Tariff-based Competitive Bidding in the
Power Sector




Is it working or not?
Contents

• Overview of Competitive Bidding in India


• Concerns in Bidding Framework in Recent Times


• Aspects to be Reviewed




2   Deloitte
Overview of Competitive
Bidding



3
Electricity Act 2003 de-licensed the generation sector

Private Power Policy of 1991              Electricity Act 2003
• Under this policy CEA became pivotal • CEA approval for TEC for generation
  with its project appraisal role          projects was done away with but for
                                           large hydro projects
• CEA’s function was to evaluate PPA’s
  entered into by SEB’s, approve tariffs • Under EA 2003, as per Sec 82, setting
  and issue techno economic                up of state regulatory commissions is
  clearances (TEC)                         made mandatory and under Sec 86
                                           (b), Commissions are given authority
• CEA approval was a huge bottle neck
                                           to regulate power purchases
  for most of the projects
                                         • Section 63 of EA has revolutionized
                                           power purchase procedures and
                                           erstwhile MoU route with state
                                           utilities is no longer valid as a means
                                           of procurement


4
Guided by Section 63 of Electricity Act 2003, National Tariff Policy
mandates the utilities to procure power through competitive bidding route
Before 06 Jan 2006                                  After 06 Jan 2006
• Approval of PPA governed through                  • National Tariff Policy mandates that the
  individual State Regulatory Acts, which             power procurement for future
  was on a cost plus basis and offered a              requirements should be through a
  regulated return of only 14%                        transparent competitive bidding
                                                      mechanism
• There was lack of clarity on the basis for
  approval of PPA and the scope for                 • Process to be followed as per the
  negotiations on almost every cost item              guidelines issued by the Central
  resulted in long drawn processes                    Government
Clause 5.1 of tariff policy “Even for the Public    • Competitive bidding mechanism allows
Sector projects, tariff of all new generation and     for the bidder to bid on a competitive
transmission projects should be decided on the        return basis and the process is
basis of competitive bidding after a period of        transparent and time bound
five years or when the Regulatory Commission is
satisfied that the situation is ripe to introduce   • From 6th January 2011, all new public
such competition.”                                    sector projects also required to supply
                                                      through competitive bidding

5
Developers now have option to invest in mega power projects, facilitated
by Government, through a tariff based competitive bidding process
Power procurement under Case 2                                     Winning Bids for Ultra Mega Power Projects
• Central Government/State Government                      Project              Fuel
                                                                                           Tariff
                                                                                                       Winner
  facilitates these projects and the                                                       (Rs./kWh)
  procurers are the state utilities                        Sasan                Captive    1.19        Reliance
                                                           Tilaiya              Captive    1.77        Reliance
• location, technology and fuel is
                                                           Mundra               Imported   2.26        Tata
  specified by the procurer
                                                           Krishnapatnam        Imported   2.33        Reliance
• tariff (capacity and energy charges) for
  25 years to be quoted in the bid                           Winning Bids for state sponsored Case 2 projects
                                                                                           Tariff
     ‒ selection is based on lowest                        Project         State
                                                                                           (Rs./kWh)
                                                                                                       Winner
       levelized tariff                                    Jhajjar         Haryana         2.996       CLP
                                                           Talwandi
                                                                           Punjab          2.864       Sterlite
                                                           sabo
•   Bidders have bid higher for levelized fixed cost for
    linkage projects (state specific risks/ transaction                                    0.81 (35%
                                                           Bhaiyathan      Chhattisgarh                Indiabulls
    costs being factored into higher FC)                                                   merchant)
•   Reliance, Lanco, Tata Power, Sterlite, CLP etc.        Karchana        UP              2.97        JaiPrakash
    have all quoted FC in a narrow range on all other
    Projects – Key differentiator is Fuel Strategy!!!      Bara            UP              3.02        JaiPrakash

6
Independent Power Plants can tie up their capacities under long term
PPAs through a transparent tariff based competitive bidding process
Power procurement under Case 1                               Players participating in Case 1 bids
• State utilities are now mandated to             Developer                                                                                        Capacity bid*
                                                  Adani Power                                                                                              8500
  procure power through competitive               CLP                                                                                                      1150
  bidding process                                 Essar                                                                                                    4050
                                                  Indiabulls                                                                                               1200
    ‒ quantum is to be approved by the            JSW Energy                                                                                               1500
      Commission and bid process must be          Lanco                                                                                                    1500
      as per standard guidelines                  PTC + Players                                                                                            2200
                                                  Reliance Power                                                                                           5400
    ‒ tariff discovered to be adopted by          Tata                                                                                                       800
      regulator, subject to overall            4.50                            * Same plant may have been offered in different bids
                                               4.00
      reasonableness                           3.50
                                               3.00
• power can be sourced from any                2.50
                                               2.00
  developer                                    1.50
                                               1.00
    ‒ location, technology or fuel is          0.50
                                                 -




                                                                                                                                                              UP
                                                                                                                                       Karnataka




                                                                                                                                                                   AP
                                                                                                                                                    R-infra
                                                                                                                           Rajasthan
                                                       Gujarat




                                                                                                                 Gujarat
                                                                 Maharashtra




                                                                                           Maharashtra
                                                                                 Haryana




                                                                                                         Bihar
      specified by the procurer
• IPPs have an option to tie-up only part of
  their capacity                                      2007 2008 2008 2009 2010 2010 2010 2010 2011 2011 2011
7
More Peaking Case 1 bids are expected in future

• Traditional Case 1 bids were long term     State           Type      Capacity
  bids for base load for 25 years            Maharashtra     LT Base   4000
                                             Gujarat         LT Base   6000
• Gujarat and Haryana have called for fuel   Haryana         LT Base   2000
  based bids or restricting bids on non-     Bihar           LT Base   1500
  escalable basis
                                             Rajasthan       LT Base   1000
                                             Karnataka       LT Base   2000
• There have been many short term bids
  and some medium term bids.                 Torrent Power   MT Base   150
                                             R-infra         LT Base   1500

• Recently, some utilities have called for   R-infra         MT Base   450
  peaking medium term bids, but have not     R-infra         MT Peak   450
  got any participation.                     UP              LT Base   5000
                                             AP              LT Base   2500
• There is a gradual shift to tie up for     AP              MT Base   700
  peaking loads as base loads are expected   Tata Power      MT Base   200
  to be met by UMPP and state and central
                                             Tata Power      MT Peak   150
  additions.
8
Solar Generation - CERC Tariff Vs Bid Tariff


                                  CERC Tariff      Avg. Bid Tariff
                 20
                      17.91
                                            15.39                    15.39
                 16

                              12.16
                                                                             11.48
  Rs. Per Unit




                 12
                                                     8.77
                  8
                        32 %                       43%                 25 %
                      reduction                 reduction            reduction
                  4


                  0
                      SPV Batch-I           SPV Batch-II                 ST
Concerns with Bidding Process
Case 2 Bidding

Domestic Coal Based Projects – Captive Mine-based
• Coal reserve estimations were inadequate in all cases bid out
• As a result, infeasible / substantially larger coal mines allocated than
  required for Power Project, leading to allegations of misuse and profiteering

Linkage Based Projects
• Coal supply has varied significantly from assumptions at the stage of bidding
• Often ACQ is only at 50-60% of capacity, balance having to be procured from
  other sources

Imported Coal Based Projects
• Major regulatory changes in countries of import not recognised



 11
Case 1 Bidding

Linkage based Projects
• Earlier formulation did not permit blending – not aligned to current realities!
• Current formulation permits blending only as a fixed proportion
  ‒ this is a risk inappropriate for Sellers to bear
• Wide post-bid variations in fuel supply conditions for a Power Project makes
  a firm energy price bid impractical in current times




  In all cases, including UMPPs, the Central Government distances itself after
  projects are bid out.

  • Are State Utilities capable of effective post-award monitoring?
  • Weak monitoring will lead to private sector resorting to “managing” the
    environment post project awards.
 12
Reverse Bidding in Solar


• Are underlying factors driving price reductions (from Batch 1 to Batch 2)
  sustainable?
     ‒ Global oversupply in PV modules (particularly in thin-films), was a
      major contributor
     ‒ Solar Projects still unable to get non-recourse finance


• Is competitive bidding the right strategy for emerging technologies?
     ‒ Is it a wise strategy for solar thermal ?
     ‒ What happened to the demonstration projects under JNNSM?
     ‒ Does excessive focus on tariffs hold the danger of early failures, which
      could result in stakeholders confidence being set back by a few years ?



13
Aspects to be Reviewed
Way forward

1. Nothing wrong with basic framework of Competitive Bidding u/s 63.
     ‒ Only modifications required to make implications of fuel side
      contractual defaults by a Govt. Supplier (viz, CIL) to be passed-thru
2. Competitive Bidding in the Power Sector should not be confused with
   Licensing.
     ‒ The role of the Public Sector is crucial in both Case-2 and Case-1
      projects.
     ‒ Inadequately prepared projects will invariably create information
      asymmetries & competitive distortion.
3. Technologies which are not fully commercial require public sector to
   take a lead in on-field demonstration
     ‒ Uncertainties are too many to create true competition
     ‒ Need for high Technical Qual Req while selecting the Private Partner
     ‒ Focus on successful on-field demonstration first before expecting
      competitive tariffs.

15
Thank You




16

Más contenido relacionado

La actualidad más candente

Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchangesNageswar Rao
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorVijay Menghani
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsAmitava Nag
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...Amitava Nag
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in IndiaDaya Kherwar
 
POWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxPOWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxmohammedmarzook1
 
Electricity Markets and Principle Market Design Models
Electricity Markets and Principle Market Design ModelsElectricity Markets and Principle Market Design Models
Electricity Markets and Principle Market Design ModelsLeonardo ENERGY
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case studyWaseem Hashmat
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaAmitava Nag
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power marketKomal Nigam
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignLeonardo ENERGY
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)shyamies11
 

La actualidad más candente (20)

Indian electricity market and power exchanges
Indian electricity market and power exchangesIndian electricity market and power exchanges
Indian electricity market and power exchanges
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission ProjectsTariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
Tariff Based Competitive Bidding (TBCB) for Intra-State Transmission Projects
 
Open access ppt
Open access pptOpen access ppt
Open access ppt
 
From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...From centralised long-term planning to market-based access: Proposed change i...
From centralised long-term planning to market-based access: Proposed change i...
 
Open access
Open accessOpen access
Open access
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Indian Electricity Grid Code
Indian Electricity Grid CodeIndian Electricity Grid Code
Indian Electricity Grid Code
 
POWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptxPOWER PURCHASE AGREEMENT.pptx
POWER PURCHASE AGREEMENT.pptx
 
Electricity Markets and Principle Market Design Models
Electricity Markets and Principle Market Design ModelsElectricity Markets and Principle Market Design Models
Electricity Markets and Principle Market Design Models
 
DSM.pptx
DSM.pptxDSM.pptx
DSM.pptx
 
Electricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_newElectricity market 2030_presentation_long_new
Electricity market 2030_presentation_long_new
 
Availability based tariff
Availability based tariffAvailability based tariff
Availability based tariff
 
ABT a complete report and a case study
ABT a complete report and a case studyABT a complete report and a case study
ABT a complete report and a case study
 
Power Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in IndiaPower Grid's Inter-State transmission charges in India
Power Grid's Inter-State transmission charges in India
 
bidding strategies in indian restructured power market
bidding strategies in indian restructured power marketbidding strategies in indian restructured power market
bidding strategies in indian restructured power market
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Electricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market DesignElectricity Markets Regulation - Lesson 2 - Market Design
Electricity Markets Regulation - Lesson 2 - Market Design
 
Tariff determination for hydro power plant
Tariff determination for hydro power plantTariff determination for hydro power plant
Tariff determination for hydro power plant
 
ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)ABT-UI & Deviation Settlement Mechanism (DSM)
ABT-UI & Deviation Settlement Mechanism (DSM)
 

Destacado

Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?IPPAI
 
Tariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsTariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsAmitava Nag
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulationsNavajyoti Martha
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in IndiaIndian Energy Sector
 
Don't Start A Bidding War: Outmaneuver Your PPC Competitors
Don't Start A Bidding War: Outmaneuver Your PPC CompetitorsDon't Start A Bidding War: Outmaneuver Your PPC Competitors
Don't Start A Bidding War: Outmaneuver Your PPC CompetitorsClean Digital
 
Mcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujaMcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujamcci175
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGRAVI PAL SINGH
 
Effect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaEffect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaIPPAI
 
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2IPPAI
 
Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?IPPAI
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...Sakshi Saini
 
Financial & operational opportunities for disco ms under uday
Financial & operational opportunities for disco ms under udayFinancial & operational opportunities for disco ms under uday
Financial & operational opportunities for disco ms under udaySakshi Saini
 
Operational challenges in India's power sector
Operational challenges  in India's power sectorOperational challenges  in India's power sector
Operational challenges in India's power sectorpradhansushil
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reformsPSPCL
 
Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaIPPAI
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEAAshish Verma
 
Cutting Edge PPC Bidding Strategies You Should Be Using
Cutting Edge PPC Bidding Strategies You Should Be UsingCutting Edge PPC Bidding Strategies You Should Be Using
Cutting Edge PPC Bidding Strategies You Should Be UsingHanapin Marketing
 

Destacado (20)

Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?Competitive Bidding in the Power Sector : Is It Working?
Competitive Bidding in the Power Sector : Is It Working?
 
Tariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projectsTariff based competitive bidding for intra state trans. projects
Tariff based competitive bidding for intra state trans. projects
 
Multi year tariffs and regulations
Multi year tariffs and regulationsMulti year tariffs and regulations
Multi year tariffs and regulations
 
Power Transmission & Distribution in India
Power Transmission & Distribution in IndiaPower Transmission & Distribution in India
Power Transmission & Distribution in India
 
Don't Start A Bidding War: Outmaneuver Your PPC Competitors
Don't Start A Bidding War: Outmaneuver Your PPC CompetitorsDon't Start A Bidding War: Outmaneuver Your PPC Competitors
Don't Start A Bidding War: Outmaneuver Your PPC Competitors
 
Mcc tariff models dr harish ahuja
Mcc tariff models dr harish ahujaMcc tariff models dr harish ahuja
Mcc tariff models dr harish ahuja
 
COMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDINGCOMPETITIVE TARRIFF BIDDING
COMPETITIVE TARRIFF BIDDING
 
Effect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in IndiaEffect of Primary Fuels on the Availability and Cost of Power in India
Effect of Primary Fuels on the Availability and Cost of Power in India
 
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2Day-3, Mr. Ajay Kumar contract sanctity case 1  case 2
Day-3, Mr. Ajay Kumar contract sanctity case 1 case 2
 
Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?Competitive bidding in the Power Sector: Is it working or not?
Competitive bidding in the Power Sector: Is it working or not?
 
Power distribution tariff in india 2016 discom wise and consumer wise compre...
Power distribution tariff in india 2016  discom wise and consumer wise compre...Power distribution tariff in india 2016  discom wise and consumer wise compre...
Power distribution tariff in india 2016 discom wise and consumer wise compre...
 
Financial & operational opportunities for disco ms under uday
Financial & operational opportunities for disco ms under udayFinancial & operational opportunities for disco ms under uday
Financial & operational opportunities for disco ms under uday
 
Operational challenges in India's power sector
Operational challenges  in India's power sectorOperational challenges  in India's power sector
Operational challenges in India's power sector
 
Power sector reforms
Power sector reformsPower sector reforms
Power sector reforms
 
Uday Ujjwal
Uday UjjwalUday Ujjwal
Uday Ujjwal
 
Managing fuel supply & uncertainty in India
Managing fuel supply & uncertainty in IndiaManaging fuel supply & uncertainty in India
Managing fuel supply & uncertainty in India
 
Tariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEATariff and Duty of Electricity supply in various State of India-A review by CEA
Tariff and Duty of Electricity supply in various State of India-A review by CEA
 
Electricity policies
Electricity policiesElectricity policies
Electricity policies
 
Tarif based comp_bidding
Tarif based comp_biddingTarif based comp_bidding
Tarif based comp_bidding
 
Cutting Edge PPC Bidding Strategies You Should Be Using
Cutting Edge PPC Bidding Strategies You Should Be UsingCutting Edge PPC Bidding Strategies You Should Be Using
Cutting Edge PPC Bidding Strategies You Should Be Using
 

Similar a Tariff-based Competitive Bidding in the Power Sector

Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012rupeshsingh_1
 
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:Carolyn Elefant
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012rupeshsingh_1
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxmsounak95
 
Wind Force Newsletter Dec, Edition, 2011
Wind Force Newsletter   Dec, Edition, 2011Wind Force Newsletter   Dec, Edition, 2011
Wind Force Newsletter Dec, Edition, 2011rupeshsingh_1
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012rupeshsingh_1
 
Wind Force Newsletter Feb, Edition, 2012
Wind Force Newsletter   Feb, Edition, 2012Wind Force Newsletter   Feb, Edition, 2012
Wind Force Newsletter Feb, Edition, 2012rupeshsingh_1
 
Wind Force Newsletter Nov, Edition, 2011
Wind Force Newsletter   Nov, Edition, 2011Wind Force Newsletter   Nov, Edition, 2011
Wind Force Newsletter Nov, Edition, 2011rupeshsingh_1
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012rupeshsingh_1
 
Ewura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayEwura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayandrewmnzava
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC OfferingGCAdvisors
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camcocrifcambs
 
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...prashantkumarchinama
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010Ngy Ea
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALATahnoon Elahi
 
Day-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASDay-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASIPPAI
 

Similar a Tariff-based Competitive Bidding in the Power Sector (20)

Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
 
REC status
REC statusREC status
REC status
 
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
OREC Webinar: From Silicon Valley to Wall Street to Foggy Bottom:
 
Wind Force Newsletter January, Edition, 2012
Wind Force Newsletter   January, Edition, 2012Wind Force Newsletter   January, Edition, 2012
Wind Force Newsletter January, Edition, 2012
 
Introduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptxIntroduction to Virtual Power Purchase Agreement instruments.pptx
Introduction to Virtual Power Purchase Agreement instruments.pptx
 
Wind Force Newsletter Dec, Edition, 2011
Wind Force Newsletter   Dec, Edition, 2011Wind Force Newsletter   Dec, Edition, 2011
Wind Force Newsletter Dec, Edition, 2011
 
Wind Force Newsletter May, Edition, 2012
Wind Force Newsletter   May, Edition, 2012Wind Force Newsletter   May, Edition, 2012
Wind Force Newsletter May, Edition, 2012
 
Wind Force Newsletter Feb, Edition, 2012
Wind Force Newsletter   Feb, Edition, 2012Wind Force Newsletter   Feb, Edition, 2012
Wind Force Newsletter Feb, Edition, 2012
 
REC status
REC statusREC status
REC status
 
Wind Force Newsletter Nov, Edition, 2011
Wind Force Newsletter   Nov, Edition, 2011Wind Force Newsletter   Nov, Edition, 2011
Wind Force Newsletter Nov, Edition, 2011
 
Wind Force Newsletter September, Edition, 2012
Wind Force Newsletter   September, Edition, 2012Wind Force Newsletter   September, Edition, 2012
Wind Force Newsletter September, Edition, 2012
 
Tata power
Tata powerTata power
Tata power
 
Ewura presentation at the Renewable energy day
Ewura presentation at the Renewable energy dayEwura presentation at the Renewable energy day
Ewura presentation at the Renewable energy day
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC Offering
 
Political Economy of Energy Reforms
Political Economy of Energy ReformsPolitical Economy of Energy Reforms
Political Economy of Energy Reforms
 
CRIF Final Presentation, Camco
CRIF Final Presentation, CamcoCRIF Final Presentation, Camco
CRIF Final Presentation, Camco
 
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...
PES-Webinar-4-PPTs-Sreekumar-New_Challenges_in_Electricity_Distribution--22-M...
 
Vant hof 2010
Vant hof 2010Vant hof 2010
Vant hof 2010
 
200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA200 MW Solar Projects Investor's, Developer's Meet - KERALA
200 MW Solar Projects Investor's, Developer's Meet - KERALA
 
Day-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IASDay-3, Mr. Vimal Kirti Singh, IAS
Day-3, Mr. Vimal Kirti Singh, IAS
 

Más de IPPAI

The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsIPPAI
 
Standards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinStandards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinIPPAI
 
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar PillaiIPPAI
 
Smart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergSmart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergIPPAI
 
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...IPPAI
 
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonSmart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonIPPAI
 
Industry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIndustry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIPPAI
 
Future cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganFuture cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganIPPAI
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonIPPAI
 
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikSmart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikIPPAI
 
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...IPPAI
 
The Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryThe Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryIPPAI
 
From Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergFrom Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergIPPAI
 
INAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulINAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulIPPAI
 
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...IPPAI
 
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningSmart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningIPPAI
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...IPPAI
 
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...IPPAI
 
Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...IPPAI
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezIPPAI
 

Más de IPPAI (20)

The Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve KearnsThe Move Towards Sustainable Transport in London - Mr. Steve Kearns
The Move Towards Sustainable Transport in London - Mr. Steve Kearns
 
Standards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael MulquinStandards – building blocks of the Smart City - Michael Mulquin
Standards – building blocks of the Smart City - Michael Mulquin
 
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
21st Century Grids and India’s journey towards smarter grids - Reji Kumar Pillai
 
Smart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den BergSmart City Principles - Rogier van den Berg
Smart City Principles - Rogier van den Berg
 
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...TImportance of certification and standardization for Smart Cities - Mr. Raymo...
TImportance of certification and standardization for Smart Cities - Mr. Raymo...
 
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor GibsonSmart, Secure and Sustainable Cities India – Mr. Trevor Gibson
Smart, Secure and Sustainable Cities India – Mr. Trevor Gibson
 
Industry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik VigIndustry Qualifications India - Cdr(Retd.) Kartik Vig
Industry Qualifications India - Cdr(Retd.) Kartik Vig
 
Future cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy MulliganFuture cities catapult - Dr. Cathy Mulligan
Future cities catapult - Dr. Cathy Mulligan
 
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken DragoonCan the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
Can the dream of 100% renewable energy be a reality? - Mr. Ken Dragoon
 
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt PattanaikSmart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
Smart Cities, Smart Consequences? - Mr. Devdutt Pattanaik
 
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
From Islands to Cities – Applications for Smart Energy Storage - Dr. Wolfram ...
 
The Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet MistryThe Road to Smart Cities - Jeet Mistry
The Road to Smart Cities - Jeet Mistry
 
From Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard SchombergFrom Smart Grid to Smart Cities - Richard Schomberg
From Smart Grid to Smart Cities - Richard Schomberg
 
INAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry DhaulINAUGURAL ADDRESS - Mr. Harry Dhaul
INAUGURAL ADDRESS - Mr. Harry Dhaul
 
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...Future Cities:  Innovation, Investment and Transformation - Professor Sir Dav...
Future Cities: Innovation, Investment and Transformation - Professor Sir Dav...
 
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James DunningSmart Water and Waste Management for Smart Cities - Mr. James Dunning
Smart Water and Waste Management for Smart Cities - Mr. James Dunning
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
 
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
Eyewatch a versatile mobile platform for security and M-governance - Cdr (Ret...
 
Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...Importance of Innovation for Water and Water Management for Smart Cities - As...
Importance of Innovation for Water and Water Management for Smart Cities - As...
 
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum ParwezSmart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
Smart Water and Wastewater Management For Smart Cities - Mr. Anjum Parwez
 

Último

Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DaySri Ambati
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 

Último (20)

E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo DayH2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
H2O.ai CEO/Founder: Sri Ambati Keynote at Wells Fargo Day
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 

Tariff-based Competitive Bidding in the Power Sector

  • 1. Tariff-based Competitive Bidding in the Power Sector Is it working or not?
  • 2. Contents • Overview of Competitive Bidding in India • Concerns in Bidding Framework in Recent Times • Aspects to be Reviewed 2 Deloitte
  • 4. Electricity Act 2003 de-licensed the generation sector Private Power Policy of 1991 Electricity Act 2003 • Under this policy CEA became pivotal • CEA approval for TEC for generation with its project appraisal role projects was done away with but for large hydro projects • CEA’s function was to evaluate PPA’s entered into by SEB’s, approve tariffs • Under EA 2003, as per Sec 82, setting and issue techno economic up of state regulatory commissions is clearances (TEC) made mandatory and under Sec 86 (b), Commissions are given authority • CEA approval was a huge bottle neck to regulate power purchases for most of the projects • Section 63 of EA has revolutionized power purchase procedures and erstwhile MoU route with state utilities is no longer valid as a means of procurement 4
  • 5. Guided by Section 63 of Electricity Act 2003, National Tariff Policy mandates the utilities to procure power through competitive bidding route Before 06 Jan 2006 After 06 Jan 2006 • Approval of PPA governed through • National Tariff Policy mandates that the individual State Regulatory Acts, which power procurement for future was on a cost plus basis and offered a requirements should be through a regulated return of only 14% transparent competitive bidding mechanism • There was lack of clarity on the basis for approval of PPA and the scope for • Process to be followed as per the negotiations on almost every cost item guidelines issued by the Central resulted in long drawn processes Government Clause 5.1 of tariff policy “Even for the Public • Competitive bidding mechanism allows Sector projects, tariff of all new generation and for the bidder to bid on a competitive transmission projects should be decided on the return basis and the process is basis of competitive bidding after a period of transparent and time bound five years or when the Regulatory Commission is satisfied that the situation is ripe to introduce • From 6th January 2011, all new public such competition.” sector projects also required to supply through competitive bidding 5
  • 6. Developers now have option to invest in mega power projects, facilitated by Government, through a tariff based competitive bidding process Power procurement under Case 2 Winning Bids for Ultra Mega Power Projects • Central Government/State Government Project Fuel Tariff Winner facilitates these projects and the (Rs./kWh) procurers are the state utilities Sasan Captive 1.19 Reliance Tilaiya Captive 1.77 Reliance • location, technology and fuel is Mundra Imported 2.26 Tata specified by the procurer Krishnapatnam Imported 2.33 Reliance • tariff (capacity and energy charges) for 25 years to be quoted in the bid Winning Bids for state sponsored Case 2 projects Tariff ‒ selection is based on lowest Project State (Rs./kWh) Winner levelized tariff Jhajjar Haryana 2.996 CLP Talwandi Punjab 2.864 Sterlite sabo • Bidders have bid higher for levelized fixed cost for linkage projects (state specific risks/ transaction 0.81 (35% Bhaiyathan Chhattisgarh Indiabulls costs being factored into higher FC) merchant) • Reliance, Lanco, Tata Power, Sterlite, CLP etc. Karchana UP 2.97 JaiPrakash have all quoted FC in a narrow range on all other Projects – Key differentiator is Fuel Strategy!!! Bara UP 3.02 JaiPrakash 6
  • 7. Independent Power Plants can tie up their capacities under long term PPAs through a transparent tariff based competitive bidding process Power procurement under Case 1 Players participating in Case 1 bids • State utilities are now mandated to Developer Capacity bid* Adani Power 8500 procure power through competitive CLP 1150 bidding process Essar 4050 Indiabulls 1200 ‒ quantum is to be approved by the JSW Energy 1500 Commission and bid process must be Lanco 1500 as per standard guidelines PTC + Players 2200 Reliance Power 5400 ‒ tariff discovered to be adopted by Tata 800 regulator, subject to overall 4.50 * Same plant may have been offered in different bids 4.00 reasonableness 3.50 3.00 • power can be sourced from any 2.50 2.00 developer 1.50 1.00 ‒ location, technology or fuel is 0.50 - UP Karnataka AP R-infra Rajasthan Gujarat Gujarat Maharashtra Maharashtra Haryana Bihar specified by the procurer • IPPs have an option to tie-up only part of their capacity 2007 2008 2008 2009 2010 2010 2010 2010 2011 2011 2011 7
  • 8. More Peaking Case 1 bids are expected in future • Traditional Case 1 bids were long term State Type Capacity bids for base load for 25 years Maharashtra LT Base 4000 Gujarat LT Base 6000 • Gujarat and Haryana have called for fuel Haryana LT Base 2000 based bids or restricting bids on non- Bihar LT Base 1500 escalable basis Rajasthan LT Base 1000 Karnataka LT Base 2000 • There have been many short term bids and some medium term bids. Torrent Power MT Base 150 R-infra LT Base 1500 • Recently, some utilities have called for R-infra MT Base 450 peaking medium term bids, but have not R-infra MT Peak 450 got any participation. UP LT Base 5000 AP LT Base 2500 • There is a gradual shift to tie up for AP MT Base 700 peaking loads as base loads are expected Tata Power MT Base 200 to be met by UMPP and state and central Tata Power MT Peak 150 additions. 8
  • 9. Solar Generation - CERC Tariff Vs Bid Tariff CERC Tariff Avg. Bid Tariff 20 17.91 15.39 15.39 16 12.16 11.48 Rs. Per Unit 12 8.77 8 32 % 43% 25 % reduction reduction reduction 4 0 SPV Batch-I SPV Batch-II ST
  • 11. Case 2 Bidding Domestic Coal Based Projects – Captive Mine-based • Coal reserve estimations were inadequate in all cases bid out • As a result, infeasible / substantially larger coal mines allocated than required for Power Project, leading to allegations of misuse and profiteering Linkage Based Projects • Coal supply has varied significantly from assumptions at the stage of bidding • Often ACQ is only at 50-60% of capacity, balance having to be procured from other sources Imported Coal Based Projects • Major regulatory changes in countries of import not recognised 11
  • 12. Case 1 Bidding Linkage based Projects • Earlier formulation did not permit blending – not aligned to current realities! • Current formulation permits blending only as a fixed proportion ‒ this is a risk inappropriate for Sellers to bear • Wide post-bid variations in fuel supply conditions for a Power Project makes a firm energy price bid impractical in current times In all cases, including UMPPs, the Central Government distances itself after projects are bid out. • Are State Utilities capable of effective post-award monitoring? • Weak monitoring will lead to private sector resorting to “managing” the environment post project awards. 12
  • 13. Reverse Bidding in Solar • Are underlying factors driving price reductions (from Batch 1 to Batch 2) sustainable? ‒ Global oversupply in PV modules (particularly in thin-films), was a major contributor ‒ Solar Projects still unable to get non-recourse finance • Is competitive bidding the right strategy for emerging technologies? ‒ Is it a wise strategy for solar thermal ? ‒ What happened to the demonstration projects under JNNSM? ‒ Does excessive focus on tariffs hold the danger of early failures, which could result in stakeholders confidence being set back by a few years ? 13
  • 14. Aspects to be Reviewed
  • 15. Way forward 1. Nothing wrong with basic framework of Competitive Bidding u/s 63. ‒ Only modifications required to make implications of fuel side contractual defaults by a Govt. Supplier (viz, CIL) to be passed-thru 2. Competitive Bidding in the Power Sector should not be confused with Licensing. ‒ The role of the Public Sector is crucial in both Case-2 and Case-1 projects. ‒ Inadequately prepared projects will invariably create information asymmetries & competitive distortion. 3. Technologies which are not fully commercial require public sector to take a lead in on-field demonstration ‒ Uncertainties are too many to create true competition ‒ Need for high Technical Qual Req while selecting the Private Partner ‒ Focus on successful on-field demonstration first before expecting competitive tariffs. 15