The Effective Management of Time Patrick Weaver  PMP Mosaic Project Services Pty Ltd 17 th  August 2010 The most comprehensive Oracle applications & technology content under one roof
Outline ,[object Object],[object Object],[object Object],[object Object],[object Object]
Time is not money! ,[object Object],[object Object],[object Object],[object Object],[object Object]
The state of play ,[object Object],[object Object],[object Object],[object Object]
Time -v- Money ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Burj Khalifa  -v-  Empire State Building 102 Floors built in 410 days  The steel frame rose at the rate of four and a half floors per week Empire State Bldg.   completed in 1931 Burj Khalifa   Dubai   208 floors in 5+ years
Burj Khalifa  -v-  Empire State Building If the Burj Khalifa in Dubai had been built at the same speed as the Empire State Building it would have opened two years earlier!   The steel frame rose at the rate of four and a half floors per week Empire State Bldg.   completed in 1931 Burj Khalifa   Dubai   208 floors in 5+ years
Time -v- Money ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Skills and Knowledge ,[object Object],[object Object],[object Object],[object Object],[object Object]
Skills and Knowledge ,[object Object],[object Object],[object Object],[object Object],[object Object]
Planning -v- Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Project Planning ,[object Object],[object Object],[object Object]
Project Planning ,[object Object],[object Object]
Project Scheduling ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Designing the schedule ,[object Object],[object Object],[object Object],[object Object]
Designing the schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],See: Core Papers @  http://www.mosaicprojects.com.au/Planning.html
Designing the schedule ,[object Object],Figure © Guide to Good Practice in the Management of Time in Complex Projects
Developing the schedule ,[object Object],[object Object],[object Object]
Developing the schedule ,[object Object],[object Object],[object Object],[object Object]
Schedule Density   Activities are progressively  expanded to greater levels of ‘density’ as more information becomes available Unless the work is designed in its entirety and all subcontractors and specialists appointed before any work commences, it is impossible to plan the work in its entirety, in detail at the beginning of a project. Figures © Guide to Good Practice in the Management of Time in Complex Projects
Schedule Density   Low-density is appropriate for work, which is intended to take place 12 months, or more in the future.  Tasks may be several months in duration Medium density is appropriate for work, which is intended to take place between 3 and 9 months after the schedule date. At this stage the work should be designed in sufficient detail to be allocated to contractors, or subcontractors.  Task durations should not exceed 2 months.
Schedule Density   High-density scheduling is an essential prerequisite for undertaking work. The schedule is prepared with the people doing the work. Task durations should be no more than the update cycle  As the density is increased, adjustments to the plan take into account actual performance to date, resources, work content, and other factors necessary to achieve the overall schedule objectives.
Schedule Density The activity coding structure (ID) maps high to medium to low density
Sensible Activities ,[object Object],[object Object],[object Object],[object Object],[object Object],Personal preference – ALL constraints are placed on Milestones
Activity Identification ,[object Object],[object Object],[object Object],[object Object]
Attributes of a ‘Good Activity’ ,[object Object],[object Object],[object Object],[object Object]
Estimate Activity Durations ,[object Object],[object Object],[object Object],[object Object]
Estimate Activity Durations ,[object Object],[object Object],[object Object],[object Object],See: The Cost of Time (Durations)-  www.mosaicprojects.com.au/Resources_Papers_009.html
Developing the schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],See: Links, Lags & Ladders -  www.mosaicprojects.com.au/Planning.html#Core_Papers
Links Cause Problems ,[object Object],[object Object],[object Object],Task A - 10 Days Work Task C - 12 Days Work SS +4 SS +1 FF +3 Task B - 3 Days Intermittent Work
Links Cause Problems ,[object Object],Task A - 10 Days Work Task C - 12 Days Work SS +1 Task B - 3 Days Work FF +1 Task A - 10 Days Work Task C - 12 Days Work SS +1 Task B - 6 Days Work FF +1 Typical software solution Increasing the duration of ‘critical’ Task B reduces the overall duration of the work! A strange result……
Maintaining the Schedule ,[object Object],[object Object],[object Object],[object Object],[object Object]
Maintaining the Schedule ,[object Object],[object Object],[object Object],[object Object],See: Managing for Success - The power of regular updates-  www.mosaicprojects.com.au/Resources_Papers_002.html
Reporting Options ,[object Object],[object Object],See: Seeing the Road Ahead - the challenge of communicating schedule data  http://www.mosaicprojects.com.au/Resources_Papers_106.html
Reporting Options Data is not information, information is not knowledge, knowledge is not understanding, understanding is not wisdom.  Clifford Stoll See:  Beyond Reporting - The Communication Strategy  http://www.mosaicprojects.com.au/Resources_Papers_094.html
The Guide  – future developments ,[object Object],[object Object]
The Guide ,[object Object],[object Object],[object Object]
Qualification Framework ,[object Object],[object Object],[object Object],[object Object]
Education Framework ,[object Object],[object Object],[object Object],[object Object]
New Developments ,[object Object],[object Object],[object Object],[object Object],[object Object]
Educational Framework ,[object Object],[object Object],[object Object],[object Object]
Conclusion ,[object Object],[object Object],[object Object],[object Object]
Conclusion ,[object Object],[object Object],[object Object],[object Object],Useful schedule are useful because they are used!
Discussion ,[object Object],[object Object],[object Object],[object Object]
Tell us what you think… ,[object Object],[object Object]

Más contenido relacionado

Más de InSync Conference

IBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution CentreIBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution CentreInSync Conference
 
In Sync Running Apps On Oracle
In Sync  Running Apps On OracleIn Sync  Running Apps On Oracle
In Sync Running Apps On OracleInSync Conference
 
Oracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD EdwardsOracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD EdwardsInSync Conference
 
In sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-finalIn sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-finalInSync Conference
 
In sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-finalIn sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-finalInSync Conference
 
Optim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentationOptim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentationInSync Conference
 
Nswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer PresentationNswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer PresentationInSync Conference
 
Insync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed AnnouncementInsync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed AnnouncementInSync Conference
 
InSync10 Implement JDE Financial Analytics and Make Better Decisions
InSync10  Implement JDE Financial Analytics and Make Better DecisionsInSync10  Implement JDE Financial Analytics and Make Better Decisions
InSync10 Implement JDE Financial Analytics and Make Better DecisionsInSync Conference
 
Ebs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementationEbs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementationInSync Conference
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...InSync Conference
 
More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...InSync Conference
 

Más de InSync Conference (20)

IBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution CentreIBM and Oracle Joint Solution Centre
IBM and Oracle Joint Solution Centre
 
In Sync Running Apps On Oracle
In Sync  Running Apps On OracleIn Sync  Running Apps On Oracle
In Sync Running Apps On Oracle
 
P6 r8
P6 r8P6 r8
P6 r8
 
P6 analytics
P6 analyticsP6 analytics
P6 analytics
 
Upk presentation insync
Upk presentation insync Upk presentation insync
Upk presentation insync
 
Oracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD EdwardsOracle Fusion Middleware for JD Edwards
Oracle Fusion Middleware for JD Edwards
 
In sync10 grc_suite
In sync10 grc_suiteIn sync10 grc_suite
In sync10 grc_suite
 
In sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-finalIn sync10 cliffgodwin-ebs-final
In sync10 cliffgodwin-ebs-final
 
In sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-finalIn sync10 cliffgodwin-appskeynote-final
In sync10 cliffgodwin-appskeynote-final
 
Mnod linsync10 oba
Mnod linsync10 obaMnod linsync10 oba
Mnod linsync10 oba
 
D linsync10 ofa5yrs
D linsync10 ofa5yrsD linsync10 ofa5yrs
D linsync10 ofa5yrs
 
D linsync10 fusaapps
D linsync10 fusaappsD linsync10 fusaapps
D linsync10 fusaapps
 
Optim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentationOptim Insync10 Paul Griffin presentation
Optim Insync10 Paul Griffin presentation
 
Nswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer PresentationNswh Insync 2010 Ammar Customer Presentation
Nswh Insync 2010 Ammar Customer Presentation
 
Insync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed AnnouncementInsync10 IBM JDE Sol Ed Announcement
Insync10 IBM JDE Sol Ed Announcement
 
InSync10 Implement JDE Financial Analytics and Make Better Decisions
InSync10  Implement JDE Financial Analytics and Make Better DecisionsInSync10  Implement JDE Financial Analytics and Make Better Decisions
InSync10 Implement JDE Financial Analytics and Make Better Decisions
 
Life after upgrading to r12
Life after upgrading to r12Life after upgrading to r12
Life after upgrading to r12
 
Ebs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementationEbs operational reporting at santos evaluation, selection & implementation
Ebs operational reporting at santos evaluation, selection & implementation
 
Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...Santos change management utility, our alternative to application change manag...
Santos change management utility, our alternative to application change manag...
 
More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...More effective and more flexible security to lower your total cost of ownersh...
More effective and more flexible security to lower your total cost of ownersh...
 

Management of time_-_P_Weaver

  • 1. The Effective Management of Time Patrick Weaver PMP Mosaic Project Services Pty Ltd 17 th August 2010 The most comprehensive Oracle applications & technology content under one roof
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. Burj Khalifa -v- Empire State Building 102 Floors built in 410 days The steel frame rose at the rate of four and a half floors per week Empire State Bldg. completed in 1931 Burj Khalifa Dubai 208 floors in 5+ years
  • 7. Burj Khalifa -v- Empire State Building If the Burj Khalifa in Dubai had been built at the same speed as the Empire State Building it would have opened two years earlier! The steel frame rose at the rate of four and a half floors per week Empire State Bldg. completed in 1931 Burj Khalifa Dubai 208 floors in 5+ years
  • 8.
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. Schedule Density Activities are progressively expanded to greater levels of ‘density’ as more information becomes available Unless the work is designed in its entirety and all subcontractors and specialists appointed before any work commences, it is impossible to plan the work in its entirety, in detail at the beginning of a project. Figures © Guide to Good Practice in the Management of Time in Complex Projects
  • 21. Schedule Density Low-density is appropriate for work, which is intended to take place 12 months, or more in the future. Tasks may be several months in duration Medium density is appropriate for work, which is intended to take place between 3 and 9 months after the schedule date. At this stage the work should be designed in sufficient detail to be allocated to contractors, or subcontractors. Task durations should not exceed 2 months.
  • 22. Schedule Density High-density scheduling is an essential prerequisite for undertaking work. The schedule is prepared with the people doing the work. Task durations should be no more than the update cycle As the density is increased, adjustments to the plan take into account actual performance to date, resources, work content, and other factors necessary to achieve the overall schedule objectives.
  • 23. Schedule Density The activity coding structure (ID) maps high to medium to low density
  • 24.
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. Reporting Options Data is not information, information is not knowledge, knowledge is not understanding, understanding is not wisdom. Clifford Stoll See: Beyond Reporting - The Communication Strategy http://www.mosaicprojects.com.au/Resources_Papers_094.html
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.