IRJET- Variable Frequency Drive Used in Treadmill
 
23PESGM4448.pdf
23PESGM4448.pdf23PESGM4448.pdf
23PESGM4448.pdf
 
Power Factor.ppt
Power Factor.pptPower Factor.ppt
Power Factor.ppt
 
powerfactor.pdf
powerfactor.pdfpowerfactor.pdf
powerfactor.pdf
 
IRJET - Power Quality Improvement in Distribution Power System using STATCOM
IRJET - Power Quality Improvement in Distribution Power System using STATCOMIRJET - Power Quality Improvement in Distribution Power System using STATCOM
IRJET - Power Quality Improvement in Distribution Power System using STATCOM
 
UHF Transistors
UHF TransistorsUHF Transistors
UHF Transistors
 
project
projectproject
project
 
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
POWER QUALITY IMPROVEMENT OF DISTRIBUTION GRID USING ULTRA CAPACITOR INTEGRAT...
 
Sprabq8
Sprabq8Sprabq8
Sprabq8
 
IRJET- Dynamic Wireless Electric Vehicle Charging System
IRJET-  	  Dynamic Wireless Electric Vehicle Charging SystemIRJET-  	  Dynamic Wireless Electric Vehicle Charging System
IRJET- Dynamic Wireless Electric Vehicle Charging System
 
Eh35754760
Eh35754760Eh35754760
Eh35754760
 
デザインキット・DCモータ制御回路の解説書
デザインキット・DCモータ制御回路の解説書デザインキット・DCモータ制御回路の解説書
デザインキット・DCモータ制御回路の解説書
 
O0704080084
O0704080084O0704080084
O0704080084
 
General Power Quality
General Power QualityGeneral Power Quality
General Power Quality
 

Más de IPPAI

The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsIPPAI
 
Standards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinStandards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinIPPAI
 
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar PillaiIPPAI
 
Smart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergSmart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergIPPAI
 
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...IPPAI
 
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonSmart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonIPPAI
 
Industry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIndustry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIPPAI
 
Future cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganFuture cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganIPPAI
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonIPPAI
 
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikSmart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikIPPAI
 
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...IPPAI
 
The Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryThe Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryIPPAI
 
From Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergFrom Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergIPPAI
 
INAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulINAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulIPPAI
 
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...IPPAI
 
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningSmart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningIPPAI
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...IPPAI
 
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...IPPAI
 
Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...IPPAI
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezIPPAI
 

Más de IPPAI (20)

The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
 
Standards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinStandards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael Mulquin
 
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
 
Smart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergSmart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den Berg
 
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
 
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonSmart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
 
Industry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIndustry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik Vig
 
Future cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganFuture cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy Mulligan
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
 
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikSmart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
 
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
 
The Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryThe Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet Mistry
 
From Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergFrom Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard Schomberg
 
INAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulINAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry Dhaul
 
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
 
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningSmart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
 
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
 
Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
 

Último

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseri bangash
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 

Último (20)

A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Ancillary Services Accounting & Settlement Mechanisms

  • 1. Ancillary Services Accounting & Settlement Mechanisms H K Chawla DGM, NRLDC 1
  • 2. Regulatory Provisions • Maiden definition in Indian context in the CERC (Indian Electricity Grid Code), Regulations, 2010 “Ancillary services in power system (or grid) operation means services necessary to support the power system (or grid) operation in maintaining power quality, reliability and security of the grid, e.g active power support for load following, reactive power support, black start etc” Clause 11(1) (b) of the amended CERC UI Regulations, 2009 (Application of Fund Collected through UI) “Providing ancillary services including but not limited to ‘load generation balancing’ during low grid frequency as identified by the Regional Load Despatch Centre, in accordance with the procedure prepared by it, to ensure grid security and safety:” • NLDC prepared the approach paper & submitted it to CERC 2
  • 3. Present Scenario • STOA Limitations Fragmented capacity Match Making • Unscheduled Interchange (UI): Balancing Mechanism for inadvertent interchange Limits on UI Volume Price Uncertainty Frequent Start-Stop operation
  • 4. • Impact - Frequent Unplanned Load shedding - Value of load lost. • Need for – Flexibility and customization – Harnessing all available generation resources before load shedding
  • 5. Power Supply Position (Feb’ 2013) Region Energy Deficit % Peak Deficit % Requirement Demand (MU) (MW) Northern 19,967 -8.0 36,923 -9.3 Western 21,456 -1.9 37,343 -2.6 Southern 22,544 -16.5 35,901 -13.1 Eastern 8,133 -4.6 14,338 -5.3 North Eastern 877 -6.7 1,934 -4.6 All India 72,977 -8.4 126,439 -7.9 Source: CEA Monthly Report
  • 6. FREQUENCY DURATION CURVE APR'12 TO JULY'12 FREQUENCY DURATION CURVE APR'12 TO JULY'12 For Dated 1-4-2012 to 31-7-2012 50.7 50.5 Frequency Below 49.7 Hz for 39% of Time. 50.3 50.1 FREQ(In Hz) 49.9 49.7 49.5 49.3 49.1 48.9 48.7 0 10 20 30 40 50 60 70 80 90 100 Scroll % of Time Zoom
  • 7. Why Ancillary Services for India ? • Reliability , Security, stability and Power quality • Restructured Power Systems • Lack of adequate Primary, Secondary and Tertiary Response Lack of Adequate Reserves • Loose Power Pools • Absence of Tight Frequency Control 7
  • 8. Primary, Secondary and Tertiary Responses Primary Secondary Tertiary
  • 9. Targets • Harness Fragmented Generation at Optimum Cost • Availability of more peaking capacity • Opportunity for Generators – Help the grid – Monetary Incentive – Mitigate load shedding – Value of Lost Load • Relieve of congestion – (utilization of Kayamkulam despite congestion) • Renewable Generation - Handling Variation thereby facilitating integration Confidence to Pumped storage plants 9
  • 10. Kayamkulam Flowgate Limiting injection SR Import would relieve congestion Flowgate Limiting towards SR S1-S2 exchange import Kayamkulam Generation NLDC 10
  • 11. Classifications of Ancillary Services • Frequency Support Ancillary Services (FSAS) • Voltage Control Ancillary Service • Black Start Ancillary Service
  • 12. Section 27 (2) of the Electricity Act 2003 “Provided further that no Regional Load Despatch Centre shall engage in the business of generation of electricity or trading in electricity.” Role 􀁻 Despatch Decision 􀁻 Involvement in trading in electricity is avoided as Facilitation through power exchanges
  • 13. Section 28 (3) of the Electricity Act 2003 ‘The Regional Load Despatch Centre shall a) be responsible for optimum scheduling and despatch of electricity within the region in accordance with the contracts entered into with the licensees or the generating companies operating in the region. b) keep accounts of quantity of electricity transmitted through the regional grid.’
  • 14. Section 32 (2) of the Electricity Act 2003 ‘The State Load Despatch Centre shall a) be responsible for optimum scheduling and despatch of electricity within a State in accordance with the contracts entered into with the licensees or the generating companies operating in that State. b) .. c) keep accounts of quantity of electricity transmitted through the State grid.’
  • 15. Existing Mechanism for Energy Accounting • Energy accounting on 15-minute time block basis. • Three part tariff for both beneficiaries as well as generators • Three parts are : Generators Beneficiary (State) Capacity Charge Declared Capacity Capacity Share Energy Charge Scheduled Energy Schedule Drawal UI Charge Difference between Difference between Scheduled energy and Schedule drawal and Actual Generation actual drawal 15
  • 16. UI Mechanism • For deviation from scheduled generation/ Drawal • Monday to Sunday is the weekly accounting period • Inputs – DC, Scheduled Injection/ Drawal, Bilateral/ collective exchanges, Metered Energy, Frequency • Issued Weekly by RPCs • Physical account maintained by RLDCs • Interest on late payment of UI charges • Responsibility of the State/SLDC- Further apportioning/recovery of UI charges from the various Discoms and embedded customers in the State 16
  • 17. Unscheduled Interchange Curve 2000.00 UI Rate VS Frequency (w.e.f 17.09.2012) 1800.00 1800 (Payment Side) Paisa/KWH 1600.00 FREQ Normal Range(50.20 - 49.50 HZ) 1400.00 1200.00 900 49.50 1000.00 800.00 49.70 HZ 600.00 28.12 49.80 400.00 200.00 28.50 Paisa/0.02 50.00 HZ HZ 0.00 16.50 Paisa/0.02 49.72 50.04 49.00 49.04 49.08 49.12 49.16 49.20 49.24 49.28 49.32 49.36 49.40 49.44 49.48 49.52 49.56 49.60 49.64 49.68 49.76 49.80 49.84 49.88 49.92 49.96 50.00 50.08 50.12 50.16 50.20 50.24 50.28 HZ Frequency (HZ) 4/15/2013 POSOCO 17
  • 18. 2000 UI Charges ( payment side) UI Rate VS Frequency (w.e.f 17.09.2012) 1800 1800 (Payment Side) Paisa/KWH FREQ Normal Range(50.20 - 49.50 HZ) ADDL UI for OD (in the range < 49.70 HZ & < 49.50 HZ & < 49.20 HZ) 1600 ADDL UI for APM (in the range < 49.70 HZ & < 49.50 HZ) 100 % 49.20 ADDL UI for UI (in the range < 49.70 HZ & < 49.50 HZ & < 49.20 HZ) 1400 1260 Addl UI for O/D Paisa/KWH 49.50 HZ 1200 1080.00 40 % Paisa/KWH 20 % 1000 20 % 800 900 10 % 49.70 HZ 590.63 Paisa/KWH 590.10paise/kwh 28.12 600 49.80 400 505.80 463.65 28.50 Paisa/0.02 HZ 200 49.50 421.50 paise/kwh 50.00 HZ 16.50 0 Paisa/0.02 HZ 49.52 49.00 49.04 49.08 49.12 49.16 49.20 49.24 49.28 49.32 49.36 49.40 49.44 49.48 49.56 49.60 49.64 49.68 49.72 49.76 49.80 49.84 49.88 49.92 49.96 50.00 50.04 50.08 50.12 50.16 50.20 50.24 50.28 Frequency (HZ) 4/15/2013 POSOCO 18
  • 19. 1200 UI Charge receipt side UI Rate VS Frequency (w.e.f 17.09.2012) 1100 FREQ Normal Range 1000 900 Paisa/KWH (Infirm Liquid Fuel) Buyer/Bef UD>10 % of sch or 250 MW whichever is less & Seller/Gen >20 % of sch subject to 105 % of inst Cap in a 900 block or 101 % of Inst cap over a day APM for OG > 105% DC in a block or 101 % over Avg DC 800 49. 48 HZ 700 28.12 Paisa/0.02 600 49.80 HZ 28.50 Paisa/0.02 500 450 Paisa/KWH HZ 400 16.50 Paisa/0.02 421.50 Paisa/KWH 330 Paisa/KWHn (Infirm Imported Coal/RLNG) HZ 300 260 Paisa/KWH ( Infirm APM Gas as fuel) 49.80 HZ 49.82 HZ 200 165 paisa/KWH (Infirm Coal /Lignite/hydro) 50.00 HZ 100 0 49.32 49.36 49.00 49.04 49.08 49.12 49.16 49.20 49.24 49.28 49.40 49.44 49.48 49.52 49.56 49.60 49.64 49.68 49.72 49.76 49.80 49.84 49.88 49.92 49.96 50.00 50.04 50.08 50.12 50.16 50.20 50.24 50.28 Frequency (HZ) 4/15/2013 POSOCO 19
  • 20. Year-wise Status of UI Amount Billed
  • 21. Existing Settlement System RLDCs and SLDCs have a key role in the metering and settlement system • RLDCs at the regional level • SLDCs at the State level Objective of the settlement system is to determine Who bills whom for how much quantum of power and how much money?
  • 22. 10 MW TRADER 10 MW @ Rs. 2.00/ u @ Rs. 2.20/ u A B AGREEMENTS A ACTUAL FLOW B 8 MW 12 MW GRID
  • 23. TRADER Rs. 2.20/ u for Rs. 2.00/ u for 10 MW 10 MW PAYMENTS A B UI for 2 UI for 2 MW MW UI POOL A/C
  • 24. Interchange: Possible Combinations Scheduled-Scheduled Unscheduled-UnscheduledExisting SI UI Possible Combinations SI UI Scheduled-Unscheduled Interchange under FSAS UI SI NLDC 24
  • 25. FSAS • Focus – Stabilize the frequency by utilizing the left over fragmented generation capacity. • Umbrella (un-despatched generation) – Liquid fuel based – Diesel based – Merchant/ IPPs/ CPPs • Liquid fuel and diesel based capacity – The load serving utilities partially harnessing intra-state and inter-state sources. – Un-despatched capacity and need of load serving entities fragmented. – Such Generations commercially feasible, if UI rates are higher than their costs. 25
  • 26. Framework of FSAS • Facilitation of FSAS through Power Exchanges • New product for introducing FSAS • Separate category of user group – Seller registration for FSAS • Users to be Part of the existing settlement mechanism including deviations • Proper visibility with data, communication, telemetry • Standing clearance from concerned SLDC/RLDC 26
  • 27. Procedure • Competitive Bidding Process • Window to open after closure of Day Ahead Market – Sellers to bid in either of the exchanges – Declaration of supplier, bid area, quantum, duration, price • Adherence to the ‘anonymity philosophy • Sellers in DAM with un-cleared bids and other sellers with surplus/idle power can be the Prospective participants. 27
  • 28. Possible Opportunity for FSAS Ancillary Lost Sell Volume (Sell Bid-Unconstrained MCV) (Apr-12 to Mar-13) Volume in MWH
  • 29. • Compilation and Stacking of bids – For every time block of the next day – Stacking based on bid price • Overall optimization by stacking and despatch of bids on National basis
  • 30. Despatch under FSAS • Despatch in real time – System Conditions – Deficit anticipation by the system operator . • Lower limit in the IEGC frequency band ie 49.70 Hz as the threshold frequency. • System operator will trigger FSAS below threshold frequency. – Merit Order of bids • Despatch certainty of at least 12 time blocks (i.e 3 hours) to prevent frequent start-stop operation. 30
  • 31. • Backing down,subject to system conditions, during the said 12 time blocks, compensation to the extent of their fixed cost. • Despatch in case of Congestion – Pan India merit order may be discounted – TTC/ATC across Inter & Intra Regional to be honoured • Consent from seller to ascertain its readiness – Participants option to schedule in STOA continue.
  • 32. Scheduling & Accounting for FSAS • Scheduling to be routed through Power Exchanges similar to that of Day Ahead Market • PXs to reveal the injection point/ identity of the identified bidders. • Despatched bids: incorporated in schedule of Sellers • Unmatched one to one schedule 32
  • 33. • Despatched bid quantum attributed towards drawal of the POOL; a fictitious notional entity. • Drawees/ users of despatched power quantum to pay back for the service in the form of UI charges • Scheduling as per present practice on regional basis – By SLDCs for embedded players
  • 34. Integration of Settlement Mechanism with UI Mechanism Seller 1 Buyer 1 Buyer 2 Day ahead schedule (MW) 100 75 25 Schedule under FSAS (MW) 15 0 0 UI (MW) 5 12 8 Total (MW) 120 87 33 15 MW @ 12 MW @ UI rate FSAS clearing Buyer 1 rate UI POOL Seller 1 (Regional) 8 MW @ UI rate Buyer 2 5 MW @ UI rate 34
  • 35. Settlement under FSAS • Settlement Uniform pricing – As paid to the costliest generator who was called in last for that respective time block • Energy based settlement • Upper limit of CERC UI vector : ceiling price 35
  • 36. • Payment to sellers through power exchanges – Transfer of Funds from respective regional UI pool to exchanges next day . – Exchange to pay to the supplier of services same day • Scheduling , Transmission charges(PoC) and losses as applicable for STOA transactions
  • 37. Voltage Control Ancillary Service • VCAS to support & maintain voltage within the permissible limit. • Provision for Voltage control ancillary service embedded in IEGC. • Priced for regional entities except generating stations for Reactive Energy Exchange when voltages beyond 103% or 97%. • Cost of supplying reactive power – The capital cost of the equipment . • Generators – Reluctant to operate synchronous condenser mode Friction and windage losses. – Sometimes reduction in real-power production capability. • Participation in Voltage Control by Generators may be compensated through Ancillary Service.
  • 38. Black Start Ancillary Service • Black start – Process to recover or reenergize a system from total or partial failure • Generating units with black start facility – Certain identified units – Required for black start of an electrical power system – Should be able to start without external support • CEA (Technical Standards for Connectivity to the Grid) Regulations, 2007 – Clause 6(4) (c) “Participate in contingency operation such as load shedding, increasing or reducing generation, islanding, black start, providing start up power and restoration as per the procedure decided by appropriate Load Despatch Centre;”. • Mandatory service as of now
  • 39. • Startup supply requirement – 0.5% for hydro stations – 2% of the installed capacity for gas turbines • Expenditure associated with Black Start – capital cost of the equipment used to start the unit – cost of the operators – routine maintenance and testing cost – cost of fuel • Equipment cost recovered as fixed charges in generation tariff. • Units not reimbursed for the operating cost . • Need for Black Start as an Ancillary Service for voluntarily procurement from generating units.
  • 40.
  • 41.
  • 42. ALL INDIA WIND ENERGY GENERATION 250 225 2011-12: MAX-168 MU; MIN-7 MU; AVG-57 MU 200 2012-13: MAX-224 MU; MIN-9MU; AVG-81 MU 175 150 MU/DAY 125 100 75 50 25 0 01-Apr 01-May 31-May 30-Jun 30-Jul 29-Aug 28-Sep 28-Oct 27-Nov 27-Dec 26-Jan 25-Feb 26-Mar MONTH 2011-12 2012-13
  • 43. Wind Generation in Rajasthan from April'12 to Jan'13 1200 Apr-12 1050 May-12 Jun'12 900 Jun-12 750 Jul'12 Jul-12 May'12 Aug-12 600 MW Sep-12 Aug'12 450 Apr'12 Oct-12 300 Dec'12 Nov-12 Sep'12 150 Dec-12 Jan'13 Oct'12 Nov12 Jan-13 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 TIME
  • 44. Integration of Renewable Generation • Renewables 26.36 GW installed capacity targeted for 45 GW by 2015 (RPO target level of 10% Nationally). • Challenges for grid operators – Reliability top priority – Variability and uncertainty in aggregate electric demand . – Unit Commitment – Integration of intermittency nature of Renewable Generation – Frequency Control – Reactive Power Management – Physical constraints (i.e., available transmission) – Institutional constraints ( market structure) • FSAS to complement the diurnal changes in renewable generation. • FSAS to facilitate renewable integration by reducing the impact of their variation.
  • 45. Summary • Ancillary services separate from basic system services as such to be remunerated appropriately • Discovery of Information – Undespatched generation: Quantum & price – Spinning Reserves: quantum & price • Home Grown Solution • Competitive Bidding • Cost to customers – Imbalance price based on the prevailing UI vector • Merit Order Despatch – Overall Countrywide Optimization 45
  • 46. • Operational Flexibility for drawees • Generators -Respond to price signals -Incentive for response and helping the grid • UI and Ancillary – Two of the four pillars of market, Should co-exist • Reliance on FSAS as a routine practice to be avoided • Frequency Curve will get further smoothen with the availability of FSAS • Powerful signal for investment to Generators
  • 47. Pillars of Market Design Sally Hunt – ‘ Making Competition Work in Electricity’ 47
  • 48. Way Forward • Staff paper by CERC • National Diagolue • Capacity Building at SLDC • Procedure by Nodal Agency/NLDC • Implementation • Monitoring of actual delivery • Demand Response • NLDC/Nodal Agency indemnification.
  • 49.
  • 50. Evolution of Power Market in India Ancillary Market Transmission Pricing (PoC)2011 PX 2008 Open Access 2004 ABT 2002-03 IEGC Feb.’2000
  • 51. A Typical Dispatch Surpluses/Deficits - Balance supply and demand 36 Forecast Contingency Real-time 34 Day Ahead, UI PX 32 Buy Buy 00 MW 30 Sell Sell 28 26 ADVANCE SHORT TERM BILATERAL CONTRACTS 24 22 FIRM SHARES IN ISGS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Hours
  • 52. Pumped Storage Plants……. facilitation through FSAS • Nearly Rs. 2/kWh differential in peak and off peak prices of power • Increased standard of living……load curve with pronounced humps. • Higher level of pithead based coal generation……..lower off peak prices • Narrowing of frequency band would further increase the differential between peak and off peak prices in the market. • Absorbing large quantities of intermittent generation…..a major challenge……….pumped storage a beautiful complement