SlideShare una empresa de Scribd logo
1 de 2
Descargar para leer sin conexión
The Brazilian Private Sector Partnership Program, a partnership between IFC, the
Brazilian Development Bank (BNDES), and the Inter-American Development Bank
(IDB), together with Estruturadora Brasileira de Projetos (EBP), a company established
by the major banks in Brazil and BNDES, provided support for the advisory work.
Brazil’s second round of airport concessions will increase operational efficiency, im-
prove the level of service to international standards, and expand the infrastructure
capacity of two major Brazilian airports: Galeão and Confins, located in Rio de Janeiro
and Belo Horizonte, respectively. The Galeão airport transaction closed on April 2,
2014, followed by the Confins transaction, which closed on April 7, 2014.
The consortium Aeroportos do Futuro, composed of Odebrecht and Changi Airport
Group, was awarded the Galeão airport. For Confins, the concession was awarded to
the Aerobrasil consortium, composed of CCR/SA and Flughafen Zurich AG.
Public-Private Partnership Stories
Brazil: Galeão and Confins Airports
This series provides an overview of
public-private partnership stories
in various infrastructure sectors,
where IFC was the lead advisor.
IFC Advisory Services in
Public-Private Partnerships
2121 Pennsylvania Ave. NW
Washington D.C. 20433
ifc.org/ppp
Photo © Igor Pereira Santorsula
BACKGROUND
With the aim of introducing private efficiency in the operation of
its airports, the Federal Government of Brazil launched a tender
for the São Gonçalo do Amarante airport (ASGA) in 2011. This
project was part of a pilot which laid the groundwork for future
concessions of major Brazilian airports.
The first round of airport concessions took place in late 2011
when the government launched the tender three major airports:
Guarulhos (São Paulo), Viracopos (Campinas), and Brasília.
Following this successful concessions, in mid-2012, BNDES
approached IFC to assist with the second round of airport
concessions, which would comprise the Galeão and Confins
airports, in cooperation with Estruturadora Brasileira de Projetos
(EBP).
IFC’S ROLE
The National Aviation Secretary (SAC) authorized EBP to develop the
financial, engineering, and environmental studies necessary for the
two airport projects. In order to undertake these activities, EBP and
IFC signed a Cooperation Agreement.
TRANSACTION STRUCTURE
Galeão
Galeão International Airport is located in the southeast region of
Brazil; the airport supports business and tourism activity in Rio
de Janeiro and serves as a major air transportation hub for the
country and region. The airport is:
•	 strategically located for domestic services and the domestic hub for
GOL and TAM airlines;
•	 the primary commercial airport in the Rio de Janeiro area, the second
busiest in Brazil, and the fourth busiest in Latin America;
•	 an international gateway with a large origin and destination passenger
base and a strong inbound visitor market.
The Galeão project was structured as a 25-year concession,
through which the operation and management of assets is
transferred to the concessionaire. The concessionaire is responsible
for providing all necessary investments, including civil works,
to meet growing demand. The construction of an independent
10/28 runway system (to be completed before reaching 262,900
passenger movements per year) is required in the concession
agreement.
Confins
Tancredo Neves International Airport, also known as Confins
International Airport, is located in the municipalities of Confins
and Lagoa Santa, 41 kilometers from downtown Belo Horizonte.
The airport is the main commercial airport in the Belo Horizonte
metropolitan region, the capital and largest city in the state of
Minas Gerais with a population of approximately six million
people. The airport serves as a domestic hub connecting with
population areas in the northeast and southwest. Airlines such
POST-TENDER RESULTS
•	 Over $3.2 billion in investments is expected to be
mobilized for both airports.
•	 42 million people are expected to receive improved
access to services.
•	 Both winning bidders are qualified and experi-
enced airport operators.
•	 The Galeão airport winning bid, submitted by
Aeroportos do Futuro, was the highest bid to date
in the airport concessions process.
as Azul and GOL have already begun to develop secondary hub
operations at the airport.
The Confins project was structured as a 30-year concession,
through which the operation and management of assets is
transferred to the concessionaire. The concessionaire has the
responsibility to provide all the necessary investments, including
civil works, to meet growing demand. The construction of a
second independent runway (to be completed before either
reaching 198,000 passenger movements per year or December 31,
2020) is required in the concession agreement.
Both concessionaires will be remunerated on the basis of a fixed
and a variable concession fee. The fixed fee was set as part of
the bid criteria (the highest concession fee), and the variable fee
corresponds to five percent of the concessionaire’s total annual
gross revenue.
BIDDING
Both projects were auctioned at the Bovespa Stock Exchange. Five
consortiums submitted a total of eight proposals.
Galeão airport was awarded to the Aeroportos do Futuro
consortium, composed of Odebrecht, a leading Brazilian
engineering and construction company, and Changi Airport
Group, the operator of the Singapore Changi Airport. They
are expected to invest $2 billion over the life of the concession.
The Confins airport was awarded to the Aerobrasil consortium,
composed by CCR/SA, a large Brazilian engineering and
construction company. and Flughafen Zurich AG, the operator of
the Zurich Airport (Switzerland). They are expected to invest over
$1.2 billion over the life of the concession.
The winning bid for Galeão was $7.9 billion and for Confins $750
million. This was 252 percent higher than the minimum required bid
for both airports.
5/2014

Más contenido relacionado

La actualidad más candente (6)

Jutta Weimar - Session 2: Non-Aeronautical Revenue Development.
Jutta Weimar - Session 2: Non-Aeronautical Revenue Development.Jutta Weimar - Session 2: Non-Aeronautical Revenue Development.
Jutta Weimar - Session 2: Non-Aeronautical Revenue Development.
 
Itransporte No 49 - Jan 14 - Q8
Itransporte No 49 - Jan 14 - Q8Itransporte No 49 - Jan 14 - Q8
Itransporte No 49 - Jan 14 - Q8
 
Aurecon_Aerotropolis - are airport cities the wave of the future_April 2015
Aurecon_Aerotropolis - are airport cities the wave of the future_April 2015Aurecon_Aerotropolis - are airport cities the wave of the future_April 2015
Aurecon_Aerotropolis - are airport cities the wave of the future_April 2015
 
Korea IFEZ 6th 8th district RFP teaser
Korea IFEZ 6th 8th district RFP teaser Korea IFEZ 6th 8th district RFP teaser
Korea IFEZ 6th 8th district RFP teaser
 
Myron Keehn - Session 3: Implementing the Strategic Development Plan
Myron Keehn - Session 3: Implementing the Strategic Development PlanMyron Keehn - Session 3: Implementing the Strategic Development Plan
Myron Keehn - Session 3: Implementing the Strategic Development Plan
 
Resume David Penna - English
Resume David Penna - EnglishResume David Penna - English
Resume David Penna - English
 

Destacado

Tema 2 bioloelementos, auga e sales minerais
Tema 2 bioloelementos, auga e sales mineraisTema 2 bioloelementos, auga e sales minerais
Tema 2 bioloelementos, auga e sales minerais
Carmen Cid Manzano
 
Gráfico diario del ibex 35 para el 20 09 2011
Gráfico diario del ibex 35 para el  20 09 2011Gráfico diario del ibex 35 para el  20 09 2011
Gráfico diario del ibex 35 para el 20 09 2011
Experiencia Trading
 

Destacado (17)

Dump nzh 01
Dump nzh 01Dump nzh 01
Dump nzh 01
 
Tema 2 lípidos
Tema 2 lípidosTema 2 lípidos
Tema 2 lípidos
 
Dump nzh 02
Dump nzh 02Dump nzh 02
Dump nzh 02
 
Campanha Belle Vie
Campanha Belle VieCampanha Belle Vie
Campanha Belle Vie
 
Welcome
WelcomeWelcome
Welcome
 
Tema 2 bioloelementos, auga e sales minerais
Tema 2 bioloelementos, auga e sales mineraisTema 2 bioloelementos, auga e sales minerais
Tema 2 bioloelementos, auga e sales minerais
 
Gráfico diario del ibex 35 para el 20 09 2011
Gráfico diario del ibex 35 para el  20 09 2011Gráfico diario del ibex 35 para el  20 09 2011
Gráfico diario del ibex 35 para el 20 09 2011
 
Licencias creative commons
Licencias creative commonsLicencias creative commons
Licencias creative commons
 
A whiff of volker
A whiff of volkerA whiff of volker
A whiff of volker
 
Ct 17 de setiembre, 2011
Ct 17 de setiembre, 2011Ct 17 de setiembre, 2011
Ct 17 de setiembre, 2011
 
Que es el ciber bullying
Que es el ciber bullyingQue es el ciber bullying
Que es el ciber bullying
 
Eliane e tania
Eliane e taniaEliane e tania
Eliane e tania
 
FabAlley Case study
FabAlley Case studyFabAlley Case study
FabAlley Case study
 
варианты использования учетной системы
варианты использования учетной системыварианты использования учетной системы
варианты использования учетной системы
 
протокол испытаний
протокол испытанийпротокол испытаний
протокол испытаний
 
It global meetup_02a
It global meetup_02aIt global meetup_02a
It global meetup_02a
 
критерии отбора аналитиков
критерии отбора аналитиковкритерии отбора аналитиков
критерии отбора аналитиков
 

Similar a PPPStories_Brazil_GaleaoConfinsAirports

Brazilian Outlook 2010
Brazilian Outlook 2010Brazilian Outlook 2010
Brazilian Outlook 2010
MarceloMello
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
Dr. Anders Adrem
 
Stock report of Prumo Logística Global S
Stock report of Prumo Logística Global SStock report of Prumo Logística Global S
Stock report of Prumo Logística Global S
João Paulo Figueiredo
 
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
SE7050
 

Similar a PPPStories_Brazil_GaleaoConfinsAirports (20)

Investment in port and airport infrastructure in latin america finpro
Investment in port and airport infrastructure in latin america finproInvestment in port and airport infrastructure in latin america finpro
Investment in port and airport infrastructure in latin america finpro
 
Brazilian Outlook 2010
Brazilian Outlook 2010Brazilian Outlook 2010
Brazilian Outlook 2010
 
Ppp final project (artifact)
Ppp final project (artifact)Ppp final project (artifact)
Ppp final project (artifact)
 
Fraport AG and the NAIA-3 Debacle: A Case Study
Fraport AG and the NAIA-3 Debacle: A Case StudyFraport AG and the NAIA-3 Debacle: A Case Study
Fraport AG and the NAIA-3 Debacle: A Case Study
 
Hawaii Gubernatorial Candidates Colleen Hanabusa and David Ige - The Daniel K...
Hawaii Gubernatorial Candidates Colleen Hanabusa and David Ige - The Daniel K...Hawaii Gubernatorial Candidates Colleen Hanabusa and David Ige - The Daniel K...
Hawaii Gubernatorial Candidates Colleen Hanabusa and David Ige - The Daniel K...
 
Air Transport in Brazil - a brief overview
Air Transport in Brazil - a brief overviewAir Transport in Brazil - a brief overview
Air Transport in Brazil - a brief overview
 
Managing_Airport_Construction_Projects
Managing_Airport_Construction_ProjectsManaging_Airport_Construction_Projects
Managing_Airport_Construction_Projects
 
Businessplanbr
BusinessplanbrBusinessplanbr
Businessplanbr
 
Frankfinn Aviation presentation
Frankfinn Aviation presentationFrankfinn Aviation presentation
Frankfinn Aviation presentation
 
LGA Redevelopment Project Opportunities for Certified MWBE Firms
LGA Redevelopment Project Opportunities for Certified MWBE FirmsLGA Redevelopment Project Opportunities for Certified MWBE Firms
LGA Redevelopment Project Opportunities for Certified MWBE Firms
 
Investments & Business oportunities - Airport Concessions
Investments & Business oportunities - Airport ConcessionsInvestments & Business oportunities - Airport Concessions
Investments & Business oportunities - Airport Concessions
 
Apresentação Secretaria de Aviação Civil - Reunião de pré-lançamento IBAS-Int...
Apresentação Secretaria de Aviação Civil - Reunião de pré-lançamento IBAS-Int...Apresentação Secretaria de Aviação Civil - Reunião de pré-lançamento IBAS-Int...
Apresentação Secretaria de Aviação Civil - Reunião de pré-lançamento IBAS-Int...
 
Report on airport engineering
Report on airport engineeringReport on airport engineering
Report on airport engineering
 
USTDA 2015 Annual Report - El Dorado International Airport in Colombia, South...
USTDA 2015 Annual Report - El Dorado International Airport in Colombia, South...USTDA 2015 Annual Report - El Dorado International Airport in Colombia, South...
USTDA 2015 Annual Report - El Dorado International Airport in Colombia, South...
 
Zhytomyr International Airport
Zhytomyr International Airport Zhytomyr International Airport
Zhytomyr International Airport
 
Stock report of Prumo Logística Global S
Stock report of Prumo Logística Global SStock report of Prumo Logística Global S
Stock report of Prumo Logística Global S
 
Public Private Partnership In Indian Airports
Public Private Partnership In Indian AirportsPublic Private Partnership In Indian Airports
Public Private Partnership In Indian Airports
 
AirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introductionAirportCreators PTE Amsterdam 2017 - introduction
AirportCreators PTE Amsterdam 2017 - introduction
 
GAD Review
GAD ReviewGAD Review
GAD Review
 
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
Readings for "The Need of Building the Third Runway at Hong Kong Internationa...
 

PPPStories_Brazil_GaleaoConfinsAirports

  • 1. The Brazilian Private Sector Partnership Program, a partnership between IFC, the Brazilian Development Bank (BNDES), and the Inter-American Development Bank (IDB), together with Estruturadora Brasileira de Projetos (EBP), a company established by the major banks in Brazil and BNDES, provided support for the advisory work. Brazil’s second round of airport concessions will increase operational efficiency, im- prove the level of service to international standards, and expand the infrastructure capacity of two major Brazilian airports: Galeão and Confins, located in Rio de Janeiro and Belo Horizonte, respectively. The Galeão airport transaction closed on April 2, 2014, followed by the Confins transaction, which closed on April 7, 2014. The consortium Aeroportos do Futuro, composed of Odebrecht and Changi Airport Group, was awarded the Galeão airport. For Confins, the concession was awarded to the Aerobrasil consortium, composed of CCR/SA and Flughafen Zurich AG. Public-Private Partnership Stories Brazil: Galeão and Confins Airports This series provides an overview of public-private partnership stories in various infrastructure sectors, where IFC was the lead advisor. IFC Advisory Services in Public-Private Partnerships 2121 Pennsylvania Ave. NW Washington D.C. 20433 ifc.org/ppp Photo © Igor Pereira Santorsula
  • 2. BACKGROUND With the aim of introducing private efficiency in the operation of its airports, the Federal Government of Brazil launched a tender for the São Gonçalo do Amarante airport (ASGA) in 2011. This project was part of a pilot which laid the groundwork for future concessions of major Brazilian airports. The first round of airport concessions took place in late 2011 when the government launched the tender three major airports: Guarulhos (São Paulo), Viracopos (Campinas), and Brasília. Following this successful concessions, in mid-2012, BNDES approached IFC to assist with the second round of airport concessions, which would comprise the Galeão and Confins airports, in cooperation with Estruturadora Brasileira de Projetos (EBP). IFC’S ROLE The National Aviation Secretary (SAC) authorized EBP to develop the financial, engineering, and environmental studies necessary for the two airport projects. In order to undertake these activities, EBP and IFC signed a Cooperation Agreement. TRANSACTION STRUCTURE Galeão Galeão International Airport is located in the southeast region of Brazil; the airport supports business and tourism activity in Rio de Janeiro and serves as a major air transportation hub for the country and region. The airport is: • strategically located for domestic services and the domestic hub for GOL and TAM airlines; • the primary commercial airport in the Rio de Janeiro area, the second busiest in Brazil, and the fourth busiest in Latin America; • an international gateway with a large origin and destination passenger base and a strong inbound visitor market. The Galeão project was structured as a 25-year concession, through which the operation and management of assets is transferred to the concessionaire. The concessionaire is responsible for providing all necessary investments, including civil works, to meet growing demand. The construction of an independent 10/28 runway system (to be completed before reaching 262,900 passenger movements per year) is required in the concession agreement. Confins Tancredo Neves International Airport, also known as Confins International Airport, is located in the municipalities of Confins and Lagoa Santa, 41 kilometers from downtown Belo Horizonte. The airport is the main commercial airport in the Belo Horizonte metropolitan region, the capital and largest city in the state of Minas Gerais with a population of approximately six million people. The airport serves as a domestic hub connecting with population areas in the northeast and southwest. Airlines such POST-TENDER RESULTS • Over $3.2 billion in investments is expected to be mobilized for both airports. • 42 million people are expected to receive improved access to services. • Both winning bidders are qualified and experi- enced airport operators. • The Galeão airport winning bid, submitted by Aeroportos do Futuro, was the highest bid to date in the airport concessions process. as Azul and GOL have already begun to develop secondary hub operations at the airport. The Confins project was structured as a 30-year concession, through which the operation and management of assets is transferred to the concessionaire. The concessionaire has the responsibility to provide all the necessary investments, including civil works, to meet growing demand. The construction of a second independent runway (to be completed before either reaching 198,000 passenger movements per year or December 31, 2020) is required in the concession agreement. Both concessionaires will be remunerated on the basis of a fixed and a variable concession fee. The fixed fee was set as part of the bid criteria (the highest concession fee), and the variable fee corresponds to five percent of the concessionaire’s total annual gross revenue. BIDDING Both projects were auctioned at the Bovespa Stock Exchange. Five consortiums submitted a total of eight proposals. Galeão airport was awarded to the Aeroportos do Futuro consortium, composed of Odebrecht, a leading Brazilian engineering and construction company, and Changi Airport Group, the operator of the Singapore Changi Airport. They are expected to invest $2 billion over the life of the concession. The Confins airport was awarded to the Aerobrasil consortium, composed by CCR/SA, a large Brazilian engineering and construction company. and Flughafen Zurich AG, the operator of the Zurich Airport (Switzerland). They are expected to invest over $1.2 billion over the life of the concession. The winning bid for Galeão was $7.9 billion and for Confins $750 million. This was 252 percent higher than the minimum required bid for both airports. 5/2014