8. Flow Time Reduction for 747-8 Aircraft Wing Ribs
(Production Manufacturing & Assembly Line)
Ship Set No.“54” Added Approx. 20% More Parts to Each Ship Set.
Ship Set No. “66” Increased Production from 1.5 Ship Sets/Month to
2.0 Ship Sets/Month (33% increase)
Overall Flow Time Reduction = 52+%