SlideShare una empresa de Scribd logo
1 de 4
IRSHADALI IFTEKHAR ATTAR
E-mail: irshadali3j90@gmail.com
Mobile: (+91) 9090960221
Looking for a position in reputed organization to Contribute my subject knowledge, communication and
technical skills and interest for the benefit of Organization.
⇒ A result oriented professional with 2 years 9 months of experience in Radio Network
Optimization, drive test and Transmission (Optical fiber) in Telecom sector.
⇒ Capabilities in planning, managing and executing projects for start-ups, developing technical
resources, hardware.
⇒ Adept in managing service functions & streamlining the working Standards Operating System
for enhanced operational effectiveness.
⇒ An effective communicator with excellent relationship management skills and strong analytical,
leadership, decision-making, problem solving & organizational abilities.
Current Organization : Huawei Telecommunication Ltd.
Period : Since 5 Dec 2015
Synopsis : Currently working as Radio network optimization Engineer On GI Staffing payroll.
⇒ KPI’s (key performance indicator) Daily monitoring KPI’s analysis and optimization of LTE
Network
⇒ Perform OSS KPI for cluster, Daily dashboard KPI from iManager U200
⇒ Run new LTE site RF scripts viz. CSFB script, IRAT script, Neighbor addition for intra and external
cells and maintain Rf parameter
⇒ Neighbor script preparation by using U-Net
⇒ Maintaining and updating KPI dashboard, project weekly report, Cluster Report
⇒ New LTE sites RF data planning like PCI, Prach, site ID, CI, CGI, ECI by using tools like U-Net.
⇒ Drive test Log file analysis by using Genex Probe to find out the issue and optimize its parameter
accordingly on U2000 and doing Physical optimization to resolve coverage related issue.
⇒ SCFT report & Cluster report making by using Genex Assistance
⇒ Perform link budget ,design criteria, CW and Model Tuning.
Tools Used : iManager U2000, Genex Probe, Genex Assitant, FMA, OMstar, Atoll, U-Net,
SONMaster, Google Earth, QXDM.
Current Organization : LinkQuest Telecom Ltd.
Period : 18 Feb 2015– 30 Nov 2015
Synopsis : Currently working as DT & RF Engineer in Ericsson On LinkQuest Telecom payroll.
⇒ Evaluating quality of service parameters/ KPI’s (key performance indicator) Daily monitoring KPI’s
analysis and optimization of 2G
* Worst cell analysis and neighbor addition
*Hands on experience on WinFIOL Command Tool, Network Analysis tool
Citrix client application and MapInfo.
⇒ Finding out Pilot Pollution and removed by doing some Physical Optimization.
⇒ Log File Analysis and Generate all Plot with the Help of Mapinfo.
⇒ Studying log files and analyzing reasons for poor RSCP, low Ec/No value, call drops, SHO & IRAT
HO failures & detecting sectors-swap with the help of sector PSC.
Page 1
Career Objective
Organizational Details
⇒ Analysis of drive test data & solutions to problems including drop calls, frequency interference,
IRAT handovers etc.
⇒ Recommend appropriate solutions to meet the agreed KPI thresholds.
⇒ Post Processing Tool TEMS Route Analysis.
⇒ SCFT: HSDPA and HSUPA testing, Latency testing, RSCP testing, Ec/No testing, Soft, Softer and
Hard handover testing.
⇒ Analyze drive test logfiles, identify coverage and quality issue.
⇒ 3G drive , SWAP Rectification.
⇒ VSWR checking and resolving by taking corrective action.
⇒ To check proper signal, swap of sector, handover from BTS to BTS. Identify interference and other
critical performance issues in the network and recommend appropriate solution.
⇒ Escalating automation related site wise issue to respective help desk team for solution of SCFT
report generation issues.
⇒ Maintaining and updating daily trackers (issue tracker/Analyze tracker/filed attempts tracker).
⇒ Optimization.
⇒ Done 3G SCFT on U900 & U2100 and report preparation.
⇒ Sector edition on sites.
⇒ Cluster Drive with Two MS for short and long call.
⇒ Drive testing 3G (WCDMA) including HSDPA, HSUPA, Ping test and R99 test.
⇒ Analysis of Drive test data and solution to problems including drop calls, frequency interference,
inadequate handover etc.
⇒ Pre-Post drive test Schema Frequency Download & on TSTP project.
⇒ Major Highway & Railway drive test & analysis.
⇒ Drive test for BSC, MSC, XCDR & for LAC RAC changes.
Tools Used : TEMS 16.3, MapInfo 11.5, Compas, Tilt Meter, GPS, W995 sony erricsom mobile
Ericsson tools- Citrix ICA Client, WinFIOL 7.0, Mycomm
Organization : Alcatel-Lucent Managed Solution Pvt. Ltd (DAKC NOC Mumbai): Reliance Project
Period : 17 Aug 2014 – 10 Feb 2015
Synopsis : The project was executed with the following responsibilities:
⇒ To troubleshoot SDH circuits ranging from E1 to STM-64 band width on OSS.
⇒ To configure SDH equipments ranging from STM-1 to STM-16 in terms of synchronization,
Provisioning and management.
⇒ Responsible for transmission network performance management, optimization as per Network
Growth for Optical Transport.
⇒ Operational knowledge of the FIBCOM, Marconi and Nortel transmission equipment.
⇒ Software utilities used are Clarity OSS, Preside Manager and ALUMS web portal.
⇒ Making fault ticket for SDH and DWDM .
Alaarm Monitoring: To manage Pan India Network of reliance Communication,
monitor alarms (both GSM & CDMA) of different vendor like Lucent, Huawei,ZTE,
Responsible for O&M of BTS, BSC system for the entire CDMA and GSM network
and taking action to rectify the same
Ticket Generation: Intial fault clearance activities, creation of Trouble Tickets and
its Rectification, assignment to the circle team. Rectifying network related faults
of reliance GSM and CDMA.
Rectification:Check site status(BSC sites – BTS ) and give information to field
employees about the sites.
Daily Shift Report: Take daily shift report and update tickets according to status
of sites &report to team lead about all ticket count.
Page 2
Organization : TDS Pvt Ltd.
Period : 3 Aug 2013 – 14 Aug 2014
Synopsis : The project was executed with the following responsibilities:
⇒ To check proper signal, handover from BTS to BTS.
⇒ 2G drive and 3G drive.
⇒ 3G Single Cell Function Test(SCFT).
⇒ Cluster drive.
⇒ To check whether neighbor is defined on site or not.
⇒ Finding weak coverage Zone and reasons for call drop by analyzing log file.
⇒ Optimization.
⇒ Sector edition on sites.
⇒ Benchmark Drive (comparison drive of about four operator for both 2G and 3G) for data
throughput, Rx level, Rx Quality, RSCP, Ecno.
Tools Used : TEMS 10, MapInfo 8, GPS , Tilt meter & Compass.
Degree/ Academic University
Month & Year of
Passing
Percentage Class
B.E.(E&TC) Univ. Of Pune July 2013 60.26 First Class
12th
(H.S.C)
State Board
Pune
Feb 2009 67.50 First Class
10th
(S.S.C)
State Board
pune
March 2006 46.80 Second Class
• Certification On C programming from NIIT with 76%.
• Certification in C ++ programming from NIIT with 78%.
S. No. Name of the Project Institute Project Guide Technology
01
Colour Sorting Machine Using LDR
[B.E. Project]
S.V.I.T, Nashik Bhalerao A. S. Automation And
Control
02
Cell Phone Detector
[T.E. Sem II]
S.V.I.T, Nashik Patil U.V. Radio Wave
Detection
03
Hart Beat Meter
[S.E. Sem II]
S.V.I.T, Nashik Kale A. Piezoelectric Effect
 Telecommunication
 Network Engineering
Page 3
Area of Interest
Academic Qualification
Projects Done
Certification
 Ability to build customer relationships.
 Strong written and verbal communications.
 Fast learner and Hard Worker.
 Willing to work efficiently and effectively.
Full Name : Attar Irshadali Iftekhar
Father’s name : Iftekhar Masud Attar
Current Address : Plot N0-133, Shree Vihar, Near Indian Oil, Patia square, Bhubaneshwar-751024
Date of Birth : 03-07-1990
Gender : Male
Marital Status : Single
Nationality : Indian
Hobbies : Playing Chess, Watching movies and Surfing net
I hereby declare that the above information given is true and correct to the best of my knowledge.
Place : Bhubaneshwar,Odisha, India
Date : 16 / 05 /2016 (Irshadali Iiftekhar Attar)
Page 4
Personal Skills
Personal Profile
Declaration

Más contenido relacionado

La actualidad más candente (20)

SKK RESUME (1)
SKK RESUME (1)SKK RESUME (1)
SKK RESUME (1)
 
Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016Pradeep Jain-Resume-2016
Pradeep Jain-Resume-2016
 
Akash Tandon - Resume
Akash Tandon - ResumeAkash Tandon - Resume
Akash Tandon - Resume
 
Bhawesh Resume(1)
Bhawesh Resume(1)Bhawesh Resume(1)
Bhawesh Resume(1)
 
sahil_resume
sahil_resumesahil_resume
sahil_resume
 
Above 4 Year Experience in telecommunication as RF Engineer
Above 4 Year Experience in telecommunication as RF EngineerAbove 4 Year Experience in telecommunication as RF Engineer
Above 4 Year Experience in telecommunication as RF Engineer
 
Sumeet (Resume)
Sumeet (Resume)Sumeet (Resume)
Sumeet (Resume)
 
Birendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_ResumeBirendra -Kumar-Yadav_Resume
Birendra -Kumar-Yadav_Resume
 
aniruddh khare resume (1)
aniruddh khare resume (1)aniruddh khare resume (1)
aniruddh khare resume (1)
 
Nilesh rai
Nilesh raiNilesh rai
Nilesh rai
 
sks
skssks
sks
 
Resume_Vaibhav Singh
Resume_Vaibhav SinghResume_Vaibhav Singh
Resume_Vaibhav Singh
 
Harshit Sengar Resume
Harshit Sengar Resume Harshit Sengar Resume
Harshit Sengar Resume
 
Harshit resume
Harshit resumeHarshit resume
Harshit resume
 
shajeer cv
shajeer cvshajeer cv
shajeer cv
 
Muhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTEMuhammad Jebran_RF Consultant_2G_3G_LTE
Muhammad Jebran_RF Consultant_2G_3G_LTE
 
CHANDER PRAKASH
CHANDER PRAKASHCHANDER PRAKASH
CHANDER PRAKASH
 
Niraj (RF)
Niraj (RF)Niraj (RF)
Niraj (RF)
 
TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016TUSHAR_SRIVASTAVA_April_2016
TUSHAR_SRIVASTAVA_April_2016
 
CV_Satbir
CV_SatbirCV_Satbir
CV_Satbir
 

Destacado

Aplikom06 math cad_statistik
Aplikom06 math cad_statistikAplikom06 math cad_statistik
Aplikom06 math cad_statistikArif Rahman
 
Pitch Deck Presentation
Pitch Deck PresentationPitch Deck Presentation
Pitch Deck PresentationNick Roberts
 
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...Theodore Hester
 
Christian Havens OHSA regulations report
Christian Havens OHSA regulations reportChristian Havens OHSA regulations report
Christian Havens OHSA regulations reportChristian Havens
 
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016Fondazione Matera-Basilicata 2019
 
Katja Friedrich
Katja FriedrichKatja Friedrich
Katja Friedrichmymobileeu
 
Summer internship on sales promotion
Summer internship on sales promotionSummer internship on sales promotion
Summer internship on sales promotionDheeraj Sharma Sharma
 
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...Diego Guzmán
 
L 02-bangladesh-geographical & environmental settings
L 02-bangladesh-geographical & environmental settingsL 02-bangladesh-geographical & environmental settings
L 02-bangladesh-geographical & environmental settingsEqbal Hassan Leeion
 
Luis castillo alcaldia de baruta
Luis castillo alcaldia de barutaLuis castillo alcaldia de baruta
Luis castillo alcaldia de barutaLuis Jose Castillo
 

Destacado (18)

BMW trip
BMW tripBMW trip
BMW trip
 
Aplikom06 math cad_statistik
Aplikom06 math cad_statistikAplikom06 math cad_statistik
Aplikom06 math cad_statistik
 
MART - www.martgeldi.com - Hizmetlerimiz
MART - www.martgeldi.com - HizmetlerimizMART - www.martgeldi.com - Hizmetlerimiz
MART - www.martgeldi.com - Hizmetlerimiz
 
Pitch Deck Presentation
Pitch Deck PresentationPitch Deck Presentation
Pitch Deck Presentation
 
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...
FZ4003 - Masters Dissertation - Synthesis of 4-(4-Alkylphenyl) and 4-(4-Alkyl...
 
SOMOS DON BOSCO
SOMOS DON BOSCOSOMOS DON BOSCO
SOMOS DON BOSCO
 
Christian Havens OHSA regulations report
Christian Havens OHSA regulations reportChristian Havens OHSA regulations report
Christian Havens OHSA regulations report
 
Arun
ArunArun
Arun
 
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016
Iker Tolosa (donostia 2016) presentation - build up 28-29 giugno 2016
 
Katja Friedrich
Katja FriedrichKatja Friedrich
Katja Friedrich
 
Forties Hospital
Forties HospitalForties Hospital
Forties Hospital
 
Scatter-Gather
Scatter-GatherScatter-Gather
Scatter-Gather
 
E-work ppt
E-work pptE-work ppt
E-work ppt
 
Summer internship on sales promotion
Summer internship on sales promotionSummer internship on sales promotion
Summer internship on sales promotion
 
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...
[GuzmánDiego] Informe Práctica 3 - Destilación simple, fraccionada y con arra...
 
L 02-bangladesh-geographical & environmental settings
L 02-bangladesh-geographical & environmental settingsL 02-bangladesh-geographical & environmental settings
L 02-bangladesh-geographical & environmental settings
 
Gavin Farrarl&d
Gavin Farrarl&dGavin Farrarl&d
Gavin Farrarl&d
 
Luis castillo alcaldia de baruta
Luis castillo alcaldia de barutaLuis castillo alcaldia de baruta
Luis castillo alcaldia de baruta
 

Similar a irshadali_CV

Similar a irshadali_CV (20)

Inaku Patrick Jones Cv
Inaku Patrick Jones CvInaku Patrick Jones Cv
Inaku Patrick Jones Cv
 
Nitesh_CV
Nitesh_CVNitesh_CV
Nitesh_CV
 
Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17Atul Gupta_CV_13 feb'17
Atul Gupta_CV_13 feb'17
 
NeerajKumarGupta_CV
NeerajKumarGupta_CVNeerajKumarGupta_CV
NeerajKumarGupta_CV
 
Resume_Srinivas
Resume_SrinivasResume_Srinivas
Resume_Srinivas
 
Ankit Tomar_Resume
Ankit Tomar_ResumeAnkit Tomar_Resume
Ankit Tomar_Resume
 
Resume_Ajith
Resume_AjithResume_Ajith
Resume_Ajith
 
Musahid Resume
Musahid ResumeMusahid Resume
Musahid Resume
 
Resume Alok
Resume AlokResume Alok
Resume Alok
 
Lakshman Resume 3 years experience
Lakshman Resume 3 years experienceLakshman Resume 3 years experience
Lakshman Resume 3 years experience
 
SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016SK_RF ENGR@NETKOM 2016
SK_RF ENGR@NETKOM 2016
 
Rahul kumar_2016
Rahul kumar_2016Rahul kumar_2016
Rahul kumar_2016
 
Devender Kumar_CV
Devender Kumar_CVDevender Kumar_CV
Devender Kumar_CV
 
RF_Govind_Dolare_CV
RF_Govind_Dolare_CVRF_Govind_Dolare_CV
RF_Govind_Dolare_CV
 
Satisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 yearSatisha Kumar_RF Engg(3G)_3.6 year
Satisha Kumar_RF Engg(3G)_3.6 year
 
Pankaj Patel Resume
Pankaj Patel  ResumePankaj Patel  Resume
Pankaj Patel Resume
 
Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016Mohit Kapoor resume March 2016
Mohit Kapoor resume March 2016
 
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrsCV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
CV_Nitin Awasthi_Sr. RF Engineer_6.7 yrs
 
Sagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization EngineerSagar Kuchekar_LTE_RF_Optimization Engineer
Sagar Kuchekar_LTE_RF_Optimization Engineer
 
Resume
ResumeResume
Resume
 

irshadali_CV

  • 1. IRSHADALI IFTEKHAR ATTAR E-mail: irshadali3j90@gmail.com Mobile: (+91) 9090960221 Looking for a position in reputed organization to Contribute my subject knowledge, communication and technical skills and interest for the benefit of Organization. ⇒ A result oriented professional with 2 years 9 months of experience in Radio Network Optimization, drive test and Transmission (Optical fiber) in Telecom sector. ⇒ Capabilities in planning, managing and executing projects for start-ups, developing technical resources, hardware. ⇒ Adept in managing service functions & streamlining the working Standards Operating System for enhanced operational effectiveness. ⇒ An effective communicator with excellent relationship management skills and strong analytical, leadership, decision-making, problem solving & organizational abilities. Current Organization : Huawei Telecommunication Ltd. Period : Since 5 Dec 2015 Synopsis : Currently working as Radio network optimization Engineer On GI Staffing payroll. ⇒ KPI’s (key performance indicator) Daily monitoring KPI’s analysis and optimization of LTE Network ⇒ Perform OSS KPI for cluster, Daily dashboard KPI from iManager U200 ⇒ Run new LTE site RF scripts viz. CSFB script, IRAT script, Neighbor addition for intra and external cells and maintain Rf parameter ⇒ Neighbor script preparation by using U-Net ⇒ Maintaining and updating KPI dashboard, project weekly report, Cluster Report ⇒ New LTE sites RF data planning like PCI, Prach, site ID, CI, CGI, ECI by using tools like U-Net. ⇒ Drive test Log file analysis by using Genex Probe to find out the issue and optimize its parameter accordingly on U2000 and doing Physical optimization to resolve coverage related issue. ⇒ SCFT report & Cluster report making by using Genex Assistance ⇒ Perform link budget ,design criteria, CW and Model Tuning. Tools Used : iManager U2000, Genex Probe, Genex Assitant, FMA, OMstar, Atoll, U-Net, SONMaster, Google Earth, QXDM. Current Organization : LinkQuest Telecom Ltd. Period : 18 Feb 2015– 30 Nov 2015 Synopsis : Currently working as DT & RF Engineer in Ericsson On LinkQuest Telecom payroll. ⇒ Evaluating quality of service parameters/ KPI’s (key performance indicator) Daily monitoring KPI’s analysis and optimization of 2G * Worst cell analysis and neighbor addition *Hands on experience on WinFIOL Command Tool, Network Analysis tool Citrix client application and MapInfo. ⇒ Finding out Pilot Pollution and removed by doing some Physical Optimization. ⇒ Log File Analysis and Generate all Plot with the Help of Mapinfo. ⇒ Studying log files and analyzing reasons for poor RSCP, low Ec/No value, call drops, SHO & IRAT HO failures & detecting sectors-swap with the help of sector PSC. Page 1 Career Objective Organizational Details
  • 2. ⇒ Analysis of drive test data & solutions to problems including drop calls, frequency interference, IRAT handovers etc. ⇒ Recommend appropriate solutions to meet the agreed KPI thresholds. ⇒ Post Processing Tool TEMS Route Analysis. ⇒ SCFT: HSDPA and HSUPA testing, Latency testing, RSCP testing, Ec/No testing, Soft, Softer and Hard handover testing. ⇒ Analyze drive test logfiles, identify coverage and quality issue. ⇒ 3G drive , SWAP Rectification. ⇒ VSWR checking and resolving by taking corrective action. ⇒ To check proper signal, swap of sector, handover from BTS to BTS. Identify interference and other critical performance issues in the network and recommend appropriate solution. ⇒ Escalating automation related site wise issue to respective help desk team for solution of SCFT report generation issues. ⇒ Maintaining and updating daily trackers (issue tracker/Analyze tracker/filed attempts tracker). ⇒ Optimization. ⇒ Done 3G SCFT on U900 & U2100 and report preparation. ⇒ Sector edition on sites. ⇒ Cluster Drive with Two MS for short and long call. ⇒ Drive testing 3G (WCDMA) including HSDPA, HSUPA, Ping test and R99 test. ⇒ Analysis of Drive test data and solution to problems including drop calls, frequency interference, inadequate handover etc. ⇒ Pre-Post drive test Schema Frequency Download & on TSTP project. ⇒ Major Highway & Railway drive test & analysis. ⇒ Drive test for BSC, MSC, XCDR & for LAC RAC changes. Tools Used : TEMS 16.3, MapInfo 11.5, Compas, Tilt Meter, GPS, W995 sony erricsom mobile Ericsson tools- Citrix ICA Client, WinFIOL 7.0, Mycomm Organization : Alcatel-Lucent Managed Solution Pvt. Ltd (DAKC NOC Mumbai): Reliance Project Period : 17 Aug 2014 – 10 Feb 2015 Synopsis : The project was executed with the following responsibilities: ⇒ To troubleshoot SDH circuits ranging from E1 to STM-64 band width on OSS. ⇒ To configure SDH equipments ranging from STM-1 to STM-16 in terms of synchronization, Provisioning and management. ⇒ Responsible for transmission network performance management, optimization as per Network Growth for Optical Transport. ⇒ Operational knowledge of the FIBCOM, Marconi and Nortel transmission equipment. ⇒ Software utilities used are Clarity OSS, Preside Manager and ALUMS web portal. ⇒ Making fault ticket for SDH and DWDM . Alaarm Monitoring: To manage Pan India Network of reliance Communication, monitor alarms (both GSM & CDMA) of different vendor like Lucent, Huawei,ZTE, Responsible for O&M of BTS, BSC system for the entire CDMA and GSM network and taking action to rectify the same Ticket Generation: Intial fault clearance activities, creation of Trouble Tickets and its Rectification, assignment to the circle team. Rectifying network related faults of reliance GSM and CDMA. Rectification:Check site status(BSC sites – BTS ) and give information to field employees about the sites. Daily Shift Report: Take daily shift report and update tickets according to status of sites &report to team lead about all ticket count. Page 2
  • 3. Organization : TDS Pvt Ltd. Period : 3 Aug 2013 – 14 Aug 2014 Synopsis : The project was executed with the following responsibilities: ⇒ To check proper signal, handover from BTS to BTS. ⇒ 2G drive and 3G drive. ⇒ 3G Single Cell Function Test(SCFT). ⇒ Cluster drive. ⇒ To check whether neighbor is defined on site or not. ⇒ Finding weak coverage Zone and reasons for call drop by analyzing log file. ⇒ Optimization. ⇒ Sector edition on sites. ⇒ Benchmark Drive (comparison drive of about four operator for both 2G and 3G) for data throughput, Rx level, Rx Quality, RSCP, Ecno. Tools Used : TEMS 10, MapInfo 8, GPS , Tilt meter & Compass. Degree/ Academic University Month & Year of Passing Percentage Class B.E.(E&TC) Univ. Of Pune July 2013 60.26 First Class 12th (H.S.C) State Board Pune Feb 2009 67.50 First Class 10th (S.S.C) State Board pune March 2006 46.80 Second Class • Certification On C programming from NIIT with 76%. • Certification in C ++ programming from NIIT with 78%. S. No. Name of the Project Institute Project Guide Technology 01 Colour Sorting Machine Using LDR [B.E. Project] S.V.I.T, Nashik Bhalerao A. S. Automation And Control 02 Cell Phone Detector [T.E. Sem II] S.V.I.T, Nashik Patil U.V. Radio Wave Detection 03 Hart Beat Meter [S.E. Sem II] S.V.I.T, Nashik Kale A. Piezoelectric Effect  Telecommunication  Network Engineering Page 3 Area of Interest Academic Qualification Projects Done Certification
  • 4.  Ability to build customer relationships.  Strong written and verbal communications.  Fast learner and Hard Worker.  Willing to work efficiently and effectively. Full Name : Attar Irshadali Iftekhar Father’s name : Iftekhar Masud Attar Current Address : Plot N0-133, Shree Vihar, Near Indian Oil, Patia square, Bhubaneshwar-751024 Date of Birth : 03-07-1990 Gender : Male Marital Status : Single Nationality : Indian Hobbies : Playing Chess, Watching movies and Surfing net I hereby declare that the above information given is true and correct to the best of my knowledge. Place : Bhubaneshwar,Odisha, India Date : 16 / 05 /2016 (Irshadali Iiftekhar Attar) Page 4 Personal Skills Personal Profile Declaration