SlideShare una empresa de Scribd logo
1 de 16
“Power Your Business through
implementing lean Tenants”
Krishnamurty VG Pammi
IVY Comp etch Private Limited
Hyderabad India
Context
No

Program

Areas that
Revenue Duration needed
Attention

Sustenance Engineering - Test the
Compatibility of 2000 selected
1
50 Million 3 years
Application suit on Pre-released
and Released Operating systems

Development and Maintenance of
Telecom Apps (DNS and DHCP
2
4.5 Million 3 years
services for IPv4 and IPv6
networks)

3 Evangelize pre-released products
Yukon (SQL Server 2005) –
Whidbey (Visual Studio 2005) and
Long Horn server (Business Layer) 1 Million

1.5 Years

Lean Tenants Applied

- Value Stream Mapping Method
- Dependency Structure Matrix
- Work Load Levelling (through Complexity
Analysis, Resource Profiling
Work Load Levelling)
- 5S (Sort, Straighten, Shine, Standardize and
Sustain)
- Single Minute Exchange of Dies (Test
Automation)
- Time To Market is - Value Stream Mapping Method
more
- Visual Control Boards
- Low Quality
- Work Allocation
- Customer
- Dependency Matrix Structure
Involvement
- 5 Why
- Long Cycle Service
Requests with AS-is
Process
(Clarifications,
Scope Increase, low - Value Stream Mapping Methods
end user touch
- Visual Control Boards
time)
- Concurrent Engineering
- Long Cycle
Regression Window
- Less productivity
- Ineffective Work
Allocation Process
- Long Setup
Stabilization Time

Lean
Benefits

20%

16%

13%
Context…
No

Program

Areas that
Revenue Duration needed
Attention

Sustenance Engineering - Support a
47.5
4 Pharmaceutical Company's IT
Million
Division

3 years

Development of Scan, Sync and
Setup tools that replaces CD based
5 software updating procedure and 0.5 Million 1 Year
testing the same on Localized
languages

Lean Tenants Applied

-Value Stream Mapping Methods of top 20%
Incident generation Modules
-Team unable To
Work Load Levelling (through Complexity
meet Service Levels
Analysis, Resource Profiling
during Transition
Work Load Levelling)
Visual Boards

'-Ineffective
Collaboration
- Respond To
Change was Poor

Concurrent Engineering
Visual Control Boards

Lean
Benefits

11%

12%
Business Levers…

Value Driven Development - Establish common understanding about the
value we create for customer across the performing team
Continuous Stakeholder involvement - Enable Early Feedback through
continuous integration and short cycle iterations
Rolling Waving Planning – A Framework that helps us address requirement
ambiguities
“Right Person for the Right Task” – Establish an efficient work allocation
process.
Business Levers…

“No Compromise on Quality” through set of handy standards and guidelines
Empowering individuals at the front-line, thereby motivating them
Incorporating continuous improvement mindset. Looking at the ways to
decrease the possible Waste in this process.
Visual Controls – Establish framework to help detect early warnings
Practical Insights….
Goal – “Sustainable shortest lead time, best quality and value (to people and
society), most customer delight, lowest cost, high morale, safety”.

Respect For
the People

Create process flow to surface problems
Use pull systems to avoid overproduction
Level out the workload
Stop when there is a quality problem
Standardize tasks for continuous
improvement
Use visual control so no problems are hidden
Use only reliable, thoroughly tested
technology

Continuous
Improvement

Go-See
Kaizen
5 Whys

Learn to see the “whole” – Adapt “Kaizen” mindset
(each individual employee is given the opportunity to find problems in his own way
of working, to solve them and to make improvements.)
Experiments with Lean
Tenants
No

Focus Area

1

Understand Customer definition of
Value &
Connect Customer Value to single
piece flow

2

3

4

5

Lean Tenants
A) Value Stream Mapping Method
B) Takt Time

A) Design Structure Matrix
Work Allocation Process
B) Work Load Leveling
C) Value Stream Mapping Method
Optimize Test Setup
A) 5S
Media Management
B) Pull
App Library Issues
C) SMED
D) Visual Controls
E) Concurrent Engineering
F) 5 WHY
A) Visual Controls
B) 5 WHY
C) Visual Controls
Continuous Improvements/Efficiencies
D) Automation
E) Concurrent Engineering
F) Value Stream Mapping Method
Capacity Utilization
A) Work Load Levelling
1. Value Stream Mapping

Flow – Value Stream Mapping methods
helps us optimize as a whole
Everybody understands what customer
expects and corresponding acceptance
criteria
Expose hidden Bottlenecks in the flow Brings good information as to what is
really going on in the field
Team will arrive at common point of
thinking
Team Bonding because of transparent
communication and collocation
Productivity Improvement and cycle Time
Reduction
Team is now open for new ideas.
2. Design Structure Matrix
R1

R3

R4

Benefits
Lets you analyze the dependencies among
the requirements

R2

Helps you identify Cyclic Dependencies
Take preventive actions

Requirement

R3 R1 R2 R4

Independent

R3

X

Coupled

R1

1

X

1

Coupled

R2

1

1

X

Dependent

R4

1

1

X
3. Level the workload
Establish efficient Work Allocation process through
application of lean tenants
“Takt Time” [ No. of Features/ Unit Time]
“Design Structure Matrix”,
“Work load levelling”.
DSM Analysis

Complexity
Analysis

Work Allocation
Resource
Profiling
4. Concurrent Engineering
5 Core Principles of Concurrent Engineering
 High value features first
 Multiple phases with smaller release cycles
 Detailed planning (DSM)

 Early Feedback through continuous
integration and short cycle iterations

 Elaborative approach – set based thinking
 Design alternatives
 Rapid Prototyping

 Implement quickly
 Reuse of prototypes
 Early completion with additional headcount

 Integrated Review with Coding – pair
programming
 Delay decisions as late as possible
 Phase concurrency between development &
 Push features requiring clarity to later
test
releases

When Requirements keep changing, Concurrent Engineering
helps planning iterative releases taking Customer, Team into
confidence.
5.Continous Improvement

Single Minute
Exchange of Die
Automation
Usage of Out of Box
Tools like Medusa etc.
5S

ID

Task

1

Select configuration

1.1

Chassis options

1.2

Modem options

1.3

Traffic generator options

1.4

Optional components

2

Schedule resources

3

Shelf assembly

3.1

Collect components

3.2

Seat cards

3.3

Interconnect

4

Download package

5

Initialize setup

ON

OFF
6. Improve Quality Through

“Go and See Yourself”,
“5 whys”
“Standardize the procedures”
7. Visual Controls
Bug Trend (Bug Created Vs Bug Resolved)
Bug Count

20
18
16
14
12
10
8
6
4
2
0

14- 15- 16- 17- 18- 21- 22- 23- 24- 25- 28- 29- 30- 3114511/6/ 11/7/ 11/8/
Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Nov- Nov- Nov2013 2013 2013
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
13
Created #

0

6

3

3

2

4

9

6

6

9

9

11

1

13

3

5

6

4

4

11

Resolved #

0

8

5

3

2

3

7

13

18

5

2

10

1

0

5

4

18

6

3

6

#QA Verified + Closed

0

2

6

11

0

12

12

4

16

1

13

3

0

3

1

2

1

2

8

5
Lean – Accelerator our business:

It helped us focus on creating value to
customers – Thus, we achieved high
customer satisfaction
It helped us establish Handy and Flexible
practices
It empowered individuals at front line and
thus achieved high motivation levels
Team inculcated “Continuous mind-set”
Financial benefits we are able to power up
ATH2013-Krishnamurty Pammi- Power your business through implementing Lean

Más contenido relacionado

La actualidad más candente

Software Rollout
Software RolloutSoftware Rollout
Software Rollout
colmbennett
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
Steven Bonacorsi
 
Business process modelling
Business process modellingBusiness process modelling
Business process modelling
Kiito25
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
Irfan Rasheed Rana
 

La actualidad más candente (20)

Designing a to be process
Designing a to be processDesigning a to be process
Designing a to be process
 
Software Rollout
Software RolloutSoftware Rollout
Software Rollout
 
The Power of Business Process Improvement
The Power of Business Process ImprovementThe Power of Business Process Improvement
The Power of Business Process Improvement
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Introduction to Six Sigma
Introduction to Six Sigma Introduction to Six Sigma
Introduction to Six Sigma
 
Erp Implementation Project Planning
Erp Implementation Project PlanningErp Implementation Project Planning
Erp Implementation Project Planning
 
Overview of Rational Services Offerings
Overview of Rational Services OfferingsOverview of Rational Services Offerings
Overview of Rational Services Offerings
 
Business process modelling
Business process modellingBusiness process modelling
Business process modelling
 
Enterprise system implementation strategies and phases
Enterprise system implementation strategies and phasesEnterprise system implementation strategies and phases
Enterprise system implementation strategies and phases
 
Agile Project Management for PMP's
Agile Project Management for PMP'sAgile Project Management for PMP's
Agile Project Management for PMP's
 
White Belt DMAIC Project Line G MTTR
White Belt DMAIC Project Line G  MTTRWhite Belt DMAIC Project Line G  MTTR
White Belt DMAIC Project Line G MTTR
 
Business process management case studies
Business process management case studiesBusiness process management case studies
Business process management case studies
 
The Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six SigmaThe Quality Standard: ISO 9000 , CMM and Six Sigma
The Quality Standard: ISO 9000 , CMM and Six Sigma
 
Architecture Series 5-4 Solution Architecture Draft
Architecture Series 5-4   Solution Architecture   DraftArchitecture Series 5-4   Solution Architecture   Draft
Architecture Series 5-4 Solution Architecture Draft
 
Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)Lean six sigma - Waste elimination (Yellow Belt)
Lean six sigma - Waste elimination (Yellow Belt)
 
Protorative Methodology
Protorative MethodologyProtorative Methodology
Protorative Methodology
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
BPR OR Business Process Re-engineering
BPR OR Business Process Re-engineeringBPR OR Business Process Re-engineering
BPR OR Business Process Re-engineering
 

Similar a ATH2013-Krishnamurty Pammi- Power your business through implementing Lean

Similar a ATH2013-Krishnamurty Pammi- Power your business through implementing Lean (20)

Quantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROIQuantifying DevOps Adoption Empirically for Demonstrable ROI
Quantifying DevOps Adoption Empirically for Demonstrable ROI
 
DevOps Approach (Point of View by Ravi Tadwalkar)
DevOps Approach (Point of View by Ravi Tadwalkar)DevOps Approach (Point of View by Ravi Tadwalkar)
DevOps Approach (Point of View by Ravi Tadwalkar)
 
Isec
IsecIsec
Isec
 
Enterprise Agile - Hybrid of Methods
Enterprise Agile - Hybrid of MethodsEnterprise Agile - Hybrid of Methods
Enterprise Agile - Hybrid of Methods
 
The Devops Handbook
The Devops HandbookThe Devops Handbook
The Devops Handbook
 
Ncerc rlmca202 adm m4 ssm
Ncerc rlmca202 adm m4 ssmNcerc rlmca202 adm m4 ssm
Ncerc rlmca202 adm m4 ssm
 
Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?Software Development Lifecycle: What works for you?
Software Development Lifecycle: What works for you?
 
Lect-4: Software Development Life Cycle Model - SPM
Lect-4: Software Development Life Cycle Model - SPMLect-4: Software Development Life Cycle Model - SPM
Lect-4: Software Development Life Cycle Model - SPM
 
Software Engineering (An Agile View of Process)
Software Engineering (An Agile View of Process)Software Engineering (An Agile View of Process)
Software Engineering (An Agile View of Process)
 
Agile Transformation
Agile TransformationAgile Transformation
Agile Transformation
 
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
Thomas Axen - Lean Kaizen Applied To Software Testing - EuroSTAR 2010
 
Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)Software Development Life Cycle (SDLC)
Software Development Life Cycle (SDLC)
 
System Development Life Cycle (SDLC) - Part II
System Development Life Cycle (SDLC) - Part IISystem Development Life Cycle (SDLC) - Part II
System Development Life Cycle (SDLC) - Part II
 
LKIN17: Enabling Enterprise Agility though a Hybrid Agile Implementation Mode...
LKIN17: Enabling Enterprise Agility though a Hybrid Agile Implementation Mode...LKIN17: Enabling Enterprise Agility though a Hybrid Agile Implementation Mode...
LKIN17: Enabling Enterprise Agility though a Hybrid Agile Implementation Mode...
 
Lean Kanban India 2017 | Case study - Hybrid Agile Implementation Model to En...
Lean Kanban India 2017 | Case study - Hybrid Agile Implementation Model to En...Lean Kanban India 2017 | Case study - Hybrid Agile Implementation Model to En...
Lean Kanban India 2017 | Case study - Hybrid Agile Implementation Model to En...
 
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
VMworld 2013: Moving Enterprise Application Dev/Test to VMware’s Internal Pri...
 
Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)Top Business Benefits of Application Lifecycle Management (ALM)
Top Business Benefits of Application Lifecycle Management (ALM)
 
Software Development Life Cycle Part II
Software Development Life Cycle Part IISoftware Development Life Cycle Part II
Software Development Life Cycle Part II
 
DevOps 101
DevOps 101DevOps 101
DevOps 101
 
Devops transformation in the Rational Collaborative Lifecycle Organization
Devops transformation in the Rational Collaborative Lifecycle OrganizationDevops transformation in the Rational Collaborative Lifecycle Organization
Devops transformation in the Rational Collaborative Lifecycle Organization
 

Más de India Scrum Enthusiasts Community

Más de India Scrum Enthusiasts Community (20)

Deciphering Agile Big Data
Deciphering Agile Big DataDeciphering Agile Big Data
Deciphering Agile Big Data
 
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
“How We Learnt to Stop Worrying and Live with Uncertainty” – Case Studies fro...
 
Rubber Meets the Road
Rubber Meets the RoadRubber Meets the Road
Rubber Meets the Road
 
Can Agile Enthusiasm See The Organization Through?
Can Agile Enthusiasm See The Organization Through?Can Agile Enthusiasm See The Organization Through?
Can Agile Enthusiasm See The Organization Through?
 
Agile​ ​HR​ ​From​ ​the​ ​trenches
Agile​ ​HR​ ​From​ ​the​ ​trenchesAgile​ ​HR​ ​From​ ​the​ ​trenches
Agile​ ​HR​ ​From​ ​the​ ​trenches
 
Evolutionary Change
Evolutionary ChangeEvolutionary Change
Evolutionary Change
 
Software 4.0 : “How” of Building Software Driven Business
Software 4.0 : “How” of Building Software Driven BusinessSoftware 4.0 : “How” of Building Software Driven Business
Software 4.0 : “How” of Building Software Driven Business
 
Agile Digital Architecture
Agile Digital ArchitectureAgile Digital Architecture
Agile Digital Architecture
 
Governance mechanism to further business agility
Governance mechanism to further business agilityGovernance mechanism to further business agility
Governance mechanism to further business agility
 
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
Opening the Mainframe world to Mobile Ecosystem in a seamless and beneficial ...
 
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
Workplace Happiness - Is Business Agility Taking us Towards Happy Workplaces?
 
Wave 2 of Agile: Agile Leadership Redefined
Wave 2 of Agile: Agile Leadership RedefinedWave 2 of Agile: Agile Leadership Redefined
Wave 2 of Agile: Agile Leadership Redefined
 
Agile Engineering Environment – 2017
Agile Engineering Environment – 2017Agile Engineering Environment – 2017
Agile Engineering Environment – 2017
 
Management for Agility and Outcomes
Management for Agility and OutcomesManagement for Agility and Outcomes
Management for Agility and Outcomes
 
Agile Mindset Shifting: Agile For All
Agile Mindset Shifting: Agile For AllAgile Mindset Shifting: Agile For All
Agile Mindset Shifting: Agile For All
 
Agile Engineering Environment – 2017
Agile Engineering Environment – 2017Agile Engineering Environment – 2017
Agile Engineering Environment – 2017
 
Wave 2 of Agile: Agile Leadership Redefined
Wave 2 of Agile: Agile Leadership RedefinedWave 2 of Agile: Agile Leadership Redefined
Wave 2 of Agile: Agile Leadership Redefined
 
Five (Oops!) Six Mistakes You are Making as a Leader
Five (Oops!) Six Mistakes You are Making as a LeaderFive (Oops!) Six Mistakes You are Making as a Leader
Five (Oops!) Six Mistakes You are Making as a Leader
 
Empower the Forbidden Power Players
Empower the Forbidden Power PlayersEmpower the Forbidden Power Players
Empower the Forbidden Power Players
 
Agility in Education System for Digital India
Agility in Education System for Digital IndiaAgility in Education System for Digital India
Agility in Education System for Digital India
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 

ATH2013-Krishnamurty Pammi- Power your business through implementing Lean

  • 1. “Power Your Business through implementing lean Tenants” Krishnamurty VG Pammi IVY Comp etch Private Limited Hyderabad India
  • 2. Context No Program Areas that Revenue Duration needed Attention Sustenance Engineering - Test the Compatibility of 2000 selected 1 50 Million 3 years Application suit on Pre-released and Released Operating systems Development and Maintenance of Telecom Apps (DNS and DHCP 2 4.5 Million 3 years services for IPv4 and IPv6 networks) 3 Evangelize pre-released products Yukon (SQL Server 2005) – Whidbey (Visual Studio 2005) and Long Horn server (Business Layer) 1 Million 1.5 Years Lean Tenants Applied - Value Stream Mapping Method - Dependency Structure Matrix - Work Load Levelling (through Complexity Analysis, Resource Profiling Work Load Levelling) - 5S (Sort, Straighten, Shine, Standardize and Sustain) - Single Minute Exchange of Dies (Test Automation) - Time To Market is - Value Stream Mapping Method more - Visual Control Boards - Low Quality - Work Allocation - Customer - Dependency Matrix Structure Involvement - 5 Why - Long Cycle Service Requests with AS-is Process (Clarifications, Scope Increase, low - Value Stream Mapping Methods end user touch - Visual Control Boards time) - Concurrent Engineering - Long Cycle Regression Window - Less productivity - Ineffective Work Allocation Process - Long Setup Stabilization Time Lean Benefits 20% 16% 13%
  • 3. Context… No Program Areas that Revenue Duration needed Attention Sustenance Engineering - Support a 47.5 4 Pharmaceutical Company's IT Million Division 3 years Development of Scan, Sync and Setup tools that replaces CD based 5 software updating procedure and 0.5 Million 1 Year testing the same on Localized languages Lean Tenants Applied -Value Stream Mapping Methods of top 20% Incident generation Modules -Team unable To Work Load Levelling (through Complexity meet Service Levels Analysis, Resource Profiling during Transition Work Load Levelling) Visual Boards '-Ineffective Collaboration - Respond To Change was Poor Concurrent Engineering Visual Control Boards Lean Benefits 11% 12%
  • 4. Business Levers… Value Driven Development - Establish common understanding about the value we create for customer across the performing team Continuous Stakeholder involvement - Enable Early Feedback through continuous integration and short cycle iterations Rolling Waving Planning – A Framework that helps us address requirement ambiguities “Right Person for the Right Task” – Establish an efficient work allocation process.
  • 5. Business Levers… “No Compromise on Quality” through set of handy standards and guidelines Empowering individuals at the front-line, thereby motivating them Incorporating continuous improvement mindset. Looking at the ways to decrease the possible Waste in this process. Visual Controls – Establish framework to help detect early warnings
  • 6. Practical Insights…. Goal – “Sustainable shortest lead time, best quality and value (to people and society), most customer delight, lowest cost, high morale, safety”. Respect For the People Create process flow to surface problems Use pull systems to avoid overproduction Level out the workload Stop when there is a quality problem Standardize tasks for continuous improvement Use visual control so no problems are hidden Use only reliable, thoroughly tested technology Continuous Improvement Go-See Kaizen 5 Whys Learn to see the “whole” – Adapt “Kaizen” mindset (each individual employee is given the opportunity to find problems in his own way of working, to solve them and to make improvements.)
  • 7. Experiments with Lean Tenants No Focus Area 1 Understand Customer definition of Value & Connect Customer Value to single piece flow 2 3 4 5 Lean Tenants A) Value Stream Mapping Method B) Takt Time A) Design Structure Matrix Work Allocation Process B) Work Load Leveling C) Value Stream Mapping Method Optimize Test Setup A) 5S Media Management B) Pull App Library Issues C) SMED D) Visual Controls E) Concurrent Engineering F) 5 WHY A) Visual Controls B) 5 WHY C) Visual Controls Continuous Improvements/Efficiencies D) Automation E) Concurrent Engineering F) Value Stream Mapping Method Capacity Utilization A) Work Load Levelling
  • 8. 1. Value Stream Mapping Flow – Value Stream Mapping methods helps us optimize as a whole Everybody understands what customer expects and corresponding acceptance criteria Expose hidden Bottlenecks in the flow Brings good information as to what is really going on in the field Team will arrive at common point of thinking Team Bonding because of transparent communication and collocation Productivity Improvement and cycle Time Reduction Team is now open for new ideas.
  • 9. 2. Design Structure Matrix R1 R3 R4 Benefits Lets you analyze the dependencies among the requirements R2 Helps you identify Cyclic Dependencies Take preventive actions Requirement R3 R1 R2 R4 Independent R3 X Coupled R1 1 X 1 Coupled R2 1 1 X Dependent R4 1 1 X
  • 10. 3. Level the workload Establish efficient Work Allocation process through application of lean tenants “Takt Time” [ No. of Features/ Unit Time] “Design Structure Matrix”, “Work load levelling”. DSM Analysis Complexity Analysis Work Allocation Resource Profiling
  • 11. 4. Concurrent Engineering 5 Core Principles of Concurrent Engineering  High value features first  Multiple phases with smaller release cycles  Detailed planning (DSM)  Early Feedback through continuous integration and short cycle iterations  Elaborative approach – set based thinking  Design alternatives  Rapid Prototyping  Implement quickly  Reuse of prototypes  Early completion with additional headcount  Integrated Review with Coding – pair programming  Delay decisions as late as possible  Phase concurrency between development &  Push features requiring clarity to later test releases When Requirements keep changing, Concurrent Engineering helps planning iterative releases taking Customer, Team into confidence.
  • 12. 5.Continous Improvement Single Minute Exchange of Die Automation Usage of Out of Box Tools like Medusa etc. 5S ID Task 1 Select configuration 1.1 Chassis options 1.2 Modem options 1.3 Traffic generator options 1.4 Optional components 2 Schedule resources 3 Shelf assembly 3.1 Collect components 3.2 Seat cards 3.3 Interconnect 4 Download package 5 Initialize setup ON OFF
  • 13. 6. Improve Quality Through “Go and See Yourself”, “5 whys” “Standardize the procedures”
  • 14. 7. Visual Controls Bug Trend (Bug Created Vs Bug Resolved) Bug Count 20 18 16 14 12 10 8 6 4 2 0 14- 15- 16- 17- 18- 21- 22- 23- 24- 25- 28- 29- 30- 3114511/6/ 11/7/ 11/8/ Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Oct- Nov- Nov- Nov2013 2013 2013 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 Created # 0 6 3 3 2 4 9 6 6 9 9 11 1 13 3 5 6 4 4 11 Resolved # 0 8 5 3 2 3 7 13 18 5 2 10 1 0 5 4 18 6 3 6 #QA Verified + Closed 0 2 6 11 0 12 12 4 16 1 13 3 0 3 1 2 1 2 8 5
  • 15. Lean – Accelerator our business: It helped us focus on creating value to customers – Thus, we achieved high customer satisfaction It helped us establish Handy and Flexible practices It empowered individuals at front line and thus achieved high motivation levels Team inculcated “Continuous mind-set” Financial benefits we are able to power up

Notas del editor

  1. Value and WasteValue— The moments of action or thought creating the product that the customer is willing to pay for. In other words, value is defined in the eyes of the external customer. Imagine a customer was observing the work in your office. At what moments would they be willing to reach into their pocket, pull out money, and give it to you?…Waste— All other moments or actions that do not add value but consume resources. Wastes come from overburdened workers, bottlenecks, waiting, handoff, wishful thinking, and information scatter, among many others