SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
James Spaulding
Resume
1 
 
Executive Brief of Qualifications 
James Spaulding PMP 
San Antonio TX 
 
 Experienced in complexity and managerial requirements for performance based contracting 
 Energy savings analysis and expertise with understanding of guarantees and safety margins 
 Prior military officer experience, understand required leadership qualities 
 Experience with complex integration of multiple Siemens functional business lines to execute 
 Understand ROI and Risk Mitigation applied to business decisions for a go no go 
 Decision maker on viability analysis for pursing specific opportunities 
 Recipient of multiple awards for collaboration and pulling complex teams together  
 Primary communicator with multiple Federal agencies and customers 
 Speaker and education facilitator on alternative financed  projects 
 C‐Level and Policy Level interaction experience 
 Understand the importance of relationship building with customers for collaboration 
 Finance contact between financial institutions and customers 
 Have direct relationships with national financial institutions  
 Expert in Energy Performance Contracting to include Water, Energy, and Waste and Energy Security 
 Direct experience in facilitating PC with infrastructure construction and M&V 
 Experience managing complex projects a plus in understanding how to maximize energy conservation measures 
 Sought after for public speaker on Energy sustainability and Alternative Energy options and integration 
 Understanding of the complex multi depth Federal project approval processes 
 Knowledge of Federal Acquisition Regulation similarities between State and Federal 
 Procurement expert in selecting vendors/subcontractors that benefit project and budget 
 Long term resident of San Antonio, this is home, easy access to east or west coast 
 Prior business owner of two construction companies in San Antonio, understand skin in the game 
 Experience in Federal, Municipality, University, Schools and Hospital (MUSH) markets with PC 
 Engineering background from Louisiana Technical University 
 18 years experience in the Energy business with external and internal financed projects 
 Management experience on very large ARRA project across 11 state 
 Firm believer in cradle to grave long term customer interaction as well as land and expand 
 Thorough understanding of contract terms and conditions and ability to negotiate fairly 
 Proficient in Excel, Microsoft Power Point, Oracle CRM and Microsoft Projects 
 PMP certified, know how to build teams, drive sales and bring projects to close, not afraid to ask questions 
James Spaulding
Resume
2 
 
“Jim is results oriented and demands the same of him as he does of his people. He consistently meets
or exceeds expectations with a strong customer focus. Jim is proactive and takes ownership of the
issues seeing them through to resolution. He is very effective in formulating ideas and solutions and
contributing to the development of the company’s strategy and direction. His dedication to serving his
external customers as well has those internal is second to none.” April 29, 2015
~ Mike Kearney, Senior Director, Siemens Building Technology Group ~
JAMES	SPAULDING		
18406	Emerald	Forest	Dr	♦	San	Antonio,	TX	78219	
Home:		(210)	402‐2899	♦	Cell:		(210)	218‐5731	♦ E‐mail:		swspaulding@hotmail.com		
https://www.linkedin.com/in/spauldingjames	
PPRROOFFEESSSSIIOONNAALL SSUUMMMMAARRYY
Dynamic	Senior	Level	Director	Federal	Energy	Solutions/Operations	Management	Professional	with	18+	years	
experience	in	business	development,	team	building,	and	effective	project	execution	strategy		♦	Accomplished	
strategic	manager	with	proven	ability	to	increase	bottom‐line	profitability	♦ Experience	to	effectively	make	
business	decision	that	are	based	and	what’s	best	for	the	customer,	project	and	budget	♦	Articulate	communicator,	
building	rapport	at	all	levels	♦	Proven	architect	of	cohesive,	high‐performance	teams	♦	Results‐driven	leader	who	
thrives	in	a	high‐expectation,	fast‐paced	environment	♦	Skilled	business	analyst,	implementing		leading‐edge	value	
solutions	♦	Strategic	and	tactical	program/project	manager	with	PMP	credentials		
CCOORREE CCOOMMPPEETTEENNCCIIEESS 
P&L	responsibility	♦	Federal	energy	solutions	business	development	♦	Value	engineering	in	all	aspects	of	energy	♦	
Leadership	development,	training	and	coaching	♦	Benchmarking	and	performance	metrics	♦ Materials/logistics 
management	♦ Professional services, project controls and critical path planning ♦	Superior	organizational	skills	with	
strong	attention	to	detail	♦	Vendor/supplier/subcontractor	management	♦	Multi‐site	management	skills	♦	
Extensive	estimating	experience	in	both	parametric	and	average	means	methods♦ Direct	pipeline	development	
experience	♦ Committed	to	exceeding	customer	expectations	♦	Meticulous	about	quality	control	♦	Passionate	about	
hands‐on	leadership	by	example	and	expanding	all	contracts	and	developing	new	opportunities	
PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE
SSIIEEMMEENNSS		IINNFFRRAASSTTRRUUCCTTUURREE		AANNDD		CCIITTIIEESS		 		 		 		 				 Chicago,	IL		
A	$79.4B	global	energy,	environmental	and	infrastructure	company	with	services	including	power	generation	and	
distribution,	innovative	alternative	energy	and	water	savings	projects		of	all	types,	mega	infrastructure	projects,	
horizontal	projects,	for	various	federal	division	as	well	as	city,		state,	and	local	entities.		With	362,000	employees,	the	
company	has	customers	in	more	than	150	countries	and	is	a	global	presence.		
National	Director	Federal	Energy	Solutions	January/2012	–	April/2015	
Reported	directly	to	Senior	Vice	President	Building	Technology.		Manage	all	strategic	business	decisions	and	
operational	tactical	aspects	of	a	$200M+	Federal	energy	savings	performance	savings	contracts	and	operations	
business	line.	Duties	include	Staffing,	Proposal	Capture	Management	Development,	Business	Development
James Spaulding
Resume
3 
 
Training,	Operations	Direction,	QA	Oversight,	Cost	Control	Coordination,	Client	Management,	Finance	directions	
and	education,	Safety	for	multiple	high	value	projects	providing	business	oversight,	contract	development	and	add‐
on	opportunity	guidance	and	close	out	service	measurement	verification	contract	support	on	multiple	national	
locations	and	military	installations.	
 Managing	20	direct	reports	and	100	indirect	functional	matrix	reports.	Grew	business	from$5M	in	2010	to	
over	$200M	in	FY2014	
 Marquee	projects	included	Ft	Irwin	Waste	to	Energy	and	Co‐Gen	Energy	Security	project	to	include	
developing	a	15	mile	pipeline	with	KERN	River	Gas	Utility,	Dollar	value	in	excess	of	$100M,	National	
contract	with	Forest	City	for	financed	performance	guaranteed	conversion	of	their	military	housing	to	
dynamic	controlled	ground	source	heat	pumps	in	conjunction	with	water	saving	measures	such	as	meters	
and	demand	flow	control	pumps,	Dollar	value	in	excess	of	$200M	,	Corpus	Christi	Army	Depot	Maintenance	
Facility	Energy	Savings	Performance	Contract,	value	in	excess	of	$50M,	DOI	National	Parks	Service	Energy	
Performance	Contract	to	include	$3M	in	annual	water	savings,	value	$39M,	ESCO	for	performance	based	
contracting	at	Ft	Irwin	and	Dugway,	projects	include	energy,	water	and	alternative	energy	augmentation,	
value	in	excess	of	$60M		
 Implemented	standardized	project	status	call	format	and	daily	client	reports	form	used	weekly,	improving	
internal	communication	by	75%	and	increasing	client	satisfaction	by	a	factor	of	5	on	CPAR	evaluations.	
 Brought	Siemens	Government	Technology,	Infrastructure	and	Cities,	Major	Projects,	Legal,	Finance	and	
various	other	internal	and	external	business	lines	together	to	form	a	cohesive	team,	accomplished	this	by	
getting	all	parties	to	set	aside	difference	and	focus	on	the	customer	and	the	project,	led	to	a	98%	on	time	
success	rate	with	a	100%	outstanding	customer	feedback,	gathered	on	a	monthly	basis	
 Implemented	metrics‐driven	account	receivable	process,	improving	billing	accuracy	and	cash	flow	by	15%.		
 Launched	Project	wide	“Know	your	Job”	cross	functional	initiative,	involving	all	project	functional	
personnel	to	learn	their	competencies	as	well	as	understanding	the	other	project	functions	to	enhance	the	
communication	and	efficiency	between	functional	groups	resulting	in	a	20%	reduction	in	overall	time	
charged	against	specific	projects	because	of	understanding	gained	on	the	project	processes.	
 Standardized	processes	including	organizational	structure,	work	breakdown	structure,	and	cross	
functional	workflows	which	enabled	10%	G&A	reduction	with	no	impact	to	project	service.	
EEAATTOONN		GGRROOUUPP		 		 		 		 				 Cincinnati,	IL		
Eaton	is	a	power	management	company	with	2013	sales	of	$22.0	billion.	Eaton	provides	energy‐efficient	solutions	that	
help	our	customers	effectively	manage	electrical,	hydraulic	and	mechanical	power	more	efficiently,	safely	and	
sustainably.	Eaton	has	approximately	103,000	employees	and	sells	products	to	customers	in	more	than	175	countries.	
Director	of	Federal	Energy	Solutions	Business	Development	May/2008	–	January/2012	
Reported	directly	to	Vice	President	Federal	Programs.		Responsibility	for	“kick	starting”	Eaton	Federal	Energy	
Saving	Performance	Contracting	Program	and	establishing	Eaton	as	a	recognized	Energy	Savings	Company	(ESCO)	
in	the	industry	
 Hired	and	managed	8	direct	reports	focused	on	growing	the	Federal	business	and	90	indirect	functional	
matrix	reports.	
 Achieved	Department	Of	Energy	(DOE)	ESCO	status	in	a	record	60	days	by	walking	approval	through	
utilizing	relationship	and	knowledge	of	process		
 Recognized	as	a	pinnacle	performer	in	2011	for	collaboration,	communication	and	growth
James Spaulding
Resume
4 
 
SSHHAAWW		GGRROOUUPP		 		 		 		 				 Baton	Rouge,	LA		
A	$19.4B	global	energy,	environmental	and	infrastructure	company	with	services	including	power	generation	and	
distribution,	vertical	construction	of	all	types,	mega	infrastructure	projects,	horizontal	projects,	for	various	federal	
division	as	well	as	city,		state,	and	local	entities.		With	27,000	employees,	the	company	has	customers	in	more	than	150	
countries.		
Director	of	Operation,	Atlantic	Contingency	Construction	(ACC),	Joint	Venture	February/2006	–	May/2008	
Reported	directly	to	President	of	ACC.		Manage	all	strategic	business	decision	and	operational	tactical	aspects	of	
$1.0B+	in	Worldwide	NAVFAC	Global	Contingency	Contract	Vehicle,	Operation	Duties	include	Staffing,	Proposal	
Capture	Management	Development,	Business	Development	Training,	Operations	Direction,	QA	Oversight,	Cost	
Control	Coordination,	Client	Management,	and	Safety	on	a	Global	scale	
 Managing	17	direct	reports	and	65	indirect	functional	matrix	reports.	
 Marquee	projects	included	Navy	Photovoltaic	and	Energy	Efficiency	Upgrades	in	excess	of	a	$100M	Dollars,	
85MM	Design	Construct	LEED	Silver	Building	Integrated	Photo	Voltaic	Green	Secure	Compartmentalized	
Information	Facility,	Sustainable	OFF	Grid	Energy	Design	Build	Administration	Complex	for	USFWS	
Vieques	Puerto	Rico,	High	Efficiency	Operations	Centers	in	the	Bahamas	and	Santo	Domingo,	Photovoltaic	
and	Geo	Thermal	enhanced	Design	Build	Visitor	Center	for	USFWS,	Paris	Tennessee	
 Consolidated	Multiple	Functionality	such	as	QA	and	Safety	under	the	single	auspices	of	the	Construction	
Manager	for	smaller	projects	reducing	G&A	operating	expenses	by	$200K	per	project.		
 Created	Project	Support	War	Rooms,	leveraging	employee	feedback	which	improved	project	moral	and	
schedule	efficiency	by	15%	and	sustained	a	voluntary	separation	rate	of	less	than	1%.		
MMEERRCCEEDDEESS		IINNCC..		 		 		 		 				 Melbourne,	FL		
A	$2.4B	national	construction	company	with	construction	services	including	infrastructure	development,	and	vertical	
construction	of	all	types.		
Director	of	Operation,	Mercedes	Inc				May/2004	–	February/2006																																																									San	Antonio,	TX	
Reported	directly	to	Company	Senior	VP.		Managed	three	major	developments	and	coordinated	raw	land	
acquisition	infrastructure	development	operations,	across	the	San	Antonio	Division,	in	some	of	the	most	severe	
topographical	locations	in	South	West	Texas.	
 $250M	P&L	responsibility;	managed	5	direct	reports	and	150	indirect	reports	in	3	locations.				
 Marquee	projects	included	Sonoma	Verde,	Vineyards,	Mountain	Lodge,	Dominion,	and	Edgewater	
 Designed	and	implemented	Time/Cost	Control	processes,	reducing	production	time	by	35%	(from	180	
days	to	117	days)	with	no	negative	impact	to	customer	service	levels	and	a	15%	reduction	in	overhead	
cost.	
 Upgraded	staff	and	streamlined	procurement	management	processes	and	workflows,	generating	an	
additional	$12M	in	annual	revenue,	capitalized	on	statewide	buying	power.			
 Implemented	“just	in	time”	supply	chain	improvements,	saving	$200K	annually,	year‐over‐year.	
 Improved	division	margin	performance	by	introducing	cross	functional	sales	teams.		
 Restored	customer	satisfaction	levels	from	80%	to	100%	will	recommend	within	one	year	following	
implementation	of	“customer	is	always	right”	training.			
 Consolidated	construction/supply	services	and	leveraged	corporate	accounts,	reducing	actual	construction	
costs	by	15%,	$1.8M	annually	on	a	division	level.	
 Instituted	construction	manager	effectiveness	training,	improving	customer	and	subcontract	satisfaction	
survey	results	by	20%.
James Spaulding
Resume
5 
 
TTOOLLLL		BBRROOTTHHEERRSS		IINNCC..		 		 		 		 				 Horsham,	PA		
An	$8.7B	national	construction	company	with	construction	services	including	land	development,	and	vertical	
construction	of	all	types	projects.		
Project	Manager,	Toll	Brothers	–	San	Antonio,	TX	–	May/2002	–	May/2004	
Reporteded	directly	to	Division	VPGM	&	Division	Marketing	VP.		Key	driver	in	creating	a	$75M	profitable	division.			
Responsible	for	taking	a	non	profitable	division	and	turning	it	into	the	most	profitable	division	within	the	
company.	Increased	strategic	plans	for	new	growth	initiatives,	marketing	collateral,	and	support	of	business	
development/business	acquisition	opportunities.	
 Authored	business	plan	used	to	make	a	$200M	land	development	acquisition.	
 Coordinated	interaction	between	City,	State	and	Local	Officials	as	well	as	Utility	Service	Companies	for	
streamlined	fast	tracked	development	results	
 Developed	and	launched	the	1st	Division‐wide	web‐based	customer	satisfaction	survey.	
	
TTEEAAMM		CCOONNSSTTRRUUCCTTIIOONN,,		LLLLCC..		 		 		 		 				 San	Antonio,	TX		
A	$20MM	Texas	based	Construction	Company	with	commercial	construction	services	including	land	development,	and	
vertical	construction	of	all	types’	projects.		
Business	Owner,	Team	Construction	–	San	Antonio,	TX	–	May/1996	–	May/2002	
Responsible	for	all	facets	on	multiple	commercial	projects	within	the	state	of	Texas	and	surrounding	area.	Projects	
ranged	in	value	from	$750K	to	over	$20M.	Directly	responsible	for	initial	start	up	of	the	company	with	building	the	
project	teams,	coaching,	motivating,	and	instructing	dynamic	methodologies	for	successful	project	completion	as	
well	as	setting	priorities	for	asset	allocation	and	project	development	timelines.	Manage	the	proposals,	contracts,	
purchasing,	construction	operations,	capital	acquisitions,	and	closing	departments,	ensuring	all	departmental	goals	
were	achieved.	
 Built	start‐up	commercial	construction	company	operations	from	scratch	and	within	6	months	of	company	
entering	the	market,	showed	positive	cash	flow	and	profit	projections	exceeding	10%	in	first	year	of	
operation.			
 Grew	operational	revenues	from	$1M	to	$50M	in	4	years.	
 $50MM	P&L	responsibility;	managed	21	direct	reports	and	100	indirect	reports.	
 Exceeded	plan	sales	targets	by	14%	in	1999,	5%	in	2000,	23%	in	2001,	and	25%	in	2002.	
 Deployed	sales	management	metrics	and	implemented	“action	selling”	training	–	to	achieve	individual	sales	
resource	performance	of	>100%	of	target	across	8	sales	resources.		
UUNNIITTEEDD		AAIIRRLLIINNEESS				 		 		 		 				 Chicago,	IL		 		
Pilot,	Captain	Check	Airman	–	May/1996	–	May/2004	
Managed the training and quality control of all new transition pilots into the Airbus A320/319, as well as flying the line. 
Unique position and flexible schedule allowed for enhancement of my construction skills and the ability to start a 
business on the side. A true challenge in maximizing time management. 
	UUNNIITTEEDD		SSTTAATTEESS		AAIIRR		FFOORRCCEE		 		 		 				 	 Worldwide		 .		
Fighter	Pilot,	A‐10	–	Aug/1984	–	May/1996	
Followed a dream, and became a fighter pilot. Progressed in every aircraft to the position of instructor, adaptable 
personality made for easy selection into positions where interaction was required with others.	Noncurrent	Top	Secret	
SCI	clearance
James Spaulding
Resume
6 
 
EEDDUUCCAATTIIOONN
LOUISIANA	TECH	UNIVERSITY,	Ruston,	LA	
Bachelor	of	Science,	Aviation	Engineering	Technology	
PPRROOFFEESSSSIIOONNAALL DDEEVVEELLOOPPMMEENNTT,, NNOOTTAABBLLEESS	
 Special	training	(highlights):		Project	Manager	Institute,	Project	Manager	Professional	(PMP)	–8	year;	
Command	Resource	Leadership	Training	(CLR)	United	Airlines;	Executive	Leadership	Training	at	Toll	
Brothers;	Federal	Design	Build	Training	and	Integration,	Capture	Management;	Shaw	Group.	
 Industry	experience	includes	Conventional	Energy	&	Utilities,	Sustainable	Energy	Development,	Waste	
Water	Treatment	Plants,	Commercial	Office	Complex’s,	Specialty	DOD	Construction	(SCIF),	Visitor	Centers,	
Levees,	T‐Walls,	Lock	Gates,	Pump	House’s,	Pipelines,	and	Balance	Cut	and	Fill	land	development.	
 Member	of	PMI,	AFSRME,	SAME,	ASNE. 

Más contenido relacionado

Similar a Director BD Resume - JSpaulding2015

Cfs Roadshow Linked In (2)
Cfs Roadshow Linked In (2)Cfs Roadshow Linked In (2)
Cfs Roadshow Linked In (2)Tim
 
Resume_Vipul Kashyap
Resume_Vipul KashyapResume_Vipul Kashyap
Resume_Vipul KashyapVipul Kashyap
 
Sorana_Linder_resume-2016
Sorana_Linder_resume-2016Sorana_Linder_resume-2016
Sorana_Linder_resume-2016Sorana Linder
 
GPBrown Resume Contracts and Operations Management 02242016
GPBrown Resume Contracts and Operations Management 02242016 GPBrown Resume Contracts and Operations Management 02242016
GPBrown Resume Contracts and Operations Management 02242016 G. Patrick Brown, MBA
 
TTLS Services Overview
TTLS Services OverviewTTLS Services Overview
TTLS Services Overvieweddydees1
 
TTLS Services Overview
TTLS Services OverviewTTLS Services Overview
TTLS Services Overvieweddydees1
 
contractsresume09232016
contractsresume09232016contractsresume09232016
contractsresume09232016Brian Toalson
 
Elaine Strathern CV Nov 2016
Elaine Strathern CV Nov 2016Elaine Strathern CV Nov 2016
Elaine Strathern CV Nov 2016Elaine Strathern
 
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...LandorLINKS
 
Clark Dial RESUME 5-15-2015
Clark Dial RESUME 5-15-2015Clark Dial RESUME 5-15-2015
Clark Dial RESUME 5-15-2015Clark Dial, CFCM
 
Diane Resume 7-09-2015
Diane Resume 7-09-2015Diane Resume 7-09-2015
Diane Resume 7-09-2015Diane Marshall
 
An Overview Of Project Financing
An Overview Of Project FinancingAn Overview Of Project Financing
An Overview Of Project FinancingEdureka!
 

Similar a Director BD Resume - JSpaulding2015 (20)

RWD_2016_DOD-TS
RWD_2016_DOD-TSRWD_2016_DOD-TS
RWD_2016_DOD-TS
 
Cfs Roadshow Linked In (2)
Cfs Roadshow Linked In (2)Cfs Roadshow Linked In (2)
Cfs Roadshow Linked In (2)
 
Michael Myrick Resume (4)
Michael Myrick Resume (4)Michael Myrick Resume (4)
Michael Myrick Resume (4)
 
Resume_Vipul Kashyap
Resume_Vipul KashyapResume_Vipul Kashyap
Resume_Vipul Kashyap
 
MRP Resume_2016-12
MRP Resume_2016-12MRP Resume_2016-12
MRP Resume_2016-12
 
MRP Resume_2016-12
MRP Resume_2016-12MRP Resume_2016-12
MRP Resume_2016-12
 
Sorana_Linder_resume-2016
Sorana_Linder_resume-2016Sorana_Linder_resume-2016
Sorana_Linder_resume-2016
 
Ted' Resume
Ted' ResumeTed' Resume
Ted' Resume
 
GPBrown Resume Contracts and Operations Management 02242016
GPBrown Resume Contracts and Operations Management 02242016 GPBrown Resume Contracts and Operations Management 02242016
GPBrown Resume Contracts and Operations Management 02242016
 
TTLS Services Overview
TTLS Services OverviewTTLS Services Overview
TTLS Services Overview
 
TTLS Services Overview
TTLS Services OverviewTTLS Services Overview
TTLS Services Overview
 
contractsresume09232016
contractsresume09232016contractsresume09232016
contractsresume09232016
 
Elaine Strathern CV Nov 2016
Elaine Strathern CV Nov 2016Elaine Strathern CV Nov 2016
Elaine Strathern CV Nov 2016
 
Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes Today's Contracting - Contracts Risks and Disputes
Today's Contracting - Contracts Risks and Disputes
 
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
Bill Taylor, Changing approach and behaviour in service delivery: a provider'...
 
Daniela Resume_2016
Daniela Resume_2016Daniela Resume_2016
Daniela Resume_2016
 
Clark Dial RESUME 5-15-2015
Clark Dial RESUME 5-15-2015Clark Dial RESUME 5-15-2015
Clark Dial RESUME 5-15-2015
 
ronaldresume 11-8-16
ronaldresume 11-8-16ronaldresume 11-8-16
ronaldresume 11-8-16
 
Diane Resume 7-09-2015
Diane Resume 7-09-2015Diane Resume 7-09-2015
Diane Resume 7-09-2015
 
An Overview Of Project Financing
An Overview Of Project FinancingAn Overview Of Project Financing
An Overview Of Project Financing
 

Director BD Resume - JSpaulding2015

  • 1. James Spaulding Resume 1    Executive Brief of Qualifications  James Spaulding PMP  San Antonio TX     Experienced in complexity and managerial requirements for performance based contracting   Energy savings analysis and expertise with understanding of guarantees and safety margins   Prior military officer experience, understand required leadership qualities   Experience with complex integration of multiple Siemens functional business lines to execute   Understand ROI and Risk Mitigation applied to business decisions for a go no go   Decision maker on viability analysis for pursing specific opportunities   Recipient of multiple awards for collaboration and pulling complex teams together    Primary communicator with multiple Federal agencies and customers   Speaker and education facilitator on alternative financed  projects   C‐Level and Policy Level interaction experience   Understand the importance of relationship building with customers for collaboration   Finance contact between financial institutions and customers   Have direct relationships with national financial institutions    Expert in Energy Performance Contracting to include Water, Energy, and Waste and Energy Security   Direct experience in facilitating PC with infrastructure construction and M&V   Experience managing complex projects a plus in understanding how to maximize energy conservation measures   Sought after for public speaker on Energy sustainability and Alternative Energy options and integration   Understanding of the complex multi depth Federal project approval processes   Knowledge of Federal Acquisition Regulation similarities between State and Federal   Procurement expert in selecting vendors/subcontractors that benefit project and budget   Long term resident of San Antonio, this is home, easy access to east or west coast   Prior business owner of two construction companies in San Antonio, understand skin in the game   Experience in Federal, Municipality, University, Schools and Hospital (MUSH) markets with PC   Engineering background from Louisiana Technical University   18 years experience in the Energy business with external and internal financed projects   Management experience on very large ARRA project across 11 state   Firm believer in cradle to grave long term customer interaction as well as land and expand   Thorough understanding of contract terms and conditions and ability to negotiate fairly   Proficient in Excel, Microsoft Power Point, Oracle CRM and Microsoft Projects   PMP certified, know how to build teams, drive sales and bring projects to close, not afraid to ask questions 
  • 2. James Spaulding Resume 2    “Jim is results oriented and demands the same of him as he does of his people. He consistently meets or exceeds expectations with a strong customer focus. Jim is proactive and takes ownership of the issues seeing them through to resolution. He is very effective in formulating ideas and solutions and contributing to the development of the company’s strategy and direction. His dedication to serving his external customers as well has those internal is second to none.” April 29, 2015 ~ Mike Kearney, Senior Director, Siemens Building Technology Group ~ JAMES SPAULDING 18406 Emerald Forest Dr ♦ San Antonio, TX 78219 Home: (210) 402‐2899 ♦ Cell: (210) 218‐5731 ♦ E‐mail: swspaulding@hotmail.com https://www.linkedin.com/in/spauldingjames PPRROOFFEESSSSIIOONNAALL SSUUMMMMAARRYY Dynamic Senior Level Director Federal Energy Solutions/Operations Management Professional with 18+ years experience in business development, team building, and effective project execution strategy ♦ Accomplished strategic manager with proven ability to increase bottom‐line profitability ♦ Experience to effectively make business decision that are based and what’s best for the customer, project and budget ♦ Articulate communicator, building rapport at all levels ♦ Proven architect of cohesive, high‐performance teams ♦ Results‐driven leader who thrives in a high‐expectation, fast‐paced environment ♦ Skilled business analyst, implementing leading‐edge value solutions ♦ Strategic and tactical program/project manager with PMP credentials CCOORREE CCOOMMPPEETTEENNCCIIEESS  P&L responsibility ♦ Federal energy solutions business development ♦ Value engineering in all aspects of energy ♦ Leadership development, training and coaching ♦ Benchmarking and performance metrics ♦ Materials/logistics  management ♦ Professional services, project controls and critical path planning ♦ Superior organizational skills with strong attention to detail ♦ Vendor/supplier/subcontractor management ♦ Multi‐site management skills ♦ Extensive estimating experience in both parametric and average means methods♦ Direct pipeline development experience ♦ Committed to exceeding customer expectations ♦ Meticulous about quality control ♦ Passionate about hands‐on leadership by example and expanding all contracts and developing new opportunities PPRROOFFEESSSSIIOONNAALL EEXXPPEERRIIEENNCCEE SSIIEEMMEENNSS IINNFFRRAASSTTRRUUCCTTUURREE AANNDD CCIITTIIEESS Chicago, IL A $79.4B global energy, environmental and infrastructure company with services including power generation and distribution, innovative alternative energy and water savings projects of all types, mega infrastructure projects, horizontal projects, for various federal division as well as city, state, and local entities. With 362,000 employees, the company has customers in more than 150 countries and is a global presence. National Director Federal Energy Solutions January/2012 – April/2015 Reported directly to Senior Vice President Building Technology. Manage all strategic business decisions and operational tactical aspects of a $200M+ Federal energy savings performance savings contracts and operations business line. Duties include Staffing, Proposal Capture Management Development, Business Development
  • 3. James Spaulding Resume 3    Training, Operations Direction, QA Oversight, Cost Control Coordination, Client Management, Finance directions and education, Safety for multiple high value projects providing business oversight, contract development and add‐ on opportunity guidance and close out service measurement verification contract support on multiple national locations and military installations.  Managing 20 direct reports and 100 indirect functional matrix reports. Grew business from$5M in 2010 to over $200M in FY2014  Marquee projects included Ft Irwin Waste to Energy and Co‐Gen Energy Security project to include developing a 15 mile pipeline with KERN River Gas Utility, Dollar value in excess of $100M, National contract with Forest City for financed performance guaranteed conversion of their military housing to dynamic controlled ground source heat pumps in conjunction with water saving measures such as meters and demand flow control pumps, Dollar value in excess of $200M , Corpus Christi Army Depot Maintenance Facility Energy Savings Performance Contract, value in excess of $50M, DOI National Parks Service Energy Performance Contract to include $3M in annual water savings, value $39M, ESCO for performance based contracting at Ft Irwin and Dugway, projects include energy, water and alternative energy augmentation, value in excess of $60M  Implemented standardized project status call format and daily client reports form used weekly, improving internal communication by 75% and increasing client satisfaction by a factor of 5 on CPAR evaluations.  Brought Siemens Government Technology, Infrastructure and Cities, Major Projects, Legal, Finance and various other internal and external business lines together to form a cohesive team, accomplished this by getting all parties to set aside difference and focus on the customer and the project, led to a 98% on time success rate with a 100% outstanding customer feedback, gathered on a monthly basis  Implemented metrics‐driven account receivable process, improving billing accuracy and cash flow by 15%.  Launched Project wide “Know your Job” cross functional initiative, involving all project functional personnel to learn their competencies as well as understanding the other project functions to enhance the communication and efficiency between functional groups resulting in a 20% reduction in overall time charged against specific projects because of understanding gained on the project processes.  Standardized processes including organizational structure, work breakdown structure, and cross functional workflows which enabled 10% G&A reduction with no impact to project service. EEAATTOONN GGRROOUUPP Cincinnati, IL Eaton is a power management company with 2013 sales of $22.0 billion. Eaton provides energy‐efficient solutions that help our customers effectively manage electrical, hydraulic and mechanical power more efficiently, safely and sustainably. Eaton has approximately 103,000 employees and sells products to customers in more than 175 countries. Director of Federal Energy Solutions Business Development May/2008 – January/2012 Reported directly to Vice President Federal Programs. Responsibility for “kick starting” Eaton Federal Energy Saving Performance Contracting Program and establishing Eaton as a recognized Energy Savings Company (ESCO) in the industry  Hired and managed 8 direct reports focused on growing the Federal business and 90 indirect functional matrix reports.  Achieved Department Of Energy (DOE) ESCO status in a record 60 days by walking approval through utilizing relationship and knowledge of process  Recognized as a pinnacle performer in 2011 for collaboration, communication and growth
  • 4. James Spaulding Resume 4    SSHHAAWW GGRROOUUPP Baton Rouge, LA A $19.4B global energy, environmental and infrastructure company with services including power generation and distribution, vertical construction of all types, mega infrastructure projects, horizontal projects, for various federal division as well as city, state, and local entities. With 27,000 employees, the company has customers in more than 150 countries. Director of Operation, Atlantic Contingency Construction (ACC), Joint Venture February/2006 – May/2008 Reported directly to President of ACC. Manage all strategic business decision and operational tactical aspects of $1.0B+ in Worldwide NAVFAC Global Contingency Contract Vehicle, Operation Duties include Staffing, Proposal Capture Management Development, Business Development Training, Operations Direction, QA Oversight, Cost Control Coordination, Client Management, and Safety on a Global scale  Managing 17 direct reports and 65 indirect functional matrix reports.  Marquee projects included Navy Photovoltaic and Energy Efficiency Upgrades in excess of a $100M Dollars, 85MM Design Construct LEED Silver Building Integrated Photo Voltaic Green Secure Compartmentalized Information Facility, Sustainable OFF Grid Energy Design Build Administration Complex for USFWS Vieques Puerto Rico, High Efficiency Operations Centers in the Bahamas and Santo Domingo, Photovoltaic and Geo Thermal enhanced Design Build Visitor Center for USFWS, Paris Tennessee  Consolidated Multiple Functionality such as QA and Safety under the single auspices of the Construction Manager for smaller projects reducing G&A operating expenses by $200K per project.  Created Project Support War Rooms, leveraging employee feedback which improved project moral and schedule efficiency by 15% and sustained a voluntary separation rate of less than 1%. MMEERRCCEEDDEESS IINNCC.. Melbourne, FL A $2.4B national construction company with construction services including infrastructure development, and vertical construction of all types. Director of Operation, Mercedes Inc May/2004 – February/2006 San Antonio, TX Reported directly to Company Senior VP. Managed three major developments and coordinated raw land acquisition infrastructure development operations, across the San Antonio Division, in some of the most severe topographical locations in South West Texas.  $250M P&L responsibility; managed 5 direct reports and 150 indirect reports in 3 locations.  Marquee projects included Sonoma Verde, Vineyards, Mountain Lodge, Dominion, and Edgewater  Designed and implemented Time/Cost Control processes, reducing production time by 35% (from 180 days to 117 days) with no negative impact to customer service levels and a 15% reduction in overhead cost.  Upgraded staff and streamlined procurement management processes and workflows, generating an additional $12M in annual revenue, capitalized on statewide buying power.  Implemented “just in time” supply chain improvements, saving $200K annually, year‐over‐year.  Improved division margin performance by introducing cross functional sales teams.  Restored customer satisfaction levels from 80% to 100% will recommend within one year following implementation of “customer is always right” training.  Consolidated construction/supply services and leveraged corporate accounts, reducing actual construction costs by 15%, $1.8M annually on a division level.  Instituted construction manager effectiveness training, improving customer and subcontract satisfaction survey results by 20%.
  • 5. James Spaulding Resume 5    TTOOLLLL BBRROOTTHHEERRSS IINNCC.. Horsham, PA An $8.7B national construction company with construction services including land development, and vertical construction of all types projects. Project Manager, Toll Brothers – San Antonio, TX – May/2002 – May/2004 Reporteded directly to Division VPGM & Division Marketing VP. Key driver in creating a $75M profitable division. Responsible for taking a non profitable division and turning it into the most profitable division within the company. Increased strategic plans for new growth initiatives, marketing collateral, and support of business development/business acquisition opportunities.  Authored business plan used to make a $200M land development acquisition.  Coordinated interaction between City, State and Local Officials as well as Utility Service Companies for streamlined fast tracked development results  Developed and launched the 1st Division‐wide web‐based customer satisfaction survey. TTEEAAMM CCOONNSSTTRRUUCCTTIIOONN,, LLLLCC.. San Antonio, TX A $20MM Texas based Construction Company with commercial construction services including land development, and vertical construction of all types’ projects. Business Owner, Team Construction – San Antonio, TX – May/1996 – May/2002 Responsible for all facets on multiple commercial projects within the state of Texas and surrounding area. Projects ranged in value from $750K to over $20M. Directly responsible for initial start up of the company with building the project teams, coaching, motivating, and instructing dynamic methodologies for successful project completion as well as setting priorities for asset allocation and project development timelines. Manage the proposals, contracts, purchasing, construction operations, capital acquisitions, and closing departments, ensuring all departmental goals were achieved.  Built start‐up commercial construction company operations from scratch and within 6 months of company entering the market, showed positive cash flow and profit projections exceeding 10% in first year of operation.  Grew operational revenues from $1M to $50M in 4 years.  $50MM P&L responsibility; managed 21 direct reports and 100 indirect reports.  Exceeded plan sales targets by 14% in 1999, 5% in 2000, 23% in 2001, and 25% in 2002.  Deployed sales management metrics and implemented “action selling” training – to achieve individual sales resource performance of >100% of target across 8 sales resources. UUNNIITTEEDD AAIIRRLLIINNEESS Chicago, IL Pilot, Captain Check Airman – May/1996 – May/2004 Managed the training and quality control of all new transition pilots into the Airbus A320/319, as well as flying the line.  Unique position and flexible schedule allowed for enhancement of my construction skills and the ability to start a  business on the side. A true challenge in maximizing time management.  UUNNIITTEEDD SSTTAATTEESS AAIIRR FFOORRCCEE Worldwide . Fighter Pilot, A‐10 – Aug/1984 – May/1996 Followed a dream, and became a fighter pilot. Progressed in every aircraft to the position of instructor, adaptable  personality made for easy selection into positions where interaction was required with others. Noncurrent Top Secret SCI clearance
  • 6. James Spaulding Resume 6    EEDDUUCCAATTIIOONN LOUISIANA TECH UNIVERSITY, Ruston, LA Bachelor of Science, Aviation Engineering Technology PPRROOFFEESSSSIIOONNAALL DDEEVVEELLOOPPMMEENNTT,, NNOOTTAABBLLEESS  Special training (highlights): Project Manager Institute, Project Manager Professional (PMP) –8 year; Command Resource Leadership Training (CLR) United Airlines; Executive Leadership Training at Toll Brothers; Federal Design Build Training and Integration, Capture Management; Shaw Group.  Industry experience includes Conventional Energy & Utilities, Sustainable Energy Development, Waste Water Treatment Plants, Commercial Office Complex’s, Specialty DOD Construction (SCIF), Visitor Centers, Levees, T‐Walls, Lock Gates, Pump House’s, Pipelines, and Balance Cut and Fill land development.  Member of PMI, AFSRME, SAME, ASNE.